Loading...
HomeMy WebLinkAboutLog134 Page 1 of 2 David W. Johnson From: James parker [jparker@jeffpud.org] Sent: Monday, November 28, 2005 1: 10 PM To: David W. Johnson Subject: RE: Marrowstone Construction: MLA05-00276 David: Enclosed are 2 DOH documents that recognize that the PUD has DOH approval for the extension of water lines onto Marrowstone Island. The first approves our project report, which amends the PUD's approved WSP, the second is recognition of our additional treatment at the Sparling well which will provide the PUD with sufficient water for the distant future. Also I will send some links to the sections of the RCW that deals with water rights for municipalities. RCW 90.03.386 para (2). Which simply states that the PUD can use it water rights anywhere within its approved service area. If you have any other questions please call. Jim -----Original Message----- From: David W. Johnson [mailto:dwjohnson@co.jefferson.wa.us] Sent: Monday, November 28,20058:10 AM To: James parker Subject: FW: Marrowstone Construction: MLA05-00276 Jim, Please address this email ASAP and return to me for review. Thanks! From: Nancy Dorgan [mailto:ndorgan@waypoint.com] Sent: Sunday, November 27,20053:32 PM To: David W. Johnson Cc: Lorna Delaney; Wiatrak, Phil (ECY); Klocke, Karen (DOH); Josh Peters; 'Gerald Steel' Subject: Marrowstone Construction: MLA05-00276 David W. Johnson Jefferson County Department of Community Development David: LOG 'TEM # ('1, '-\-. pag~._ l__of,_~_.. 11/28/2005 Page 2 of 2 Attached is the .pfd file for the Marrowstone summary judgement on the LUD formation. Judge Williams ruled that: "The Court finds that formation of the LUD is not precluded even though at the time of the formation of the LUD the specific improvements contemplated were not within the specific provisions of the public water system coordination act or the PUD's own water service plan. Those plans must be amended. however. prior to any construction of the proposed LUD." As I stated in my earlier comments on MLA05-00276, there has been no programmatic SEPA review of the impacts of the Marrowstone system on the Chimacum Creek sub- basin that will be the source of Marrowstone water. Lacking to date is relevant SEPA review of: (1) the PUD's 2004 Water System Plan update; (2) a DOH-required amendment to that WSP for the new Marrowstone system; (3) the PUD's engineering Project Report for construction of the Marrowstone system; (4) Marrowstone construction permits, which DCD deemed to be SEPA-exempt, despite adjacent wetlands and shoreline considerations (5) proper completion, with SEPA, of an amendment to the County's Coordinated Water System Plan referred to above in Judge Williams' ruling. The Marrowstone water system has almost successfully eluded programmatic environmental review, a review that has nothing to do with 8" pipes. The project has also been phased in such a way as to avoid SEPA review of necessary and known under-water components of the water system. If the requested permits in MLA05-00276 are issued, they will not be consistent with the existing Jefferson County Coordinated Water System Plan. WUCC approval of the Marrowstone service area is not a sufficient CWSP amendment. Such an amendment needs to be a legislative/SOCC decision with prior SEPA notice and determination, and then given final DOH approval. None of that has happened yet. How and when does the County intend to address the CWSP inconsistency? Thank you. Nancy LOG ITEM # ~ Pag'3. "7- .ot.!i:- 11/2812005 STA TE OF \VASHINCTON DEPARTMENT OF HEALTH SOUTHWEST DRI"'KING W..