Loading...
HomeMy WebLinkAboutLog001 ,-" 'l DRAFT OUTLINE Jefferson County PUD#l Pre-Application PRE04-00035 October 29, 2004 DCD Conference Room 10:00 am Attendees: Mike Moren I 'J1""'- ~S.2:1NG.L.et.1 t.€". ) Jl....... ~ P~t>.a\ Jim Pearson, DPW; Randy Marx of Env Health; Stacie Hoskins, DCD' Public Works: Stormwater: DOE Stormwater Management Manual for Western Washington Roads: Submit Stormwater Management Plan ~~~ ~~~~~ ~~ b<sE. .Nl.<(~ ~~ ~ ~ f.,r.....J...r~ ~~..,..JPciu..L ~~ ~ ~ ~ I~J (} O' (loa..'... ~~~~ \ ~ ~~""'-' (1 t Sc> {lr ~IJ ~'eAN "-be fw - h~ IN'''-r \QJ~' Environmental Health: Water: Septic Commun' drainfield: Need Work throu or . ed. . ogs to identify area (15 - 20 holes) over threshold. PUD would own and operate once Commu' ea or individual drain fields: .. 1 ua easements. Want to see four holes per system (2 for . or reserve). Then can permit systems later on existin i won't have to have a l' oles dug. Permitted through Jefff Co E ealth. l>uN'-f ~oW' ~ ~ ~.- r-:. ~ ~ t C' - ~ J...-t~~o --<... .-9..... ~ J~ \. -:r~. co.'::" ~-l. ~ ~ ~ ~ - ~ ~ >>- ~w\~~ ~e- ~ "~" 4~~~ ~-t..~~~\~ ~ ~O ~~ ~ 4.>rI~.t ~ ' ~~~~. .~ ~ ~UJ ~~~-~t- ~ 0 n ~ ~ d-. ~l,... ~ ~ ~.J.. ~ J.-:./f" ~ k.r- t ~ ~~. r ~ \.a\..t- ~ ~ 1.i l'(" ~ ~ U-a.- t ~ ('.~AJ. - Uf '" ~ , LOG ITEM # ( Page--1-ofd~~ PRE04-00035 _JCPUD#LBeckett Point.doc Page 1 of 2 .. , DRAFT OUTLINE DRD: 1. Zoned RR 1:20 2. ESA's: Suburban Shoreline designation Shoreline also designated as Type 1 Stream, Wetland as Type 5: proposed UDC Amendments may impact Fish & Wildlife buffers. Due to be completed by end of 2004. Wetlands: Type II require 100-foot buffer, mitigation to reduce (reg's changed in 2001.) Update delineation with buffer and discuss mitigation. Flood: Follow Flood Damage Prevention Ordinance LSHA 1,2 & 3 and Seismic hazard: Geotechnical report to address stability of soils Susceptible Aquifer Recharge Area Fish & Wildlife (Eagle, Great Blue Heron) Send to WDFW; - .c. ~\A.... r- T........t-. Coastal SIPZ 3. ESA's and buffers depicted on site plan; Wetland Delineation, geotechnical report 4. Unified Development Code available online at: http://www.co.iefferson.wa.uslcommdevelovment/udc/default.htm ....... UDC Section 3, Table of Uses Minor Utility Development in RR 1:20 zone is C(a) Use Base fee Notice of application Notice Board 612.00 124.00 8.00 ~, UDC Section 5, Shoreline Management Master Program Utilities in a Suburban Shoreliune Designation is identified as a Secondary use. Shoreline Substantial Development (Secondary Use) Base fee 1,409.00 Requires Notice of Application included above Notice Board included above Notice of Hearing 124.00 SEP A review (if required-difficult to read Figure 3) 432.00 12, 1.- r'J/). ~ 'l,?~9 , -=. ~ ~C::::rN\"~'" ~~~. ~ ~^ - ~W ~~_ -40~~ ~ ~~ ~-~ ~ LJ-L ~~.c ~~~.. PRE04-00035_JCPUD#I_Beckett Point.doc LOG ITEM # { Pag~.. 2 _ofd,5f -"- Page 2 of 2 Beckett Point 2003 Page 1 of 3 # \ Page 6 M ofdSr Beckett Point 2003 Page 2 of 3 # I Page~of~$f .' ~ Beckett Point 2003 Page 3 of 3 # 1 Page .5 of ~ ... ~~ , \ Page 1 of 2 Stacie Hoskins From: Stacie Hoskins Sent: Wednesday, August 03, 20057:33 AM To: 'Jean Carr' Subject: RE: Beckett Point Question Hi Jean, The fees total $2,492.00 for land use review, and you may submit one check for the fees. The breakdown is as follows: 1. Conditional (Administrative) Use Permit $612 Base Fee 127 Notice of Application 8 Notice Board 2. Shoreline Substantial Development (Secondary Use) 1,177 Base Fee o Notice of Application - included above o Notice Board - included above 127 Notice of Public Hearing 3. SEPA Review: @$441 Please include this summary with your application so the Permit Technician may receipt in the fees. Public Works and Environmental Health Department fees are not included in this summary. Public Works will bill the applicant prior to permit decision. Health Dept fees should be based on the type of septic application. Contact a Permit Technician at (360) 379-4450 regarding septic fees. Please contact me with any other questions. Regards, Stacie L. :}{oskins Development Services Manager, DRD Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 Phone 360-379-4463 Fax 360.379.4451 shoskins@co.jefferson.wa.us -----Original Message----- From: Jean Carr [mailto:JCarr@parametrix.coml Sent: Tuesday, August 02, 20054:04 PM To: Stacie Hoskins Subject: Beckett Point Question Hi Stacie We are just about ready to submit our application, and I want to be sure we include the right fees. It looks to me from your fee schedule like we need: 8/3/2005 # Page-0 LOG ITEM I of~ 1. Conditional (Administrative) Use Permit: @ $625 2. Shoreline Substantial Development (Secondary Use): @ $1,439 3. SEPAReview: @$441 ... ..... ~ ,~ Is this correct? Also, can we provide one check for all the fees combined? Thanks Stacie! Jean Carr Parametrix Olympic Office (360) 459-3609 jcarr@parametrix.com Page 2 of 2 # Page 1 LOG ITEM { of ;1&f 8/3/2005 10.77 Ch. ~m rrIrrI (1)0 ..." mg 5:!. ("")""D :r:2 % !'lP,88 -f # . e?S~ p aJ~ ~ ~~ ... a -1~ ~ ~~ ? a . a "" <:)'I~ ~ ~?88 ~S~~ P 62 aJ""l~ - k <..9 ~ .>> ".s. P, G> <Z ~ -\ ~-~ I o ~J -=1' m ~ >(I)m %0 IT1 Z c: 0 ITI-f " X~9 ~Q :cz ... b ::....\ <9~~ IJIO-?h'f-~ ~ ~ ~ ~C ~ ~~ N-~ ~~ ~O~ 'XS8 '1'1 II~................ '" "- ,>/~Vt"'" ;...-'\ \ ~ \ \~ \ ,~~y~ "'-= ~ \ OJ.'''Y/ ~ q~ \ q \ . ~ -.:::.:::- (~:~71 ~ ~ q ;. '- ~::: ;0.- - '<I ~- '\. 6'~ ~~. A O~<t: ':Af)- Oq,,,,. 7>- ,y~ ~~ ~~ G") o < .. -i )>(1) m ZO ITI Z c: ("") ITI-t " x:r: ~ CD ~"'D 02 :r:z -t VlG)O p:loo + + + + + + + + + + o o CD ... + + + + I I I I I I 1+ I I I 1+ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \+ \ \ \ \ \ \ \ \ \ \ \+ \ \ I + + + + + + + + + + + + + + + + + + + + + + + + + + + + LOG ITEM I + Q. III 1:.::E -II 0_ D. .- M In G1='ti ~.= .S!. .!!l ~ e 1L1llD. x- 0 '" ~ Q. X 'iil Q. 0 .:5- '" '" Q. Z Z Q. < .:5- I- 0 U F '" F ~ z UlQ. ~ "'''' Q. ZUl Q. ~O '" ::> '" I- Q. ::> ~~ 0 Q. ~~ Z 0 ::> z 0 ::> ,,0 '" 0 ZU " '" '" " F...J '" '" Ul...J 0 0 ><3< Z Z "'~ ::> ::> 0 00 '" '" '" < 0 '" '" "- Z '" "- ::> ~ ::> 0 lD '" ~ 0 " Z "'''' :I: < ~~ " ~ z'" :;: ~ ::>Ul >- 0", '" I- "'''' < 0 Ul::> Z 0 OUl is "- Q.Ul 0'" '" 0 "'''' 0 on Q.Q. I 0 ...J >- '" '" '" G: ::> 0 Z g " <( '" '" t5 ~~ 0 U u< 0 ~I ,,~ '" Ul ~~ 0 Q. 0 ><< '" "'Q. Q. D ~ + + + + + + + + i . ! ~~I- W >C w ~<1Z ~ E :;;! ::! ~ l. 0 . '" Page 1 of 1 Stacie Hoskins From: Stacie Hoskins Sent: Wednesday, March 16,200510:21 AM To: Peter Bonyun; Colleen Zmolek; Kathie Anne Sukert; Rebecca Carlson Subject: exempt storage buildings Hi All, Just a reminder that all new structures are subject to the Environmentally Sensitive Area buffers, and people inquiring about sheds need to know they must maintain ESA buffers. I spoke with two representatives for the Beckett Point Homeowner's Association today, and they are going around and around with Mrs Olsen, a resident of Beckett Point. Mrs Olsen has provided documentation from the International Building Code stating that a 200 sq ft structure is EXEMPT from a permit. Please note that UDC Section 3.6.5 states the section is applicable as follows: Any land use or development activity which is subject to a development permit or approval under this Code may only be undertaken on land located within or containing an ESA or its buffer if the provisions of this Section 3.6.4 are met. Uses and activities in environmentally sensitive areas, or their buffers for which no permit or approval is required by any other cOimty ordinance, remain subject to the development standards and other requirements of this Section. New sheds are not li~;ted under exemptions. Thanks, Stacie L. Hoskins Associate Planner, DRD Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA )8368 Phone 360-379-4461 Fax 360-379-4451 shoski n s@co.jefferson.wa.us 3/16/2005 LOG ITEM # I Page ID ~ of JSI Map OUq)u" . Page 1 of 1 [J ;W o Legend Seleded Features Road System PllIR:ltIIfHoI 2000 Mdal PI'IOlOS Boundsdes o ~Cady . w_ DOihlrCl:'luniM OR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with spect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Wed Mar 16 09:46:06 2005 LOG ITEM "L L #U" Page...JL.. of JS5r http://gisserver/servlet/com,esrLesrimap.Esrimap?ServiceName=ovmap&ClientV ersion=4.0&F orm= ... 3/16/2005 Map OutPut . , Legend [J Seleded FeaCUres .;vi Road Syatem o Parcellli-H 2000 JUlMI PI'lotofl BotJndalles o .IIllILWbl Ctad)o . w... DOIhltCGunfi!o!l OR INFORMATIONAL PURPOSES ONlY- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with espect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Wed Mar 16 09:46:06 2005 Page 1 of 1 t.~f 'ifc.r LC)G ITEM I Paa~3 12- of~<1'" ,;~', ~ http://gisserver/servlet/com.esri.esrimap.Esrimap?ServiceN ame=ovmap&ClientV ersion=4,O&F orm=... 3/16/2005 Map Output . , Page 1 of 1 Cl #' D Legend Sell!lded FeabJ..liI Road SysteM Patcllll&-H 2000 Aerl8l Photos BOIJndartelil o ~Cl:uiIy . Wti8 DOIlIlrCcunfil!lli OR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with espect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Wed Mar 16 09:46:06 2005 LOG ITEM 4+ ~ 'tt Page-J . of~ http://gisserver/servlet/com.esri.esrimap,Esrimap?ServiceN ame=::ovmap&ClientV ersion==4.0&Form=::., , 3/16/2005 d. Coverage. This Section applies to all uses and aclMties within ESAs or their designated buffers unless otherwise exempt The foIowing permits and approvals shan be subject to and coordinate with the requirements of this section: clearing and grading; site plan approval; sewage disposal; subdivision or short subdivision; binding site plans; building permit; planned residential development; shoreline substan- tial development; variance; conditional use permit; cet1ain forest practice permits (Class IV General. Class III Conversion Option Harvest Plans); other permits leading to the development or alteration of land; and rezones if not combined with another development permit. In instances where a proposal involves a parcel of real property with more than one ESA or _ESA buffer, the standards that pertain to each identified ESA shall apply. When provisions of this...,section conflict with one another, or when Provisions of this section conflict with any other local law, the provision that provides more protection to the ESA shall apply. No permit Involving a designated environmentally sensitive area shan be approved unless it Is determined to be in compliance with this code. Any action taken in an Environmentally Sensitive Area designated under this section that Is In violation of the standards and conditions contained herein is expressly prohibited. e. General exceptions. The Administrator may grant an exception to the requirements of this Section. In determining whether an exception Is appropriate, the Administrator shan require that the proposed land or water use win not create unmltigatable significant adverse environmental Impacts. In making this determination, the Administrator may require that an appfacant prepare a Special Report (per Section 3.6.10). tn granting an exception. the Administrator may require conditions of approval, including mitigation, as necessary to ensure that the subject land or water use action wUI not pose a risk of adverse enWonmentaIlmpacts. f. General exemptionS. (1) The foIowing activities are exempt from the requirements of this Section: i. Emergencies that threaten the public health, safety and welfare. An -emergency" is an unanticipated and immediate threat to public ..ea.., safety, or the environment which requires action within a time 3-13a . SECTION 3 . lAND USE DISTRICTS within an area designated as Mineral Resource land (MRL), you may be subject to inconveniences or discomforts arising from such operations, incIucflf'lQ but not limited to noise, tree removal, odors, fumes, dust, smoke, the operation of machinery, and the storage and disposal of aggregate products. One or more of the inconveniences described may occur as a result of extraction and processing opera- tions which are in conformance with existing laws and regulations. Jef- ferson County has determined that the use of certain real properties for mineral resource extraction and processing activities is necessary to ensure resource availability in the County. The County win not consider to be a nuisance those Inconveniences or olSCOmforts arising from extraction and processing operations, if such oper- ations are consistent with c0m- monly accepted best management practices and comply with local. state, and federal taws: 3.6.4 Environmentally Sensitive Areas District (ESA). a. Purpose. The Environmentally Sensitive Areas Overtay DIsbict (ESA) is adopted to inpIement the policies of the Comprehensive Plan for five types of Environmentally Sensitive Areas as defined in Sections 3.6.5-3.6.9: (1) Critical Aquifer Recharge Areas. (2) Frequently Flooded Areas. (3) Geologically Hazardous Areas. (4) FISh and Wildlife Habitat Areas. (5) WeUands. b. Applicability. Any land use or development activity which is subject to a development permit or approvaIlR1der this Code may only be undertaken on land located within or containing an ESA or its buffer if the provisions of this Section. 3.6.4 are met Uses and activities in environmentaIy sensitive areas. or 1heir buffers for . no permit or b an other o remain ect to the standards and other ~ofthiS Co Allowable Uses. All uses shan be subject to requirements specified in Table 3.1 for the underlying district. unless otherwise specified in this Code. lJniIied Development Code Secfbf 3 . Land Use Districts Amended by Ordinance No. 06-0510-04 lOG ITEM #- / Page..J:L of.dGE.... .., SECTION 3 . lAND USE DISTRICTS too short to allow compliance with this Section. ii. Normal and routine maintenance and operation of pre-existing retention! detention facilities, biofilters and other stonnwater management faciIties, irrigation and drainage ditches, farm ponds, fish ponds, manure lagoons, and livestock water ponds, provided that such activities shan not involve c0n- version of any weUand not currently being used for such activity ii. Structural alterations to buildings, permitted under the provisions of this Code, that do not alter the structural footprint or introduce new adverse impacts to an adjacent environmentally sensitive area. iv. Nonnal and routine maintenance or repair of existing utility structures within a right-of-way or existing utility corridor or easements, including the cutting, removal and/or mowing of vegelation above the ground. v. Forest Practices conducted pur_ suant to RCW 76.09, except Class IV .(general conversions) and Conversion Option Harvest. Plans (COHP). vi. NonnaI and routine installation and maintenance of propane storage tanks and wood stoves for single family houses or mobile homes. g. Nonconfonnlng Uses. (1) Any use or structure in existence on the date this code becomes effective that does not meet the buffer. requirements of this section for any designated aiticaI area shaI be considered a legal nonconfonning use. (2) Any use or strucIure for which an application has vested or for which a permit has been obIained prior to the effective date of this Code, that does not meet the buffer requirements of this section for any designated ESA, shall be considered a legal nonconforming use. (3) A legal nonconforming use or structure may be repaired or maintained without limitation by this section. (4) A legal nonconfonning use or structure that has been damaged or destroyed by fire or other calamity may be restored and its immediateJy previous use may be resumed. h. Reasonable Economic Use Variance. If the application of this Section would deny all reasonable economic use of the property, the applicant may appJy for a reasonable economic use variance, only upon denial of a pennit due to the requirements of this Section. (1) The applicant shaI apply to the Department, and the Department shaD prepare a recommendation to the Hearing Examiner. The property owner andIor applicant for a reasonable use variance has the blI'den of proving that the property is deprived of aU reasonable use; i. Notice. The Hearing Examiner shall conduct a public hearing on the variance request. Decisions of the Hearing Examine~hall be final and conclusive unless appeaied to the Appellant Examiner. Public notice shall be provided as follows: (1) The Department shaD arrange for at least one publication of the notice of hearing to appear in a newspaper of general circulation within the County at least (10) days before the hearing. Payment of all publication fees shaH be the responsibility of the applicant (2) The Department shall send notice to adjacent property owners advising them of the hearing. The notice shaD be maIed to the owners of record of aU property lying within three hundred (300) feet of the property at issue, at least ten (10) days before the public hearing. Names and addresses of adjacent property owners shaD be provided to the. Department by the applicant, subject to Department approval. (3) The Department shaD provide the appfJCant with at least two (2) copies of the heaing notice, and one copy of an affidavit of posting. The applicant shall post the notices and maintain them in place for at least ten (10) days prior to the hearing, not incIucrmg the day of posting or the day of the hearing. The notices shall be placed in conspicuous locations on or near the property and . shall be removed by the applicant after the hearing. Notices shall be mounted on easily visible boards provided by the Deparbnenl The affidavit of Unified Development Code Sec60n 3 . Land Use Districts Amended by Ordinance No. 06-051041 3-13b LOG \TEM $8:96_ \5 oC- . SECTION 3 . lAND USE DISTRICTS '. Posting shaH be signed, notarized. and returned to 1he Department alleast ten (10) days prior to 1he hearing. (4) AI hearing notices sha1 include a legal description of the property irwoIved, and a concise descripIiun of the variance reqlleSted in nonlegal language. a. Findings. A teaSOnabIe economic use varialace may be granIed only when the Hearing Cxaminer inds Ilatthe ~ meets aI of the Uowing aiteria: (1) No reasonable economic use wiIh less impact on the ESA or its buIrer is possible. (2) There is no feaslJle on-site alternative to the proposed adivities that would Blow 8 reasonable economic use wiIh less advenle impac:ts to environ- -" - '. -mentally. -sensitive areas or ESA buffers. Feasible on-site alematives shaI include. but are not Imited to: reduction in density; phasilag of project implemeldaIioc.; change in timing of activities; and revision of roacJ or parcel layout or related site pIaming considefations. (3) The ~ valiance wi! result in the mininun feasible aItefation or impairment to the environmentally sensitive areas functional c:harao- teri$tic$ and .ecisting contours. wge. taIion. fish and wikIire 'Iesources, and . hydr01ogicai c:ondifions. (4) DisUbance of environmentally sen- sitive .-eas has been minWnIzed by locating any nec;e$saty alteration in ESA buffers to the minimum extent possible. (5) The proposed variance wi not cause degradation to swface or ground water quality. (6) The proposed variance compIie$ with .. Federal. State and local statutory and common law, incIucIing the Endangeted Species Ad. and statutory IaW$ related to secIment c:ot*oI. pollution control. toodpIain - restricIions. and on de wastewater -disposal. and common law relating to property and nuisance. (7) There wit be no material ~ to nearby public or private property and no material threat to the health or safety of people on or otf the property. (8) The inabiIily to derive reasonable economic use of 1he property is not the result of actions by 1he appracant in segregating or dividing 100 hI'nN:>rtu and creating 1be ~ condiion after the etredive date of this . code. b. Conditions. (1) In gran6ng approval for reasonable economic use variances. the 'ieali'9 &anIiner may requn IRiligalelg con- diIions that wile in the ExamineR judgment. sUbsIanIiaIIy sean the objedivcs of this code. (2) In g1a1619 approval b reasonable economic use Yarialk:e$ involving ttesfgnated weIands. the Heating Ocamkter shaI c:onsider the following mitigating conditions: . i. Provision . of a I1IiIgation plan demonsbataag how the applicant intend$ to subslanUalyrestore .'-. the site to predewIopment conditions Wowing project completion; and i. The restoration. aeaIion or er."1ancemenl of weIands and 1heir bufIieIs in order to offset the impaQs resuIIing tom 100 applicants actions; the overall goal of any restoraIioI.. creation or enhancement prqect shall be no net loss of wetlaacls iJnetion and acreage. 3.6.5 CritIcal Aquifer Recharge Areas. a. ClassIfication. Critical NPIer Recharge Areas are naturally susceptible due to 1he existence of permeable sols or a seawater wedge in coasIIne aquIers. CertaIn overlying land uses can lead to water quality andfor quantity degradaUon. The foIowing das$Ifications define CrIIicaI Aquifer Recharge Areas. (1) SUsceptIble AquIfer Rec:harge Areas . are tho$e with geologic and hydrologic c:onditions that promote rapid In8Iration of recharge waters to groundwater aquifeR. For 1he purposes of this sedion. U1Iess dherwise detemiled by preparation of an Aquifer Recharge IRa Report . auUlorized l.Ilder 1his secIion. 1he foIowing geologic units. as Identified from available state of WashingtOll Oepertment of NabnI Resources geologic mawin9, define Susceptible Aquifer Recharge Areas for east Jeffersoo County. i. Alluvial fans (Ha), LOG ITEM UnitiedDevebpmentCode # {Section 3 . Land Use Districts . As amended by Ordiilance No. 07-0723-02 Page-Uof 'L.~ 3-14 SECTION 3 . lAND USE DISTRICTS . the applicant shall include on the face of any such instrument the boundary of the streamside buffer area. iv. The applicant may also choose to dedicate the buffer through a conservation easement or deed restriction that shall be recorded with the Jefferson County Auditor. Such easements or restrictions shall, however, use the forms approved by the. Prosecuting Attorney. h. Conditions. (1) General. In granting approval for a project application subject to the provisions of this section, the Administrator may require mitigating conditions that will, in the Admini- strator's judgment, substantially secure the objectives of this section. (2) Basis for Conditions. All conditions of approval required pursuant to this section shall be based upon either the substantive requirements of this section or the recommendations of a qualified professional utilizing best available science, contained within a special report required under this section. 3.6.9 Wetlands. a. Classification/Deslgnation. (1) Classification. Wetlands shall be classified using the Washington State Department of Ecology's Wetland Rating System for Western Washing- ton, ~ Edition, 1993. Wetland delineations shall be detennined by using the Washington State Wetlands Identification and Delineation Manual, March 1997, or as amended hereafter. (2) Designation. As determined using the Washington State Department of Ecology's Wetland Rating System for Westem Washington, ZMI Edition, 1993, all Category I wetlands, Category II wetlands 2,500 square feet or larger in size and Category III and IV wetlands 10,000 square feet or larger in size, shall be subject to the standards of this section. (3) Sources Used for Identification. Sources used to identify designated 3-28 wetlands include, but are not limited to: I. United States Department of the Interior, Fish and Wildlife Service, National Wetlands Inventory. ii. Areas identified as hydric soils, soils with significant soil inclu- sions and "wet spots" within the United States Department of Agriculture/Soil Conservation Service Soil Survey for Jefferson County. iii. Washington State Department of Natural Resources, Geographic Information System: Hydro- graphy and Soils Survey Layers. (4) Wetland Maps. The wetland maps prepared by the County have been produced for informational purposes only and are not regulatory devices forming an integral part of this section. b. Regulated Activities. Any land use or development activity shall be subject to the provisions of this Section, Includlna but not. limited to the following activities which are directly undertaken or originate in a regulated wetland or its buffer, unless exempted: _ (1) The removal, excavation, grading, or dredging of material of any kind, including the construction of ponds and trails; (2) The dumping, discharging, or filling of any material; (3) The draining, flooding, or disturbing of the wetland water level or water table; (4) The driving of pilings; (5) The placing of obstructions; (6) The construction, reconstruction, demolition, or expansion of any structure; (7) The destruction or alteration of wetland vegetation through clearing, harvesting, shading, intentional bum- ing, application of herbicides or pesticides, or planting of vegetation that would alter the character of a regulated wetland, provided that these activities are not part of a forest practice governed under Chapter LOG ITEM Unified Development Code ., Section 3 . Land Use Districts t"'" <'~.<!",.. .,- , "010' ,_.~.,! ,f ~ -"",,:1 . {...~ '.,' -~ of ~ 76.09 RCW (Forest Practices Act) and its rules; or (8) Activities that result in: L A significant dlange of water temperaUe; i. A significa-. dlange of Physical or chemical characteristiCs of wetlands water sources, including cpdty; or Ii. The introducIion of poIIutan1s. cc: Eiempt~ - (1) Wetlands.. The foIowitlg uses shall be allowed wiQjn a regulated weUand wiIhout having t) meet the protection stanc:IanIs., or feCI'*emenIs for weUand studies or mi6gaIun set forth in this section, 11hey ae not prohibited by any other law. However. forest prac- tices and conventions are governed by - - .chapter 76.09 RCW and its roles. L Normal maintenance. repair. or operation of ~ structures. facilities. or improved areas, SlICIl as on-de septic systems, lawns, landsGapiug, orchards, gardens. trails., and driveways. Maintenance and repair do not Include any modification that changes the character. scope, or size of the original structure. facility. or iqxoved area. and do not Include the construction of a maintenance road. &. Modification or expansion of existing uses and structures, pursuant to the requirements of the nonconfonning use and structure provisions of this Code. ii. Outdoor recreational activities, Including hunting. and fishing (pursuant to state law). birdwatchi1g. hiking, bicycl"ang, boating, and $Wimming. iv. The harvesting of wild crops in a manner that is not Iriurious to natural reproduction of such crops and provided the harvesting does not require tilling sol. planting crops, or changing existing topography, water conditions, or water sources. v. Existing and ongoing agricultural activities on lands enrolled in the Open Space Tax Program for agriculture or on lands designated as Agricultural lands of long.. Tenn Commercial Significance on the Unified Development Code Section 3 - Land Use Districts Amended by Ordinance No. 06-()510-04 SECTION 3 . lAND USE DISTRICTS . .. . -. . . official map of Comprehensive Plan land "Use Designations. For the purpose of this section, existing and ongoing 'means th~ agricuItt.rn, activities have been conducted within the five-year , period lea<fmg up to the adoptipn of Ordinance No. 05-0428-03 on April 28, 2003 . vi. NomtaI maintenance, but not c:onstnIction, of drainage cliches. vi. Use of existing nature trails. vii. Ind~aion of navigation aids and bcMnIary markers. Ix. Site irwesIigati~ work neces- sary for a project application submIIaI. such as surveys. sol logs. pen:oIaIion tests. and other related activiIies. In every case. weiand impacts shall be -- " - - --- -ft'iinirftized and cflSfiJi'tiOO areas shaI be lmmediateIy'restored. x. Dria1g or digging and main- tenance of weRs, provided that wetland impacts are minimized and disbbed areas are immedi- ~ resbed. (2) Wetland Buffers. In addition to those activi6es aIowed in regulated wetlands in this Section. the following activities are aIOwed within weUand buffers without having to meet the protection standards. or requirements for wetland studies or mIiga60n set forth in this sec6on, provided that impacts to buffers are minimized and that disUbed areas are immediately restored except as specifically allowed in subsection (2).1. below. I. In association with a single famIy residence only, the esIabIshment and expansion of lawns. landscaping, orchards, gardens. and fences. provided that: A. Lawns. landscaping, or- chards, and gardens shall be aIowed within the outer 25 percent of the buffer wid8l where no reasonable alternative is availabie. No sbucture other than fences nor any impervious sudace shaI be included In the above; and B. Fences shan be designed to aIow the unimpeded pas- sage of surface water beneath them. LOG ITEM # I Page---1lof 2~ 3-29 SEcTION 3 .'llAND Use DISTRICTS i. Activi6es having rilimal adverse impacts on buffers and no advef$e impacts on regulated wetlands. These include low intensily. passive recreational acIiviIies. such as peMous traIs, nonpetmaIMri wiIc8e waldlil19 binds, sdentific o! educaIo.aaI activiIies, and sportS fisI*v or hunIing. TtaIs witin bu<<eIs shall be designed t) m111i1.1mpacts t) the wetland, _ and &hall not Include any ImpeMous swfaces. Ii. WiIhIn the buIfers. of Category HI and rI wetlands only. vegQ- IaUon-Ined $wales designed for sfonnwater management or conveyance when topographic resfrainls defemlil.e there are no oller upIaIict alternative 1oca- tions. Swales used for detention purposes may onIy'be placed In the outer 25 percent of the buft'er. Conveyance swales may be.PIaced through the buffer. if necessary. d' Protection stMcIanIs. (1) General. Appica60n tOr ii' project on a parqI of real ~ c:ontaIning a designated weUalad or Is buft'er shaI adhere t) the reqQrements set forth below. (2) DelIMauon./va applicant submitting a project ~ shall also submit, and have approved, a wetland deIinea6cin report., as specifiecI In Section 3.6.10(;). MditionaIIy, the ioIowfng ~ shall apply: L The Ioca6on of tile we'Uand and Is boundary shall be detennIned hough the performance of a field InvesUgaUon utilizing the . metlodoIogy contained in the WashIngton State Wetlands Identitication and DelineatIon Manual. March 1997. or as amended hereafter. &. If the wetland is located off of the properly InYoIved in the project application and is inacx:essible. the best a~bIe Information shaD be used to 3-30 ,~ , determine the wetland boundary . and class. Ii. Mer approval ~ the deliaealioo report.' the wetland boundary &hall be staked and lagged In the field. ' Iv. This JeqUirement may be waived. .... the foIowing circum- .aces: A. SIngIe-I".mIt Resiliences. The ~ for a wetland deIneation and special repOrt may be waived. for construction of a singIe-famIy residence on an exIsUng lot of IeCOI'd if field InVestiga60ii by Comly staff Indicates the foIoWing: 1. SUfticIent Infonnation exists for stall t) estiInate the b0un- daries of a weiand. without a deInea6on; and 2. The singIe-famIy resi- dence and aI acces- sory strucbns and uses are not pr0- posed to be located witin. the distances Identified In Table 3-3. below. 