Loading...
HomeMy WebLinkAboutLog034 FROM : PUD1JEFFCO e PHONE NO. 3603855945 e Jun. 02 2005 09:00AM P1 " .. Public Utility District #1 Of Jefferson County Board of Comn'llssiQ~ FAX TRANSMITTAL D~ Roberts. District 1 M. KeUy Hayes. Dislric;:t 2 Wayne G, King, DistrictS DATE: Z J <..{ II\.l TIME: COMPANY: CD , 8~,c.~~ p...... _. ___.."...~am.,. es ~. Parker, Manager ."., I' , ;.., ~-- , ' / ---.. JfJn ... 2 2005 TO: ATTENTION: Fax Number: NAME: RE: (J. M :tl~~ Se-fA- FROM: NUMBER OF PAGES (including cove sheet): '2-- The in/ormation contained within thisfac$imile message may be privileged, confidential and exemptfrom disclosure under applicable laws. If you have received this communication in error, please notify US immediately at 360-385-5800 REMARKS: ~~~, I(e.U~ W~ ~t (~~ S~S.. _~ LM-~ \4 ~~ S'e: fA- ~~,~i\ - or }'III ~~l'-t , 0('" ITEM L . ,:, #~ ~ &'1 ~ Page~.-L_of~ ' FAX (360) 385-5945 ~so ~a= Road IPOBox m. Port Hadlock, WA 98339 (:206) 385-5800 ph FROM : ~UD1JEFFCO e PHONE NO. 3603855945 e Jun. 02 2005 09:01AM P2 ,; c.b~1-\- ~ From WAC 246 - 03 CHAPTER - 030 (bold and italics added) (3) New public water supply systcm~ and major extensions of existing public water supply systems. (a) Scope of major action. The approval of engineering reports or plans and specifu:ations pursuant to chapter 24~290 WAC for all surface water source development, all water system storagefacilities greater than one-halfm1llion gallons, new transmission lines longer than one thousandfeet and larger than eight inches in diameter located in new rights of way and major extensions to e.:'Ci.,...ting water distribution systems involving use of pipes greater than eight inches in diameter, which are designed to increase the existing service area by more than one square mile. (b) Timing and procedures for projects proposed by private applicants. (i) In general, when a private applicant seeks the approval of the department for a new public wat.er supply or a major extension to an existing public water supply; the private applicant shall be responsible for completing an environmental checklist, furnishing additional infonnation needed by the departrl1ent to make the threshold determination, and preparing the draft and final EIS under the direction of the responsible official. The following material presents a more detailed description of the responsibilities of the private applicant as well as of the responsible official. \,...;' (ii) Follow steps outlined in subsection (1)( c )(i1) through (iv) of this section. (iii) See subsection (2)(b)(iii) of this section. (iv) See subsection (1)( c )(vi) and (vii) of this section, (v) See subsection (2)(b)(v) of this section. (vi) See subsection (1)( c )(ix) of this section. (vii) Whenever preliminary engineering reports, or plans and specifications for a new public water supply system or a major extension to an existing public water supply system are submitted by a private applicant to the secretary for review and approval pursuant to chapter 246-2.2.0 WAC, these reports, plans and specifications shall be accompanied by a determ.ination of nonsignificance or a final EIS. ",-, (c) Timing and procedures for projects proposed by al'l agency. Whenever prelimin.ary engineering report~., plans and .~pedflcati()f1.s for a new puhlic water supply system or a major extension to an existing public water supply system are submitted by an agency to the secretary for rel,iew and approval pursuant to chapter 246-290 WA C. these reports, plans and .vpeciflCations shall be accompanied by a detel"mination of nonsign~ficance or afinal EIS. OG'" "TEM L I # ~ ~\f dlA Page. '?::-_,~ of, 2- ~.'