\TfR OPERATIONS 24 II J'aciiic A H~ . PO flu:>: .J,~ 82:; . OIYIIIPi'l/ WdshinKton 98.'W4.7823 (3601 664-076lJ . FAX: (J6()) 664-80.'i8 TDD Relay '-H{}(J-8J:l-6J88 /?I:: -:"",C,r:--., ~... f 1/.... . ! '~'f.'.' '...._1 . . Z~q,~ ....' ''';;/ "'liJ n'r. #'.,Li"'D 1 . ~"'.~...,....:..~' .-'1;. ..... '~'ry " August 4, 2005 Jim Parker Jefferson County Public Utility District #1 Post Oftice Box 929 Port Hadluck, Washington 98339 Dear Mr. Parker: Subj eet: Quirnper Water Systcm, 10 #05783, Jefferson County; Water System Improvements (Marrowstonc Island), ODW Project #05-0417 Thank you for submitting.l project report for proposed improvements for the referenced system. I have revicwed the r~pon and the 1l111nwing items are needed prior to project approval. I. The C.1P.lCity nnalysis in this report includes two proposed sources (Four Comer #1 amI #2) with a tutal <.:apacity of 300 gallons per minute (gpm). There an: currently no water rights associated with these sourcl.:S, Jefferson County Public Utility On;trict's mtent was to transfer water rights from the Sparling we 11 field to these wells. However, it is my understanding that the Department of Ecology may not allow this. Please explain what other options arc being considered to obtain the additional source capacity. If a new source capacity strategy is pursued, please submit a revised project report, Regulations establishing a schedule of fces for review of planning, engineering, and construction documents were adopted July 1, 2004 (WAC 246-290-990). An itemized bill tor $377 is enclosed, Ifyoll have any questions, please contact Bonnie Waybright at (360) 586-2510. Sincerely, 8()vv~~ W{t~JIYv~11c( ~ JERROD DAVIS. P,L::, Officc of Drinking Water Assislant Regional Manager I. :lC !ll;;lll\,'S cc: Jeffersoll County Health Department ~. - .... # Pag'l.. LOG ITEM C5~ 3 _ot~ STATE OF WASHI~(;TOt-.' f)[PARTMENT OF HEAlTH .'.( Ii 111'.\ i .~T DRI'",I:--.c' \VAHI~ ()1>rl~/\lln:-..:'i !~I1I'.lCdit -\1"1'11I/1'. PO 8m 471J'.!.f. Olympi.l, W.1~llingto" 'JIL>fI.J-;'Fi:.!:J 1../: U',Oi "'.-4-(CfJll . r,\x: (JMI) 6f,~-II().)1I rf)n R('I,,~. Sen'in'; 1-1WII-lI.H-6./l1l/ " ....;.~Jo ,,~~ /' ./.~ ~/~ October 272005 Jim Parker Jefferson County Public Utilities District #1 Post Office Box 929 Port Hadlock, Washington 98339 Dcar Mr. Parker: Subject: Quimper Water System, ID #05783, Jefferson County; Iron-Manganese Pre- Design, ODW Project #05-100] Thank you for submitting a preliminary design project report for the proposed iron-manganese project as mentioned above, received in this office on September 30, 2005. The report describes the iron/manganese water quality problems in the system and outlines standard industry corrective measure options, We accept the conclusions of this preliminary design report. When submitting the Project Report and Construction Documents, please complete and include the enclosed "Iron & Manganese Removal Facilities for Small Systems Submittal Checklist." If this project is intended to increase production of th~ Sparling Well #2, please complete and submit the enclosed Water Rights Self Assessment fonn. Regulations establishing a schedule offees for review of planning, engineering, and construction documents were adopted July 1,2004 (WAC 246-290-990). An itemized bill for $792 is enclosed. If you have any questions, pease contact me at (360) 664-8734. Sincerely, ~~/~ ~;;~OWER. P.E. Office of Drinking Water Regional Engineer Enclosures ec: Eric Story, Jefferson County PUD#l Lee H. Odell, P,E; CH2M-Hill Susan Porto, Jefferson County Public Health Bonnie Waybright, ODW l'uhli,ll<-.llll\ .\........l'..~, \\(I'k:r1~: "(II (~~di.'r dIHIII..',dlh:." ...v.~....h:n..~'llll .....-Cl~". LOG lTEWb # l?4 .. _.t'ag13~-f:i.-_ot~