110m .the estimated wetland boundary. B. SUbdivisions 'and Short SUbdivisions. The requke- ment for a wetland deIftea- tion and special report 'Will be waived for subcIvisions and short subdivisions of an existing lot of reconIlf field Investigation by Comly staff Indicates the~ 1. SUfticient Infonna6on exists for staff to estimate the b0un- daries of a weUand without a delineation; and 2. Building envelopes or building setback lineS are not proposed to be located within the L()G ITErv1 UniIied Development Code # __' Section 3 . Land U:.e Districts Pat~~~ \ 1\ of v-t c=..___;_L 4 SECTION 3 . LAND USE DISTRICTS distances identified in Table 3-3, be/ow, from the estimated wetland boundary . Table 3-3. Minimum Wetland Buffers Necessary as part of Qualifying for a Waiver from Delineation and, Special Report Requirements.t1,2.3) I " III IV Required Distance from Estimated Wetland Boundary (feet)'41 225 150 75 37 tained. Such separation may consist of logs, a tree or hedge row, or other prominent physical marking approved by the Administrator. ii. Buffer perimeters shan be marked with temporary signs at an interval of one per parcel or . every one hundred (100) feet, whichever is less. Signs shall remain in place prior to and during approved construction activities. The signs shall contain the following statement "Wetland & Buffer - Do Not Remove or Alter Existing Native Vegetation." iii. In the case of short plat, long plat, binding site plan, and site plan approvals under this Code, the applicant shall include on the face of any such instrument the boundary of the wetland and its buffer. iv. The applicant may also choose to dedicate the buffer through a conservation easement or deed restriction that shall be recorded with the Jefferson County . Auditor. Such easements or restrictions shall, however, use the forms approved by the Prosecuting Attorney. (5) Buffers - Standard Requirements. The following buffer provisions shall apply: i. Buffer areas shall be required to provide sufficient separation between the designated wetland and the adjacent proposed project. ii. The appropriate width of the wetland buffer shall be determined by either: application of the standard buffer widths. set forth below in Table 3-4; or by variations to the standard buffers as allowed in Sections 3.6.9(d)(6), 3.6.9(d)(7), or 3.6.9(d)(8), below. iii. Buffers shall remain naturally vegetated except where the vegetation has been disturbed, invaded by highly undesirable Wetland Category Notes: 1. These buffers are one part of the compl~te requirements necessary to qualify for a waiver. See Section 3.6.9.d.2 above. 2. These are not starldanJ weUand buffers: they are optional buffers for cases when a delineation is not made. These minimum waiver buffers, shown in Table 3-3, are 1.5 times the standard buffer widths identified in this section. If a single-family residence, building envelope, or setback line in a subdivision is proposed to be closer to the weUand than the distance identified in the table, a weUand delineation report must be performed. ' . 3. The same opportunities for exemption from delineation shall apply to uncategorized weUands. The Department of Community Development shall be responsible for detennining the weUand category. 4. The following shall not be located within the distances identified in the table: 1) single-family residences and an accessory structures and uses; 2) subdivision building envelopes and setback lines. (3) Drainage and Erosion Control. An applicant submitting a project application shaD also submit, and have approved, a drainage and erosion control plan as specified in this Section. The plan shall discuss, evaluate and recommend methods to minimize sedimentation of designated wetlands during and after construction. (4) Buffer Marking. Upon approval of the delineation report the location of the outer extent of the wetland buffer shall be marked in the field as follows: i. A permanent physical separation along the upland boundary of the weUand buffer area shall be installed and permanently main- Unified Development Code Section 3 . Land Use Districts # P'~l'g.~ d,.. ,,;;' LOG ITEM ( {<X of 2F% 3-31 SECTION 3 . lAND USE DISTRICTS Table 3-4. species (e.g., noxious weeds), or would substantially benefit from the increased diversity of introduced species. Where buffer disturbance has occurred during construction, replanting with native vegetation shall be required. Minor pruning of vegetation to enhance views and removal of undesirable species (e.g., alders) may be permitted by the Administrator on a case-by-case basis. iv. All buffers shall be measured perpendicularly from the wetland boundary as surveyed in the field. Standard wetland buffer widths shall be as established in Table 3-4. Standard Buffer Widths for Wetlands Standard Buffer Width v. Wetland Category I 150 ft " 100 ft III 50 ft W 25ft (6) Reducing Buffer Widths. The Administrator may reduce the standard wetland buffer widths, when the project applicant demonstrates both of the following to the satisfaction of the Administrator: i. Standard wetland buffer width averaging as set forth in this section is unfeasible. ii. The project application includes a buffer enhancement plan using native vegetation which sub- stantiates that an enhanced buffer will improve the functional attributes of the buffer to provide additional protection for func- tions and values. (7) Increasing Buffer Widths. The Administrator may increase the standard wetland buffer widths when a larger buffer is necessary to protect wetland functions and values based on local conditions. This determination shall be made only when the 3-32 Department demonstrates anyone of the following through appropriate documentation: i. A larger buffer is necessary to maintain viable populations of existing species. ii. The wetland is used by species listed by the Washington State Deparbnent of Wildlife as endangered, threatened, or sensitive, or has documented priority species or habitats or essential or outstanding poten- . tial habitat for those species, or has unusual nesting or resting sites (e.g., heron rookeries and raptor nesting trees). iii. The adjacent land is susceptible to severe landslide or erosion, and erosion control measures will not effectively prevent adverse wetland impacts. iv. The adjacent land has minimal vegetative cover or slopes greater than forty-five (45) percent. (8) Averaging Buffer Widths. The Administrator may modify the standard wetland buffer widths set forth in this section by averaging. Buffer width averaging shall be allowed only when an individual or firm meeting the criteria of. Subsection 3.6.10(j)(2) demonstrates all of the following to the satisfaction of the Administrator: i. Width averaging will not adversely impact the wetland functional values. ii. The total area contained within the wetland buffer after averag- ing is. not less than that contained within the standard buffer prior to averaging. iii. The standard buffer width has not been reduced by more than twenty-five (25) percent. e. Non-Compensatory Enhancement. Non- compensatory enhancement are those wetland enhancement projects which are conducted solely to increase the functions and values of an existing wetland and which are not required to be conducted pursuant to the mitigation requirements of Section LOG ITEM ,} 'f<~ ~'\....:... #t j ~'''' ~of i' ,)Jr. ".~"', . ~'I>;\ Gt':"A':~'':;1' ""..,f Unified Development Code Section 3 . Land Use Districts SECTION 3 . lAND USE DISTRICTS 3.6.9.f, below. There are two types of n0n- compensatory enhancement: ' (1) Type 1 Non-Compensator Enhancement. Type 1 non- compensaIory enhancement projects involve 1he filing, draining, or excavating of a regulated wetland. AI applications for Type 1 non- compensaIory enhancement projects shaD be accompanied by an enhancement plan prepared In accordance with subsections (1)i-.i, below, which demonstrates that 1he proposed activities wit result in an increase in wetland functions and values. l. The enhancement plan must ,be submitted for review and approval by the Administrator: Ii. The enhancement plan must either be prepared by a qualfied wetlands consultant or accepted In writing by 1he U.S. Fish and Wildlife Service, the Washington Department of FISh and Wildlife, or the Washington Oeparbnent of Ecology. (2) Type 2 Non-Compensatory Enhancement. . Type 2 non- compensaIory enhancement projects involve wetland alterations that do not include 1he filing, draining, or excavating of a regulated wetland. Such projects might involve the removal of non-native plant species or the planting of native plant specles. All applications for Type 2 n0n- compensatory enhancement projects shaft be accompanied by an enhancement plan prepared in accordance with SUbsections (2)i-.iii. below, which demonstrates that the proposed ac(ivities wit result 'in an Increase in wetland functions and values. - - I. ' The enhancement plan shaD be submitted for review and approval by the Administrator; Ii. The enhancement plan must Include a detailed description of the activity including the following Information: A. The goal of the enhanc&- ment project; B. What plants, if any, will be removed or planted; C. How the activity will be conducted, including the type(s) of tools or machln- ery to be used; and D. The qualifications of the irdviduaI who wiI be conducting the enflarK>>. moot activity. ' Iii. The enhancement plan must either be prepared by a qualified weUands consultant or accepted " In writing by the U.S. FISh and Wildlife Service, the Washington Depar1ment of FISh and Wildlife, or the Washington Department of Eco1ogy. f. Mitigation. The overaD goal of mitigation shaD be no net loss of wetland function, value, and acreage. (1) Mitigation . Sequence. Mitigation . includes avoiding, minimizing, or c:ornpensatinQ. for adverse impacts to regulated wetlands or their buffers. When a proposed use or development activity poses potentially significant adverse inpacts to a regulated Wetland or its buffer, the preferred sequence of mitigation as defined below shaD be followed. unless the applicant demonstrates that an overriding public benefit would warrant an exception to this preferred sequence. l. Avoiding the Impact altogether by not taking a certain, action , or parts of actions on that portion of the site which contains the regulated wetland or Its buffer; ii. Minimizing inpacts by limiting the degree or magnitude of the action and Its implementation; iii. Rectifying the impact by repairing, rehabititating, or restoring the affected environment; Iv. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; or , v. CompensatIng for the Impact ~ replacing, enhancing, or provid- Unified Development Code Sec60n 3 . Land Use Districts LOG ITEM # I Page 20 of~_ 3-33 SECTION 3 . lAND USE DISTRICTS , . ing substitute resources or enviroNnents. (2) Compensatory Mitigation-General Requirements. As a condition of any permit or other approval aIowing alteration which results in the loss or degradation of regulated wetlands. or as an enfon:ement action pursuant to Section 10 of this Code, compensatofy mitigation shaI be required to offset impacts resulting from the actions of the appIcant or any Code violator. i. Except persons exempt under this Section, any person who aItsIs or proposes to alter regulated welIands shaD restore or create areas of weUand equivalent to or larger than those altered in order' to compensate for wetland losses. The foIowing Table 3-5 specifies the ratios that apply to aeation or restoration which is in-kind, on-site, and is accomplshed prior to or concurrenOy with alteration: Table 3-5. Required Replacement RatIos for CompensatoryWetland Mitigation. Wetland Category Replac8ment Ratiott, 6:1 3:1 2:1 2:1 1.25:1 I II or III · Forested . Saub-Stvub . Emergent IV Note: 1. The first number In the ratio specifies the acreage of wetlands 10 be created. and the second number specifies the acreage of weUands proposed 10 be altered or lost. The replacement ratios are derived from Department of Ecology PublIcation No. 97-112 (1998): -..tow EooIogy Regulates WeUands: 2. Enhancement of astIng wetlands, may be cOllsldered as compensation; but above ratios must then be doubled. -:. 3. Compensation must be completed prior to weUand destruction, where possible. 4. Compensatory mitigation must follow an approved compensatory mitigation plan pursuant to this section, with the replacement ratios as specified above. 5. Compensatory mitigation must be conducted on property which wiI be protected and managed 10 avoid fur1her development or degradation. The appIcant or Code violator must provide for long-term preservation of the compensation area. 3-34 6. The appIcant shall demonstrate suIIicient scientific expertise, supervisory ~, and financiat resom:es, Including bonding, 10 carry out the project. The appIicaIlt must demonstrate the capability for monitoring the site and making oorrections if the project fails 10 meet projected goals. (3) Compensatory Mitigation - Type. Location. and nmlng. i. . Priority will be given to in-Idnd, on-site compensation If feasible and if the wetland to be lost has a moderate to high functional value. i. When the wetland to be impacted is of a limited functional value and is degraded, compensation may be of the wetland community type most likely to succeed with the highest functional value possible. iii. Out-of-kind compensation may be allowed when out-of-kind replacement wiD best meet identified goals (for example. replacement . of historically diminished wetland types). Where out-of..ldnd replacement is accepted, greater acreage replacement ratios may be required to compensate for lost functional values. iv. Off-site compensation can be allowed only if: A. On-site compensation is not feasible due to hydrology, soils, waves, or other factors; B. On-site compensation Is not practical due to probable adverse impacts from surrounding land uses; C. Potential functional values at the site of the proposed restoration are significanUy greater than the lost wetland functional values; or D. Off-site compensation will be conducted in accordance with Section 3.6.9.f(4) (Cooperative Compensation Projects). LOG ITEM Unified Development Code Section 3 . Land Use Districts Amended by Onfmance No. 05-0428-03 # Pag;;) ~\ . of . , v. Except in the case of cooperative compensation projects, off-site compensation must occur within the same watershed where the weiland loss occurs, provided that Category-IV wetlands may be replaced outside of 1I1e watershed if there is no reasonable technical alternative. The stormwater storage function provided by Category-IV wet- lands must be provided for within the design of the development project. vi. Except in the case of cooperative compensation pr0- jects, in selecting compensation sites applicants must pursue locations in the following order of preference: A. Filled, drained, or cleared sites which were formerly wetlands and where appro- priate hydrology exists; and B. Upland sites, adjacent to wetlands, if the upland is significantly disturbed and does not contain a mature forested or shrub com- munity of native species, and where the appropriate natural hydrology exists. vii. Construction of compensation projects must be timed to reduce impacts to existing wildlife and flora. Construction must be timed to assure that grading and soil movement occurs during 1I1e dry season. Planting of vege- tation must be specifically timed to 1I1e needs of the target species. (4) Cooperative Compensation Projects. The County may encourage, facilitate, and approve cooperative projects where one or more applicants, or an org~tion with demonstrated capability, may undertake a compensation project if it is demonstrated that i. Creation of one or several larger wetlands may be preferable to many small wetlands; Unified Development Code Section 3 . Umd Use Districts Amended by Ordinance No. 04-0422-02 SECTION 3 . LAND USE DISTRICTS ii. The group demonstrates the organizational and fiscal capability to act cooperatively; iii. The group demonstrates that long term management of the compensation area can and will be provided; and Iv. There is a clear potential for success of the proposed com- pensation at the identified compensation site. Conducting compensation as part of a cooperative process does not reduce or eliminate the required replacement ratios outlined in this Section. 3.6.10 Special Reports. a. Waivers. The Administrator many waive the requirement for a special report when an applicant demonstrates aU of the following: (1) The proposal involved will not affect the environmentally sensitive area in a manner contrary to the goals, purposes and objectives of this Code. (2) The minimum protection standards required by this section are satisfied. b. General Contents. (1) Scale Map and Written Report. Special reports for environmentally sensitive areas shall include a scale map of the development proposal site and a written report. (2) Impacts Assessment. The special report shall identify and characterize any critical area as a part of the larger development proposal site, assess impacts of the development proposal on any environmentally sensitive areas on or ad"jaCeIlt to the development . proposal site, and assess the impacts of any alteration proposed for a critical area. (3) Protection Mechanisms. The special report shall propose adequate protection mechanisms that may include mitigation, maintenance and monitoring plans, and performance surety. (4) Preparer - Proof of Qualifications. Special reports shall include docu- mentation certifying the qualifications of the preparer. c. Consultants. (1) Retaining Consultants. Jefferson County may retain consultants to assist in the review of special reports LOG~'TEM 3-35 # t .- Page"~ 7~~of~ SECTION 3 . lAND USE DISTRICTS outside the range of staff expertise. The applicant shall pay for the costs of retaining said consultants. d. Responsibility. (1) General. Special reports shall include documentation certifying the quaftfica- tions of the preparer. (2) Determining Accuracy and Sufficiency. The Adminislrator shall verify the accuracy and sufficiency of all special reports. (3) Nonacceptance of Inaccurate or Insufficient Reports. If the Admini- strator finds that a special report does not accurately reflect site conditions, or does not incorporate appropriate protection mechanisms, the Admini- strator shall issue a report citing evidence (e.g., soil samples, well log data, etc.) that demonstrates where the special report is insufficient or in error. The applicant may then either revise the special report and submit another special report, or appeal the administrative determination pursuant to this Code. ' e. Aquifer Recharge Area Report. (1) General. Aquifer Recharge Area Reports serve as the primary means for Jefferson County. . to verify the accuracy of its Critical Aquifer Recharge Area map and to determine specific aquifer protection measures to be applied to prevent significant adverse groundwater quality impacts. (2) Aquifer Recharge Area Report Content M Initial evaluation shall be made by a qualified groundwater scientist/engineer. The Aquifer Recharge Area Report shall include: I. A detailed description of the project, inclucflng all processes and other activities which have the potential for contaminating groundwater. Ii. A hydrogeologic evaluation which includes, at a minimum: A. A description of the hydrogeologic setting of the aquifer region; B. Site location, topography, drainage, and surface water bodies; C. Soils and geologic units underlying the site; 3-36 LOG ITEM # P"':;;fl~ ~ 'h of ~...f., iJl.J# -..e=J (3) D. Groundwater characteristics of the area, inclUding flow direction and gradient, and existing groundwater quality; E. The location and charac- teristics of wells and springs within one thousand (1,000) feet of the site; F. M evaluation of existing groundwater recharge, and; G. A cflScussion and evaluation, of the potential impact of the proposal upon groundwater recharge. iii. A contaminant transport analysis for the uppermost groundwater supply aquifer assuming an accidental spill or release of project specific contaminants or on-site sewage discharge, or both if applicable; Iv. A discussion and evaluation that details available on-site spill response and containment equipment, employee spill response training, and emer- gency service coordination measures; v. Proposed beSt management practices to minimize exposure of permeable surfaces to potential pollutants and to prevent degradation of ground- water quality; and;- vi. Requirements for a monitoring program with financial guarantees/assurances that the monitoring program will be implemented. Professional Qualifications. The minimum qualifications for ground- water scientists and engineers performing groundwater and con- taminant transport evaluations and preparing Aquifer Recharge Area Reports shall be established pursuant to acceptable industry standards for training and experience and as established by the State of Wash- ington in the Washington Admini- strative Code or by statute. County Review. Reports shall be forwarded to the Jefferson County Environmental Health Division for technical review. The Environmental (4) Unifielj Development Code Section 5 ~ Land Use Districts Amended by OrdilUlllce No, 07-1224-01 . . SECTION 3 . lAND USE DISTRICTS Health Division shall review the Reports within thirty days of receipt to determine their adequacy. The County may request additional information in order to determine the adequacy of the Reports. The Administrator shall determine appropriate conditions as identified in the Report to mitigate proposed land uses. The Administrator shaD be authorized to collect fees necessary to recover costs associated with processing and review of Aquifer Recharge Area Reports, implementation of the protection standards contained in this section, and administration of the general provisions of the Aquifer Recharge Area provisions of this Code. Such fees will be incorporated into the Jefferson County Fee Schedule. f. Drainage and Erosion Control Plan. (1) General. This plan shall address best management practices which are physical, structural or managerial practic;es, that when used singly or in combination, prevent or reduce pollution of water. (2) Qualifications of the Preparer. Drainage and erosion control plans shall be prepared by a licensed professional engineer, except for small parcel erosion control plans. (3) Information Requirements. The design standards and information requirements for submission of drainage and erosion control plans shall be established in accordance with the Department of Ecology's Stormwater Management Manual currently adopted by Jefferson County. g. Geotechnical Report. (1) General. This report shall include a description of the geology of the site, conclusions and recommendations regarding the effect of geologic conditions on the proposal, and opinions and recommendations on the suitability of the site to be developed. (2) Qualifications of the Preparer. Geotechnicaf reports shall be prepared by a licensed geotechnical engineer, a professional geologist, or a licensed professional engineer knowledgeable in regional geologic conditions with professional experience in landslide. erosion, or seismic hazard evaluation. (3) Information Requirements. i. A description of the geologic setting of the region, based upon readily available data, including: A. Site location and topography; B. Soils and geologic units underfying the site; and C. The location and charac- teristics of springs within one thousand (1,000) feet of the site. ii. An evaluation of the potential impact of the proposal upon existing geological hazards. iii. A discussion and evaluation of the potential impact of the proposal upon existing geological hazards. iv. Recommendations on appro- priate protection mechanisms, if necessary, to minimize the risk of erosion or landslide. h. Grading Plan. (1) General. This plan shall identify the proposed development project including the movement of material onsite, along with the proposed and existing contours of the site, and cross-sections thereof. (2) Qualifications of the Preparer. Grading plans shall be prepared by a rtcensed professional engineer or an indMdual with at least three years experience in the preparation of grading plans who is knowledgeable of Unified Development Code Section 3 . Land Use Districts Amended by Ordinance No. 04-0422-02 - 3-37 LOG ITEM # 1 Pag2~,_02Lof ~<;~ SECTION 3 . lAND USE DISTRICTS . I sol conc:fdions and geology in Jefferson County. (3) Information Requirements. i. A description of the generai vicinity of the proposed site. ii. The property limits and accurate contours of existing ground and . details of terrain and area drainage. iii. limiting dimensions, elevations of finish contours to be achieved by the grading, and proposed drainage channels and related construction. iv. Detailed plans of all surface and subsurface drainage devices, walls, cribbing, dams and other protective devices to be con- structed with, or as a part of, the proposed work together with a map showing the drainage areas and the estimated runoff of the areas served by any drains. v. The location of any buildings or structures on the property where the work is to be perfonned and the location of any buldings or structures on land of adjacent owners that are within fifteen (15) feet of the property or which may be affected by proposed grading operations. ' vi. A discussion and evaluation of the. potential impact of the proposed grading upon desig- nated critical areas. vi. Recommendations on appro- priate protection mechanisms, if liecessary, to prevent degrada- tion of designated critical areas and to ensure pubrlC safety. i. Habitat Management Plan (1) General. This report shan identify how the development impacts of the proposed project will be mitigated. The Washington Department of Fish and Wildrlfe Priority Habitat and Species Management Recommendations shall be the basis for this report. (2) Qualifications of the Preparer. Habitat management plans shaH be prepared by persons who have a minimum of a Bachelor's Degree in 3-38 Wildlife or FISheries Habitat Biology, or a related degree in a biological field from an accredited coHege or university with a minimum of four YeatS experience as a practicing fish or wikIife habitat biologist. (3) Information Requirements. i. A map(s) prepared at an easily readable scale, including the following information: A. The location of the proposed development site, ~ncJuding property limits; B. The relationship of the site to surrounding topographic and cultural features; C. The nature and density. of the proposed development or land use change; D. Proposed building locations and arrangements; and E. ~e boundaries of forested areas. ii. A legend that includes the foUowinQ information: A. A complete and accurate legal description as pre- scribed by the triggering application fonn (the description shaH include the total acreage of the parcel); B. Title, sCale and, north arrows; C. Date, including revision dates, if applicable; and D. Certificates by' a professional biologist as appropriate. iii. A report that contains the following information: A. A description of the nature, density and intensity of the proposed development in sufficient detal to allow analysis of such land use change upon identified fish and wildlife habitat; B. The applicanfs analysis of the effect of the proposed development, activity or land use change upon the fish or wildlife species LOG ITEM # r:. Jl"".....'...,-. '~2:b . r~ "ri,'''':'. >:,..."