HomeMy WebLinkAboutSDR2022-00012 Site Devleopment Review 002284035JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street | Port Townsend, WA 98368
360-379-4450 | email: dcd@co.jefferson.wa.us
http://www.co.jefferson.wa.us/260/CommunityDevelopment
SITE DEVELOPMENT REVIEW
Per Ordinance No: 09-10033-22 and Jefferson County Code (JCC) 18.40.440, site development
review (SDR) process will provide owners and developers of land an assessment of site
requirements for development of a parcel.
Site development review is a required assessment, prior to development, of the physical aspects and constraints of the site for the purpose of development. While it will not vest a property to development regulations, it provides for a professional analysis of the site according to current
development regulations
A guaranteed right to development can only be established once a development permit application
or building permit application vests pursuant to JCC 18.40.320. Jefferson County Department of Community Development Planning Staff has completed a site
development review on parcel 002284035. This site development review reflects the conditions of
the property at the date the review was completed.
Zoning: This parcel is zoned Rural Residential 1 dwelling unit per 5 acres (RR1:5). This is a non-conforming lot and is 3.21 acres. Legal Lot of Record Status: This parcel maintains the same legal description in all deeds dating
back to 1983. The parcel is made up of two legal descriptions per bank requirements for lending
because the parcel is in two sections. This was confirmed with the Jefferson County Assessor’s
Office. Review of all deeds and parcel history indicates that this parcel was not separated and
remains as one as required by subdivision code with the current zoning. Several county approvals have been made on this property including a detached garage (BLD2001-00269), single-family residence (BLD2002-00294), and a revision of a garage into an ADU (BLD2022-00288) and
associated septic systems (SEP1994-00269 and SEP2022-00066).
Critical Areas: Critical Aquifer Recharge Area (CARA)
CARA: No impacts from CARA to the proposed revision to approved BLD2022-00288. Required Reports: None
Stormwater permitting: The stormwater proposal must comply with the 2019 Stormwater
Management Manual for Western Washington. Infiltration is likely infeasible on the site, as soils do
not support required drainage rates. Next Steps: Follow up with assigned project planner H. Smith on additional information request
sent 11/16/2022. hsmith@co.jefferson.wa.us