Loading...
HomeMy WebLinkAboutLog183 tit tit ~ .. Washington State Department of Transportation Douglas B. MacDonald Secretary of Transportation Olympic Region Utilities Office 150 Israel Road SW, F14, Tumwater PO Box 47417 Olympia, WA 98504-7417 360-570-6743/ Fax 360-570-6697 TTY: 1-800-833-6388 www.wsdot.wa.gov December 22, 2005 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, W A 98368 Attn: David Johnson RECEIVED OEe Z 3 2005 Re: PUD # 1 of Jefferson County Water Distribution System SR 116, Marrowstone Island JEffmSD~ &OU~TI Den Dear Mr. Johnson: The Olympic Region has been involved in discussion and reviews with PUD # 1 of Jefferson County about the water distribution system along and across the SR 116 right of way on Marrowstone Island for the last several years. Listed below are some of the critical elements identified in the Region's preliminary reviews of the PUD proposed water distribution system. 1. The proposed installation shall comply with the requirements of the WSDOT Utilities Accommodation Policy. WSDOT publication M 22-86. http://www . wsdot. wa.gov/fasc/EngineeringPublications/manuals/Final %20UAP .p df 2. No open cuts of the roadway, SR 116 or County Road intersections, will be allowed on this project. All crossing must be bored or jacked and cased. 3. No longitudinal installation will be allowed on the foreslopes of ditches. 4. To avoid delays for the traveling public, work on the project will be restricted to off peak seasons, from approximately Labor Day through Memorial Day. 5. The PUD will be required to get all required permits for the project. The Region may review all permits prior to issuing a franchise amendment approving the work. 6. The PUD will be required to get any required documents from underlying property owners within the limits of the project. This would be in locations wr5(:;~ doesn't have fee title to the right of way. , j Q ~ # \ u- Page-Lotl::::_ 1 e e p. . 4. ~ 7. At a minimum, the PUD shall implement the BMP's as outline in WSDOT manual M 31-16, Highway Runoff Manual, to mitigate storm water runoff. 8. All new aboveground objects installed in the SR 116 right of way must meet the minimum control zone requirements. When possible, the Region would prefer objects like fire hydrants to be located on County right of way. 9. All service meters shall be located off the SR 116 right of way. 10. All drainage courses, ditches, culverts, etc. shall be restored to original condition. The Region has had some discussion with the PUD about flattening the slopes into the ditches as a way of meeting the minimum depth requierements. If you have any questions give me a call at (360) 570-6743. Sincerely, ~~g.pL..~ Kyle R. McKeon Region Utilities Engineer KRM:jrn Attachments cc: Bill Riley File # Page LOG ITEM lSS "z ot2~ REC..VIf\\;7i'f-:,\n J; .: . ... .'ldtJi .. V 1It11Jr n ,... I' 2 '11 fVH".... U... \". .'t) Ll.njO ,ij~ffEH~nN DOOWW..OCQ