......1 ""'.:::$""'. Unified Development Code Section 3 . Land Use Districts of " .. . SECTION 3 . LAND USE DISTRICTS identified by the Washington Department of Fish and Wildlife within the identified priority habitat, utilizing the management guidelines; C. A plan by the applicant that shall explain how any adverse impacts created by the development will be mitigated. iv. Possible mitigating measures that may include, but are not limited to: A. Establishment of buffer zones; B. Preservation of critically important plants and trees; C. Umitation of access to habitat area; D. Seasonal restriction of con- struction activities; and E. Establishing a timetable for periodic review of the plan. j. Wetland Delineation Report. (1) General. This report shall be required when a proposed development encroaches upon a designated wetland or its buffer, and shall be used to identify the boundaries and classification of the designated wetland. (2) Qualifications of the Preparer. Wetland delineation reports shall be prepared by either a biologist with wetlands expertise, or an individual or firm who has been certified by the United States Army Corps of Engineers, Region 10, to perform wetland delineations. (3) Information Requirements. i. A map(s) prepared at an easily readable scale, including the following information: A. Wetland boundaries; B. Sample site and sample transects; C. Boundaries of forested areas; and D. Boundaries of wetland classes if multiple classes exist ii. A legend that includes the following information: A. A complete and accurate legal description. as pre- scribed by the triggering application form (the description shall include the total acreage of the parcel); B. TrtIe, scale and north arrows; C. Date, including revision dates, if applicable; and D. Certificates by a pro- fessional biologist as appropriate. iii. A report that contains the following information: A. A discussion of the delineation methods and results, with special empha- sis on technique used from the Washington State Wetlands Identification and Delineation Manual, March 1997, or as amended hereafter; B. A description of relevant site information acquired from the National Wetland,lnven- tory maps and the Soil Survey for Jefferson County; C. The acreage of each wetland on the site, based on the survey, if the acreage will impact the buffer size determination or the project design; and D. All completed field data sheets numbered to cor- respond to each sample site. E. Project cross sections, both before and after completion, in relation to the surface elevation of the wetland must be indicated for proposed activities which involve cutting or filling operations within the wetland or its proposed buffer. Unified Development Code Section 3 . Land Use Districts LOG ITEM # I Pagadh .ofJIi. 3-39 SECTION 3 . LAND USE DISTRICTS ... . ~ ... ... F. Classification of the wetland in accordance with the standards adopted in this Section and a detailed written analysis of the existing regulated wetland including: vegetation com- munities classified per the U.S. Fish and Wildlife Service Classification of Deepwater Habitats (1979); species ~mpositiQrl of vegetation communities, including presence and percent cover; existing soils; and existing hydro- logic conditions including inflow/outflow, source of water within the system, relative water quality, and seasonal changes in hydro- logy, if applicable. G. A detailed analysis of wildlife species use of the wetland and its buffer. H. A detailed analysis of the e~ng wetland buffer including species compo- sition and perCent coverage, whether the buffer is disturbed or not. and the functional value of the buffer in relation to the regulated wetland. I. If the development activity would eliminate all or part of a regulated wetland then a detailed compensatory miti- . gation plan as outlined in Section 3.6.10.j(4), below must be provided. (4) Mitigation Plan Contents. All wetland restoration, creation, and enhance- ment projects required by this Code, either as a condition of project approval or as the result of an enforcement action, shall follow a mitigation plan prepared by a qualified specialist as defined herein and conducted in accordance with the requirements described in this Code. The applicant or violator must receive written approval of the mitigation plan by the Administrator prior to com- mencement of any wetland restoration, creation, or enhancement activity. 3.6.11 Airport Essential Public Facility District (A). a. Purpose. The purpose and intent of this section is to regulate land uses within the -Airport Essential Public Facility" overlay district in 'order to encourage orderly economic development in a manner compatible with airport operations and adjacent properties and to protect existing general aviation public use airports from conflicting or incompatible adjacent land uses or activities. b. Designation. The overlay district (see Official Comprehensive Plan Map) applies to all Port of Port Townsend owned property within the Jefferson County International Airport (JCIA). The JCIA is a general aviation airport that provides recreational, business, flight training, charter and air taxi services and other uses. c. Allowable and Prohibited Uses. All new development within the Jefferson County International Airport shall be restricted to uses which are clearty identified as aviation support facilities or aviation related . development (1) Aviation Support Facilities. Aviation Support Facilities are those uses which directly support flight operations and the operation of the Jefferson County Airport, and include, but are not limited to: . i. Passenger service terminals, including food service; ii. Navigational aids; iii. Runway aprons; iv . Terminal buildings; v. Hangars; vi. Fuel storage facilities; vii. Operations/maintenance facilities; VIII. Automobile parking. (2) Aviation Related Development: Aviation Related Development are those uses which are reliant upon the airport for their businesses, which include but are not necessarily limited to: i. Aircraft repair facilities; LOG ITE~:A ~,,' \ "11- F.. J"~".w::) d:L' (;;'f"L 'rlt a"'...."""".! ~ Q - .~.- 3-40 Unified Development Code Section 3 . Land Use Districts .' --,- "~ H"-~&. " ~ --.--'-----.-- ~"D. .~___ _;-___. ._ .o...lr=.r.:&. _ ..____.. ---- . -. -----Ht--c--- ~----- --~=-~~~~ .~~~_:==,--~ .-~----.---.--J~ 'f ----- o. "~,~__.__ . t ~,_ ----- -+ --.---.- -1' ------- --'--'---' - ------- --- ,- - 1_____,-_._-,-, -.-------------.,-- t __ _ ___ ___ . . - -----~---------+-_._~- --=---- ~-~-~-------------+~=-. -=- H_____'===_j. . ___ .. -== __=~~'_ -- t + --------- ---, -'._-,._- - --- - - - -f~'-~,~-------- - --,.--.- ----".---.-'--..-'-.=1.= · LOGlTEfVf _________--c--- .#.. \ _ ..-- - 1 I ,PaQc~ of dSf? _---- ----.- . ';i)> ., " JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT UNIFIED DEVELOPMENT CODE TYPE I LAND USE PERMIT APPLICANT: FREDERICK A FORSTER 15922 SE 42ND PL BELLEVUE WA 98006 DATE ISSUED: April 10, 2003 DATE EXPIRES: April 10, 2008 MLA NUMBER: MLA03-00098 PROJECT PLANNER: S HOSKINS PROJECT DESCRIPTION: ROAD APPROACH & 911 - BECKETT POINT RD Site Plan Approval Advance Determination (SPAAD) PROJECT LOCAnON: Parcel numbers 931 970023 and 002231 001, Beckette Point South Beach Annex, Lot 35, in Section ~3, Township 30, Range 02 West, WM, located on Beckett Point Rd, Port Townsend, WA 98368 - FINDINGS: 1.) The Administrator finds that this application complies with applicable provisions of the Unified Development Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County Comprehensive Plan and Land Use map. 2.) The application was reviewed by the Jefferson County Department of Community Development staff on March 12, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Suburban Shoreline, Fish & Wildlife Habitat (Blue Heron), Wetlands, Seismic Hazard, Flood, Susceptible Aquifer Recharge Area, Coastal Seawater Intrusion Protection Zone (SIPZ). 3.) Washington State Department of Fish & Wildlife offered no comment on the application. The site is cleared, and the proposal will not conflict with blue heron habitat. 4.) The wetlands are located opposite Beckett Point Rd from the subject parcel. The Administrator determined the wetland buffer value is negated at the road. 5.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 6.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 7.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms. 8.) Buffers are areas that shall be maintained in their natural condition, however, minor pruning or alteration of vegetation may be permitted as long as the function and character of the buffer are not diminished. 9.) Among the native conifer species which may be used in buffers or for re-vege~tion include, but are not limited to: Grand Fir (Aibes grandis), Sitka Spruce (Picea Sitchensis), Shore Pine (Pinus Contorta), Douglas Fir (Pseudotsuga Menziesii), Western Red Cedar (Thuja Plicata), and Western Hemlock (Tsuga Heterophylla). Among native tree species which may be used includes: Vine Maple (Acer Circinatum), Big-Leaf Maple (Acer Macrophyllum), Red Alder (Alnus Rubra), Pacific Madrone (Arbutus Menziesii), Quaking Aspen (Populus Tremula), Black Cottonwood (Populus Trichocarpa), Bitter Cherry (prunus Emarginata), Oregon White Oak (Quercus Garryana), Cascara (Rhamnus Purshiana), Pacific Willow (Sa/iz Lasiandra1,.. an. d SCO. uler's Willow (Saliz Scouleriana). LOG iTEM I p(;f~i;i~:-3 0 ___of ~)f ,( <t Among the native shrub species which may be used are: Sevice-Berry (Amalanchier Alnifolia), Red Osier Dogwood (Comus Stolonifera) Salal (Gaultheria Shallon), Ocean Spray (Holodiscus Discolor), Indian Plum (Oemlaria Cerasiformis), Pacific Ninebark (Physocarpus Capitus), Red Flowering Currant (Ribes Sanguineum), Wild Rose (Rosa Nutkana), Swamp Rose (Rosa Pisocarpa), Willows (Salix ssp.), Red Elderberry (Sambucus Racemosa), Snowberry (Symphoricarpos Albus), Evergreen Huckleberry (Vaccinium Ovatum), Red Huckleberry (Vaccinium Parvifolium). 10.) Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwaterlfreshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer. 11.) The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permil applications on existing lots of record. . ~... A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mgll in groundwater sources within 1000 feet. ' - 12.) The standard setback for residential structures, including common appurtenant structures such a$ garages anc workshops, shall be thirty (30) feet or one (1) foot for each foot of bank height, whichever is greater. This setback shall be measured from the bank's edge when the bank's height exceeds 10 feet. When the bank's height is less than 10 feet, the setback shall be measured from the ordinary high water mark. The setback shall not exceed 100 feet. 13.) The proposal was reviewed against the site plan determination criteria of the Unified Development Code (Section 8.7). The criteria for approval is as follows: 1. The proposed site plan conforms to all applicable county, state, and federal land use, environmental and health regulations and plans, including but not limited to the following: The Jefferson County Comprehensive Plan and the provisions of the Unified Development Code. Staff comment: The application was reviewed for consistency under the proviSions of the Unified Development Code, Comprehensive Plan, and Shoreline Master Program. The application was found in compliance with all ordinances pertaining to the proposed development. 2. Adequate provisions for utilities and other public services necessary to serve the needs of the proposed site plan have been demonstrated, including open spaces, drainage ways, roads, and other public ways, potable water, sewerage disposal, fire flow and other improvements. Staff comment: The proposal was not reviewed for open space as the parcel is approximately 3,167 square . feet (0.072 7 acres) in size. This SPAAD has not been reviewed for adequacy of sewerage disposal. Jefferson County Department of Environmental Health commented on the application on March 18, 2003 and determined the 20 foot building setback from the road should be adequate to allow tanks and a driveway assuming the parcel connects to the future community drainfield. Environmental Health also noted no plans are currently before the county to instal the community drainfield and the number of bedrooms allowed to connect is not known. PUD #1 completed a Water Availability Notification May 3, 2003 for Lot 35 of Beckett Point Beach Annex. This connection is required prior to building permit final sign off and would fulfill the requirements for potable water and fire flow. Beckett Point Rd is a county local access road. A road approach permit (RAP03-00049) was reviewed under this application. An address of 1024 Beckett Point Rd has been assigned to the parcel. The applicant shall adhere to the Washington State Department of Ecology Stormwater Management Manual for stormwater control. 3. The probable significant adverse environmental impacts of the proposed site plan, t~~r ~'h8J1. ny . practical means of mitigating adverse impacts, have been considered such that the pr~.' JlWMve an unacceptable adverse effect upon the quality of the environment, in accordance w, the State Environmental of .---- . > ..... Policy Act (SEPA) implementing the provisions contained within Section 8 of this Code and Chapter 43.21 C RCW. Staff comment: Single family residences are EXEMPT from the State Environmental Policy Act (SEPA). WAC 197-11-800(1 )(b)(i) identifies the construction of any residential structure of four (4) dwelling units. 4. Approving the proposed site plan will serve the public use and interest and adequate provision has been made for the public health, safety and general welfare. Staff comment: The proposal will not affect the public health, safety, and general welfare. 14.) The revised site plan as submitted with the Site Plan Approval Advance Determination (SPAAD) application on March 18, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped approved site plan dated February 2, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 15.) This approval is for a SPAAD only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and cOnditions which may be placed on future permits. CONDITIONS: 1.) All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials. , 2.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, durin,g-construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the puget Sound Basin. 3.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 4.) VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets; faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). 5.) Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be . illustrative of the types of water conservation measures. VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: 1. Installation of a flow meter, 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: - a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. Flood proofing measures are to be used as required by the Jefferson County Flood Damage Prevention Ordinance. All new construction shall use construction methods which minimize flood damage. New construction shall have the lowest floor elevated to at least one foot above base fI~a~1\ If Fully enclosed areas below the lowest floor that are subject to flooding are prohibit urheW ~s ~ automatically equalize hydrostatic flood forces on exterior walls by allowing for the ~try and exit f floodwater. Pag<~:.3t _ot~~ 6.) 7.) 8.) 9.) 10.) , . Designs for meeting this requirement must either be certified by a registered professional engineer or architect or must meet or exceed the following criteria: a. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. b. The bottom of all openings shall be no higher than one foot above grade. c. Openings may be equipt with screens, louvers, or other coverings or devices provided that they permit the automatic entry and exit of floodwater. 11.) All new construction shall: a. be anchored to prevent flotation, collapse, or lateral movement of the sturcture. b. be constructed with materials and utility equipment resistant to flood damage and potential damage to adjacent properties. c. be constructed using methods and practices that minimize flood damage. d. have structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. e. electrical, heating, ventilation, plumbing, air-conditioning equipment, and other service facilities shall be designed and/or othelWise elevated or located so as to prevent water from entering or accumulating within the components during conditions of flooding. 12.) Flood proofing of structures shall be provided by one or more of the following methods: a. Landfill: (Note: Landfills are not permitted in the f1oodway.) The placement offill may be utilized to elevate the structure and must comply with the standards and poliCies of the Jefferson County Shoreline Master Program, if applicable. b. Pole, pier or piling construction: The use of poles, piers, or piles for the foundation of the structure may be used to allow the unrestricted flow of flood waters during periods at a base flood. The lowest floor must be one foot above the base flood level. c. Parallel Foundation Walls: Foundation walls may be designed and constructed to provide open spaces through which water can flow unrestricted to equalize pressure. In velocity flood situations, it is important that all foundation walls be parallel to the flow of the floodwaters. d. Extended Foundation Walls and Basements: (Note: Extended foundation walls and basements are not permitted in the f1oodway.) The lowest habitable floor of a residence may be constructed on foundation walls that extend above grade to one foot above the height of the base flood provided that residential construction complies with the requirment of Section 5.101 (2), -Residential Construction; regarding the design of enclosed areas. 13.) Utilities shall be designed as specified in Section 5.20 of Ordinance No. 18-1120-95. - 14.) Upon submittal of a building permit application, the applicant must provide a flood elevation certificate. 15.) Duration of Approval - Several of the included findings shall become conditions upon the submittal of a building and septic permit. The duration of approval of the Site Plan shall be effective for five (5) years from the date of original approval by the Administrator. If a building permit has not been issued within the five (5) year period, the Site Plan Approval Advance Determination (SPAAD) cannot be revived or extended except by new application that must meet all the existing criteria and conditions listed in this Section. Knowledge of the expiration date shall be the responsibility of the applicant. The county will not provide notification prior to expiration. '# Limitations of Approval - Approval of the site plan shall not guarantee the performance of specific site features or improvements (e.g. wells, septic systems, stormwater drainage facilities, etc.) and shall not be immune from changes in state or federal law which are enacted or have an effective date after the date of ths Site Plan Approval Advance Determination (SPAAD) and which may affect the performance and implementation of the site plan and associated use or activity. Any subsequent land division or boundary line adjustment of a parcel or lot which has received site plan approval advance determination under this Section 8.7 shall void soch site plan approval and require a new site plan approval advance determination application. Approval of a site plan under this section does not constitute authority to comence any development or building activity until such time as final authorizing permits are issued (e.g., septic, wells, stormwater management, or building permit, etc.). Modification to an approved site plan may be required by the applicant and approved by the Administrator subject to the provisions for Type I decisions. (Please request a copy of Section 8.7 of the UDC for criteria pertaining to modifications). 16.) The applicant shall.adhere to the Department of Ecology Stormwater Management Manual at time of development application. 17.) A minimum of two (2) on-site parking spaces are required for the single family residence. 18.) Maximum building height is 35 feet. 19.) Total impervious surface coverage shall not exceed 25%. Impervious surface includes driveways, rooftops, concrete, etc. Pre-existing legal lots of record less than one acre in size in Rural Residential Districts are subject to the stormwater requirements in UDC Section 6.7 and must meet the -Area of Impervious Surface Coverage- to the maximum extent practicable as determined by the Administrator. - 20.) Minimum setback from the parcel boundary adjacent to Beckett Point Rd is 20 feet. Minimum setback from Ordinary High Water Mark is 30 feet. Minimum side setbacks are 5 feet. 21.) THIS SPAAD IS ONLY VALID IF A COMMUNITY DRAINFIELD FOR BECKETT POINT IS INSTALLED AND MADE AVAILABLE TO LOT 35 OF BECKETT POINT SOUTH POINT BEACH ANNEX. THIS SPAAD APPROVAL SHALL BE CONSIDERED NULL AND VOID WITHOUT A SEWER CONNECTION. LOG ITEM F)a.gs?: of . " ., NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development. Development pursuant to this permit shall be undertaken subject to the applicable development and performance standards of the Jefferson County Unified Development Code. If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Adminis1rator shall be notified at once. The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that "takes" listed spedes (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as "critical habitat" for a listed spedes. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following: - Set back buildings, utilities and roads as far as possible from surface waters (streams, rivers, lakes, marine waters), or at least 150 feet from the edge of the water - All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters - Remove minimal vegetation for site development, especially large trees - Allow trees that have fallen into surface waters to remain there - Infil1rate stormwater from buildings and driveways onsite through drywells rather than discharging dintctly into surface waters or roadside ditches - Any individual, group, or agency can bring suit for a listed species "taking," even if you are in compliance with Jefferson County development codes. The risk d a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle at (206)526-6613, or the U.S. Fish and Wildlife Service at (503) 231-6121. APPEALS: Pursuant to RCW 36.70C, the applicant or any aggrieved party may appeal this final decision to Jefferson County Superior Court within twenty-one (21) calendar days of the date of issuance ofthis land use decision. For more informatio e ed to judical appeals see UDC Section 8.5.2. l'IE r\1 I 32- of;lS8 ._-- -- ~(/(JJ8b Z,.p,ry _- 9?L. -~ - :9Npfld f?'M '3(7/1 =rn;;rg l-;d q/VCp =1> Z~9/ - ~7...t~ Cl.32t;i C/"'r;'~;j -..If; 1J 'f- -.- .. . i;_ ~ y-.. Z' = -J-1 - :r7~ ",61 J. a 'fl'&7.?I ..t.NI~. .J-/.~ilgt '/";./ / II I' / I . -- e-/t2. K "-- ',/1 r;;JQ n: I .. aL(9 ..L-o;z,a;rdd- :;r~. rrff:;>ft3!td Of) ..!?~ -L t71 _./~ >: w ,.9 ::1;/s;. J _____ --,f ',~: r r ~.- f , I .... SS;; ..JC17 X:;;N~tr ~ #..t(1~ 1..JN/cx:I ..I-I.~ ~ ZC10t. b/~ b ()()(j).p n021ttcf : fvr;ud/';!/v~a' 7~ lN3~d0l3^3a ..uINn~~~o~ ~o 'ld30 AlNnOO NOSH3~~3r eooz Z HdY NV'ld g~IS a~AOHddV J.N3l'\1d013^30 AlINnllVr.lO:l :10 'ld AlNnOO NOSli3~:.!3r ..<<_. .. ~ t I \ ~'. ,,~' ':-""-'~i 0 I _.. ~ fA ~ ~ ~ c,~J ij' ........ . .........._ M..... ....__..__....._ ........... .......::...:-..... Ol;'i!'1;.I-Q7//<;7 ...~ i7d!:?IY~ ., \. , I ~(}/ u.?7 ,.9 l I I I i I I t _......-~...I I . f " I J f j , ' 1 I I f . -....- ,....- ,.- ;:::I'::Jrm~ ;f7;;~ ,t; ~. 1p~/Cl7/ne 7 -f:1'l.J.N.z.I.tJt:J, It i ~. i ~ .~ .2:. l~- ~ JOI 10) !~ ! , i , i ...in . 71t'/.l'/Y~/~a J./YiIV-tr..L::a f7 - -!7'E -' fT7 .J;.9 I I i I I I L~ /<1'i tf - e e 4-< '<:t 0 0 0 - N II) --- 1,0 ~ --- 0 ~ - - II) ~ ~ ~ Z [II 1,0 (") 0\ 00 II Cl ...... 1;'-. ~ cod S o o N o .... o ..s:::: fr I-< o ..s:::: ~ II) s:: ...... 'E .8 rll --- II) .... ...... rll .0 II) ~ rll ;::l d ~ l=i o ~ ~ (,j...l II) .- o' o LOG ITEM ~ # I ] Page ~1_'( of ~~E'i .r::1 M~O~m e e FEATURES NOT SURVEYED-002 231 001/BECKETT POINT Page 1 of 1 ::';;~"_""'~_"I FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Wed Oct 0614:09:522004 LOG ITEM # I Page 3.<) of g5K http:// gisserver/servlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovrnap&ClientV ersion=4. O&F orm=... 10/612004 Map Output e e Page 1 of 1 .;v' Legend Road System 0 AsMssor Map&-H 0 Parcels-H Boundaries 0 ~~ 0 w_ D 0II'a' Caorii!!s FOR INFORMATIONAL PURPOSES ONLY. , efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Wed Oct 1311:31:002004 LOG ITEM # I Page~_of{)'5R: http:// gisserver/servlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/1312004 Map Output e e Page 1 of 1 ;V Legend Road Syslam 0 Assessor Maps-H 0 Pan::els-H Boundaries 0 ~C<u1!y 0 w_ 0 0II'I!lr~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Wed Oct 13 11 :31 :002004 LOG ITEM #_.. I Pag€)3 7 ofL58 - http:// gisserver/servlet/com.esri.esrimap.Esrimap ?ServiceName=ovrnap&ClientV ersion=4.0&F orm... 10/13/2004 Assessor Detail Building #1 Page 1 of 1 Assessor Detail Building #1 Parcel Number: 931910003 Buildin Number 1 Buildin Exterior Building Type: CABIN Building Style: 1 STY Building Quality:AVERAGE Building Condition: FAIR Foundation: POST & BLOCK/PIERS Exterior: SIDING/STUCCO (LAP) Roof Cover:WOOD SHINGLE Buildin Rooms Bedrooms: 0 Full Baths: 0 Half Baths: 0 1st Addition ype: rea: 0 ear Built: 0 Exterior: Roof: Year Built 1945 Buildin Area 1st Floor Area: 375 2nd Floor Area: 0 3rd Floor Area: 0 Loft Area: 0 ttic Area: 0 otal Area: 375 Basement Area: 0 Mobile Home Make: Model: Length: Width: ear Built: kirting: rea: 0 2nd Addition Year Remodeled o Buildin Interior Int. Walls (Cabin): FINISHED INTERIOR WALLS Heat: WOOD ONLY/NONE 000 STOVE rade: FAIR Floor Cover (1): Floor Cover (2): Gena e To view another buildin associated with this arcel. Seled buildin ype: rea: 0 ear Built: 0 Exterior: Roof: 123 HOME I COUNTY INFO I DEPARTMENTS I SEARCH Best viewed with Microsoft Internet Explorer 6.0 or later eWLoQQ.w_s. - Mac ITEl\1 ( f~i'~i'.:;;~_~..._of ~~_ http://www.co.jefferson.wa.us/assessors/parcel/ assessordetail.asp ?ParceLNO=93191 0003 10/13/2004 Parcel Print Parcel Number: 931910003 Page 1 of 1 06/11/2004 OWner Mailing Address: BECKETT POINT FISHERMEN'S CLUB % DAVID G GOODING PORT TOWNSEND WA 983685717 Site Address: 555 BECKETT POINT RD PORT TOWNSEND 98368 Section: Qtr Section: Township: Range: Planning area: Sub Division: Land Use Code: 23 NE1j4 30N 2W Quimper (2) BECKETT POINT HWY HEIGHTS ADD 1100 - HOUSES (single units, non-farm) School District: Fire Dist: Tax Status: Tax Code: Port Townsend (50) Cape George (6) Taxable 161 Property Description: BECKETT POINT HWY HEIGHTS ADD I LOT 8 IMPS ONLY I o No Photo Available ( i1:,;,';';.;':~'d;;'<"--2'"'''''' ~'f ~-q "',;;,;.... e'l ~",.~ _..""'''''......,..,.., -'-- http://www.co.jefferson.wa.us/assessors/parcel/parcelprint.asp ?P ARCEL_NO=93191 0003 10/13/2004 Parcel Tax History Page 1 of 1 Valuation Information for Parcel Number: 931910003 Assessed fair Market Value Improvements: $6710 Improved Land: $0 Property Sales Information Affidavit Number: Z3481 Legal Document Description: QCD 3/2/94 Sales Amount: $0 Sales Code: Unimproved Land: $0 Taxable Value: $6710 Current and Prior Year Taxes Tax Year Tax Amount 1997 80.72 1998 76.64 1999 82.02 2000 79.9 2001 74.12 2002 71.66 2003 72.2 2004 70.08 Taxes Paid 80.72 76.64 82.02 79.9 74.12 71.66 72.2 35.04 Current and Prior Year Port Ludlow Drainage Year Tax Amount Not applicable for this Parcel Taxes Taxes Paid NOTE: This is for informational use only. Do not pay taxes based off this information. Please refer to your current tax statement or contact the Treasurer's office at (360)385-9150 HOME I COUNTY INFO I DEPARTMENTS I SEARCH Best viewed with Microsoft Internet Explorer 6.0 or later fJ Windows - Mac ( "-~~'.'-'(i. .;'~'- 'd5& V &'\).,:;., ",,,",", .,,,,~~"~c<<~t#l, ' http://www.co.jefferson.wa.us/assessors/parcel/valuationdetail.asp ?Parcel_no=93191 0003 10/13/2004 Beckett Point 2003 Page 1 of 3 LOG ITEM ~ge!i~ ofC;S8 Beckett Point 2003 Page 2 of 3 LUl:J I # } :~ Page_~2.. of ~ Beckett Point 2003 Page 3 of 3 ofJ5D4 Map O~tput Page 1 of 1 0 Legend P an::a1S-H Contours , 10FOOICMbur /''0'' / ;./ !iI FOCiI CMbur Boundaries 0 Je!I!IorIla'l C<ul!y 0 w_ 0 CItIer~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Wed Oct 06 13:49:57 2004 LOG ITEM 1...1- I 'd' Pb.8e3!/-of~~ http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm=... 10/612004 Map Output Page 1 of 1 0 Legend P arc:e1&-H Centours /v 10FCXII~ j'/ 5:JFCXII~ 2000 Aerial PhOtos Boundaries 0 J<llbsol Cartr 0 w_ 0 Otu~ FOR INFORMATIONAL PURPOSES ONLY- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Wed Oct 0613:51:01 2004 LOG ITEM it Page_LIS- of~& http:// gisserver/servlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovrnap&Client V ersion=4. O&F orm=... 10/6/2004 Map Output Page 1 of 1 0 Legend Paroels-H Contours N 10 FlXII C<ri:Iur I ;./ 5J I'lXII C<ri:Iur Lands.lide Hazard . SIid<!s . High . MOdeI'aI/! ,..., ~ 2000 Aerial Photos Boundaries 0 .JeIIersoo Cotriy 0 Wt/t:!r 0 Ohr~ FOR INFORMATIONAL PURPOSES ONl y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Wed Oct 06 14:11 :562004 LOG ITEM -lJ. ~'r ( Pagel/X; ofOl-Sg \ http:// gisserver/servlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovrnap&Client V ersion=4.0&F orm=... 