HomeMy WebLinkAbout2022_11_17_Packet-RevisedHarm Reduction
Allison Berry, MD MPH
Health Officer for Jefferson and Clallam Counties
Harm Reduction
•The use of evidence-based practices to reduce the harms
associated with a given activity or disorder
•A commitment to the fundamental humanity and value of the
person served, regardless of their risk behaviors
Harm Reduction
•Sexual health •COVID-19
Substance Use Disorder
SUD in Jefferson County
Evidence-Based Intervention
Naloxone distribution
Syringe services
Testing, treatment, and vaccination
Outreach services
Safer smoking support
Syringe Service Programs
At every visit, clients receive:
•Education on safe syringe disposal
•Safer injection education
•Naloxone training
•Referrals to treatment
•Access to primary care
•Referrals to social supports
Safer Smoking Support
Questions?
References
•Center for Disease Control. What works: evidence-based strategies
for your school, 2020.
https://www.cdc.gov/healthyyouth/whatworks/what-works-
overview.htm
•University of Washington ADAI. Opioid trends in Washington State,
2021. https://adai.washington.edu/WAdata/deaths.htm#showdiv1
•Center for Disease Control. What are Syringe Service Programs.
https://www.cdc.gov/ssp/docs/SSP-Infographic_print.pdf
•University of Washington ADAI. Policy Brief on Safer Smoking, 2022.
https://adai.uw.edu/wordpress/wp-
content/uploads/SaferSmokingBrief_2022.pdf
•Beekman, Daniel. Seattle Times April 2022. Tacoma’s pioneering
needle exchange now using smoking supplies to reach fentanyl,
meth users. https://www.seattletimes.com/seattle-
news/politics/tacomas-pioneering-needle-exchange-now-using-
smoking-supplies-to-reach-fentanyl-meth-users/
2023 Additional Fees and Other Information
GENERAL
TECHNOLOGY FEE +5%
All fees listed below, with the exception of the Food
Handlers Permit (FHP), will have a 5% technology fee
added
Health Officer Administrative Hearing 401.00 Title 8
Administrative Hearing Appeal 401.00 Title 8
Hearing Examiner Appeal 280.00 Title 19
Technical Assistance/Plan Review - Minimum 104.00
Technical Assistance/Plan Review - Per Hour 104.00
Late Fee for Invoices 60.00 See Resolution #88-20
Case Scanning/Technology Fee 36.00
O & M Inspection Report Manual Data Entry & Payment Processing Fee 51.00
78.00 Plus the Auditors Office recording fee
405.00 Plus recording fee and fee for filing & removing Notice to Title
ONSITE SEWAGE DISPOSAL
Sewage Disposal Permits
New Conventional 685.00 Valid for 3 years
New Alternative 998.00 Valid for 3 years
New septic tank and/or pump chamber only 409.00 Issued in conjunction with an existing sewage disposal system
or community system
New Community or Commercial:
Conventional 865.00 Base Fee - Valid for 3 years
Alternative 1,106.00 Base Fee - Valid for 3 years
Each Connection 108.00 Add to base permit fee
Development and Review Financial Assurance and System Operation
Agreements 104.00 Per Hour
Septic Permit with SPAAD (conventional)369.00
Septic Permit with SPAAD (alternative)685.00
- Applies to existing installed sewage disposal system; the
Technical Assistance/Plan Review hourly rate will be charged
for repairs where the applicants require additional assistance
Repair - Conventional 343.00
Repair - Alternative 499.00
Repair - Septic tank and/or pump chamber only 205.00
Repair - Community or Commercial: Conventional 433.00
Repair - Community or Commercial: Alternative 553.00
Modification or Reserve Area Designation 311.00
Expansion 648.00
Redesign 207.00 Applies to pending or active but not installed
Minor Site Plan Change 75.00
Reinspection 259.00
162.00
Annual Renewal 60.00
Compliance Inspection 99.00
Evaluation of Existing System/Monitoring Inspection
Septic system only 402.00
Septic system plus water sample 454.00
Retest/Reinspection 207.00
On Site Sewage - Building and Planning
Subdivision Review Base Fee 621.00 Plus Per lot fee
Boundary line adjustment or Lot Certification base review fee 243.00 Plus Per lot fee
Planned rural residential development review fee 243.00
Per lot fee 108.00 For Subdivision Review, Boundary Line Adjustment and
Planned Rural Residential Development Review fees
Pre application meeting fee 243.00
Density exemption review fee 155.00
Field Work for Density Exemption Review 104.00 Per Hour
Building Application Review:
Residential - Individual OSS 155.00 Review after Building Permit issued, is same fee
Commercial - Individual OSS 311.00 Review after Building Permit issued, is same fee
Community OSS 311.00 Review after Building Permit issued, is same fee
Revised Site Plan Review 78.00 Review of resubmission before Building Permit is issued
208.00 Valid for 2 years. Future septic permit application fee will be
discounted by this fee amount if submitted within 2 years.