10/612004 .'M6-272-09501 Location. (1) Persons shall design and install ass to meet the minimum horizontal separations shown in Table I, Minimum Horizontal Separations: TABLE I Minimum Horizontal Separations N_pllblk wcD or nc"" .. 100 ft. SOft. SOft. PubUe driaIcIDc wafer _D 100 ft. 100 ft. 100 ft. Pubic drlnkJnc water ~ 200fL 200ft. 100 fL SPrlDc or sarrace water -" as drlaJdac water SOIll"CeJ,J 100 ft. SOft. SOft. Pressarlzed water sapJll1 ...- 10 ft. 10 ft. 10 fL Properly dec:ollUlllssJoaed _... 10 fl NlA N/A Surlac:e water MarfDe water 100 fl SOft. 10 ft. ...... FresIa water 100 fL SOft. 10 ft. BuDdIne rolllldau.. 10 fL - S'fL" 2fL Property or c__at ... · 5 fL SfL N/A IDtcrecptor Ie........ ....., draiuge ditches Dowa-gradleat' 30 fL S fL N/A Up-gradieDt' lOfL NlA N/A DoWD1:radlellC cats or beDks witla at least 5 tc. or ......... 1IIlCIIs&arbed soil ...e . restrkOYe layer dae .. . stncCanl or textual cha. . 25ft. NlA N/A DowD1:radlellC cats or b..b with less than 5 tc. or ....1aaI, undJstlll'bed, soD abon . ftSCrkOyc layer dae .. . slndural or textaraJ chaace SO rL N/A N/A 'f~ 1 WBllildiag sewer" IS dcfiaecl by tile lDost CVJaI edllioa of lite u..rOl'lD P1uIbi., Code. "No8-perforated dlalribudoaw lacJ8des pressUR sewer lruspon Iiaes. 1 If S1IrUce Wiler is ,sed IS a pablie driakias Wlter supply, lite cIestper .... locale lite ass oatside or lite Rquift:d suitaly CODlrol aRt, 1 Measured from lite oldiaal)' ligll-Wller mart. I I · ne Ioal heallla offICer may approve I sewer IraRspon !iac wlllaia 10 feet of I waler supply IIRC If Ihc sewer lIac Is roRsCnncd ia acc:orducc wilb sec:tioa 2.4 of IItc dcpartlDeat of ccology's "Crileril For Sewaae Worts DcsIga: revised Oclobcr 1985, or eqaivalcnl. 24 I -.-...."...~ -'-'._-'-"--.~...J5 K ?",., !t1-'"'' ~ "T.''''';' "(."~'" .-:."~- t'" ....-j r~" ~.~'';: :~:..{:;-":f;~,., }..",; :s It' . ..~ ./ ~C"""'O(""~"4) 2.'J:t;"'D,^"",, BI2."s.S. ;lDIS.C Sr.T IN C....,c.fl.c...." AT T""e. aO....T L....u...c.14,""'.. F~...I..'''T'V ~'T"""""e:D MV'/.Oo-r '''101 IC),I- II- - 4. r- -, J:.~.:.. '-. !?'.J' N7e .26'10:; ... llf ~~ ~:; ES ... I~ I!!~ <> tDei i" < '" o 10 20 H......l ill I IlO I SCALE, '" 20' .----- ..'o1f"CI>(",~"")"".,,,...,......:.. PO"T 'vi....... U"""Sl Of'4 $.,0.10" Po.,. -r....... I So .. '-'........c...S CocwCIL. FOell"'': Nw Cotto t:,...,TLrr.a... Se.eTICHot 2.41, 'l.I;C VOl.. IS 0' 'S,,,.""evt. P.II'I Jr I 1:1 . '" ~! 01 ;1:.:: ~~ .!, 1 1 I \ \ \ ' . I 'I \ ,. --_;Uti:? /..... 'D I ~';~ I ...,,-1ifo...tUNfoo Pa.. ." "tn~."".' p~.....,.. I ~ PA~~ ~I " " " (..,.,...) - - -1- - .... you.....o 4.......04~ c...,.,c,. ~'t ~:.:~ ~ ~:~:: i:~~ 7.4 ,., N ... N (.) '" (.) ., '" CO N ... o ... ~13 . ... > . 0,> Dig FOR BASIS OF BEARINGS AND PUT NOTES SEE VOL. 15 OF SURVEYS PAGE IN. SVI/4N111/4. SECTION 24. T.30 N.. R.2 U.. UM. \WI' U'm .... I'Ul'IMO 11 "Ica TAavu. (GOV. T LOT 2) 11I1_ ... ",-u .TH a __ IlRftatu: 'IT*'- ""'lOll tMl....nt __ 'I'm TiM't. Hllel..... cn. .. PORn 'tlIlIIt _Ill. ., 1M: ....,*'""'. AUDITOR'S CERTIFICATE '~~.~I!~!~I~t~ SURVEYOR'S CERTIFICATE 1"'8 !itA, *"E-C11.r Ul'lInIHtl ~ ,,,..,!:y l'/All[ VltIDl "' fU!"PYI.I. IN COIINMIWtc( III," TN( 1[G'Jfllrnoc1S 0' fit[ .....U IIEtoItIIJNC ACT AT 1'Hr _EMf'! elf. ""I\TN lO'SELL OH oIUNl 16. tOO. -~"'~, ..."". 151 If'Y~ aE~I~~.&&.....u, PUT JEFFEll8Dll COUIlTl'. UA8IlINClTOH. f'DI\. AlII 11000 SURVEYl NG 1 NC ;'...... F16 2155 DISCOVEflT RD. PDR, TOUN6E"ND. UA. gUISe PHONE 3tiO-a05-59te rAX 360.379.5659 J&!I!!2. 0 f('T !I,," AE8A1t WIT" CAI' .~.VOOD 'I.' i'JlII" . 'CUID 1IDNl.ItDr! AI NOTtO . In !I rOOT ITUl nHCE P0ll1 ON p,u.,nTf L UK D X <. \.::. -...I ~ K'T JIt.~ OIl: ,. MAIL FDJ ttMv ., fTATIOtIS "",,,..,,,,._.L~_ 1.10' r:/ 1~ ..-:rtJ._--', ,d.....llJ- BY COUNTERSIGNED ~o .0 N ~N 1) ~<l.. m ,"i"h {.'.1 f ~ () -- CD f'T1 (J)O 0" cf'T1 -1=1 :I: -c OJo f'T1_ l>Z 0-1 :c Q "<? ~ ~~ ?Q .~~ q >(1) aJ ZO rr1 ZC: (") 1"1-1 " x:r: 3 aJ ~." (")~ :r:z ... >(1) m %0 ,." zc:O 1"1-1 " x:r: 9 CD ~." 02 :r:z -I B 10.77 en. =Em 1"1fT1 U)(") ..." m9 ~. 0'" :r:2 z -I f. s;nr=t88 ~-4~~ "">-4(".1 p><r-.... CD~~ ~ .?,p ~ .>> CI.;. - ~ G"> ~ v .....4 ~~c -o/O~Jl'f"~ I$' ~ A ~co~~ ~ b ::.-\ .;...> II ~ ............ "/~V("'" ;..;\ ~,~ , 0;~v ~ ~ 119":, 9~ \ ,'"I, _ ::: :::_ /(;s.,Y/ '\~ ~, ..>_~- "Qf '\~';:.-- ~.~ ~e ~~. A o~~ ~rOq,)-7> ~~ ~~ ~J' .p.(i)O . 00 :::l<;'N o -IN . ~ r-N 00 -10 U N U(i)O CXlOO Co <;, ~ U-;.J:a. o,-N . 00 -10 0.l N 'f Qo Z-.,. "^ ~ <: o-'^ 1 .... I VI ~ 1330.91' . ~ 9~~E~ ~j;jr-~'::E-48 (Xl,^ 0, ~"S,~ . , Q> .L~ ~ . 1I'Q-~ ~ . "( ~'-1 ~% -st~. G') o < .. --i 5 --i tv Page 1 of 1 Stacie Hoskins From: Allegra Bothell [allegra@drizzle.com] Sent: Tuesday, October 05, 2004 1 :58 PM To: Stacie Hoskins Subject: Beckett Point Stacy, The house sits on lot #29 and #30. The vacant lot next door is #31. See you Wednesday at 3pm. Thanks, Allegra Allegra Bothell Windermere Port Townsend Office 360.385.9344 Mobile 360.301.5953 Email allegra@allegra-bothell.com Web www.allegra-bothell.com ~~~~ ~l)~ - kU- F I.. W a~'VY1 C?_...- u. -". \ n-"~,, i lS'-"l't ~, ~~~ ~ ~ 888N4 c..... - Jl.,.U- ~ - ku" ~~~~\\%~ ~ \N:1L--~ ~~ &.P:t .-/)eeL th~ ~ (L\J\<.. ~ U'AA (3) 0:>'TS ,~ +- (~ t~ ll\?P~ ~\f?JL ~ '1;"3~ -la:ott~ gg f.Mtol~~ ~.~ ~13' \~4 \'3 - t't€ ~~ ~ ~'t /'-f ~ \S- (S6't ~~--rr- fr. t.D). ~ ~y I~ ~ ~f€ . '*'~~~ 6(:. ~'f (...l" ~ ~~ '" 1 0/612004 (t"'.'~"::":'-6J._'N' V""- ~J'dSf. '..,,, :., ." ..."..." # .;:1" ~ .""'..i.J:,,',;'::'>,,":, _,_'~ I Message Si-Q C<i F,(I Page 1 of 1 ~ Michelle Farfan ~ ~f><"- ~ \o(Co{~,{ To: ptnancy@olypen.com Subject: RE: 2 Very Quick Questions Hi Nancy: Sorry for the delayed response. I have been out sick since 8/31 for 2 weeks and playing new grandma since 9/13. The UDC does have a moratorium on subdivision on Marrowstone Island. Even if the parcel would meet the criteria to subdivision it cannot happen basically until public water is provided. The UDC became effective on January 16, 2001. As far as BP, I would like to suggest you meet with Stacie Hoskins, I have been assigned the Port Ludlow Lead Planner and it seems to be consuming the majority of my time. Stacie is very capable and if she is unsure about something she will talk to me about it. Stacie has done several reviews of projects in BP. If this is acceptable to you her number is 379-4463 or email atshoskins@co.iefferson.wa.us. I'll look for the last email (dated July 30, 2004. I have a hard copy) and if I have it I'll forward it to you. L.o+s- Michelle -----Original Message----- From: Nancy Stelow [mailto:ptnancy@olypen.com] Sent: Tuesday, September 14, 2004 11:18 AM To: Michelle Farfan Subject: 2 Very Quick Questions Michelle, You responded to an emaill sent a few months ago and I have lost it. The questions dealt with Beckett Point and building on Garden Club Road, on Marrowstone. If possible, I would like to set an appointment and sit down and chat about 2 lots that have not been built on in BP, they think are buildable and by today's standards I am not so sure. But, my primary interest at the moment is: I asked about a rumor of Marrowstone moratorium on building. I think you said, no, there is no moratorium, but you said something was stopped effective 2000. My brain cells have died in that memory section of my brain. There is a 15 acre piece with a house on it that I perceive is zoned 1 in 5, so with the right ingress/egress, etc, I perceive it could be subdivided in the future. Can you refresh my memory of what was in place so that could not happen? And if I can set an appointment to discuss Beckett Point...,what is your schedule this week or week of the 27th? Thanks Michelle! Nancy Stelow ,,,. '~^'.'""'-5L-" roa ~\. ,':~ .,"",;1";" ,':~'" f"~?-. ~i' ' . ~.>' c;,"i,';:;~,;t;'~;r~.' , ,~V 9120/2004 ~-'~ '!f""'=-jj "-=-"9 ~-"lj ~'fj ~-~ "'F"'~ ~--"9 ~-~ ~------ 1 '4 .., I i "'" i ~ -1 ~ I 1 "I I ~ i .. [.'0""7""""''''''''7.' . I. FROM ,__~,_~"'-----, -"---'- DATE t,~!.;s/~'tifiJj TIME l~:_~t .....,-, COMPANY .......__1~..~_l~l,Ce-....._.....,...,.--.,--._---...... FAX ~., ~'l.. ~ (C\ \'i lo"-i - ttc teN ~ ~ 't ~. ::t ~ ~ ~ ~ ^~ ~O ~~ \-\1\...'- *ff.6C'~tN4' )1'4 ~~"\ ttf;'cL ~ "I ift .,,=--'~.- G'f~ -.~ --- Map Output Page 1 of 1 0 Legend Ass.es.so( Maps-H 0 Paroel&-H Landstide Hazard . S!idas . Hi(tl . t.locIclralcI - S/ifIC I , 2000 Aerial Ptlotos Boundaries 0 ~ Co.Intf 0 w_ 0 0hIr~ FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Wed Oct 13 11 :26:20 2004 LOG ITEM # Page_53 of as' g http:// gisserver/serv let/com.esri.esrimap.Esrimap ?ServiceName=ovrnap&Client V ersion=4. O&F orm... 10/1312004 Map Output Page 1 of 1 0 Legend ~ssor Maps-H 0 Parcels-H Landslide Hazard . SIiicbS . HPi'I . M<'J<b'alil =' ~ 2000 Aerial PhOtos Boundal'ills 0 ~ COI&'II)' 0 w_ 0 oto:s Cc:u1Ms FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Wed Oct 13 11 :26:20 2004 LOG ITEM # Page~5:i ofd<)K http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/13/2004 Map Output Page 1 of 1 0 Legend Assessor Maps-H 0 Parcel&-H 2000 Aerial Photos Boundaries 0 ~CW'1Iy 0 w_ 0 Oh;r~ FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Wed Oct 13 11 :27:032004 LOG ITEM # Page~Of dS"o http:// gisserver/servlet/com.esri.esrimap.Esrimap ?ServiceName=ovrnap&Client V ersion=4. O&F orm. ,. 10/13/2004 Map Output Page 1 ofl 0 Legend Assessor Maps-H 0 Parcels-H 2000 Aerial Photos Boundalies 0 ~Cculty 0 WtIrJr 0 Ob:s C<ames FOR INFORMATIONAL PURPOSES ONLY- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Wed Oct 13 11 :27:03 2004 LOG ITEM # ?age_~)b of..6$.[ http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/13/2004 Map Output Page 1 ofl ~ Legend Road System 0 Assessor Maps-H 0 Paroels-H Contours ^/ 10 f' cd Cali:lur " ;"/ ro Fool Cali:lur Boundaries 0 Jo!5an!an C<Uily 0 w_ 0 Otler Cades ! 1\4"4'> p-cMded by ~CanIy CerrI-oI So-.;oe GIS FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Wed Oct 13 11 :27:54 2004 LOG ITEM # pageS=7 ofp http:// gisserver/servlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/13/2004 Map Output 1 ill"", ~decI by JefI=<rI C<U1f)- C<>'1hlI ~-= GIS Page 1 of 1 Legend .;-/ Road System o Assessor Maps-H o Paroels-H Contours ,N 10 Fool ConbJr ,N 00 Fool ConbJr Boundaries 0 ~ C<ioriy 0 WtkJ< 0 0Ih0t~ FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Wed Oct 13 11 :27:54 2004 LOG ITEM # , Pag~L_l)(J of~J> http:// gisserver/servlet/com.esri.esrimap.Esrimap ?ServiceName=ovmap&Client V ersion=4. O&F orm... 10/13121Y04 m f'TI (J)O 0" c:f'TI -1=1 :t: -c CJo f'TI _ l>Z 0-1 ::c B 70.77 Ch, ~m 1"'1fT1 (1)0 -I^ m~ >!." (')0 ::1:_ Z -t --- ~, Q '7~ ~ ~0: '..... Q '<b~ q ~?88 . ~N ~~...~ P 68 CD...... ~ ~ <.9 ~ .>> "..s. C> ~ 0# ...4 b ::.-\ ~~c +O..p)J~~ ~ ~ A ~CO~)' ;y )>(1) a:J ZO rr1 ZC: (') fT1-t ^ )(:t: 3 a:J ~." (')Q :t:z -I CD ~ .....". )>(.1) a:J %0 rr1 % c: (') fT1-t ^ X:I: 9 a:J fTI >." 02 :J:Z -I ./1 ~.............. ", ^,/~V<", ......., \ ~, ~, ^./~y~ 1': \.~" __ ^'''Y/ ~ 9~ \. 9 \ . ~ ;::' ;::' _ /'/S) ~ 9 ',-">:::=:"'- "Q;/ ~:::=-- ~~e ~~ A O~~ ";,tf,. O~;-7> ~~ ~..y ?'"~ Q> ~~ ~ . 1( 0 r~ ~ . . '( ;0'-1 ,c~ -s'~. G") o < .. -f IA VlG)O ~ .p.G)Q ())OO r .... . 00 Co <;. N 0 ~<;'N VI-i~ O-lN orN -f N . ~ rN . 00 -10 00 VI . T -10 N VI N 00 N ~.. /0- ~ <'0 ~o 0 ~ N 1 -N 1330.91' .,.. I VI Ul r-?o~ ~8 P'!:;;5?o~~-l8 0 R z gm~ "" OJ ,n ,..... ~........?';.. . , , ~ 'i , , I CkJ' -rJ , I I ".~,f I~ S> ~ N --- ~ ~ ~3: O~ o..w iI-CO \....\)~ '.. W3: ~~ ....~O coZ i" ~ f-(/) Zf- . O-::J: . C) Q..- LaJ f-::J: f- "'~ / ,J\ " ~ d-~ <$;~~ ~~~~ ~~~ foe. d-~ G ~ ~<o<v'f V.....<<; ~x.. ~<J- <o~ ,?O ~ t:- vx.. ~~ <o<v'f . ~l;j ~~x.. <o<vv~ ,?O \ '""~::;..'...'~.7'....~.om._..'_';:~..i,...'T~ .,/:' """~__...~~,,,;~-.e--~ Proposed UDC Amendments Pursuant to Review of Best Available Science (Christensen 2004) Note: All references to Fish and Wildlife Habitat Areas (FWHAs) in the UDC to be changed to Fish and Wildlife Habitat Conservation Areas (FWHCAs). These include, but are not limited to, references in Sections 1, 2, and 3. UDC SECTION 3 - LAND USE DISTRICTS Note: Table of Contents to be modified appropriately. 3.6.7 Geologically Hazardous Areas a. Classification/Designation (2) Designation. The following erosion, landslide, aRG-seismic. and channel miqration zone (CMZ) hazard areas shall be subject to the standards of this section: iv. Channel Miaration Zones (CMZs). Areas subiect to the natural movement of stream channel meanders. In the Hiqh Risk CMZ area, channel miqration is likely within the next 100 years; in the Moderate Risk CMZ area, channel miqration is possible in the next 100 years. Areas protected from channel movement due to the existence of permanent levees or infrastructure improvements such as roads and bridqes constructed and maintained by public aqencies are excluded from the Hiqh or Moderate Risk desiqnation. These areas also do not include areas outside the meander hazard which may be subiect to rapid movement of the entire stream channel or avulsion. (3) Sources Used for Identification. vii. US Department of the Interior, Bureau of Reclamation. 2004. Channel Miqration Zone Study for the Duckabush, Dosewallips, Biq Quilcene and Little Quilcene Rivers, Jefferson County, Washinqton. Denver, CO. viii. Perkins Geoscience. 2004. Channel Miqration Hazard Maps for the Dosewalltps, Duckabush, Biq Quilcene and Little Quilcene Rivers, Jefferson County. Washinqton. Seattle, WA. b. Protection Standards. (6) Buffers - Standard Requirements. vii. A buildinq setback line is required to be five (5) feet from the edqe of any buffer area for a landslide hazard area OR to outside the full extent of the Hiqh Risk channel miqration zone. whichever is qreater. Proposed UDC Amendments per BAS Review LOG September 22, 2004 Page 1 of 5 # 17' f"'l,..".,.., /.", < .,.~ f" .t..'.::.~; .......llL.\... (; r . J . 3.6.8 Fish and Wildlife Habitat Conservation Areas.1 a. Classification/Designation. Fish and wildlif-e h3bit3t areasFish and Wildlife Habitat Conservation Areas (FWHQAs) include both aquatic and terrestrial areas within Jefferson County. The approximate location and extent of critical fish 3nd wildlife h3bit3t 3re3sFish and Wildlife Habitat Conservation Areas are displayed in the Washington Department of Fish & Wildlife's (WDFW) Priority Habitat and Species (PHS) Program database, and Jefferson County's Core Wildlife Habitat Conservation Areas database. The following designations shall be used in classifying ~environmentally critical areas to be regulated under this section. (1) Those waters that meet the criteria for type S, F, Np, and Ns as set forth in Chapter 222-16-030 and Chapter 222-16-031 WAC. Included in this definition are streams, lakes, and marine waters that are requlated under RCW 90.58 RCW, Shoreline Manaqement Act, and wetlands associated to requlated water bodies. f4-f(2) Areas that are recoqnized by Federal or State aqencies for which federal or state endanqered, threatened, and sensitive species of fish and wildlife have a primary association. This includes known locations of nests, rookeries, or other breedinq areas; and habitat areas tarqeted for preservation by Federal, State and/or local qovernment which provide wildlife habitat benefits. (3) Areas that contain habitats and species of local importance, includinq-areas identified as Core Wildlife Habitat in Jefferson County's Wildlife Habitat Conservation Areas database~ (3)Thoso w3tors th3t meet the criteria for type 1, 2, 3, '1 3nd 5 stro3ms as set forth in Ch3pter 222 16 030 IN/\C. (4) Areas with which fedoral or st3te ond3ngered, threatened, 3nd sensitive species of fish and wildlife have 3 primary 3ssociation. b. Sources Used for Identification. Sources used to identify fish and INildlife h3bit3t 3ro3sFish and Wildlife Habitat Conservation Areas include, but are not limited to: (1) United States Department of the Interior, Fish and Wildlife Service, National Wetlands Inventory. (2) Washington State Department of Natural Resources, Water Type Index Maps. (3) Washington State Department of Fish and Wildlife, Non-Game and Priority Habitats_and Species Data Bases. (4) Jefferson County Shoreline Master Proqram and associated inventory and analysis. (5) National Wetlands Inventory database. (6) Coastal Zone Atlas, Jefferson County. (7) WRIA 16, WRIA 17, WRIA 20, and WRIA 21 Limitinq Factors Analyses. (8) Jefferson County's Core Wildlife Habitat Conservation Areas database. 1 As stated above, all references to Fish and Wildlife Habitat Areas (FWHAs) in this section and the UDC as a whole will be replaced with Fish and Wildlife Habitat Conservation Areas (FWHCAs). September 22, 2004 Page 2 of 5 Proposed UDC Amendments per BAS Review ----=~"1.~.' ofgL Sa ! - e. Regulated Activities. (2) All land divisions... ii. The applicant must submit a Habitat Manaqement Plan if the proposal is located within a desiqnated Core Wildlife Habitat Area or Corridor, unless the proposal is for a PRRD. as requlated in Section 3 of this Code. The Habitat Manaaement Plan must demonstrate that the land division and subsequent development will not result in fraamentation and loss of wildlife habitat function. Hill. After preliminary approval... mjy. Buffer areas... (4) Bank Stabilization. LA stream channel and bank, bluff, and shoreline may be stabilized when naturally occurring earth movement threatens existing legal structures (structure is defined for this purpose as those requiring a Building Permit pursuant to the Uniform Building Code), public improvements, unique natural resources, public health, safety or welfare, or the only feasible access to property, and, in the case of streams, when such stabilization results in maintenance of fish habitat or improved water quality. as demonstrated throuqh a Habitat Manaqement Plan or equivalent study or assessment. Bluff, bank and shoreline stabilization shall follow the standards of the Jefferson County Shoreline Master Program, Geologically Hazardous Areas provision in this Section, and the Floodplain Management Ordinance. lL The Administrator may-shall require that bank stabilization be designed by a professional engineer licensed in the State of Washington with demonstrated expertise in hydraulic actions of shorelines. For bank stabilization projects within FWHQAs, the applicant must provide a qeotechnical report that demonstrates that omphasis shall bo placed on bioengineering solutions (vegetation versus hard surfaces) unless provod by the 3pplicant to be are infeasible. The report must document the enqineerina rationale why bioenqineerinq solutions are infeasible in a manner which can be confirmed by review by other enqineerinq professionals. Bank stabilization projects may also require a Hydraulic Project Approval from the Washington Department of Fish and Wildlife which will be determined after consultation with WDFW. (5) Gravel Mining. Gravel mining is discouraged within FWHAs or their buffers, and it shall not be permitted if it causes unmitigatable significant adverse impacts, but it may be allowed following the review and approval of a Habitat Management Plan, including a detailed mining and reclamation plan pursuant to the applicable performance standards in Section 4 (Mineral Extraction) or as otherwise required in this Code. (6) Forest Practices, Class IV General. Timber harvesting with associated development activity involving land conversions from Forest Use, or otherwise meeting the DNR definition as a Class IV General application, shall comply with the provisions of this Section, including the maintenance of buffers, where required. Proposals correspondinq with Class IV General applications and located within a desianated Core Wildlife Habitat Area or Corridor must either conform to the minimum standards of UDC Section 4.16.7 or include a Habitat Manaqement Plan that demonstrates that the activity will not be detrimental to the function of the Core Wildlife Habitat Area or Corridor. Proposed UDC Amendments per BAS Review LOG ITEI\A September 22,2004 . ... Page 3 of 5 .&1. 1}~ r"JIF~:::=-~ '1 ov~,..rd~ f' t::t":~,::;;_~';: .-) - 00 \;o;!t' "" . I A . n g. Protection Standards. (4) Vegetation Retention. iv. Veqetation in a delineated channel miqration zone (CMZ) shall be manaqed consistent with DNR Forest and Fish rules for timber harvest. which encouraqe the development of mature trees to provide a source of habitat-forminq larqe woody debris (LWD). [222-30-020(12) WAC] (5) Buffers - Standard Requirements. v. Standard streamsiGe buffer widths shall be applied to each side of the stream waterbody in accordance with Table 3-2. Table 3 2. Standard Streamside Buffers. 8uffef Stream Type 'Nidths Typo 1 & 2 4-aG-ft Typo 3 +OO-ft Type '1 +OO-ft Type 5 --W-ft ~Joto: Stro3m typo shQ.lf bo doterminod using tho crito.riQ sot forth in ChQptor 222 16030 LJI/AC. Table 3-2. Standard Streamside Buffers. Buffer Stream Tvpe Widths Cateqorv S 150 ft Cateqorv F 150 ft Cateqory Np 100 ft Cateqorv Ns 50 ft Note: Stream type shall be determined usinq the criteria set forth in Chapter 222- 16-030 WAC (Chapter 222-16-031 WAC until adoption bv the Forest Practices Board) vi. The standard marine shoreline buffer width shall be 100 feet. The first 50 feet of the buffer is an "inner core" buffer to be requlated as per buffers listed in Table 3-2. The next 50 feet of buffer is to be manaqed for low impact as an "outer core" buffer. In the outer core buffer, native veqetation is encouraqed. If landscapinq or lawn is to be planted. pesticides-includinq herbicides-and fertilizers shall be prohibited to maintain the non-native veqetation. (7) Increasing Buffer Widths. Fi~ii(:";;7" [/ r'i:~O ":"~' ~-...L---.\.';' i v( Proposed UDC Amendments per BAS Review September 22, 2004 Page 4 of 5 l ,. . n iV.lf tho FWH/\ lios within ~m 3re3 where there is evidonce of 3 migr3ting stre3m or river ch3nnel, incro3sod protection will be necess3ry. B3sed upon sito h3bit3t conditions and spocios prosence, the buffer m3Y be extondod. 'v'-;-iv. If streams are located in ravines... 3.6.9 Wetlands. d. Protection Standards. Table 3-3. Minimum Wetland Buffers Necessary as part of Qualifying for a Waiver from Delineation and Special Report Requirements.li. 2.3) Required Distance from Estimated Wetland Boundary (feet)14) na300 150 75 J+52 Wetland Category I II III IV Table 3-4. Standard Buffer Widths for Wetlands Wetland Category I II III IV Standard Buffer Width 4W-200 ft 1 00 ft 50 ft ~35 ft 3.6.13 Planned Rural Residential Developments (PRRDs). 10. Modification of Permitted Densities - Density Bonuses. d. Criteria for Approval of Bonus Densities. (5) Environmental Design. Items for consideration under this criterion include on-site designs providing regional benefits, including drainage control using natural drainage and landscaped drainage retention facilities; flood control measures, particularly those measures serving regional needs; significant public access provided to designated potential open space or park areas, shoreline areas, trails, scenic sites and viewpoints; provision for substantial and exceptional landscape treatment; preservation of critical fish and wildlife habitat identified for thre3tened and ond3ngerod species; and the use of recycled materials and resource conserving designs. [End] ~.~c_"~_~__ ~::?';;f\.;'j t~,td--' Sf' It ~"'-;y"i,,+ ",,,/~ "'" _._iLz. _,,_~. __,_ Proposed UDC Amendments per BAS Review September 22. 2004 Page 5 of 5 Stacie Hoskins From: Sent: To: Cc: Subject: Stacie Hoskins Tuesday, October 19, 2004 7: 12 AM 'Michael Moren' Randy Marx; Jim Pearson RE: Beckett Point project Hi Mike, We're confirmed for October 29, 2004 at 10:00 am for the Beckett Point sewage system pre- application. See you then, Stacie L. Hoskins Associate Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 Phone 360-379-4463 Fax 360-379-4451 shoskins@co.jefferson.wa.us -----Original Message----- From: Michael Moren [mailto:mmoren@parametrix.com] Sent: Monday, October 18, 2004 1:16 PM To: Stacie Hoskins Subject: RE: Beckett Point project - Figure 3 Stacie, Oct. 29th would also be the best date in October for us. Thank you, Mike Moren Parametrix, Inc. 5700 Kitsap Way, Suite 202 Bremerton, WA 98312-2234 mmoren@parametrix.com p: (360) 850-5320 f: (360) 479-5961 Phone 360-379-4463 Fax 360-379-4451 shoskins@co.jefferson.wa.us 1 -"---.0 (p-- ;;F' /}~?L _"""""'_ '<.,.>-s t:7'-I Parametrix ENGINEERING. PLANNING. ENVIRONMENTAL SCIENCES 5700 KITSAP WAY, SUITE 202 BREMERTON, WASHINGTON 98312-2234 T. 3600377.0014 F. 360.479.5961 www.parametrix.com TRANSMITTAL FORM To: Jefferson County - Department of Community Development 621 Sheridan St. Port Townsend, WA 98368 Date: Project Number: Project Name: October 29, 2004 256-1820-009 Beckett Point Sanitary Improvements We are transmitting the following materials: One copy of the Wetlands Delineation and Ranking report for Beckett Point. Comments: A Wetlands Delineation and Ranking Report for Beckett Point was prepared by Dr. Kenneth M. Brooks of Pacific Rim Aquatic Environmental Sciences in 2000. The majority of the existing development lies along the perimeter of a large sand spit jutting out into Discovery Bay. The report identified, classified and delineated a wetland in the middle of the sand spit. This report will be used for the wetland delineation and classification for this project. These are: o PER YOUR REQUEST o FOR YOUR INFORMATION o FOR YOUR REVIEW AND APPROVAL ~ FOR YOUR FILES o FOR YOUR ACTION Sent Via: o U.S, MAIL o GROUND SERVICE o EXPRESS OVERNIGHT o COURIER o HAND DELIVERY/PICK UP Si"T/ti Mike Moren ~ cc: LfJG ITEM F'i.",;,,,',,,, fa 7 i" Ci..... ,; ""'7 ~ .of ;;'S'K" (Rev. 07/03) ;>~, , '~, Wetlands Deiineation and Ranking Tax Lot 1 in Sections 23 and 24 of Township 30N, Range 2Win Jefferson County, Washington as shown on the Official Record Map of the Cape George Fishermen, Inc~ Salmon Club drafted in 1951 and adoptedfor club records on June 10, 1958. Produced for: Mr. Tom Shute, Board of Trustees Beckett Point Fisherman's Club, Inc. 760 Beckett Point Road Port Townsend, WA 98368 Produced by: Dr. Kenneth M. Brooks Pacific Rim Aquatic Environmental Sciences 644 Old Eaglemount Road Port Townsend, WA 98368 5 August, 2000 ITE~v1 pi~;:~ (P8 _ of dSf " ~., ... Table of Contents 1. Introduction Page 1 " 1 1 4 4 4 5 5 5 5 5 7 7 8 9 11 2, Qualifications 3. Property Description 4. In-Office Survey 4.1. Soils 4.2. National Wetland Inventory 5, Field Inspection Notes 5.1. Topography 5.2. Soils 5.3. Vegetation 5.4. Hydrology 5.5. Wetland determination 5.6, Wetland ranking 6. Conclusions and Recommendations 7. References 8. Appendices 1. Upland Log (1). 1987 Corps of Engineers Routine On Site Data Sheet 2. Wetland Log (2). 1987 Corps of Engineers Routine On Site Data Sheet 3. Wetland Log (3). 1987 Corps of Engineers Routine On Site Data Sheet 4. Upland Log (4). 1987 Corps of Engineers Routine On Site Data Sheet 5. Wetlarid Log (5). 1987 Corps of Engineers Routine On Site Data Sheet 6. Washington State Department of Ecology Wetlands Rating Field bata Form ,~~i: P,0::~";) ~1' ~of~ ii ~ .. .. .. List of Figures Figure la. Southeast portion of Tax Lot 1 in Sections 23 and 24 of Township 30N, Range 2W in Jefferson County, Washington as shown on the Official Record Map of the Cape George Fishermen, Inc. Salmon Club drafted in 1951 and adopted for club records on June 10, 1958. This delineation was completed on July 30, 2000 by Dr. Kenneth M. Brooks. 2 Figure Ib, Northeast portion of Tax Lot 1 in Sections 23 and 24 of Township 30N, Range 2W in Jefferson County, Washington as shown on the Official Record Map of the Cape George Fishermen, Inc. Salmon Club drafted in 1951 and adopted for club records on June 10, 1958. This delineation was completed on July 30, 2000 by Dr. Kenneth M. Brooks. 3 Figure 2. U.S. Fish and Wildlife Service National Wetland Inventory of Beckett Point, Jefferson County, Washington. 5 -'~C.--=;~O-(;r~~ iii ;""''''~--..,...'''''' ~ " ~ .. , Wetlands Delineation and Ranking Tax Lot 1 in Sections 23 and 24 of Township 30N, Range 2W in Jefferson County, Washington as shown on the Official Record Map of the Cape George Fishermen, Inc. Salmon Club drafted in 1951 and adopted for club records on June 10, 1958. 1.0. Introduction. Aquatic Environmental Sciences examined this property on July 30,2000. Wetlands were determined using the routine method defined in the 1987 Corps of Engineers Wetlands Delineation Manual (Technical Report Y-87-1) as required in paragraph 11.1003.3.a. of the Jefferson County Interim Critical Areas Ordinance (1994). These procedures also satisfy the requirements of the "Vi{ ashington State Wetlands Identification and Delineation Manual (Ecology Publication #96-94, dated March 1997). The property and delineation is described in Figures (1a) and (1b). 2.0. Author's Qualifications. Dr. Brooks is the owner of Aquatic Environmental Sciences, Inc. He has a Doctorate in Marine Biology from the University of Washington School of Ocean Sciences and Fisheries and was Director of the Fisheries Technology Program at Peninsula College from August 1992 until January 1997. The author is a Qualified Level (I) and Level (IT) wetland consultant in Clallam County and has ten years experience in delineating, constructing and managing wetlands throughout western Washington, Wetland mitigation projects include several major projects approved by the Department of Ecology, Environmental Protection Agency and the U.S. Army Corps of Engineers. In 1996, Dr. Brooks inventoried all of the wetlands on the Long Beach Peninsula for the City of Ocean Shores under a grant with the Department of Ecology. 3.0. Property Description. This property (Tax Lot 1) is located on a sandy spit centered at approximately 48.070 N by 122.880 W. Excepting the sandy-gravelly fill, observed soils are generally composed of sands (0.250 to 1.00 mm) with an overlying layer of organic matter that varies between 5 cm and 15 cm in depth. The perimeter of the spit has been filled and is nearly fully developed with vacation homes and permanent residences. This is particularly true on the seaward side of Beckett Point Road. The inland side of the road is partially developed and generally devoted to garages supporting the homes located on the seaward side. A very steep hill butts the property to the northeast providing an adequate buffer with no development. A tidal lagoon is located in the northeastern 1/3 of the unfilled portion of the high tidal marsh comprising much of the wetland. Anecdotal history conveyed by Mr. Tom Shute indicat~d that the lagoon once enjoyed an opening to Discovery Bay. However, that opening was filled with the completion of Beckett Point Road, which now cuts off the lagoon from any tidal flushing. The lagoon remains brackish with a salty crust lying on the soil's surface in areas that were not inundated during this survey. The lagoon's water level is reported to rise in the winter and fall in the summer. That is likely the result of the collection of rainwater and/or shallow groundwater flowing down the steep hill from the northeast. This freshwater would sit on top of the underlying saltwater permeating the sandy substrates. Much of this description is hypothesis based on anecdotal evidence and the author's experience and training in physical oceanography, Neither the hydrology nor the geology of the spit was rigorously investigated during thIs survey. I &'''"' '..,....-1\.1 I j" !M)t; , ~~;f JL "d~ """,\.-.", ~ _ t.d . 1 . I ~ ,...- \)~ ~.. "t' ee, \ ... ... 150' ,~ <1;- 7a~, Lo,i;....1 2..5.5 ACY"es North . ~",'" ,. .:,;.:~:':'.~';('~:'>" -.......,.. .,.... .,.,-;, ~'\," -->:;,/r"':,:','J_ ' '. '-.. ',. -- ," ~ ' . -""';c'" Soil Log _ _ _ WetlandBoundary ... Delineation transect Figure 1a. Southeast portion of Tax Lot 1 in Sections 23 and 24 of Township 30N, Range 2W in Jefferson County, Washington as shown on the Official Record<Map of the Cape' . George Fishermen, Inc. Salmon Club drafted in 1951 and adopted for club records on June 10, 1958. This delineation was completed on July 30, 2000 by Dr. ~t Brooks. +,.., ~',-,/:;'fo,-~:~ ~ """-:.., ~- l"'\fKY _~#v-LI::-...\~,~J'~~ f/ltJNe:X rH 13CIlCH I C'l"1tJ . . Figure lb. Northeast portion of Tax Lot 1 in Sections 23 and 24 of Township.30N, Range 2W in Jefferson County, Washington as shown on the Official Record Map of the Cape ~ . George Fishermen, Inc. Salmon Club drafted in 1951 and adopted for Clllb.reeordsoD Jun. 10, 1958. This delineation was completed on July 30, 2000 by Dr. Kenneth M. .rooks. 01 g Wetland Boundtuy Delineatiatl.transe "~"'.,....>~.~ 2. ''''';:~ ."",J.-.~"-,-t~,.,,,}- ~ , I . ~~ ::if/) iS~ g~~~~j~ ~'i. fg I< -<<<'4.jjJ ~o,g 0 ~ 0 ~ iiitiBi!@~~~i Q C ~ o Q ...- v.I - 4) ....... fU E Q o Q or- .'-'"~-1< .~m t>d--~ 'dJ 1 "..,..,,'~ . . ,~- 1 ~ ~ ~ .= I ! .J'. .s ~ i 1 r;Q. 'S i ! = .... J ~ 'iJ ! i z B .E ~ fI:.l !i "" ~ ." = i ~ r.q j;) ~ i' ~ .. ), , 5.0, Field Inspection Notes. This property was platted and portions filled for residential development before the Clean Water Act was enacted. Road construction, filling and home construction have significantly changed the geology and hydrology of Beckett Point by stabilizing the shoreline and by cutting off the flow of seawater into the tidal lagoon: Native soils throughout the property are dominated by sand. Excepting'the area lying to the southeast, the entire wetland boundary is well defined by historic filling. A single transect was evaluated along the southeastern wetland boundary to establish the wetland boundary in this gently sloping area. 5.1. Topography. The property is flat with a steep hill lying to the northeast. That hillside represents the only natural landscape surrounding the wetlands observed on this property. The remainder of the wetlands are ringed with homes and Beckett Point Road. 5;2, Soils. The southwestern 1.4 of the spit is upland (Log 1). The soils are dominated by sand with a matrix color of lOY/4 in the Munsel gley chart. However, the color is associated with the color of the parent material and not with chemical processing in an anaerobic environment. The upland soils were not mottled and had a relatively high chroma. Upland soils on the hillside lying northeast of the spit (Log 4) were also sandy with a high chroma matrix color of 4/5GY. They were not mottled and showed no secondary , characteristics of prolonged saturation. The Munsell Gley Chart #1 color of wetland soil at Log (2) was 5/IOGY; at Log (3), lOCated in the tidal lagoon, soils were darker with the same chroma at 3/lOGY.Wetland soils at Log (5) had a'Munsell color of 4/l0Y. All of these wetland soils were dull and gleyed. Soils at Log (3) contained more clay than at other sites, were darker and hydrogen sulfide was organoleptically detectable at depths greater than 40 cm. Surficial substrates to a depth of approximately 15'cm in the tidal lagoon also contained more finely divided organic matter than was observed in other wetland areas. 5.3. Vegetation. Plant preferences are those given in Reed (1988) for Region (9). The plant community within the wetland boundaries is dominated by saltgrass (Distichlis spicata), seaside arrowgrass (Triglochin maritimum), Pacific silverweed (Potentilla pacifica), perhaps European beach grass (Ammophila arenaria) and glasswort (Salitomia virginica). The wetland located in the most northeastern portion of the spit (delineation flags 29 through 32) contains a dense stand of what appears to be teasel (Dipsacus ct fullonum or sylvestris). This is an introduced species and I must say it is quite spectacular. Upland plants include Douglas fir (Pseudotsuga menziesii) on the northern hillside, rosehips (Rosa ct gymnocarpa), a variety of grasses, thistle (Circium sp.) and madrone (Arbutus menziesii). 5.4. Hydrology. Soils in the tidal lagoon were inundated to an undetermined depth over an area of greater than one acre. Soils throughout the remainder of the delineated wetland remained saturated on July 30, 2000. The entire wetland area met the hydrologic requirements of the 1987 USACE manual during the dry part of the year. ".."'~"""..""<c"''"_,.'''''_''''~..,.,...~.~ 7~,~",;'i.f:d~a 6 , . . 5.5. Wetland determination. The NWI was constructed in large part through the examination of aerial photography without the benefit of ground truthing. A$ previously stated, this survey found hydrology, soils and vegetation meeting requiremenls to designate the entire area within.the delineation boundary described in Figures (1a) and (lb) as a regulated wetland, 5.6. Wetland ranking. The ranking of this wetland is complicated by previous development, which has significantly altered the hydrology. Estuarine wetlands are defined by Cowardin et al. (1979) as those that, "Consist of deepwater tidal habitats and adjacent tidal wetlands that are usually semi-enclosed by land but that have open, partly obstructed, or sporadic access to the open ocean, and in which ocean water is at least occasionally diluted by freshwater runoff from the land." The construction of Beckett Point Road intercepted the flow of seawater into the interior tidal pond on this property and strictly speaking, these 'wetlands do not meet Cowardin's definition because they do not have access to the ocean. The presence of salt tolerant plants and a crust of salt near the tidal lagoon suggested that this environment is still brackish. The wetland is greater than five acres and therefore would be considered Category I, if it indeed were an estuary. H the wetland is not considered an estuary, then its lack of complexity; lack of connection to other valuable habitats, and lack of natural buffers significantly reduces the value of this area. It scored only 12 points in the significant habitat value assessment included in Appendix (7). The wetland would be considered a Category ill wetland with this score. The classification of this wetland has some sigruficance for property owners surrounding this parcel. The Jefferson "County Interim Critical Areas Ordinance, at paragraph 6,505.5, requires a 75' buffer for Low Intensity land uses around a Class I wetland and a 25' buffer around a Class ill wetland. It is the opiition of this author that the Beckett Point wetlands represent a special case not strictly meeting Cowardin's definition of an estuary and having higher ecological value than would be recognized in a strict interpretation of the Washington State Wetland Rating System. Category I wetlands are those described as the "cream of the crop," Among other things, they are wetlands that are rare within a given region or that are relatively undisturbed and contain ecological attributes that are impossible to replace within a human lifetime, if at all. Wetlands such as that found at Beckett Point are certainly rare within our region. The pond likely provides a shelter for marine birds during periods of high winds and heavy seas and there are not many areas within Puget Sound that have healthy communities of salt tolerant plants like saltgrass and glasswort. It would indeed be very. difficult, if not impossible, to construct a wetland mimicking the functions and values found at Beckett Point. In contn:lst, Class ill wetlands are those that provide important functions and values. In general, these wetlands are smaller, less diverse, and/or more isolated in the landscape than Category IT wetlands. They occur more frequently, are difficult to replace, and need a moderate level of protection, The Beckett Point wetland is isolated, it is not very diverse, 'but it is quite large. It would be essentially ilJlPossible to replace. Lastly, Category IT wetlands are those that, "1) provide habitat for very sensitive or important wildlife or plants; 2) are either difficult to replace; or 3) provide very high functions, particularly for wildlife habitat." It is the author's opinion that Category IT best fits the current .~".~ .,~~~~~ 7 . . state of the Beckett Point wetlands and Category IT is the classification determined for this report. It should be noted that a well-constructed channel to Discovery Bay, coupled with careful yard keeping by the residents, could nearly restore this wetland to Class I with significant habitat value for a broad range of marine fauna and flora. The Jefferson County Intenm Critical Areas Ordinance requires a 50' buffer from Class IT wetlands for low intensity land uses. 6,0. Conclusions and Recommendations. The wetland was delineated on July 30, 2000. The delineation is marked in the field by 57 wire flags placed on the boundary of the wetland. The location of the flags was enhanced by tying surveyor's ribbon as high on adjacent vegetation as possible. The approximate location of each of the 57 flags is given in Figures (la) and (lb). The delineation was not surveyed and no claim with respect to the exactness of Figures (la) and (lb) is made. Individual property owners can assess the location of the wetland boundary adjacent to their property by locating the wire flags. I recommend that each property owner permanently mark those locations because the flags will be lost within a year or two. In general, the wetland boundaries are well defined by the previously placed fill. Because each lot was filled to a different location, the wetland boundary, while well defined, is very irregular. . I recommend that the wetland be designated as Category IT and that a 50' setback be required. Based on field observations, it appears that most new construction on the interior side of Beckett Point Road will require a variance from Jefferson County. The Beckett Point Fisherman's Club asked that Idetermine the boundary of the buffer in the southwest corner of the wetland to determine the permit requirements for construction of a covered picnic structure on the playground. A flag was placed at a distance of 75' from the wetland boundary during the July 30, 2000 delineation. Based on thedassification of this wetland as Category IT and not Category I, that flag can be moved 25' toward the wetland. In either case, there is adequate room to construct the picnic cover outside the wetland's buffer and a variance is not required. Prior to construction closer than 75' from ~e wetland boundary, I recommend that the Jefferson County Planning Department concur with the Category IT recommendation. Please call if I can be of further assistance. Sincerely, ~,..d4M, Gnneth M. Brooks Aquatic Environmental Sciences c,(,c,(,(,e-(,,,,,,,c ",."ort:SSIOtv....{,"'ee fifJ <l~ ,........ n erc:t ",. "<.Thtt "" ~ .' '. 0.... ........ 0.' Kenneth M "~O~ " . . . \,\ : 0< : Brooks : (i) ~ 0) Ul" \)-" .--ca :'2.'. ~ :Co?: ~"6'. .'" :Otto. ~ 0 . .P... . ">) 4tt ...... ~J'I". #1253 . . ',(0 44 ~.D ~ .........1)"" ~ 4 .... APB 44 "PPll1l9'11t,tt . .. "~.~- j-7 ;:~}t?)217 8 ,- "."..''''<-.;;"",.".....'''',Ji>".,'''''''~.,' ,t2:::::fd..e.., ~>-.._--..~-....-....-:.-':"_....__..-..".-...:..~,... .A.... . . . Wetland Bibliography' Bigley, R.E., and S.W. Hull. 1993. ReCognizing Wetlands and Wetland Indicator Plants on Forest Lands. Washington State DNR, Forest Land Management Division, Contribution No. 500. Caduto, M.J., 1990. Pond and brook: a guide to nature in freshwater environments. University Press of New England, Hanover, NH 03755 Cowardin, L.M., V. Carter, F.C. Golet and E.T. LaRoe. 1979. Classification of Wetlands and Deepwater habitats of the United States. U.S. Department of the Interior, Fish and Wildlife Service Document FWS/OBS-79/31. Office of Biological Services, Washington, D.C. 20240. King County. 1986. Wetland Plants of King County, and the Puget Sound Lowlands. Kitsap County Interim Critical Areas Ordinance. 1994. Including amendments as adopted February 27; 1995 by the Kitsap county Board of Commissioners. Kitsap County Ordninance No. 170-1994. 69 pp, plus appendices. Federal interagency Committee for Wetland Delineation. 1989. Federal Manual for Identifying and Delineating Jurisdictional Wetlands. U.S. Army Corps of Engineers, -U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, and U.S,D.A. Soil Conservatio.n Service, Washington, D.C. Cooperative technical puplication. 76 pp. plus appendices. MunselL 1994. Munsell Soil Color Charts, Macbeth Division of Kollmorgan Instruments Corporation, 405 Little Britain Road, New Windson, NY 12553. , Franklin, J.F.. and C.T; Dyrness. 1973. Natural Vegetation of Oregon and Washington. USDA Forest Service General Technical Report PNW -8. Jefferson County Ordinance No. 05-0509-94. 1994, Interim Critical Areas Ordinance. 68 pp, Kozloff, E.N. 1976. Plants and Animals of the Pacific Northwest. University of Washington Press, Seattle and London. Ni~ring, W.A. 1992. The Audubon Society nature Guides - WETIANDS. Alfred A, Nopf, Inc. New York, NY North Bend Critical Areas Ordinance. Chapter 14.10. ~."'._--'-'-'-.-~?1?' ,],[_"",!C; i:~f!... 9 . , Reed, P.B., Jr., 1988. National list of plant species that occur in wetlands: Northwest (Region 9). U.S. Fish WildI. Servo BioI. Rep. 88(26.9). 89 pp. Steward, A.N., J.D. LaRea andH.M. Gilkey. 1963. Aquatic Plants of the Pacific Northwest. Oregon State University Press, Corvalis, Oregon. U.S. Soil Conservation Service. 1993. Western Wetland Flora - Field Office Guide to Plant Species, USDA Soil Conservation Service, West national Technical Center, Portland, Oregon. U.S. Soil Conservation Service. 1992. Soil Survey of Snoqualmie Pass Area, Parts of King and Pierce Counties, Washington. 601 pp, plus appendices. Washington State Department of Ecology. 1993. Washington State Wetlands Rating System- Western Washington. Second Edition. Publication #93-74. . Washington State Department of Ecology. 1997. Washington State Wetlands Identification and Delineation Manual. Ecology Publication #96-4. 93 pp. plus appendices. ""..m"'_,,~1?J:'""W~-"_'_._ ,,1~~L.,~.C. Jd3.. 10 . ) DATA FORM 1 WETLAND DETERMINATION El , . APPl1e~ flA _ ~ I Applie..ioo Name:' t.. -oMt 17..< Number: .2lJtJ7 s....:~ .Cou..y: ~I Legal Deserip.io.: Date: 1//)f) Plot No.: I lir Project . Nallle: hal'#- ,()-JfJL Town8hip:~Range:_____ . S~ction: 2312tp . Vegetation llist t~e threo dominant species in each vegecation layer (S if only 1 or 2 layers)). Indicate species with observed morphological or known physiological adaptations wich an ascerisk. Indicator Indicator Species Status Species Status ,:i :f Trees . ~~tjv . 2. . 3. lI~L ~ 7'.' Yd~. 8. /!- . . Vlr~iP(rrJ F/Jevl . ~V~ff,~ PA&l t- . , 9. Other indicators: _ ; 4,Ly,rLJ;"~- : I 1 Sedes and phase: tl>- On hydric so11s u.st? Yes~i No--=...: Mottled: Yes_; No~. Mottle color: N(j ~atrix col~r: 'lfJY/;{:((}4 i) Gleyed: Yes_ No~ Other indicators: /\1tlnJl...- , .: ~ Hydr.ic so11s: Yes_ No-X-.; Basis: ~e <~L _ Jt.,nA'l-offleJ -~Ld' I . , 4ail' ~ d ~ .,(,II dytt.. del ' , . j Saplings/shrubs Woody vines : . 4. /lfP7llt 10. ~e$/J ~ NUrK/hII4 S. H. 6. 12. % of species that are OBL, FACW, and/or FAC: ~'. flydrophytic'vegetation: Yes ____ No~. ~s: Ala AIL ., : J:I' ~r. ': I' :1 Ii So11 Hydrologr . , Inundated: Yes___; No~. Depth of standing water: Saturated soils: Yes_____i No~. Depth to Other indicators: r .I , e Wetland hydrology: Atypical situation: Yes~; No~. ~&: Normal Circumstances? Yes~ No_____. ~ Wetland Determination: Wetland i Nonwetland X . ' ! Co"".ne~: <>If ~ Ii) l"'f.dk/if!i$ d#IML ~ ?L ~ '"" 1 ->>I'd Jr1 ~ "'- ~iL J ~ ~ /A.,.,- ^- ~ M>7l- i ~ AJ'{J--z::Lu pv k ~,rmined by: . 'r I B2' I ~ i rr ~:. ;'1'1 '^.'''''',.....''_'n...'~ -, 00-" (i}j'ii3?9 .~~~~~,,><'''- -~- .' DATA FORM 1 WETLAND DETERMINATION ! 'd~ -...... . . , .II ~ . , I APPl1~t /., L. I Application Name: :u il A;,J Ii . "<<';~ tJLN~be r: ,:l(JJ) 7 . . State: fjJ,' co...ty:,z;ff~Le.al .e~cr1Pt1on. Date: D / DIJ Plot No.: IJ! )~ . 'Vegetation (list the three dominant species in each vegetation layer (S if , only 1 or 2 layers)). Indicate species with observed morpfiological or known physiological' adaptations with an asterisk. Indicator Status Project . p; . Name: .i5 e~.Jt elf' . Tovnship:~Range:~ Section: r2~ ~ ~ y. i , . , I I \ I , " Spec'ies SpeCies Indicator Status ,. :1 . Trees Herbs --;: Alert-fi/IA, /1n$~r'iv~ tJ.6 L 8. Tr;~/Odt~N h1-9-.~tip1utYJ 06~ 9. ~1~1/~ yjl'9il1lit~ t96L Woody~Je's' c -'S 'S/rU/7t j-,4f.,U) 10. ~' 11. 12. f}/ % of species that are OBL. FACW. and/or FAC:~~ Other indicators: HydrophyUc vegetation: Yes ~ No _' Basis: /CJ (iG, L hlh1e - 1. 2. 3. Sapl1nRslshrubs 4. .l/ltl'Je 5. 6. ...-...... li Jii 'r. f Soil Series arid ;phase: ~/) On hydric soils lis~? Yes~; No____. Mottled: Yes_____; No~. Mottle color: ; Ma~rix color:~;lJ~cr)( Gleyed: Yes~ No_ Other indicators: .10:J.. (7~~ _ I Hydr.1c soils: Yes~ No_; Basis: .1'tJ"J Jvnh17.':! 11J~1 .J r r. Hydrology Inundated: Y~s_____; No~. Depth of standing w~ter: Saturate<! soils: Yes-A-; No_. Depth to saturated soil: AUrMa e- . i" Other indicators: ,i I' ,I 'I II 1 " i f. ! , I' I Wetland hydrology: Yes~;No_____. Basis: Atypi,cal situation: Yes~; No~. i5-e{. MD--4/ Normal Circumstances? Yes~ No_____. Wetland Determination: Wetland Ut!5 _ - ; NQnwetland " Comments: /i)crdl ;t;dv",J/ ~4- /./ff tk~~~;L -- th./..t~ , , Ii. ,~ ~'I r~ --'/, // .f ~ ;~t. .ete=10.d by'f:""d ~/~ 1u>t-~!- 4~1 db!d - &-I ~ dI/ ~ f TEet 'I I ,-1. o/) /A ( i\ IV-"~--~~~ -...."'....-. ---,...~- ~" ~~ I DATA FORM 1 WETLAND DETERMINATION ~;. ~ APP1i~t llA' ~ I Application Name: - eOfe.' u-.t f7, ~/"ro~VI'CYII.,tyj..mber: ~t)7 Stat.: ~" Cou.ty'~t9C~~La8al D.actiptio~' Date: 7. 0 fob Plot No.: it)~ I Project 6 l1i_ ..J Name: ~at..Jf Pdut,{ . Town8h1p:~Range:~ Section: ;{.3 f el. 4- :Jj :/I' .: I i . Vegetation I (list the three dominant species in each vegetation layer (S if only 1 or 2 layers)). Indicate species with observed morphological or known physiological adaptations with an asterisk. Indicator Status Species Species Indicator Status ~ 1. 2. '3. Herbs ' --:;-: :Sa )'"[0 rn,/} 8. 0i'S f, l-J, lis I I I I I r-i/'j'AlIC19 l)I$L . i ~jt6)~ I?Jcw 9. Saplings/shrubs 4. &~LUI f;f" (r7lL ~~ ). S. Woody vines 1 6. 12.' ~ r % of species that are OBL, FACW. and/or FAC:~Other indicators: A3,Af ~~tuDtJ~~~' ~ - . -~~ Mr, ;;;1/7 - I Hydrophytic: vegetation: Yes ~ No _' Bas!s: .fil/PItA-m-.t SrnJU~. ! 10. AfcrnR.- 11. So11 Series and phase: (1~. On hydric soils list? Mottled: Yes_____; No~. Mottle color: Gleyed: Yes~ No_____ Other tndicators:, Hyd~ic soils: Yes~ NO_____t Basis: I' ,.' "I! Hydrology Inundated: . Yes_____i Saturated.soils: Other indicators: IJ, . /.J)k- Wetland hydrology: Yes~i No_____. lu r:;gi;U- Atypical situation: Yes~i No~. ; Normal Circ~mstances? Yes~ No_. , ---.; I Wetland Determination: Wetland 1/1',;;<. - I.'~j 1:vr/monweJland . I Comments: At / tit! difk//;~ i'frT #U/VU~~ ,u UI J:~- . ::cermi..d bY'P AI b~p .-.... . , ....wp.......R.~" ............ 4f2f'cAi D/X (;;l \ ~ ._._.__.._~ ~) ..:,......:.,~' ,",,""', . ;'=.. . _:""."'~. <~- ." I: 1 :; 1 ~r;j. I .. I , I I I i i j I I 1&_0/ A. y~ . :--: Other indicato:s:f~~~d~f .d~/J:i <kh", - . ~! / i i i I i . , :b/ DATA FORM 1 WETLAND DETERMINATION APPl:I.%t dJ.. A i k I rJAppl1cat:1on Name: I'JrJi. ~ ~. I"nllA)s!/JfJ1mber: ~07 State: A.I~ . C_ty'::k~ Legal ;aCriPuo.. Date: ?a lOt) Plot No.: ;t projec~ .JJ, ~ Name: eUe/1 W. Township:~Range:-EiJ/ Section:. ..:7.3 {.:}lj. . I Vegetation (list the three dominant species in each vegetation layer (5 if only ,1 or 2 layers)]. Indicate species with observed morphological or known physiological adaptations with an asterisk. Indicator Indicator SpeCies Status Species Status Trees 1. j). Hr" 2. 3. Saplin$!:s/shrubs 4. M'7lJZ. ... Herbs --;-: tJr,aum ~- ("~ tVrJ/bfSl) , 8. I#tti(4/-'h'd J~e$ - 9. )c4-(!C( - .1cf1 Woody vines o. 10. /1~ 5. 11. . 6. 12. % of species that are OBL. FACW, and/or FAC: ~ . Hydrophytic vegetation: Yes _ No~. l:;;,s: So11 Series and phase: Mottled: & list? Yes X ; No . , ; Matrix col~r: 1-y'-:;r;"j . -' -' Hydrology Inundated: Yes~; No~. Saturated soils: Yes_____; No~. Other indicators: Wetland hydrology: Yes_, No~. Atypical'situation: Yes____, No~. Normal Circumstances? Yes~ No_____. .Wetland DetermjPation: Wetland co..ents~~ X45 ~ II ~ -"'1 I , :1 r , I 1'1 : f . 11 11 f I ..--.. . . , ~ I . ~_lJi '''~>''~:~~~=:-a -"""1""='"""' IIA. _, . I /1/) . Ii ".'- , DATA FORM 1 WETLAND DETERMINATION ifS;- --...1 I : Appli ant Name. , h.. ) Sta.e. tlI~ Coua.y Date: 7 ~O/D/) Plot No.: , Appl1cation N~mber: Legal Description: tJ~. project~ If~. Name: ~t '0;.4 Township: ~() ~nge:~1 Section: d3 ~'1 Vegetation [list the three. dominant species tn each yegetation layer (S if only 1 or 2 layers)). Indicate hpecies wtth observed morphological or known physiological adaptations with an asterisk. Indicator Status :1:1 r I SpeCies 'Species Indicator Status / Herbs i ---;: 5a~; l<h'niA r';i;J1<4 - M L - I : ,8. te;;se/- ..D;jf'sIf,t..t(5 e/-. Iu //(;}17~ _ AJr ~. ~jJ;)~ CM:S~/eJ'1I.;//"7 -. 06L Sapl1nRsI shrubs Woody vines /:Ji;,sh [,h/'1- :5/, i~\, '6&.L :: ~ - ;~: #0>7e' I ,I 1 . ! -6. . 12. ! . , , % of spadas tbo< ara 08L, FACIl, and'or FAC..Ytt% Otba~..:Odi~'ors. ~~: Hydrophytic vegetation: Yes x.. No _~ Basis: -' LI1 /., . _. ~ '.. ii Jj r f; i 1. /V1J7tJL 2. 3. ,j I' :1 -.... 'I , ~ I ~ ij 5011 1 Series a~d phase: ae - On hydric so11s list? Yes~.~.) No_. fi HotUad. Yas_; No-L. Hottla color. N.j. ;_ ; Mat~ri color. t1{ey -1//0 Y h.26""i Gleyad' Yas-X- No_ Otber iOdicators._~~_ . N/2-S- .>.:url!/. Hydr.ic soils: Yes~ No----:-; Basis: /e:: -~~ . . I -rk3 ~ ~ !;-tJjd;- i Hydrology Inundated: Yes_i No~.' Depth of standing water-: _ I . Saturated so11s: Yes X i No . Depth to saturated so11: db t!r#J Other indicators: . ~_ .Lrllf Wetland hydrology: Yes -K-,i No _____. BasiS: S Ii Iu n9 J.i1H1 - Atypical. s;ltuation: Yes..2S:..J No_. Normal Circumstances? Yes_____ ~o~. Wetland. Determination: Wetland;X . i- Nonwetland . , c_a~:,?4 ~ 1d1Jt.,.J/;.J N"-d~kW4/ -t ~ , 4ht~ ~t !#'j<U- .t :!::!!.a~~~~!fp*:t::i?t --:. ~d(l4 ~ -':~ ~(tLAI'-~)a/~4rv, I I iJ; 't ~ It ~ f ;;.::~S:= . J:~~:.~J. " ~ '.. )~/Y-'-"'i~~~~ ,1, t1 , ~ ",/, , I ?~.1,,,,, ,~ .'''''''-''''''.,...'.<- , ,. .,i: 'l u . /. Wetlands Rating Field Data Form J I I Background Information: Name of Rater: ~~ffiliatiOn: AES. ~~1+- t>b'l\)t Date: 7/3(}/ty, . , f I , I ; ... ... Name of wetland (if known): Government Jurisdiction of wetland: ....:ru.~ds(,.\-.\~~\ .1-0~ P.riVn _ I r I . Sccti()n:~~f.;t;T()wnship: ~ 0 of 1/4 S: - Range: a ~ - , , Location: 1/4 Section: ... Source~ of Information: (Check all sources that apply) Site visit~ V"'" USGS Topa Map: _ NWI map: ~ Aerial Photo: _ Soils survey: ..k:::::""" II ~ .1 ., ~ 1 Other: ~ Describe: When The Field Data form is complete enter Category here: 0.1. High Ouality Natural Wetland Circle Answers Answer this question if you have adequate information ur experience to do so. If not find someone with the expertise to answer the questions. Then, if the answer to questions la, Ib and Ic are all NO, contact the Natural Heritage program ofDNR la. Human caused disturbances. - Is there-significant evidence of human-caused changes to topography or hydrology of tile wetland as indicateeJ-by any of tile following conditiolLc;'! Consider only changes that may have taken place in the last 5 decades. The impacts of changes done earlier have probably been stabilized and the wetland ecosystem will be close to reaching some new ~uilibrium that may represent a high quality wetland. I;i ;11 .~ f I lal. Upstream watershed> 12% impervious. la2. Wetland is ditched and water now is not ubstructed. la3. Wetland has been graded. filled,loggcd. la4. Water in wetland is controlled by dikes. weirs, etc. laS. Wetland is grazed. ~. I '~=glMberoW).!t. ~ ~.~ '~.~~~~. rV\ AY-\ I\.i (.I, , ; Yes: ~() tu Q.2 Ycs: ~o to Q.2 Yes: ~o to Q.2 Yes: ~o to Q.2 Yes: go to Q.2 ~o toQ.2 No: go to lb. 25 Af1}~l1ai~ (6J "".~~R77~ ..~""-- })( " , . 1 b Are there populations of non-native plants which arc currently pr~ent, ~: go to Q,2 cover more than 10% of the wetland, and appear to be invad1ng native: ~go 10 Ic. populations? Briefly describe an){ nOllt:native plant POP1!la~ons and Information source(s): " eAs.,~1 tAN N "2.$;00 'tf fl.,y,., ~g ~~ 1c. Is there evidence of human-caused disturbances which have visibly degraded water quality. Evidence of the degradation of water quality include: direct (untreated) runoff from roads or parking lots; presence, or historic evidence, of waste dumps; oUy sheens; the sme)) of organic chemicals; or' iti tack use, Briefly descr;lbe: . \ It . C.2. Irreplaceable Ecological Functions: Docs the wetland: e have atlea...t 1/4 acre of organic soils deeper than 16 inches and the wetland is relatively undisturbed; OR [IIf the answer is NO because the wetland is disturhed briefly describe: Indicators of disturbance may include: ' , - Wetland has been graded, filled, logged; - Organic soils on the surface are dried-out for more than half of the year; - Wetland receives direct stormwater runoff from urban or agricultural areas.); OR 9 have a forested class greater than 1 acre; OR 9 have characteristics of an estuarine system; (~(JU...-t.J) '\ -\- ~f\ OR ' -\-0 ~\~QcNe'Yt.\ e have eel grass. Hoaling or non-floating kelp ~eds'! d - 2a. Bogs and Fens , Are any of the three following conditions met for the area of organic ~oil? I . I 2a.l. Are Sphagnum mosses a common ground cover (>3(~90) and the: cover of invasive species (see Table 3) is less than 1O%? : Is the area of sphagnum mosses and deep organic soils> 1/2 acre? Is the area of sphagnum mosses and deep organic soils 1/4-1/2 acre? 2a.2. Is there an area of organic soil which has an emergent class with at least one species from Table 2, and cover of invasive species is < 10% (see Table 3). Is the area of herbaceous plants and deep organic soils> 1/2 acre"! Is the area of herbaceous plants and deep organic soils 1/4-1/2 acre'! 26 . 0 to Q.2 , NO: Possible Cat. I contact DNR ;1 ~( ~ J (NO to all: go to Q.3) YES go to 2a YES: Go to 2b :f :/;j 'I; b i i I YES: Category 1 YES: Category In NO: Go to 21.3 YES: Category I YES: Category II NO: Go to 2a.3 ""'.-~"~I~ ;':."".Q,~~".;o,,:._ .......,.~.."'..1>"__ . . j.5' . I " , .. 2a.3, Is tfie vegetation a mixture of only hcrhaccuus plants'and Sphagnum mosses with no scrub/shrub or forested classes'! Is the area of.herbaceous plants, Sphagnum, and deep organic soils> 1/2 acre? Is the area of herbaceous plants. Sphagnum, and deep organic soils 1/4-1/2 acre? Q.2b. Mature forested wetland. . 2b.l: Does,50% of the cover of upper forest canopy consist of evergreen trees older than 80 years or deciduous trees older than 50 years? Note: The size of trees is often not a measure of age. and size cannot be used as a surrogate for age (see guidance). . 2b.2. Does 50% of the cover of forest canopy consist of evergreen trees older than 50 years, AND is the structural diversity of the foresUligh as . characterized by an additional layer of trees 20'-49' tall, shrubs 6' - 20', tall, and a herbaceous groundcover? 2b.3. Does ( 25% of the areal cover in the herbaceouslgroundcover or the shrub layer cOnsist of invasive/exotic plant species from the list on p. 19'1 Q.2c. Estuarine wetlands. I 2eI. Is the wetland listed as National Wildlife Refuge, National P!lfk. National Estuary Reserve, ~atural Area Preserve. State Park, or i Educational. Environmental or Scientific Reserves designated under WAC 332-30'-1511..... . 