Other
Waiver/Variance Application 285.00
Waiver/Variance Hearing 466.00
Wet season evaluation 648.00
General environmental health review fee 104.00 Per Hour
Licenses
648.00 Operation Monitoring & Maintenance (O, M & M)
Retest 259.00
12.00
Annual Certificate Renewal 359.00
Delinquent Renewal after January 31 648.00
FOOD SERVICE ESTABLISHMENTS
Annual Permit Fees (Based on menu Complexity & seating - menu changes may change category)
Category 1 278.00
Category 2 389.00
Category 3 655.00
With lounge, add 278.00 Separate lounge area
With catering, add 389.00
Annual Permit Issued after September 1 50% of fee 50% of Annual Permit Fee
Temporary Permits Application Fees
Low Risk Foods (Limited to Specific Listed Foods)
Single Initial Event/Additional Single Event 67.00 Same menu only
Annual (Art Walks, Open House)336.00
Recurring 101.00
Single Event (Medium and High Risk) Medium Risk Food
Initial Application (First Event)149.00 Not to exceed 21 days at your location
Limited Menu Recurring Event - per location 180.00 Not to exceed 3 days a week at a single location
Additional Event (Same Menu Only)86.00 Not to exceed 21 days at your location
JEFFERSON COUNTY PUBLIC HEALTH
ENVIRONMENTAL HEALTH DIVISION
Homeowner Authorization
Notice to Title Rescission
Recording Fee
Repair (see below for specific fees)
Applies to existing installed sewage disposal system; the
Technical Assistance/Plan Review hourly rate will be charged
for repairs where the applicants require additional assistance
Annual Operating Permit for Holding Tanks
ENVIRONMENTAL HEALTH
Installer, Pumper, Operator (maintenance person), Monitoring & Maintenance
Specialist or Technician
Soil Registration
1 of 2
2023 Additional Fees and Other Information
JEFFERSON COUNTY PUBLIC HEALTH
ENVIRONMENTAL HEALTH DIVISION
ENVIRONMENTAL HEALTH
Organized Recurring Event (e.g. Farmers Market) High Risk Food
Initial Application (First Event)149.00 Not to exceed 21 days at your location
Complex Menu Recurring Event - per location 241.00 Not to exceed 3 days a week at a single location
Additional Event (Same Menu Only)86.00 Not to exceed 21 days at your location
Demonstration
Single Event 67.00
Event Multiple Events - per location 280.00
Permit Exempt 28.00
25% Reduction for 501(c)(3) and households that meet USHHS Poverty Guidelines*75% of fee *With BoH BoCC Resolution & backfilled with General Funds.