2c.2. Is the wetland> 5 acres; . . . . . . . . . . . . . ; . . . . .. ........ _Notl:: If an area contains patches of salt tolerant vegetation that are J) less than 600 feet apart and that are separated by mudflats that go dry on a Mean Low Tide, or , 2) separated by tidal channels that are less than 100 feet wide; all the vegetated areas are to he considered together in calculating the wetland area. ' or is the wetland 1-5 acres; . . . . . . . . . . . . . . . . . . . . .. ................ or is the wetland < 1 acre? . . . . . . . . . . . . . . . . . . . . . . YES: Category I YES: Category II NO: Go to Q.3. YES: Category I NO: Go to 2h.2 YES: Go to 2b.3 NO: Go to Q.3 YES: Category I NO: Go toQ.3 j I ~: CalegoIjy I ~Go to 2cl2 ! ~atego~ I ~~I('J no w OC-\oBo..)(r ~ .,~~ ~- YES: Go to 2c.3 YES: Go to 2c.4 M.."'_~O-L7"~'- ."o'~., . ;:,~.' M=_ '" ..-.._._.",~,~-- J!i 'f 27 I,; 'I' ! " . 2c.3. Does the wetland meet at least 3 of the fllllowing 4 criteria:'.. ....., - minimqm existing evidence of human related disturbance such as diking, ditching, filling, cultivation, grazing or the presence of non- native plailt species (see guidance for definitiun); - surface water connection with tidal saltwater or tidal freshwater; " " - at least 75,% of the wetland his a 100' buffer of ungrazed pasture, o~n water. shrub or forest; - has at least 3 of the following features: low marsh; high marsh; tidal channels; lagoon(s);wood,y debris; or contiguous freshwater wetland 2c.4. Does the wetland meet all of the four criteria under 2c3. (above)'?. Q.2d. Eel Grass and Kelp Beds. 2d.1. Are eel grass beds present? . . . . . . . . . . .. . . .. . ., ......... 'l" . . , j 2d.2. Are there floating or non-floating kelp bed(s) present with greater than 50% macro algal cover in the month of August or September'! . . . . 0.3_ CategorY IV wetlands. 3a. Is the wetland: less than 1 acre and. hydrologically isolated and, comprised of one vegetated class that is dominated (> 80% areal cover) by one species from Table 3 (page 19) or Table 4 (page 20 ) 3b. Is the w~land: less than two acres and, hydrologically isolated, with one vegetated,class!. and> 90% of areal cover is any combination of species from Table 3 (page 19) 3c. Is the wetland excavated from upland and a pond smaller than 1 acre without a surface water connection to streams. lakes, rivers, or other wetland. and has < 0.1 acre of vegetation. 2H YES: Category I NO: Category II YES: Category II : NO: Category III : ., I,i :f I YES: Category I NO: go to 2d.2 YES: Category I NO: Category II YES: Category IV NO: go to 3b YES: Category IV NO: go to 3c YES: Category IV NO: go to Q.4 " :Ii: r I ~ i;l. i .", '~<?~=.,_..;;_.>> ~;.Q'4'~ . 0 ~_ . . . . . \ D . . Q.4. Significant habitat value. Answer all questions and enter duta requested. 4a. Total wetland area I Estimate area, select from choices in the near-right column, and sCore in the far column: I ,.)6' ~.. . 11.1 Enler a<"Teage of wetland here:_acrcs, and source: tSll.4L, f P I:Ir - Scrub-Shrub: if the area of scrub-shrub class is > 1/4 acre, Forested: if area of forested class is > .114 acre, Add the number of wetland classes, above, that qualify, and then score according t~ the columns at right. e.g. If there are 4 classes (aquatic bcd-;, open water, emergent & scrub- shrub), you would circle 8 points in the fartight column. 4c. Plant species diversity. For each wetland class (at right) that qualifies in 4b above, count the number of different plant species you can find that cover more than 5% of the ground. You do not have to name them. Score i!fCOlumn,at far right: e.g. If awet1and has an aquatic bed class with 3 ~pecies, an em~gent class with 4 species and a scrub-shrub class with 2 species you would circle 2, 2, and 1 in the far column. Note: Any plant species with a cover of> 5% qualifies for points within a clas.~, even those that are not of that class. Clas:i . quatic Dcd, /UJ7lIl... ,. Emergent I I I I Scrub-Shrub I fo"orestcd Circl~ scores that qualify ~ !~ I ~ . m I 3 2 >200 40-2()() 10-40 5 - 10 I - 5 0.1 - . < 0.. 1 () " i/ # of classes fui.n1s 1.......0 @.....@ 3.. .....6 4.......8 5.......10 # species in class . 2 3 >3 1 2-3 ~ >5 I 2 3-4 >4 I 2 3-4 >4 filln1s () 1 2 3 I: Jl 'r ~ o 1 CD 3 o I 2 3 ,() 1 2 3 29 "."""."-R.." ."7[. ,.. ...~. ..':::~'7;-;:p- :.~C~ , I ... ... 4d. Structural diversity. If the wetland has a forested class, add J point if each of the following classes is present within the forested class and is hlri!er than 1/4 acre: -trees > SO' tall . . . . . , . , . . . . . . . . . . . . . -trees 20'- 49' taU . . . . . . . . . . . . . . . . . . . -shrubs. . . . . . . . . . . . . . . . , . . . . . . . , . . . . -herbaceous ground cover. . . . , . . . . . . , . Also add } point if there is any "open water" or "aquatic bed" class immediately next to the forested area (ie. there is no scrub/shrub or emergent vegetation between them). . 4e. Decide from the diagr.uns below whetherinterspcrsion between wetland classes is high, moderate, low or none'] I f you think the amount of interspersion falls in between the diagrams score accordingly (i.e. a modemtely high amount of insterspcrsion would score a4, while ~l moderately low amount would score a 2) none moderate moderate 4f. Habitat features. Answer questions below. cirele features that apply, and score to right: Is there evidence that the open or standing water was caused by beavers Is a heron rookery located within 300''] Are raptor ne.e;t/s located within 300''] Are there at least 3 standing dead trees (sn~gs) per acre greater (han 10" in diClmeter at "breast height" (DB H)'!. Arc there atleac;;t 3 downed logs per acre with'a diameter > 6" for at least 10' in length'! Arc there areas (vcgetated or unvegetatcd) within the wctlandthat are ponded for at least 4 months out of the year, and the wetland has nOL qualified as having an open water class in QuesLion 4b. '] . 30 YES-} YES-I YES - ] YES-] YES -, I High,. 5 Moderate ,. 3 Low - I None - () J J;I l low high YES = 2 YES = J YES = 1 YES = 1 0E~ /to <f~~ " " ~f! i , I if ~. '.'''?lJQ='~,,?f$[ . , >J ... . --.-..-. -_... -_.,--'_......__...............~~_.._h...O"___._ '.,--.................... 4g. Connection to streams. (Score (me answer only,) 4g,l. Does the wetland provide habitat for fish at any time of the year AND does it have a perennial surface water connection to a fish bearing stream. 4g,2 Does the wetland provide fish habitat seasonally AND does it have a seasonal surface water connection to a fish bearing stream. 4g.3 Does the wetland function to export organic matter thrnugh a surface water connection at all times of the year to a perennial stre~. 4g.4 Does the wetland function to 'export organic matter through a surface water connection to a stream on a seasonal haSis? . 4h. Buffers. Score file existing buffers on a scale of 1-5 hased on the following four descriptions. If tAe condition of the huffers do not exactly match the description, SCOre either a ~int higher or lower depending on whether the huffers are less of more degraded. I i . ! Forest, saub, native grassland or open watC?f bufters are present for more than }()()'around 95% of the circumference. Forest, saub, native grassland, or open water buffers wider than HX)' fqr more than 1/2 of the wetland circumference, or a forest; scrub. graSslands, or open water buffers for more than SO' around 95% of the clrcumference. Forest. scrub, native grassland, or open water buffers wider than } (X)' for more than 1/4 of the wetland circumference, or a forest, scruh. native 'grassland, or open water buffers wider than 50' for more than 1/2 ufthe wetland circumference. Nu roads. huildings ur paved areas within .1 ()()' uf the wetland fur In(lrC than 95% of the wetland circumference. '"No roads, buildings or paved areas within 25' of the wetland for more than 95% of the circumference, or . No roads buildings or paved areas within SO' of the wetland for more than 1/2 of the wetland circumference. Paved areas, industrial areas10r rc.~identiai construction (with less than 50' hetween houses) are less than 25 feet from the wetland for more than 95% of the circumference of the wetland. YES = ti YK<; = 4 YES =4 YES=2 :l- I ! ! i I I I Scor~ = 5 i Score = 3 ., !I i - ~re:=]:)- Score = 2 Score = I Score = 0 . !i ~i J I f I 31 "..~"":2fT-;.F.-; ::::0- . .:.J,.~..~~=,.,"'>__'" ~O - "",..-.".''''''''......,....",.'.-;..f''',..4 ~ . . __ J "-' . WBSTBCH COMPANY &mroomemat ConauIting - Site PcnaJCCfng' TRANSMITTAL DATE: TO: FROM: SUBJECT: IfIt...&.. r 2..'" . l1.,I:J k~J:,.. B~--'l ~h___ U(:--Z:.; Y-Q..- f=~p." &'L:.I-./t I'~ ~;,.1 ~ "7 F/ . COMMENTS: ~V!~ r G'_.../6<~ ~~~;;:-r- +. -- ~ ~ ~~...t.-:7"f PT-: Ii:. I 'b2.r" Jt -:6 ~ ~ - -r[ -... 1-:>:. :J2 J_-~"p ,1 J W901S/070694ms -'-2:-'~~Ei"7'-~ ~L.~_~" ....c% ." ""U'~"'.""""..:.i",,,,.:.,",,,,.,.,, P.O.80z 2816 . Port Angeles, WashiJIgtoa 98362 . Telephone: (360) 452.0186 . Fa: (360) 452-4118 cmaII: bshcaOt.eDfornrd.eoul . I -a t WBSTBCH COMPANY Eudt-vdft'laatal Coasaldag . SIR P-.....A...... May 27, 2002 Mr. Bob Leach Northwestern Territories, Inc. 717 South Peabody Street Port Angeles, W A 98362 Dear Mr. Leach: Enclosed is a letter repon on the Beckett Point Alternatives and their potential environmental feasibility. This report is based on our previous work and a brief site reconnaissance update carried out with Mr. Bill Payton of NTI on May 14, 2002. I have also reviewed your map of alternative routes and the wetland repon prepared for the Beckett Point Fisherman's Club in August of 2000. Please let me know if you have any questions on this repon. An invoice is enclosed for this work. Thank: you. Sincerely, J!~~ G. Bradford Shea, Ph.D.. REA Principal " GBS/ms Enclosures WI789BKT.ALT/052702gbs . ""~2r3"'~'''--' ,.=L.,.", . .,,:ii~ P.o. Jkq 2876. POl'tAagela, W....lnttcJR 98362. Tde:phoa.C2 (360) 452-0186. Pa: U6Q) 45~118 cmail:bshea~ " (( '" f BECKBTf POINT ALTERNATIVES: IiNVIRONMENTAL FEASIBIIlTY Three aJternative routes for a proposed pipeline route for the Beckett Point Community Drainfield project were reviewed as a follow-up to Wesr.echts Preliminary Environmental Feasibility Report (Wesrech 2001). These alternative romes were developed by Nonhwe.stern Territories. Inc. (NT12001, 2002). At present, design is for a 4-6 inch pipe (probably PVCor possibly ductile iron in some areas) buried to a depth of approximately three feet. All three alternatives would involve individual pumps or pumps for small aggregare groups of residences. Effluent would be pumped along a main line (4-6 inches) located along Becken Point Road (within the Beckett Point Community). Alternatives #1 and #2 would involve routing the line extension through Beckett Point Hill Park (#1) or along Beckett Point Road (#2) extending from the base of the hillslope leading out of the community, while 13 would route a line sttaighl up the hillslope from the end of Beckett Point Road. The three proposed alternatives are as follows; 1) This alternative would involve construction of the pipe through Beckett Hill Park and then crossing Beckett Point Road just below (and south of) the old gravel pit. The line would then go in a fairly direct line through existing forest [0 the proposed drainfield area. 2} This alternative would invofve construction along Beckett Point Road to the entrance of the old gravel pit and from there, overland up the hillslope through existing forest to the drainfield area. 3) This alternative would place the line up the hillslope, roughly parallel to and east of the existing water line. The effluent line would then continue up the hillslope through existing forest to the drainfie1d area. The three alternatives each have differing potential effectS on the environment, depending on the routing, construction methods, slope stabilization and erosion control methods (particularly for #3) and timing of construction. A variety of environmental mitigation measures may be employed to reduce potential. impacts of constrUction. Operational impacts are not anticipated, except in the potential case of a leak. W1789BKT.ALTIOS2702gbs ?{'L-'~-i'~-' ,"". ~>..sf' """'''''''--,,,...,..,,.,...,,,,,,, t . . ... , Alternative #1. Beckett Point BiIlside Park This alternative runs along graveled roads through the residential area of Beckett Point Hillside Park. It will not involve running the line under as much area. of the paved road (Beckett Point Road) and will thus simplify and possibly speed up consttuction. The route south of the old gnlvel pit is near some identified nest of important species (heron and bald eagle) . We recommend that these nests be identified as to status prior to construction and that the route be timed to avoid nesting periods (generally late July through September is optimal) and if any nest is very near the route, that the route be changed to allow at least 200 feel between the pipeline construction and the nest. Alternative #2. RtaP.kett Point R~ This alternative would continue up the hillslope on Beckett Point Road, possibly necessitating construction in the roadway, and thus potential road closures. This route goes through the old gravel pit and also passes close to eagle and heron nests as identified by the Priority Habitats Division of the Washington Department of Fish and Wildlife (WDFW2001). Again, construction should occur during the late summer as defined above and nests should be identified prior to construction and a buffer established around active nests during consuuction.. Alternative #3. This alternative would involve construction on a hiIJslope of approximately 30.35 degrees, involving difficult construction and probable erosion of the hillside. It is true that the water line was laid along this approximate route, however, the effluent line would have to parallel the water line, southeast of the existing line. There may be difficulty avoiding me water storage tank an::a. and some potential for erosion or sedimentation of the marsh still exists. Apparently, however. the water line was laid without significant environmental damage. A wetland area is located immediately below the slope which would be used and would lie in the probable path of any erosion (Comparison of maps between Brooks (2000) and NTI 2(02). This route also would result in some risk to coDSUUction personnel. While this route appears from mapped infonnation [0 be slightly further from listed nest sires. me data. for these sites is old (early 1990s) and nest locations may have changed. Again. we recommend that any construction be done in lare summer and that the area be surveyed first for active nestS. An Erosion Control Plan should be prepared prior to construction and soils along the trench should be immediately restabilized following construction. WT789BKT.ALT/052702gbs "L""~'."-!1. ~'" .._~".,"-- ,?~ 'n'W" '~'. ", . c_'C."''''~ '"''::''''''''''f~':'''''''':''''~''''''''''' " . J' ... . ... Recommended Alternative From the analysis above, lhe preferred ahen18.tive to minimize environmental impacts appears to be Alternative #1 through Beckett Point Hill Park. Construction timing is recommended to occur during lhe period from late July through the end of September and standard erosion control methods should be employed to proteCt shoreline resources. The exact routing to enter the old gravel pit area should be fine tuned after a bird survey to identify existing nesting sites. It may be necessary to prooeed further north on Beckett Point Road before cutting cross country toward the dminfield area in order to miss me nest sites. Recommended Mitiearion Measures In summary. recommended mitigation measures include the following: 1) Restricting construction [0 late summer (late July through September) 2) Conducting an updated nesting survey prior to construction and then fine tuning the route to avoid active nest sites to the extent possible and to minimize need for tree removaL 3) Employ standard erosion control measures LO protect shoreline resources (in the case that Alternative #3 is chosen, a more sophisticated Erosion Control Plan should be prepared and submitted to the County, and [0 Stale Resource Agencies for review prior (0 construction). Other mitigative measures could be developed, however, the measures listed above are expected to substantially offsel impacts of the pipeline ponion of the proposed project. WT789BKT.ALT/OS2702gbs ,.. ,. .........Z:rT:-...~-;~7'--' ".,:J"I!._"..,. ~~ ., .. 904d 1t::l.LO.L .. ... .'. REFBRENCBS Brooks, K.M.2000. Wetlands Qelineation and Rankine Report: (as shown in Official Record Map of Cape George Fisherman, Inc. Salmon Club). Pacific Rim Aquatic Environmental Sciences. Port Townsend, WashingtOn. Northwestern Territories, Inc. 2002. Community Wastewater Treatment Systems. PrelimiD8IY Engineerine ~n. Beckett Point. NTI. POIt Angeles, Washington. Washington Department of Fish and Wildlife. 2001. Habitats and Species R~n in the Vi~nitv of T30R02W~ Section 23. Priority Habitats and Species Division. Olympia, Washington. Westech Company. 2001. PrelimillaQ' Environmental Feasibili~ Rqlon: Beckett Ppim CommunitY WasteW3teT Treatment System. Jefferson CountY- Washi....&tOn_ Port Angeles, WashingtOn. WT789BKT.AL T/052702gbs -"'-"--/j1- . C ~_ .,,~::I-~ . lS 3Sntl>-l ....Z (.)Q ~~ 0(.) Q:O D....J o C') If) I~ , r<y; I \) ~. .bc4 ~ !. ca :Ii b -.- c c .0 :g ....11.> t:13 !CDCD ::::J.lll:: .~ _UO -CD.. ii:ml1. D. c( :liW Z;Ci! Q~ ~~ (J o ..oJ 11. ~W g ~(/) _0 ZZ (J :> I III .. ~ j t;~ s I W_ ~ -'Z Q O- W Q:~ >< g ~<1Z D..> (/) 0 E Z Rl ... Rl 0 a.. !~; l~: I ' , ". .~ ~ ca "C _c C ::::J .- 0 OlD 11. Nt:~ !CDCD ::::J .lll:: a. gi e u.IDD. III 3 () {I') ! J: (/) u:: l-W zz o::i e.~ ~~ fd~ 1IIe. I I c I z w I e w ..oJ i I .. ::! ... ~ ~ I ~ >< !<1Z Rl ... Rl a.. 0 w g (/) o z 2 w t- - ,~ ~ (I' c>) '",~ ~,;J~ ..{.: f'\ ~ o -l ~ oL ~ ~ ~ OJ iU '" ... ~ i!l ~ l!l iU 0 It) !( N 0 ~ I<1Z III ... :. a. C'lS -:Ii c .- CD o~ (")11.(1) (1)==13 ... CD CD ::::J~'~ QUO ._ CD .. u..ml1. ,..... x 0 a::: ,..... 0- X ,..... 0- 0 Vl c( a::: ~ '-' 0- ~ Z e. 0 c( F '-' U ~ ~ F z VlO- Vl ~ ~w ZVl 0- ~o :::E 0- ::> :::E ~ 0- ::> a:::~ 0- ~a::: 0 ~~ z 0 ::> z Z 0 ::> <:)0 ~ 0 zU a::: ~ F-J w W Vl-J 0 0 x~ z z w'-' ::> ::> e @0 ~ a::: c( a::: :::E w 0 I.L Z a::: I.L ::> ~ ::> 0 II) a::: c( 0 Cl 3t z a::: a::: J: c( ~~ Cl ~ Zw J: ~ ::>Vl >- Ow a::: I- Wa::: c( 0 Vl::> z 0 OVl 25 I.L ~~ a::: 0 a::: a::: 0 It') 0-0- = 0 -J >- W a::: !i: 0 z Cl <( w a::: 1-0 0 c(z Uc( 0 Cl~ W Vl ~~ 0 0- Vl 0 xc( a::: we. e. C'I 8 ~ I I- W ~ ~ W -I c( U (/) o z 0 w C/) ~ c!) 5 ~g ~ c!) ~..J~ J: ~~ oUr 0 ~~ zi=..J 0 C/) o~o ::i i5 ll..~ o () C/) ~ z ~ 5 0 ~ w c!) A! C/) ~ 0:: w ~ ~ C/) III C/) u:: w 11. 0 :Ii ~ j..Jw in 11.:CC~ c~~ ZWo jCZ 0 ~ e -I ~ W C Z j .9 ..J ~ c!) ~ :E o::i ltic!) ....Z 0:: i1l ..J () C ..J W ~zW -O;Ci! ~i=() C~~ ..JU)Z II( o ii: <(, ~ ti ..J ~ ~ Z ~ Z o ~ W!( tig~ ~ll..~ ().~ z- o~ 0<0 ~ c!) ~~ Wz ~~ ",'.~ ' ~~ ': ";... I W ~ 00 !!!irl 0_ I-u. ZZ ~~ ..JO H::o WI- J:1i !::w!;C s:~o ~u::~ :JI-OC/) ~ffi~~ n.3a.~ :::!:u.:::!:- :Ju.:JS: a.wa.C/) z o ~ ~c!) C/)~ wt) ~- w~ ~J: u.O ~i w a. 0: ~ w l5 C/) . e ~ z ~ A. :Ii j..Jw 11.-;Ci! C~O ZWC/) jC~ i e "'>, ~ W C Z j ~ :::!: ~ :J: (J Z W ~ ~=~ ~~~ I1.WO ..JCZ c( (J ii: <'I I ~ l~".. , '<5, l~~ ;---~ !g ; CD :> c -.2 c- .- U o CD ~11.U) t:- ! CD B ::::J.lll:: .- QUa. ._ CD >t u.ID~ i ~ III .. ~ u: j s I 1!1 i!j >< L .. ell E Rl ... Rl a.. '" --DRAFT OUTLINE Jefferson County PUD#l Pre-Application PRE04-00035 DCD Conference Room Attendees: Mike Moren Jim Pearson, DPW; Randy Marx of En v Health; Stacie Hoskins, DCD October 29, 2004 10:00 am Public Works: Storm water: DOE Stormwater Management Manual for Western Washington Roads: Submit Stormwater Management Plan Environmental Health: Water: Septic Community drainfield: Need enough soil logs to identify area (15 - 20 holes) Work through DOH for permitting if over threshold. PUD would own and operate once established. Community area for individual drain fields: Need individual easements. Want to see four holes per system (2 for primary and 2 for reserve). Then can permit systems later on existing infor and won't have to have ad,ditional holes dug. Permitted through Jefff Co Env Health. LOG ITEM # Page-1()~ ofd$f PRE04-00035 _JCPUD#I_Beckett Point.doc Page 1 of 2 ~DRAFT OUTLINE DRD: 1. Zoned RR 1 :20 2. ESA's: Suburban Shoreline designation Shoreline also designated as Type 1 Stream, Wetland as Type 5: proposed UDC Amendments may impact Fish & Wildlife buffers. Due to be completed by end of 2004. Wetlands: Type II require 100-foot buffer, mitigation to reduce (reg's changed in 2001.) Update delineation with buffer and discuss mitigation. Flood: Follow Flood Damage Prevention Ordinance LSHA 1, 2 & 3 and Seismic hazard: Geotechnical report to address stability of soils Susceptible Aquifer Recharge Area Fish & Wildlife (Eagle, Great Blue Heron) Send to WDFW; Coastal SIPZ 3. ESA's and buffers depicted on site plan; Wetland Delineation, geotechnical report 4. Unified Development Code available online at: http://www.co.iefferson.wa.us/commdevelopment/udc/default.htm UDC Section 3, Table of Uses Minor Utility Development in RR 1:20 zone is C(a) Use Base fee Notice of application Notice Board 612.00 124.00 8.00 ~C(to l~C') UDC Section 5, Shoreline Management Master Program Utilities in a Suburban Shoreliune Designation is identified as a Secondary use. Shoreline Substantial Development (Secondary Use) Base fee 1,409.00 Requires Notice of Application included above Notice Board included above Notice of Hearing 124.00 1\'1 '1 SEP A review (if required-difficult to read Figure 3) 432.00 127 ~<f (. ~ LOG ITEM # Page [03 ofdEZ PRE04-00035 _JCPUD#I_Beckett Point.doc Page 2 of 2 U) CD U) :::) "tJ CD - :c - .c e a. "tJ c ca CD :c ca ~ .E <c - . C"') CD :c ca I- :It ~"' =' !jE)'i ~"l , 'I M ~! uoge~H , CD CO UJ UJ UJ CDM ('0 ..,f 0 0 0 0 0 E! CDM CD CD CD Cl CD ..... (,) (,) Cl CD Z Z Z Z Z f*:::I~ saAJasaJd 'SlfJed en..,f >- >- >- en..,f CD .~ en C\l (0 ,,~ M I UJ UJ CDM ..,f UJ UJ 0 M le!4snpul MeaH CD CO UJ ('0 0 0 CDM CD CD CD Cl CD..... (,) (,) Cl CD Z CD CD Z z en..,f >- >- >- en..,f CD >- >- en M (MafAJSI3 pue alml!no) CD CO UJ UJ UJ CDM ('0 ..,f 0 UJ 0 0 0 CDM CD CD CD Cl CD ..... (,) (,) Cl CD Z CD Z Z Z 6U\lII1:lIljnuennl!4S11pUI1II6n en..,f >- >- >- en..,f CD >- en , ('AOO 1Ia19) JeIlISIlfIUI Jq/ln M !9: CD CO UJ UJ UJ CDM ('0 ..,f 0 UJ 0 0 0 CDM ~ ~ ~ Cl CD ..... (,) (,) Cl CD Z CD Z Z z en..,f en..,f CD >- (MOO 1laJ9) en l~l!!4$lIPIII1IIfin M lepJSnpUJ iDco UJ UJ UJ CDC") ('0 ..,f 0 0 UJ 0 0 CDM CD ~ ~ Cl CD ..... (,) (,) Cl CD Z Z CD Z z paseg"a~,m~H en..,f >- en..,f CD >- en M $~ CI) UJ CI) CDM ('0 ..,f 0 0 0 UJ 0 peOJssOJ:) leJauaa CD CD CD Cl CD..... (,) (,) Cl CD Z Z Z CD z en..,f >- >- >- en..,f CD >- en M peoJSSOJ:) JOp'S,^ CD co UJ UJ CI) $~ ('0 ..,f 0 0 0 UJ 0 CDM ~ ~ CD Cl (,) Cl CD Z Z Z CD z JPOOlpoqq61aN cn...,f >- en..,f (,) CD >- en M CD co UJ UJ CI) CDM ('0 ..,f 0 0 0 0 0 peOJSSOJ:) lI:)lJallJaAUO:> CDC") ~ ~ CD Cl CD ..... (,) (,) Cl CD Z Z Z Z z en..,f >- en..,f CD en M JatUa:) a6eJl1ft. JeJnH CD co CI) CI) CI) CDM ('0 ..,f 0 0 0 UJ 0 CD CDC") CD ~ ~ Cl CD ..... (,) (,) Cl CD Z Z Z >- z en..,f >- en..,f CD I en - : J L C") (Ii~'iOlTna'~, CD co UJ CI) CDM ('0 ..,f UJ 0 0 -0 Cl CDM -0 CD CD Cl CD ..... (,) $ CD z z (,) en..,f (,) >- >- en..,f I , >- en ~ M CD CO CI) CI) CDM ('0 ..,f UJ 0 0 -0 Cl sanYO~/na ~ CDM -0 CD ~ Cl CD..... (,) (,) Cl CD ~ Z Z (,) en..,f (,) >- en..,f CD en M $~ CI) CI) CDM ('0 ..,f UJ 0 0 C3 Cl sa~S/na~ -0 CD ~ Cl CD ..... (,) (,) Cl CD ~ Z z en..,f (,) >- en..,f CD en 6UIPIoqUI , leJnH M CD co UJ CI) CDC") ('0 ..,f 0 0 ('0 UJ CDM -0 ~ ~ Cl CD ..... (,) (,) Cl CD Z Z (,) ~ Cl 'lep,laWWO:) - JSajO:l en..,f (,) en..,f CD - en ~co M C") M ~ pue aw!Jd UJ UJ CDC") ..,f UJ ..,f ..,f UJ '<I"M -0 (,) ('0 Cl CD CD Cl CD..,f CD CD Cl CD ..... (,) CD CD CD >- ;eJl1JIn'IJ6y (,) >- >- en..,f CD >- CD CD ~oll en en en C> CD c: ~ "0 CD u; u; C> UJ C '5 m ~ .... ~ 5 e ,f2 10 UJ (;) 0.. Q 0 UJ CD oll ~ UJ ~ ~ .;, CD UJ CD .!2 <:> UJ UJ ::> C> CI) 8 CD Q ~ CI) E ::> ~ c: ~ ::> CD ~ u; CD c: ~ 'B 0 UJ 0 ~ c: II) III 0 CI) LL '0 .s CI) m . UJ UJ CD UJ CD ::> .E: . ('0 ('0 CD LL UJ CD e "0 CD E "0 ~ U. > UJ c: ~ 8 ~ ~ ~:ii ..... -c ::> 0 l5 l5 . < 0.. 0.. = CI) u; c: m m- .5 olll? ro '0 oll CD -.I E CD c: ~ l5 52 (,) :::E :::E oll E 0 :> I UJ l!! 10 UJ . UJ.Q UJ ~ ::> . .Q '2 <Ii <Ii CD UJ ~o c: UJ ~ CO) "0 t:: > t: ::> UJ <( <UJ .a ~ 8 . -c J5 8- E 'E 'E Jg ~~ c: UJ 0.. ::> "0 "0 CD :; "0 S ::> E CD CD >: ~ ,0 c: 5 0.. CI) E E ~ 't)-C: c: c:UJ (,) 'fi CD B c: 0 1:5 <.2. m m::> 'C: E ::> CD .~ <Ii l!! (,) 0. 0. C> :5 CD . 0 0 < 'E UJ "0 < 0 -0 .r= I- ::> - CD = c: CI) q: oc J5 10 ro ~ ~ "0 ~ l!!c: m 5E:;: -0 ~ ::> -0 1? ::>= a:: UJ 0.. 0.. CD CD CD CD .a =:~ CD CD l!! -0 E CD Cl Cl E ao ,g ... CD (~ (E ITEM c: <Ii oll :; CD= 8- ('0 ~ m E ~ ~ ('0 (,) ('OJ::. co .c "S: ...~ "0 T E T . ::>en ::> E= E i: m .~ -c ::> c:: CD m &. c:: 0 5 5 c:: . C> <:T .... ~f3 :i z ::> I- 0.. I- ::> (,) ::> < <0 .. Page. I 0 t.f of a.5f / // ./ v ENVIRONMENTAL URBAN SUBUR- CONSER- NATURAL AQUA TIC* DESIGNATIONS BAN VANCY ADVERTISING , On-premise S S S X C Off-premise C C C X X AGRICULTURE S S P C N/A AQUACULTURE Passive Enhancement P P P C P Extensive Upland P S S X N/A Extensive Intertidal P S P S** +- Extensive Subtidal S S S S** +- Intensive Upland P S S X N/A Intensive Subtidal S S S S** +- BOAT LAUNCHES P P S C +- COMMERCIAL Water-related P S S, X +- and/or dependent and/or enjoyment Non-water dependent C C C X X*** DOCKS, PIERS, AND S S S C +- FLOATS DREDGING S S C X +- FOREST MANAGEMENT S P P C N/A INDUSTRIAL AND PORT FACILITIES Water related P S C X +- and/or dependent Non-water dependent S C C X X LANDFILLS Upland P P S X N/A Aquatic S C C X +- MARINAS P S C' X +- MINING C C C X +- MOORING BUOYS S P P C +- PARKING FACILITIES Vistas S P P C C Non-vistas S S C C 'C RECREATIONAL FACILITIES Over-night P S S X X Day use P P S C +- RESIDENTIAL P P S X X DEVELOPMENT SCIENTIFIC AND P P P S +- EDUCATIONAL FACILITIES SHORE DEFENSE WORKS S S S C C TRANSPORTATION P S C C +- FACILITIES "r . ~ UTILITIES P , S \ C C C , P - Primary S - Secondary N/A - Not Applicable C - Conditional +- - Same as upland X - Prohibited ., * Projects in the aquatic designation that originate waterward of the extreme low tide (see Figure 3), but have been classified with an arrow +- shall be considered the same as the adjoining upland. ** See Section 5.30, Aquaculture, Policy #11 LOG ITEM *** See Subsection 4.106, "Port Townsend Urban Waterfront Special District" for exception. fi- 40 "ft<'~ It . - .~inr::. /oS of.D~ >a'~,;;:'j~~.... ~ Policy To protect, conserve, and manage existing resources and valuable historical and cultural areas in order to ensure sustained resource stabilization and that sensitive natural conditions are not subject to inappropriate uses. '- 4.104 SUBURBAN Definition Areas where residential activity may approach urban density, but usually where densities permit space for small numbers of livestock, gardens, or wood lots. These areas are served by individual or community water supplies, but generally are not linked with utilities from an urban center. Commercial activities to serve the needs of the immediate area are considered an integral part of this designation. Policy To provide permanent residential and recreational areas outside of urban areas, so long as development of these areas provides adequate facilities for sewage disposal, water supply, open space, and the like without severe degradation to the lifestyle that was sought initially. 4.105 URBAN ~; Definition The urban environment is an area of high intensity land use, including residential, commercial, and industrial' development. Urban shorelines should be designated for high intensity' use or multifamily residential development. The urban designation may also be applied to areas of lower intensity use where the surrounding land use is urban and urban services are available. Policies 1. Development in urban areas should be managed so it enhances and maintains the shoreline for a variety of urban uses, with preference given to water dependent and water related uses. Water-enjoyment uses that provide access to and enhance enjoyment of the shoreline for a substantial number of persons should also be given priority in urban areas. Efficient utilization of existing urban areas in a manner consistent with this program is encouraged before further expansion into non-urban areas occurs. Pedestrian and visual access should be provided to and along the urban waterfront area. Public access to and along the water's edge should be coordinated in a walkway system and linked to adjacent existing or future walkways. , 2. 3. LOG ITEM F 31 ":Zjc:;_.LoLof ~ ...... During application review,~the basic element or intent of a proposed development will guide in the determination of the proposal's particular use activity. When a proposal contains two or more use activities within a shoreline designation, each activity may be reviewed independently and the total project considered on the whole. In the review of a shoreline permit, consideration will be given to the cumulative impact the project may have with similar use activities. This review is to ensure that the resulting total effect will not thwart the intent and policies of the particular shoreline environmental designation, nor result in substantial degradation of the shoreline itself. 4.201 PRIMARY Definition In general, those categories of uses that are deemed as being preferable with the definition and policy of a particular shoreline designation. Criteria Primary uses are presumed to be generally consistent with the policies and definition of the shoreline designation where it is located. Projects will be reviewed for consistency with specific goals and policies and must comply with the performance standards specified for the particular type of development being reviewed. ... 4.202 SECONDARY Definition Those uses that are not automatically deemed as being preferable within the- scope of the definition or policy of a particular shoreline environmental designation. Criteria Applicants for shoreline substantial development permits for secondary uses will have the burden of proof to demonstrate that: 1. The proposal will not be contrary to the general intent of the Shore-line Management Act, nor shall it be contrary to the goals, policies, and performance standards of this Master Program. 2. The proposed project will not materially interfere with the public use of public lands and waters or the private use of adjacent private lands. 3. The proposed project will not cause unnecessary adverse effects on the environment or other properties and will be compatible with other permitted uses in the area. . -., LOG ITEM 36 * ::~~3_(D 7 of d5(f I . . 7. 8. 9. 10. Upon completion of installation or maintenance projects, banks shall be restored to a suitable configuration and stability, replanted with native species, and provided with maintenance care until the newly planted vegetation is established. Utility discharges and outfalls shall be located, designed, constructed, and operated so degradation to water quality, marine life, and general shoreline ecosystems is kept to an absolute minimum. Both during and after installation, utilities shall assure that geohydraulic shore processes and marine life are basically maintained in their natural condition. Utilities located in flood prone areas shall be provided with adequate flood protection and shall not be installed to increase flood hazard or other damage to life or property. Flammable or toxic materials shall not be stored in areas subject to flooding. Utilities shall not be installed in areas subject to geological hazards, unless it can clearly be demonstrated that such hazards can be overcome. 11. 12. LOG ITEM # PafF~ (O~ of~ 80 \ '\ \ 24. salt or fresh water, unless the purpose of the vacation is to enable any public authority to acquire the vacated property for port purposes, boat moorage or launching sites, or for park, view point, recreational, educational, or other public purposes, or unless the property is zoned for industrial purposes. Further, such vacation shall not be accomplished for any purpose that is not consistent with this Master Program, and then only when all appropriate federal, state, and local permits have been issued for the intended use. Transportation facilities in flood:ways shall be designed to minimize flood water diversion or obstruction to flood water flow. ~ 5.200 UTILITIES Definition Services or facilities that produce, transmit, carry, store, process, or dispose of electric power, gas, water, sewage, communications, oil, and the like. Policies 1. Whenever utilities must be placed in a shoreline area, the location should be chosen to not' obstruct or destroy scenic views. Wherever feasible, these facilities should be placed underground or designed to do minimal damage to the aesthetic qualities of the shoreline area. 2. To an extent feasible, Jefferson County and the City of Port Townsend should incorporate major utility corridors on shorelines into their programs and plans for public access to and along water bodies. 3. Utilities should be located to meet the needs of future populations in areas planned to accommodate this growth. 4. Upon completion of installation and maintenance projects of shorelines, banks should be restored to preproject configuration, replanted with native species, and be provided with maintenance care until the newly planted vegetation is established. Performance Standards 1. Utilities shall be installed adjacent to or within existing utility or circulation easements or rights-of-way whenever feasible. 2. Utilities shall be installed underground whenever feasible. 3. Utilities shall be designed and installed to meet future needs when possible. 4. When feasible, utility corridors shall serve multiple uses such as shoreline access or recreational trails or pathways. 5. Utilities installed in the water, beach, or upon tidal areas shall assure that water quality and marine life will not suffer degradation. 6. Installation of utilities shall assure the prevention of siltation or beach erosion. 79 LOG ITEM # Page_~o~ . r.., \ ) ~ ~ I I! ~ ,>-_"J." r- ' JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT OCT - 8 <I..'.. 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450.800/831-2678.360/379-4451 Fax Pre-Application Conference The Jefferson County Unified Development Code (UDC) requires that before an application is made for all Type II and Type III project applications and Type I applications proposing impervious surfaces of ten thousand (10,000) square feet or more and/or non-single family structures of five thousand (5,000) square feet or more, a pre-application consultation must be held. The consultation includes preliminary review and administrative assistance. This service does not include extensive field inspection or correspondence. Pre-application consultation' does not limit subsequent administrative review. At the conference, Department of Community Development personnel shall provide the applicant with: (1) A list of the requirements for a completed application; (2) A general summary of the procedures to be used to process the application; (3) The references to relevant code provisions or development standards that may apply to the approval of the application; and (4) A list of any applicable hourly review fees that may be charged by one or more County agencies upon the filing of a project permit application with the County. Discussions at the conference or the information provided by the staff shall not bind or prohibit the County's future application or enforcement of all applicable laws and regulations. No statements or assurances made by County representatives shall in any way relieve the applicant of his or her duty to submit an application consistent with all relevant requirements of County, state and federal codes, laws, regulations and land use plans. NAME: Jefferson County Public Utility District No.1 MAILING ADDRESS: PO Box 929, Port Hadlock, WA 98339 REPRESENTATIVE: N/A Parametrix, Inc. (VVORK) (60) 385-5800 Contact: Mike Moren, Project Engineer TELEPHONE: (HOME) MAILING ADDRESS: 5700 Kitsap Wayj Suite 202 Bremerton, WA 98312 TELEPHONE: (HOME) N/A (VVORK) (360) 377-0014 1. Please answer all questions on this form completely. 2. Attach a sketch of the Conceptual Design for the proposed use or activity, showing the following information: a. Vicinity sketch; b. North arrow and scale; c. Property boundaries and identification of land uses on adjacent properties; d. Means of ingress and egress; e. propertynot drainage; f. Possible locations of sewage disposal and water supply systems; g. Location of utility easements; and h. Proposed location of buildings, including setbacks to property boundaries. 3. Attach payment of the applicable fee, as set forth in the Jefferson County Fee Ordinance. ~ I""""ta""""'" ......r-.. ~ L U I I L-Iva PRE-APP CONFERENCE.DOC REV. 0412212OO3 H. ., .~1 Paga -LL1L-of ~.:Jo . Property Description General Location: Approx Imate I y s I x m i u I es southwest of Port Townsend, Wash i ngton, west of the intersection of Cape George Road and Beckett Point Road. Legal Description (from Property Tax Statement): P ILot 1 & TL Tax BI 37.15 CH Parcel No. Lot 2 & 3 9-Digit Parcel Number (from Property Tax Statement): Parce I No. 002231001 and 002242003 Total Acreage: 92 (Approx.) Zone: 1 :20 % Lot Coverage: 0.004% Section 24, Township 30N, Range 2W Applicant: DOwner o Contract Purchaser o Lessee QJ Other Jefferson County PUD No. 1 Project Description To abandon individual on-site septic treatment systems and provide a central low pressure sewer collect'o existing shoreline community of Beckett Point, Washington. Property Owner (name and mailing address): Beckett Point Fi sherman's CI ub c/o Patty Sah linger 890 Beckett Point Road, Port'Townsend, WA 98368 Standard Disclosure Information provided to a prospective applicant during the pre-application consultation is based on County regulations in effect at the time of the pre-application consultation. Revised or new Countv reaulations could affect a future development application. A pre- application consultation does not vest a future development application. By signing the application form, the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liabilities, judgments, court costs, reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. This right of entry shall expire when the County (through the Administrator or the Administrator's repres tives) concludes the application has complied with all applicable laws and regulations. Access and rig~ef~ry to the a icant' pro rty shall be requested and shall occur only during regular business hours. , (SIGNATURE) Q r',' ",...~~ v ,_)Cf ~T) I hereby designate Mike Moren, Parametr i x, I nc. ronfee-u ~ ..:... LA' , (LANDOWNER SIGNATURE) ~ to act as my agent in matters related to this pre-application rf;;fio'f ... ;1 PRE-APP CONFERENCE, DOC REV, 04/22/2003 # Page, .....-. _.,.~.: fir) of~ Page 2 . r ; , r~\ I !- I'll), ! : r-" ~ Parametrix . ..; ENGINEERING. PLANNING. ENVIRONMENTAL SCIENCES 5700 KITSAP WAY, SUITE 202 BREMERTON, WASHINGTON 98312-2234 T.360.377.0014 F. 360.479.5961 .www.parametrix.com October 8, 2004 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, W A 98368 Re: Request for Pre-Application Conference for Beckett Point Community Large On-Site Septic System Project Dear Sir/Madam: " ~ \ OCT - 8 Parametrix, Inc. (Parametrix) has been retained by the Jefferson County Public Utility District No. 1 (PUD No.1) to design two large on-site septic (LOSS) systems for the shoreline community of Beckett Point, Washington. The purpose of this letter and its enclosures is to request a Pre-Application Conference with the Jefferson County Department of Community Development (DCD) to discuss the project and its permitting requirements. Beckett Point is located approximately six miles southwest of Port Townsend, Washington, on the east side of Discovery Bay, and consists mainly of recreational beach houses (see enclosed Figures 1 and 2). The Beckett Point Fisherman's Club owns the property and individual lots are leased. There are approximately 100 existing residences, full or part time, Most of the residences are located on a large sand spit. Currently, sewage treatment is provided by individual septic systems that are in questionable condition on the sand spit. During 2003, the Washington State Department of Health - Office of Food Safety and Shellfish Programs, conducted a shoreline survey of the Discovery Bay shellfish growing area. Although no "Direct Impact" or "Indirect Impact" sources of pollution were identified on or around Beckett Point, the survey did identify many parcels with on-site septic systems and labeled these as a "Potential Source" of pollution due to their age, soils, and close proximity to the shoreline. The report recommended that Beckett Point be placed on the "Concerned Status" for point source contamination. It is the intent of Parametrix to design two independent community LOSS systems, under the Washington State Department of Health - LOSS Division (DOH) jurisdiction, to replace the existing individual septic systems. Sewage would be collected and conveyed by low-pressure sewer systems (LPSS) to a series of large septic tanks. The LPSSs will each consist of several small underground sewage grinder pump stations located mainly within the beach area. Sewage will be transported to the septic tanks through small-diameter, two or three inch pressure pipelines. LPSSs of this type have been used in many communities adjacent to both fresh and marine water bodies, and have much less of an environmental impact than traditional gravity sewer systems. From the septic tanks, effluent will be pumped to large pressure drainfields located in a forested area on the eastern portion of the property above the beach community. The drainfields, located at least 600 feet horizontally from the nearest shoreline, will greatly reduce the potential for contamination of shellfish near the Beckett Point community. The enclosed Figure 3 identifies the approximate locations of the proposed pump stations, pressure pipelines, septic tanks and drainfields as well as the Ordinary High Water (OHW) mark. Typical drawing sections of the underground grinder pump stations, utility trenches and drainfield dosing tanks are shown in Figure 4. LOG ITEM # Page_II'Z-- of~ - <( 5 -- l! W to- ;Z W (/) '" \. ; \ l I. ,t L, 11" t:. f" L: . t OCT - 8 October 8, 2004 Page 2 _' .._{~f. L:' .. " The Rural and Natural Resource Land Use and Zone Designations and Shoreline Designation Overlay map of Jefferson County identified the entire shoreline around Beckett Point as a "Suburban" designation. The pump stations and pressure pipelines in the beach area will be located within the existing Beckett Point Road right-of-way. No construction activities will be located within ordinary high waterline. A Wetlands Delineation and Ranking Report for the Beckett Point community was prepared by Pacific Rim Aquatic Environmental Sciences of Port Townsend, Washington in August, 2000. The report identified and delineated a palustrine Class II wetland in the beach area, requiring a 50-foot buffer for low intensity land uses. The wetland and 50-foot buffer boundaries are shown on Figure 3. Some pressure pipeline will be laid within this buffer - within the existing Beckett Point Road - however, no construction activities will occur within the wetland. Underground Horizontal Directional Drilling (HDD) will be used to install some sections of the pressure pipelines to avoid conflicts with the wetland. Parametrix has also obtained information from the Washington State Department of Fish and Wildlife (WDFW) on Priority Habitats and Species in the project area. Great Blue Heron and Bald Eagle habitat have been identified near the project area. It is anticipated that this may have an impact on the timing of construction, and a Bald Eagle Management Plan may have to be prepared. Further coordination with the WDFW will be necessary as part of the permitting process. Should you have any questions, please feel free to contact me at (360) 850-5320. Sincerely, P ARAMETRlX Mike Moren Project Engineer Enclosures cc: Jim Parker, Jefferson County PUD No. I C: \Documents and SettingsVim ParkerILocal SettingslTemporary Internet FilesIOLKIABIL-JeffCo Pre-application 09-09-04 email.doc LOG ITEM # Pagei! 3 of~ ~o ~ ~ z}>l 1" " m ~ I f I ~ . ~ \llll!! "CDlQ o 0 c -;>;' ., CD CD CD o .. .... <\I -0 0_ -:2 2... -< s: III "C 11> r'.~_ . .,_ _,~;~.o< r ["\ \ 1"'. l \ )1 r__H \; , t ! :l!..... ." -..~. . ~r;:;:~ ~\ I. I ! .f. r .-0 0;;0 00 >t.. -tm -0 O-t z ~o "lJ ~ Z .. ~ z1>~ m )C ~ .,,'" ;om 00 ."", ~~ .-0 ZZ m... ... C;; :I: m ;0 ;:: ~ z en p c '" "1:l111"T\ .., CD -. OnlC i:;:; ::I._Ill '< - '" llld' 0- c a =' C. m -< ~ .... m Q m z c ! . ~\ 'f'-"f1~. 'i ,\ '\ IlL); ~ ~ r.~ ,.'., . t) 4.-; .J.J." . -ire. ~ Page-L(5 o(~ -IlJl"TI '< CD -. "tlnCC n~~ III _CD Cii:;.... III 0 n - ~:J 0- :J < f III .. ~ .. 3 1 ., ;c ~ -I I~'g~ "'-I"U ~;!::m mr-l ;;0 m z (') :J: e: z 0 m ~~ .. ,.. C) I~~~ I;. '--"U mre: s: "U -I ,.'1 )> Z ^ n o z .... e: .- n o z o c ::; ;::'tl ~~ "N >~ '-m '" m o o Z Gl '" >> n " " ;= .- ;:: ~ " ;; .- cn"tJm"'tJ ~C"'"C ~~E~ :r:>m< mZZ> cnO-lC ;2!:!!~ g~:;; ....;n't ~~8 ~~t5 ~5i1l ~nI ~ 5 z :;! z " ~ m .... r.. , . ;::00 >>c ...." 2~ ~m ~~ z~ GlO ~ .... 5 z -I ,~ ~ ('; I~ (')m~ '" ;;0 n-l)> ~(5z Z"TI ffi r o 12 m >> " z~ Gltn .-6 ii: - i;j 8' e: z 0 m ~~ , C) F~~ OJ "f!.;!::"U mre: s: "U C/l -I ~ (5 Z n>>n ...." 0 ozo ~ffi in .-....z s;:;;n "gJ n :I: ".-" Gl ,. Om S; " ,..... Gl ....m 00 m ~ 00 5 z LOG ITE V1 # Page~_of.d.2f + + + + + + + + + + + + o o lJ) .... + + + + "- "- "- "- "- "- "- + '-', , , , , , , + + " , , , , , + + + " , , , , " , + + + +', , '",,- , , , + + + + + '~ , , "- "- "- , + + + + + + ~ , "- "" , , , + + + + + + + "'~ + + + LOG ITEM " ff Page.JJLofdQl. Do IV "C~ - II 0.. Il. .- C'l U) 1I='lj ~.= .!!. .2l~~ II..IIIIl. + x- 0 '" x- a.. Vi' a.. 0 ~ '" '" a.. z z a.. ~ 0 ~ 0 F '" F ~ z "'a.. '" ~ "'w a.. z'" a.. ~~ ~ ::> ~ a.. ::> ~:;: 0 a.. <~ z 0 ::> z ~Z 0 ::> ,,0 '" 0 ZO " '" '" " F...J W W "'...J 0 0 x'!< Z Z w~ ::> ::> 0 00 '" '" '" < 0 ~ w I:: Z '" ::> ~ ::> 0 lD '" < 0 " ~ Z "'''' :I: < ~~ " F Zw :;: ~ ::>", >- Ow '" >- w'" < 0 "'::> Z 0 0", lL a..", 15 Ow '" 0 "'''' 0 '" a.. a.. \ + + + + + 0 + ...J >- W '" '" c;: ::> 0 Z g " :;;: Z ~o '" 0 ~~ 0 0 0 i~ "F w '" ~~ 0 a.. 0 x< '" wa.. 0.. ~ ~ ~ I I ~ ~~>- w lC w I<rZ ~ :. '" IL 0 ~o .0 l'V ~N B 10.77 Ch. =Em ...,rr1 (1)0 -I" m~ ~. (")'"'D :x: 2 % -I I' CD (TJ (/)n o^ c:(TJ -1=1 ::c -C aJo (TJ_ >z ('")-1 :c Q -1~ ~ ~~ ? a 'Q ~ ~~ q (n?88 t.l ~N <oS~~ p 52 CD~~ ~ ~ <.9 CJ .>> C'..s. GJ ~ ... .....\ )>(1) m %0 rrI ZC: 0 ITI-I " ><:x: 9 m ~'"'D (')2 :t:z -I b ::.-\ ~~c -tOJj)l~ :,y~A ~COq,~ ~ .;-> )>(1) m zo rr1 zc: 0 rr1-1 ^ ><:x: 9 a:J fI1'"'D )>0 0- ::t:z -I OJ fT1 (') ^ fT1 =I II ~.............. '" "/~V('"'""""'\\ ~\ ~ \ ^l~Y~ v. \~\ \ __ ^'-ty/ ~ q-~ q \ . ~ ;::' ;:: - (); I S),/ " 9 \ '- ...). ::::: ;;..- Q; ~-- ~.~ 8e ~~. A 01-~ ~rO~~7> ~~ ~..y ~J' q> ~ . ~() ~ ~ . . '( A)'-1 ,0% -f~. -0 ;-f :::0 !=' G") o < .. -i .p.G")o . 00 :::L<;. N O-lN . ~ r-N 00 -10 {"N N t.I {"NG")O ~ cooo 5 C:x> <;. N .... {"N-;~ or-N -i ~ . 00 -10 {"N '1 N N Qo ;t.." ,>. ~ <: 0,>. 1 .... I Vl o z 1330.91' . ~ 9~~E~ P'f;:j5?o~~~8 (X),^ I....~.......~.. ; . ~=I=t: to (I) r Sl~~ ~ ~ ~ 0 N - 0\ ....... N C+-o - 0 0 ....... ....... OJ bO ~ p.. o M 0\ 00 " 8 C'-- p., ~ s o o ~ ..... o fr """ o ..1:: r.f.l - OJ l:: ..... ] o ~ - OJ ..... ..... r.f.l is ~ ~ d ~ d o r.f.l """ ~ (.j....j OJ .-;; o (.) vi ~ LOG ITEM ~ # ~ page--fli of~ "<:t 0 0 - N c,..... - 0'1 0 N - - 0 <I) - OJ) ~ p.. - M 0'1 00 II 8 C'-. 0- m ~ e o o N o ..... o .t:: e- O .t:: m - ~ ..... - <I) ~ o .t:: m Q) ..... ..... m ~ -rn ::i d ~ ~ o m ~ ~ C,j....i <I) -""':": o C) rJi ~ LOG ITEM S # ~ Page_t20 of~ ...... ~ o ...... Q) 0.0 cd ~ III ...... Q) ~ ~ ~ Q) z III '<:t o o N --- 0\ ~ o ...... N M 0\ 00 II Q ..... c-.. 0- tn cd S o o N o ..... o ..s::: fr I-< ~ --- Q) l=1 ..... .- Q) I-< o ..s::: tn --- Q) ..... ..... tn ~ ~ tn ::;j cod ~ d o tn I-< ~ c+-; Q) .- o' () rIi g. ~ of~ LOG ITEM # PcHJS 12-1 ..;.I _ ~ - 0 <+-< 0 N 0 - - 0'1 <I) ~ OJ) 0 ~ - Pol - <I) OJ) ~ Pol ~ <I) Z rIl M M 0'1 00 II 8 c--. ~ ~ s o o N o ..... ..8 fr ~ o ..c::: en - <I) ~ .... - <I) ~ o ..c::: en Q) ..... . ... en ~ ~ en ;::::l d ~ d o en ~ ~ ti-< <I) .- o' t.) vi Q.. LOG ITEM 8 # ::::: Pag9JZ-~ ofd~ "<:t 0 ...... 0 4-< ~ 0 0\ ...... ~ <!) 0 OJ) ...... ro ~ "<:t M 0\ 00 II 8 C'-. 0- ~ 8 o o N o ..... o ..s::: e- o ..s::: tn - <!) s:: ..... ] ~ - <!) ..... ..... tn -8 ~ tn ;::l d ~ d o tn I-< ~ ti-< <!) .~ o to'! tn 0- LOG ITEM s # ~ Page_!23-o~ds1 - e;..... o - Q) 01) ~ p.. III - Q) ~ p.. ~ Q) z III '<:t o o N ---- 0"1 ~ o - lr) M 0"1 00 II Q ~ 1:'- ~ S o o N o ..... o ..s::: e- O ..s::: 00 ---- Q) r:: ..... ] o ..s::: 00 GJ ..... ..... 00 is ~ 00 ;:j cod ~ d o 00 I-< ~ t.i-< Q) .- o' o fJi LOG ITEM ft s .I.t :::::::: fJ .. ~1\,;:J~';;;F~~lda!l-Of 'J~ ~ Vl>."l<o_.ji-J ~o ....... ~ Co". _ ~ 0 - 0 t.j..; ~ 0 0'1 - ~ (\) 0 00 - C':l ~ 1.0 ~ 0'1 00 II 8 c-.. 0- tI.l C':l S o o N o - o ...s::: fr I-< o ...s::: tI.l -- (\) .5 - (\) I-< ~ Q) - ..... tI.l -fl ~ tI.l ;::s cd ~ ~ o tI.l I-< !.2 <.i-< (\) .'"":'" o ~ tI.l LOG ITEM J !: '..k~ f~~ '~"'x. ~, f,:\ 0 j...-.....~'t.,JI"".... .__ - -.::t 0 ~ 0 0 N - - 0'\ (l) ~ OJ) 0 c;l ~ - [fJ - (l) OJ) c;l ~ ~ Z III t- ~ 0'\ 00 " Cl ..... C'-. ~ c;l e o o N o ..... ..8 fr l-i o ..J::: 00 - (l) ;::: ...... - (l) l-i o ..J::: 00 - (l) ..... ...... 00 ~ ~ 00 ;::::l d ~ d o 00 l-i ~ l.i-< (l) .- 0' e,) u:i LOG ITEM ~ ~ 8 ;:geL~Of~ Map Output Page 1 of 1 o Legend Parcels-H 2000 Aerial PhokJs Boundaries o ~CW'fry o w_ D~~ FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 2907:51 :142004 LOG ITEM ~'\~" .,)./dL of 0lSil. http:// gisserver/servletJ com.esri.esrimap.Esrimap ?ServiceName=ovmap&Client V ersion=4. O&F OrIn... 10/29/2004 Map Output Page 1 of 1 0 Legend PatalJs.H ContOtlts )\./ 10 FOOl Con\:U I ;./ 5:l FOOl Con\:U Boundaries 0 ~ CourlIj 0 w_ 0 ClI'lor ~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:50:26 2004 LOG ITEM # Pag~3-OCofd5;f http:// gisserverlserv let/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/2912004 Map Output FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 o ! !-l-~~lOy~~~~QlIS_1 """ ;tV Legend Road System 0 PatallS-H Contours /".r./ 1Q Fool Conlcu: , fr &I Fool Conlcu: Boundaries 0 JcIIclrlla'r CW'lIy 0 Wtt'a 0 Oflat ~ ! I i ! ~ I J Page 1 of 1 FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:36:04 2004 LOG ITEM # Pag3w/J$of 05K http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceName=ovrnap&ClientV ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 , I / 00224~1 002242023 0 .o497710000a\ I I 977100005 .1.;;:""""002242001 ~ '--..971100916.. I 971100004 '-977100911 002242018 9n100902'>"\I~ 971100917LL 9711009()1 971101004~ ,977100912, '97110100U.-L971101ll10.'(" . . --971101009 , , t' 0022 ...4~ I '<:<002242:025 It f ( '>'<'" I if. J'~-:", d:::'OO1 ,it r4:201~~ j~,;./ .......:::::..----! 002242003 r-r-I . .~... ..--""--. ----' ./..i l~ '....~.~ ..;;/. ~2231001 ~l I I ~.. If \~. / 002242005' / /1 "-' ll/ Ll /; (l" /",=- 002231001 . i .if _4P'-- _____------ l~ 002231001. / ==d'... .- 'i 002231001 "'eii. It <.:70::;7 ,...../. . '~~.../-- .~---~ o Legend Parcels-H Landslide Hazard . . Hq. . M_ S!ide!S ......, Sli!:tIl ':;'-,. Boundaries ~CW!l!y 002242003 o o o w_ ObI< COuil!ieS & -;"ap!i ~ by Jel!Motl C<uI!-f ~ ~GlS I <L 6100 FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 2907:47:072004 LOG ITEM # PagelJJLo'f~~ http:// gisserverlservletlcom.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/2912004 Map Output Page 1 of 1 ,,;::::::'~...... ,/ ' "", ".I ,f,l ./'-~~"'" ;'/:,") l ',...... ./.," ~'1 ,/ ~)! ,,/' ~'l ././~ I ,I.~'t"" tt"".,c;::;"'~"""'~==-"-' , ;?" ,,<>' ----~~ i,! ,;...... it. -~- '1/ / ... ~ ~;_/// FEATURES NOT SURVEYED.JCPUD#1, PRE04-00035 , I ' ____-~ 0022420?1002242:023' 0 [--- "--'-. I I ,(9V1~\ 9T11oo!lo5J,~-, 002242001 j '--.~-- 971U1OOI6. I /977100004 '-977UlOO11 002242018 mU10902-->..,-j-977100917 I~ 9771??oo1 977101004'~ 977100912 )971101001 ~71101010'Z_.( "',,//' ,.00 221 ~~/'l//~~- -9771010(9)' '~>~::::l:lO?242025 , l ...........,-. , 1/... 'l->~, J,''''" tJ ) -............. /002231001 l/ 002242010 ',> Legend {I I ", / /i I 002242011 0 patcel&-H // 002242003 r-+-. Seismic:: Hazard I Boundaries I I 002242005 I ~- o o o ~ Co.olly w_ otIe<~ .t --.-----~----l 002242003 ""----- --...------ ------. 4 ...~ p-cMdod by ~ Co.olly CG1lral Ser.;ces GIS I o 615ft FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:46:27 2004 LOG ITEM -f.J. 'it. II P;g~:~LJ.L of a.S! http:// gisserver/serv let! com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 1012W21J04- I Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 o I ! I 0022dMl i roZZ<t2OZ! : tlOn42Ot'<ll <............... 1--POCKETUI-='= I.~m':::"'~~'\ I I ;.' orn<<l\108", 1.c'lnl~ 0022"~1 / ---9m~'''''''{ wnOO9tS ), /......~ ----.....-/19711~t!l;/\", I , mlOOlJOol>> c_ _ 911100/,111' II oon"ZOJ4 1002:2..2012: ,9f11~l__"'-: ...-------r--.......-"'mIOiXl'~l, I / 'nl~ 9ntO'00!> /'... -( 971100$12 \. I ~ e71100001>-:: ~ \....971t1HOOll;...., ~9111000Hll... ) , ( /-/ __ /\ ml:~~Ji I Vt;;~;=.;i r ~~c111U)/)\)19 ;/ ~h /91110tOOl~Hn.lcm:STA"E911101(J(IW.~J).:/1 I JI r/ ~~~- , ~{I>::oo, / I .",,'",. l'~ " . /'1' I -F! """'"'> <:..---"~,, / / I '....':'7 i r-- i I : , I i I ) 1002242022 I I 'L . ""'.,"" J ~.......,ass..,.~~c...Sar.;czt;GIS.1 "'" .# Legend Road Systllm 0 ParoelS-H . 2000 Shore Photos-H Shorelines-Ales .# ~ .# ~lIU1II .# UdlM .# ~ .# IotaTJ .# N3lural .# ~ .# N~ .# O\h!r Boundaries 0 ~CcuII; 0 Wale: 0 Clto!s' ~ FOR INFORMATIONAL PURPOSES ONl y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:37:37 2004 LOG ITEM ,.J. t'!'-r '~'.'~in '::\ / ) ~ . f '1c9 -'~ ''''.Lf...L~O O~ http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 o j",S:.::.-\ ~- 971ffi0901. ' ~ , L.9111~,-..\\J,;~~~,.., oon4XV}1 /1 -. on.~~ I /~11'!oog=!J ,f", I I "'"..... 9~'009(4) l~w:~;~I.m;~\ j 0022421)'8 10Q1142O"l1 ,/~'~L._'//,~I'""__ ~"""9!7'[ffl11> Ii....... /~n,~ <97116n~ ,,~, 'W7100012, I flntOtl\JO~' -<'" '. 'r-mlG'OO6 ).." '9111001l18. \.// //\ fl/~~:~~f~ I m~~=l:) r.... "9n~~~9 ) I //:: /.m"o''''r-~''''''"''.~'''''''''''''::I~: i '''.2''00'' . ':>, [' i / '....,~." oon4~ II ' ", "', 1;'/ II ""."':" V I I 1<::'>" / / ! 002242010 ,<".. I' : I '-- ,~,' //'I[ ~0022"'''' 1./ <::..... ! // .,....J1 I 0012A200$ (~/ ~~ i //... I I If' ) 1 (. I I (I 11001242'(.105 001':2.42022 ;; , ;,''1' I i ,Y; I I ;/1. /~ ~-I i j ~ ~ ~ ;/ 00223'''' ...:/", --~---~ I ,/// ~.'-- /1 ;::OO223loot L;,~'~/~/ j ~_II'~trr~~~~GlSl 0 Legend ParcebHi Streams ;V TJIP"9 ;V TJIP"5 ;V TJIP"4 ;V TJIP"3 ;V TJIP"2 ;V TJIP"I ;V ~ Boundaries 0 ~ CouI1ly 0 Wtf7iJz 0 ~~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:41 :46 2004 LOG ITE~A # Pag3.LJ 3 ofd..5J: http:// gisserverlserv let! com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 , I I /'_~__ 002242021002242023' G llln1~\ I I 917100005\~-.002242001 I I '-....., 9171009UL I /977100904 '-977100911 00'2:242018 9n100902->'\I~977100911 LL 9771??oo1 977101004~ ,977100912, ~).977,il'00t ...Ll...917101010"'-...{ 00224~/ -977101009'1':::::;'<::002242025 110, l'; I/l/ -<>..... ~ " t'.:-.... 002231001 ! / 002242010 '....::::-- " ( I oon42011' -!J 0022<>>>> H- I I r:J --~ - ~~~~ I 002242003 ----1 --------... ---.....------- i .... p-aoid;>:jlr>: ~CWIIly ~ &s:Yioe!s GIS I 0. 675fl o . Legend ParcalS-H wetlands Boundaries D D D ~CWIIly w_ 0ilIlcY ~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:44:28 2004 LOG ITEM # PagC3IJ'IofdSf http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovrnap&ClientV ersion=4. O&F orm... 10/2912004 Map Output 00z242021 .I " l~~\, "-12023/ 977100905 J,;:-- 002242001 I '--...._- 977100916. I I.. 977100004 '- 977100911 002242018 971100902 -~~--\I- 977100917 I~ 9771??oo1 97710tOO4{ ,.977100912, )- 9T710100t J.J.....971t0101O".,,{ 00224~/- -977101009',I:::<:,_'''^'''''' "^""" I i I '- "".,..,4""",., ,V;;/ ,'<~i~~ 002231001 i l 002242010. '-',,'- ~~ Ii r r'" ~~ -"--...:.:..~___// 002242003 I .,---" I -~1003 ---E!- -....~---l 002242003 ~----------- -----....-.---- Page 1 of 1 Legend patoel!rH FEMA FIRMS .Po . ANI .XfOJ . OlD" o Boundaries o ~cCJuntj o w_ DOID"~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 2907:47:442004 LOG ITEM # Paf::~.iJS Q'f dSO http:// gisserver/servlet/ com. esri. esrirnap.Esrirnap ?ServiceN ame=ovrnap&Client V ersion=4. O&F orm... 10/29/2004 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 , I /I' ~___ 0022420210022426n' 0 l~'~\ I SC 9nU10OO5 ~002242001 1..-'-.~!l11l00!l16 \. I .,..:.917100904 '-917100!111 002242018, 91710000z~-....'\""T-917100!11'7 ~ 9171??oo1917101004(, ,917100!112, -' 9itt01001 -Ll!mto10tO"-..,' // v -91710100!1 ,'_;:- r =w=> i~~~ 1001 I' 00'2242010 '-":; --::---.::.~ ,I I ~2011' >/ "Z........j I 00'2242003 I If C~:,)-' rT fr./" \,._, / 002242005 , ;J/' - _L~ ,'I II" ~~,~-r, ~- II 002:n100t4' ~...------ --------...... 002242003 i~1 I .1102231001 --"" 1 \-.~~_../ -......- 00'2242003 V:""/' ~ r . ~. --......... ~---- ----........ Map, Output ~ L4aps ~by~C<UIly CabI~G1S I C? 675ft o Legend Parcels-H Critical Aquifer- Recharge Areas o . o . . o o o SUse-UNK &l.RPA . suse suse &l.RPA &l.RPA' UNK BoundariEls ~C<UIly WtIa Olta'~ Page 1 of1 FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 2907:48:152004 LOG ITEM # Pi:,g;:~LJLofd$ http:// gisserverlserv let/corn.esri.esrirnap.Esrirnap ?ServiceN ame=ovrnap&Client V ersion=4. O&F orrn... 10/29/2004 Map Output FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 7' , I ' , ~.......... 0022420210022A2023!_ 0 /(m1CI(~\'1 , 9r7100!l05l{....- 002242001 ./ 1""'~9m00916." I V ,I 19171('J1()OO4 '- 917 1 OO9n 002242018' ;/' 917100902'-~917100911 I ( 97710000t,917101004( 917100912, 01/ ~ ):917101001 U___9m~::1~'i~"" LL 002242003 r<" , , Ii 1/ ',~42025 . l I 'f~;,,, 002231001 I 002242'OtO "y .;:::=::..~ If f l~ :%> '~'-.J.I 002242003 ~i _""j J'" (~ ~ I 002231001 ~ '_--...... 002242005 /il .L ~ 1 if PO," ~---00~1001~~ '. ~- Ili002231OO1/ ~ - . -.:'.0022A2003 I If 002231001- "-'" , .J, I f /:./:/ "". " 002242003 q~/ ~ Ll. ~ II)' JdI/lrsCn CW'Ily C~ S<\MOeS ~ I <! 61Sfl o Legend Parcel!;.H Wela-ChlOride Page 1 ofl FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:48:40 2004 100"""""" "* ~ 1OOw2Xl * 2XlOt~ SIPZ N. Ris/I. SlPZ . o o o o High Ris/I. SlPZ eaa.w SlPZ Boundaries ~CW'Ily Wtle Cl!hor~ LOG ITEM # Pag3_l3_7_ofdsd http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 ~ 1002142012' I ~OI'XI1;J ,'_i1n1~'- ',J;;,~~JaI~t41!....-.