Late Fee for Temporary Permits 50% of fee Additional (Paid when application is submitted less than 7 10
days prior to the event)
Other Food Fees
New Establishment 241.00
Food Service Plan Review 121.00 Per Hour; for review and/or approval 2 hour minimum
New Owner/Change of Owner 151.00
If paying this fee AND for minor change of floor plan or equipment or for change
of menu or style of service, may need to pay for Food Service Plan Review
Minor Change of Floor Plan and/or Equipment 151.00 If paying this fee AND for New Owner/Change of Owner or for change of menu
or style of service, may need to pay for Food Service Plan Review
Change of Menu or Style of Service 151.00 If paying this fee AND for New Owner/Change of Owner or for minor change of
floor plan or equipment, may need to pay for Food Service Plan Review
Waiver/Variance 121.00 Per Hour; for review and/or approval
Reopening Fee 121.00 Per Hour
Manager's Course 322.00
Pre-opening inspection 121.00 Per Hour
Reinspection
First Inspection 180.00
Each inspection after first 300.00
Food Handler Card
Reissue Unexpired Food Handler Card 10.00
SOLID WASTE
Annual Permit Fees
Limited Purpose Landfill 3,310.00 For the first 30 hours, then assess technical rate
Closed Landfill 2,498.00 For the first 24 hours, then assess the technical rate
Biosolid/Composting Facilities 1,175.00 For the first 11 hours, then assess the technical rate
Moderate Risk Facility 1,160.00 For the first 11 hours, then assess the technical rate
Inert Waste Landfills 562.00 For the first 5 hours, then assess the technical rate
Tranfer Station 2,498.00 For the first 24 hours, then assess the technical rate
Other Solid Waste Facilities 848.00 For the first 5 hours, then assess the technical rate
Drop Boxes 833.00 For the first 8 hours, then assess the technical rate
104.00 Per Hour
Miscellaneous Fees
New Facility Application 681.00
518.00
50% of fee
Plan, Document and Waiver/Variance Review 416.00 +$109/hour for > 4 hours and 5% of total cost for addt'l hours
for Technology Fee
WATER
Application Fee 248.00 Inspection of well construction, decommission & reconstruction
Determination of Adequate Water Supply base fee 155.00 Tech Assist and Document Review is billed at the hourly rate
Well Inspection & Water Sample for Loan 207.00
Well Site Inspection-Proposed public water supply 492.00
LIVING ENVIRONMENTS
Single Swim Pool (in operation for < 6 months of the year)356.00
Single Swim Pool (in operation for ≥ 6 months of the year)454.00
Single Spa Pool (in operation for < 6 months of the year)312.00
Single Spa Pool (in operation for ≥ 6 months of the year)454.00
Single Wading Pool (in operation for < 6 months of the year)258.00
Single Wading Pool (in operation for ≥ 6 months of the year)454.00
Spray Pool or Pools (in operation for < 6 months of the year)128.00
Spray Pool or Pools (in operation for ≥ 6 months of the year)194.00
77.00
103.00
Reinspection 104.00 Per Hour plus associated lab costs
Plan Review 104.00 Per Hour
Indoor Air (Tobacco)
Compliance Enforcement 104.00 Per Hour
Reinspection 104.00
Rebuttal Application 207.00
Exempt Facility Inspection
Facility Reinspection
Note: 2022 Fees have been adjusted per Ordinance 12-1209-96, Section 4 - Annual Fee Indexing: Fixed amount fees established by this ordinance shall be adjusted annually on the first business day of
January (Adjusted Date) by the amount of the increase in the Consumer Price Index (CPIW). The CPIW is the Consumer Price Index - US City Average for All Urban Wage Earners and Clerical Workers,
published by the Bureau of Labor Statistics for the United States Department of Labor.
The annual fee adjustment shall be calculated as follows: each fee in effect immediately prior to the Adjustment Date will be increased by the percentage increase in the CPIW as reported for the month of
September preceding the Adjustment Date. Increases will be rounded to the nearest dollar. A fee shall not be reduced by reason of such calculation. However, fee increases in accordance with this
calculation shall not exceed 5 percent per year.
Water Recreation Facilities Operation Permit
Each Additional Swim, Spa, or Wading Pool (in operation for < 6 months of the
year)
Each Additional Swim, Spa, or Wading Pool (in operation for ≥ 6 months of the
year)
Commercial Shooting Facilities
2 of 2