- '~1~~ ~}.r -~ ~F~ ['lm~J~7~OO9lt.. ~- '_. "'-,91110Q911). , ..'~ I. . 91110tOO'> ,~, "pnl@12" l 1'9T1U109l!' '. '.--t111\Y'100& ~" "tnHOml '~.-'---_-': \.,~~~7O::1~ ) ~;:~::~ ,"', '- 9~:\X,!H. tntOtOOl 'r-'.-.1 00111010'3 -.J.-----J P""01tl!:'$001242001 ~\" I<>:~" oon41"" i "<::~-.,.,-. I f'''<", R~< I ; II 002:2A2'OOS ! 00'12<I2OZ! ; I I i "-, I ..........''-.J '-, o . Legend pstcels-H Priority Habitats and Species Boundaries o o o ~ COIJ'lly w_ Ob!r~ J............,"""''''''""_.. I '1Y1 FOR INFORMATIONAL PURPOSES ONLY- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:43:24 2004 LOG ITEM # D::))'''ii(~ /") 9" .O''[:d.", I~ i- v:.;;j;.UI.....L~~ ~~ ~ http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 LOG ITEM 002242001> Map Outpu~ " FEATURES NOT SURVEYED-JCPUD#1, P '%} , 002242021002'242023 // / 1~1 4/~'oo' ~ l j.' ,6~ ~'''':~'',- /~I 'I .....::::::;.; if, /.-~--..... "- , f ~1~) l' '-...J' II l'/i /71 .~OO2231oo1 I }002231001/ --~ ; l~002231oo1 : IJ /F'/" .~ ~ ".-/ ~' :J 971100001l' f1 m100l1M .. _J00224200! ~_ .971100916 , 971100004 - 917.00911 002'242018 > 917.00902 971100917 971100901 971101004 917100912 /"'971101001 971101010 ~ - ~"''''''''J . 002242010 002242011 ' 002242.0030 -~~--. 002242003 ~ '--- ~-........._- ~. t.4.p-<Mdo:lby~Ca.dyC_ti ~~ o . 615ft # Paa:3 / :1 f Of "'" _I.J__ http:// gisserver/servletl com.esri.esrimap.Esrimap ?ServiceN ame=ovma ... I .4'1 Map Output ,.J Page 2 of2 .' ' o Legend Parcels-H Cotlnty ZOning . RtdRI!!!.id!lt6aI1:6 . RtdR1!!!.id!lt6aI1:10 .H"""1~ .~~IfJ:j, .f..i!td~ ~;.~~::~ UtA . UC . . lIB 11II ~NC . Camm<ltda!FOICSo1 . Rtd FOICSo1 . ~FOICSo1 y//, ';/); PI' 1:2:1 ~~~ IlL 1:2:1 ;~~ I'iqm EPF ~~: W,,*, Mgml EPF ....ilit:lry~ . PaNll'JldR~ D N__FOICSo1 . N__Parlt . N__R~ iii MPR.SirIje Family . MPR.s.nnds . * . ~ . ffiillillI UGA-lcWr De'Is. Res. ffiillillI UGA-Mad, De'Is. R..., ffiillillI UGA-tlit,1l De'Is. Res. ~UG.MJrbtoIf..i!td~ . UGA-UrbtoI Camm<ltda! Iillillill UGA-Viilib ~ Camm<ltda! ffiillillI UGilrNiie , A::.1T~UGA 'l~ %/// Hd1R~ ~~R~ . Nd! ZtIn<Id RuB!~ 1:2:1 Rurlll ViiI;aga ~ ~GC ~.CC Wmr~ LlPR....u~iIy MPR.~Cam""" MPR.ViiI;aga ~ LlPR.Op<In ~ MPR.~ Boundaries o ~Cour/l)' o Wmr Dom~ FOR INFORMATIONAL PURPOSES ONL Y- Wefferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy~~",:: collection. Fri Oct 29 07:49:12 2004 " \.: ITEM n- P""""'"..../u · ;:::'~~_..:.~ofd~ http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 ,'" SECTION 3 . LAND USE DISTRICTS b. Relationship to Other Regulations. While the Jefferson County Floodplain Manage- ment Ordinance requires consistency with all other applicable laws. In the event that a conflict should exist the sbicter standard shail apply to the regulated development. 3.6.7 Geologically Hazardous Areas. a. Classlfication/Deslgnatlon. (1) Classification. Geologically haz- ardous areas shaD be classified based upon a combination of erosion. landslide and seismic hazard. (2) Designation. The foIIowlng erosion, landslide and seismic hazard areas ,shaD be sUbject to the standards of this section: i. Erosion Hazard Areas. Areas containing soils or soil com- plexes described and mapped within the United States Depart- ment of Agriculture! Soil Conservation Service Soil SUrvey for Jefferson County as havi1l9 a severe or very severe erosion hazard potential. ii. landslide Hazard Areas. Areas potentially subject to mass movement due to a combination of geologic, topographic and hydrologic factors including: A. Areas of historic failures or potentially unstable slopes, such as: 1. areas described and mapped as having severe or very severe building 6mitations for dweIfings withoUt basements within the United States Depart- ment of Agriculture! Soil Conservation Service SoIl Survey for Jefferson County; 2. areas described and mapped as recent or old landslides or slopes of unstable materials within the Washington State Department of Ecology Coastal Zone 3-18 Atlas of Jefferson County; and 3. areas descnbed and mapped as areas of poor natural stability. former landslides and recent landslides by the Washington State Department of Natural Resources, Division of Geology and Earth Resources. B. Areas potentially unstable as a result of rapid stream Incision. stream bank erosion, or undercutting by wave action; and C. Areas with any Indications of earth movement. such as: 1. rockslides; 2. earthflows; 3. mudftows; and 4. landslides. Iii. Seismic Hazard Areas. Areas subject to severe risk of damage as a result of earthquake induced ground shaking. slope failure. set6ement, soU lique- faction, or surface faulting. These areas are identified by the presence of: poorly drained solis with greater than fifty percent (50%) silt and very litUe coarse material; loose sand or gravel. ,peat, artificial flU and landslide materials; or soil units with high organic content (3) Sources Used for identification. Sources used to identify geologically hazardous areas include, but are not 6mited to: i. United States Department of AgriCulturelSoU Conservation Service, SoIl Survey for Jefferson County. iI. Washington State Department of Ecology, Coastal Zone Atlas. iii. Washington State Department of Natural Resources, Slope Stability and Geologic MaPS of Eastem Jefferson County. unmelt Development Code Section 3 . Land Use Districts 'P'-""~'~W"-'-~'-_,d'5f SECTION 3 . LAND USE DISTRICTS iv. Washington State Department of Natural Resources, Geographic Infonnation System: Soil Survey. v. Washington State Department of Natural Resources, Geologic Maps of Eastem Jefferson County, Compressibility of Earth Materials in Eastem Jefferson County. vi. United States Department of the Interior, USGS Quad Maps. (4) Geologic Hazard Area Maps. The maps prepared by the County using the identification sources listed in this section have been produced for infor- mational purposes only and are not regulatory devices fonning an integral part of this ordinance. b. Protection Standards. (1) General. Application for a project on a parcel of real property containing a designated geologically hazardous area or its buffer shall adhere to the requirements set forth below. (2) Drainage and Erosion Control. i. An applicant submitting a project application shall also submit, and have approved, a drainage and erosion control plan, as specified in this section, when the project application involves either of the following: A. The alteration of a geo- logically hazardous area or its buffer; or B. The creation of a new parcel within a known geo- logically hazardous area. ii. Drainage and erosion control plans required under this section shall discuss, evaluate and recommend methods to mini- mize sedimentation of adjacent properties during and after construction. ili. Surface . drainage shall not be directed across the face of a marine bluff, landslide hazard or ravine. The applicant must demonstrate that the stonnwater discharge cannot be accom- modated onsite or upland by evi- dence of a geotechnical report, unless waived by the Admini- strator. If drainage must be discharged from a bluff to adjacent waters, it shall be collected above the face of the bluff arid directed to the water by tight line drain and provided with an energy dissipating device at the shoreline, above OHWM. iv. In addition to any erosion control methods specified in the drainage and erosion control plan, the Administrator may require hydroseeding of exposed or disturbed areas. (3) Clearing and Grading. i. In addition to the general clearing and grading provisions in Section 6, the following provisions shall also apply: A. Clearing within geologically hazardous areas shall be allowed only from April 1 to November. 1, unless the applicant demonstrates that such activities would not result in impacts contrary to the protection requirements herein; B. Only that clearing neces- sary to install temporary sedimentation and erosion control measures shall occur prior to clearing for roadways or utilities; C. Clearing limits for roads, septic, water and storm- water utilities, and tempo- rary erosion control facilities shall be marked in the field and approved by the Administrator prior to any alteration of existing native vegetation; D. Clearing for roads and utilities shall remain within construction limits which must be marked in the field prior to commencement of site work; and E. The authorized clearing for roads and utilities shall be the minimum necessary to Unified Development Code Section 3 . Land Use Districts 3-19 "~'>2~z'~,~"-'''..~. ~." SECTION 3 . LAND USE DISTRICTS accomplish project specific engineering designs and shall remain within ap- proved rights-of-way. ii. The following provisions regard- ing grading shall apply: A. An applicant submitting a project application shall also submit, and have approved, a grading plan, as specified in this section, when the application involves either of the following: 1. The alteration of a geologically hazard- ous area or its buffer; or 2. The creation of a new parcel within a known geologically hazard- ous area. B. Excavation, grading and earthwork construction regulated under this section shall only be allowed from April 1 to November 1, unless the applicant demon- strates that such activities would not result in impacts contrary to the protection requirements herein. (4) Vegetation Retention. The following provisions regarding vegetation retention shall apply: ' i. During clearing for roadways and utilities, all trees and understory lying outside of approved construction limits shall be retained: Provided that understory damaged during approved clearing operations may be pruned. ii. Damage to vegetation retained during initial clearing activities shall be minimized by directional felling of trees to avoid environmentally sensitive areas and vegetation to be retained. iii. Retained trees, understory and stumps may, subsequently be cleared only if such clearing is necessary to complete the proposal involved in the triggering application. (5) Buffer Marking. The location of the outer extent of landslide hazard area buffers shall be marked in the field' as follows: i. A permanent physical separation along the boundary of the landslide hazard area shall be installed and permanently maintained. Such separation may consist of logs, a tree or hedge row, fencing, or other prominent physical marking approved by the Administrator. ii. Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall remain in place prior to and during approved construction activities. The signs shall contain the following statement: "Landslide Hazard Area & Buffer - Do Not Remove or Alter Exist- ing Native Vegetation." iii. In the case of short plat, long plat, binding site plan or site plan approvals under this Code, the applicant shall include on the face of any such instrument the boundary of the landslide hazard area and its buffer. (6) Buffers - Standard Requirements. The following landslide hazard area buffer provisions shall apply: i. Buffer areas shall be required to provide sufficient separation between the landslide hazard area and the adjacent proposed project. ii. The appropriate width of the landslide hazard area buffer shall be determined by either: application of the standard buffer width set forth below; or, by acceptance of a geotechnical report meeting the criteria of this section. iii. Buffers shall remain naturally vegetated. Where buffer disturbance has occurred during 3-20 Unified Development Code Section 3 . Land Use Districts construction. replanting with native vegetation shaD be required. . iv. Buffers shaD be retained in their natural condition. however. minor pruning. of vegefatiQn to enhance views may be penniUed by the Administrator on a case by case basis. v. /II buffers shall be measUred perpendicularly from I1e top, toe or edge of the IandsIde hazard ~ boundary. vi. A standard buffer of thirty (30) feet shall be established from the top. toe and aI edges of landslide hazard areas. -.... - ....._,- ....- -.- '" .... - -~ (7) Reducing Buffer Widths. The AdminisIrator may reduce the standard landslide hazard area bufferwidth only when the project applicant demorlShates. to the satisfaction of the AdrMlisIIator, that the project cannot meet the reqtRd seIback.. The reduced buffer must adecptalely , profec:t the proposed project and the landslide hazard area to the maxinun extent possible.. Under no c:iR:um- stances shall the buffer width be reduced to less th8n fifteen (15) teet. . (8) IncntasIng Buffer WidIhs. The AdminisIrator may Increas e the stalldaI'd IandsIde hazard area buffer widIh' when a larger buller is necesSalY to.protect the proposed project and the landslide hazard area. This determination shall be made when the Administrator c:Iemon$bates eny one of the following through appropriate documentation: L The IandsIde area is oostabIe and ac6ve. i. The ac:Ijaari land is suscepIibIe to Sevete landslide or erosion. and erosion c:onboI measures will not effectively protect the proposed project or the IandsIde hazard area. ii. The adjacent land has minimal vegetative cover. (9) Geotechnical Report. L An ~ submitting a project application shaI submit, and Unified Development Code Secfioo 3 . Land Use DistIicts . SECTION 3 . lAND Use DISTRICTS have approved, a geotechnical report. as specified in Section 3.6.10 of this Code, wheI1 the application involves any of the following: A. The alteration of a IandsIde hazard area or its buffer. B. The aeation of a new pan:eI within a known IandsIde hazard area. C. The construction of a pubIcIy owned faciIty in a designated seismic. hazard area. i. ~ a geotechnical report is required for.-a IandsIde hazard ',.,.- '-'. "'- .~~ area..the, project,.,appIication shall not be approved unless the geotechnical report certifies aI of the foIowing: A. TheIe is minknaI IandsIde hazard as proven by a lack d evidence of IaIIdsIide . activity in the vicinity in the past B. An analysis of slope stability idi: a Ie s 1hat the proposal wllnotbe subjec:tto risk of 1andsIde; or the proposal or the IandsIde hazard area can be modified so that haz- ards are eIminated; C. The proposal wII not increase swface water dis- charge or sedimentation to adjacert propet1ies' beyond PredeveIoPmentc:onditions; D. The proposal wiD not : deaease slope stability on adjacert properties; and E. /II newly aeated buikIng sites wiI be $1abIe Wlder normal geologic conditions (If applicable). Ii. Where a geotechnical report is required 10r a seismic hazard area. Ute project application shaH not be approved unless the geotechnical report demon- strates that the proposed project wII adequately protect Ute pubrlC' safety. 3-21 m",w"'2?13:~~""'a 2ff SECTION 3 . lAND Use DISTRICTS ". c. Concrrtions. (1) General. In granting approval for a project application subject to the provisions of this section. the Administrator may require mitigating conditions tf)at will,' in the Administrato(~ judgment. substantially sean the objectives of this section. (2) Basis for Conditions. AI condiIions of approval requked ptnUant '> this secIion shall be based upon eiIher the substantive reqtftments of this section or the, recommenda6ons of a quaIfied professional. confained wiIhin a special report reqWed under this section. . 3.6.8 Fish and Wildlife Habitat Areas. a. ~ Fish and wikmfe habitat areas (FWHAs) include both aquaIic and terrestrial areas wfIhin Jefferson County. The appn>>cinlate location and an of criticaf fish and wiIdUfe habitat areas are displayed in the Washington 0epaI1ment of Fish & WIc8e's (WDfW) Priorily Habiiat and Species (PHS) Program datab6-.. The foIowing designaIions shall be used in classifying ESAs '> be regcllafed under tis section. (1) AI seasonal ranges and habitat. elements 'wiIh which &fate Istad cancIdate and moniIor species or priority game and non-game species have a primary associalioo. (2) AI habitats wiIh which species of local inIportaace have a primary association. ' (3) Those waters that meet the aIeria tOr ~ 1, 2. 3. 4 and 5 sbeams as set forth in Chapter 222-16-030 WAC. (4) Areas whh which federal or slate endangered. threatened. and sensiUve species of fish and wiIdIfe have a primary assocIa6on. b. Sources, Used for identification. Sources used to identify fish and wildlife habitat areas Include. but are not Imited '>: (1) United Slates 0epaI1ment of the interior. Fish and WIcIie Service, National Wetlands Inventory. . (2) -.Washington State Department of NaUaI Resources, Water Type Index Maps. (3) Washington State Department of Fish and Wildlife. Non-Game and Priority Habitats_and SpecIes Data Bases. c. Fish and Wddlife Habitat Area Maps. The above maps have been produced for infonnationaf purposes only and are not reguIafoIy devices forming an Integral part of this section. d. Exempt Activities. The following uses shall be allowed within a FWHA or its buffer if they are not prohibited by any other ~, provided they are conducted so as to minimize any impact on the function and character of the FHWA or its buffer. and provided they are consistent with an County-approved Habitat Management ~ or other Special Report requiied by this sec6on. or any state or federaIy approved management plan for an endangered. ....eatened, or sensitive species. (1) ReconsIruc6on of sIruclures desfroyed by fire or other means. provided that completed application tOr reconsfruo. lion OCCUIS within the previous sIrucIuraI footprint and wiIhin two (2) years of the destruc6on. ThIs provision Is Intended to apply only to that poItion of a buikIng which Ies wiIhin a FWHA or Is buffer. . (2) "1"h&'removaI of 'nwdOus-'Weeds from buffer areas. -- (3) 8dsting and ongoing landscaping activities (such as lawn and garden maintenance) and existing and ongoing agriculture activities on lands enroIed in the Open Space Tax Program for agriculUe or on lands designated as Agricultural L..ands of , Long-Term Commercial Significance on the official, map of Comprehensive Plan Land Use Designations. For the purpose of this section. existing and ongoing means that agricufturaf activities have been conducted within the five-year period leacing up to the adoption of Ordinance No. 05-0428-03 on April 28, 2003. (4) The enhancement of a buffer by planting indigenous vegetaUon. (5) The construction of traIs which shall be unpaved when located in the buffer areas and elevated when located in wetlands. which are not intended for motorized use, and which are no wider than five (5) feet, mIess additional width Is necessary for safety along a predpice. steep ~. or other hazardous area. (6) Harvesting wild crops which do not significantly affect the viabIiIy of the wild crop. 1he function of the FISh and WIdIife Habitat Area or regulated buffer (does not Include tiling of soli or alteration of the Ash and Wildlife Habitat Area. except as provided in (3). above). (7) Any of the General ExempUons authorized by Section 3.6.4. . 3-22 Unified Development Code Section 3 - Land Use Districts Amended by Ordinance No. 06-0510-04 \ I qq,-:":a;g~< , , SECTION 3 . LAND USE DISTRICTS the applicant shall include on the face of any such instrument the boundary of the streamside buffer area. iv. The applicant may also choose to dedicate the buffer through a conservation easement or deed restriction that shall be recorded with the Jefferson County Auditor. Such easements or restrictions shall, however, use the forms approved by the. Prosecuting Attorney. h. Conditions. (1) General. In granting approval for a project application subject to the provisions of this section, the Administrator may require mitigating conditions that will, in the Admini- strator's judgment, substantially secure the objectives of this section. (2) Basis for Conditions. All conditions of approval required pursuant to this section shall be based upon either the substantive requirements of this section or the recommendations of a qualified professional utilizing best available science, contained within a special report required under this section. 3.6.9 Wetlands. a. ClassificationlDesignation. (1) Classification. Wetlands shall be classified using the Washington State Department of Ecology's Wetland Rating System for Western Washing- ton, 2nd Edition, 1993. Wetland delineations shall be determined by using the Washington State Wetlands Identification and Delineation Manual, March 1997, or as amended hereafter. (2) Designation. As determined using the Washington State Department of Ecology's Wetland Rating System for Western Washington, 2nd Edition, 1993, all Category I wetlands, Category II wetlands 2,500 square feet or larger in size and Category III and IV wetlands 10,000 square feet or larger in size, shall be subject to the standards of this section. (3) Sources Used for Identification. Sources used to identify designated 3-28 ' wetlands include, but are not limited to: i. United States Department of the Interior, Fish and Wildlife Service, National Wetlands Inventory. ii. Areas identified as hydric soils, soils with significant soil inclu- sions and "wet spots" within the United States Department of Agriculture/Soil Conservation Service Soil Survey for Jefferson County. iii. Washington State Department of Natural Resources, Geographic Information System: Hydro- graphyand Soils Survey Layers. (4) Wetland Maps. The wetland maps prepared by the County have been produced for informational purposes only and are not regulatory devices forming an integral part of this section. b. Regulated Activities. Any land use or development activity shall be subject to the provisions of this Section, induding but not limited to the following activities which are directly undertaken or originate in a regulated wetland or its buffer, unless exempted: (1) The removal, excavation, grading, or dredging of material of any kind, including the construction of ponds and trails; (2) The dumping, discharging, or filling of any material; (3) The draining, flooding, or disturbing of the wetland water level or water table; (4) The driving of pilings; (5) The placing of obstructions; (6) The construction, reconstruction, demolition, or expansion of any structure; (7) The destruction or alteration of wetland vegetation through clearing, harvesting, shading, intentional burn- ing, application of herbicides or pesticides, or planting of vegetation that would alter the character of a regulated we~and, provided that these activities are not part of a forest practice governed under Chapter Unified Development Code ""'""""'5"~"~""~"~'''~ Section 3 . Land Use Districts /1,.,,,,. ,d:$Q 76.09 RCW (Forest Practices Act) and its rules; or (8) Activities that result in: i. A significant change of water temperature; i. A significant change of PhYsical or chemical characteristics of wetlands water sources, including quantity; or it The i*oduction of poIIuIants. c. Exempt ActivIties. (1) Weaancb. The following uses shall be &lowed within a regulated wetland without having ., meet the protection standa.ds. or requirements for wetland studies or mitigation set bfh in this sec6on, I they are not prohibited by any other law. However, forest prac- tices and COIlveI1ions are governed by .Chapter 76.09 RCW and Its rules. L Normal maintenance, repair, or operation of existing structures, facilities. or improved areas. such as on-site septic systems, lawns, landscaping. orchards, gardens. traIs, and driveways. Maintenance and repair do not Include any modification that changes the character, scope, or size of the original sbucture, facIity, or improved area. and do not Include 1he consbuction of a maintenance road. i. Modification or expansion of existing uses and structures, pursuant ., the requirements of the nonconforming use and sbucture provisions of this Code. ii. Outdoor recreational activities, including hunting' and fishing (pursuant to state law), blrdwatchlng. hiking, bicycrmg, boating. and swimming. Iv. The harvesting of wild crops In a manner that is not Injwious to natural reproduction of such crops and provided the harvesting does not require t1lrmg soil, planting crops. or changing existing topography, water conditions, or water sources. v. Existing and ongoing agricultural activities on lands enrolled in the Open Space Tax Program for agriculture or on lands designated as Agricultural Lands of Long-Term Commercial Significance on theoUnified Development Code Section 3 - Land Use Districts Amended by Ordinance No. 06-0510-04 SECTION 3 . lAND USE DISTRICTS ... .,. official map ,of Comprehensive Plan Land" Use Designations. For the purpose of this section, existing and drigoing means th!'it agricultural activities have been conducted within the five-year , period leading up to the adoptipn of Ordinance No. 05-0428-03 on April 28, 2003 . vi. NonnaI maintenance, but not consfruction. of drainage citches. vi. Use of existing nature flails. vii. IrstaIIa60n of navigation aids and boundary maricet's. Ix. Site inves6gaIive WOlfe neces- saty for a project application submiIfaI. such as SUIWyS, soil logs, pen:oIation tests, and other related adMUes. In every case, weiand ,~ .~ be .... ., .. ' .. ,--- -Ihtriiriiized and c:IiStiiitiea areas shaI be ImmediatelY restored. x. 0rIIing or digging and main- tenance of weBs, provided that wetland ImpacIs are minimized and cIsUbed areas are immedi- ~ restored. (2) WeUand Buffers. In addition to those activities &lowed in regulated wetlands In this Section. 1he following activities are allowed wiIhin wetland buffers wifhout having ., meet the protection standards. or ~ forweUand studies or mitigation set forth In this sec6on. provided that ~ to buffers are minimized and that disbJrbed areas are immecfl8tely restored except as specifically allowed in subsection (2)J. below. I. In association with a single famIy residence only, the establishment and expansion of lawns, landscaping. orohards, gardens. and fences, provided that: A. Lawns. landscaping, or. chards. and gardens shaD be allowed within the outer 25 percent of the buffer widfh where no reasonable alternative is available. No strucIure other than fences nor any Impervious surface shaI be included In the above: and B. Fences shaH be designed to allow the unimpeded pas- sage of sudace water beneath them. 3-29 ''''''''''''''-7''''''--,. =....,. .,,~..- lu~c,.C).5g "".~.J".".,.,".".=-.,..c."" ..........,......"".".~.....>.,'",.,~'" SEcTION 3 .i..ANo USE DISTRICTS ii. ActiviIies having minimal adverse Impads on buffers and no adverse impacts on regulated wetlands. These include low intensity, passive recreational activI6es. such as pervious 1raIs. I1OIIpe1manent wildlife watcNng blinds. scientific O!: edutaIionaI activi6es. and spoI1S ~ or ~. TiaiIs wifhin buIfer.s shaI be designed to ntiI_1mpads to the weUand" and shaI not Include my ImpeMous Slriaces. Ii. Witin 1he buffers. of CategoIy III and rv weIIaIlds only, vegQ- IatJon.Ined swales designed b' sfonnwater management or conveyance when topographic restrainls detemlill81here are no other ~ alternative 1oca- tions. Swales used b' detention purposes may onIy'be placed In the outer 25 pen::ent of 1he buffer. Conveyance swales may be ,Placed hoUgh the buffer, I necessaIY. d.' ProtectIon SfandanIs. (1) General. Application tOr 8 project on 8 parCQI of real property c:onIahWlg 8 ~ weIaIld or Is buffer shaI acI1ere to 1he Ieqt*ements set b1h below. (2) DeUnGatIon. hi applicant submit6ng 8 pcoJect application shall also submit. and have approved. a weiand deIineaticin report., as specified in ~ 3.6.10(1). MditionalIy, 1he following pf'OVisions shaft apply: L The IocaCion of ttie we'tIand and Is boundaty shaI be detennIned 1hrough the performance of 8 field Investigation utilizing the . meChodoIogy contained In the Wa$hIngton state Wetlands IdentiIication and Delineation Manual, Man:h 1997, or 8S amended hereafter. Ii. If the wetland Is located off of the property kwoIved In the project application and Is inaccessible. the best 8~ Information shaH be used to 3-30 . determine the weUand boundary , and class. Ii. Mer approval of the deIneation report.' the wefand boundary shall be staked and lagged In 1he field. Iv. ThIs requirement may be waived. l.Ilder the foIowing circum- stances: A. Slngle-:-amiIy ResIdences. The requirement b' a weiand delileation and special report may be waived. tOr construcIion of a sIngIe..famIy residence on an existing lot of record I field lnVesligalioii by Coooty staff Indicates 1he foIoWing: 1. Sufticient InIOmtation exists for sI:aIf to estimate 1he b0un- daries of 8 weiand, wIIhout a deIneation; and 2. The singIe-famIy resi- dence and aI acces- fJtJfY strucbes and uses are not pr0- posed ~ be located wifhin. the distances identified In Table 3-3, below, from the estinlated wea8nd boundaty. B. Subdivisions 'and Short Subdivisions. The reqth- ment for a wetland de1inea- tion and spedaI report 'WIll be waived for subc:Iivislons and short subdivisions of an existing lot of Iecocd I field Investigation by County staff indicates the following: 1. SUfticient Itlfonllation exists for sI:aIf to estimate the b0un- daries of a wetland without a delineation; and 2. BuIding envelopes or building setback &nes are not proposed to be located within the .\ ':t} .1.. . a..~ Unified Development Code . Section 3 . Land Use DistIicts SECTION 3 . LAND USE DISTRICTS distances identified in Table 3-3, below, from the estimated wetland boundary. Table 3.3. Minimum Wetland Buffers Necessary as part of Qualifying for a Waiver from Delineation and Special Report Requirements.(1.2.3) I II III IV Required Distance from Estimated Wetland Boundary (feet)14) 225 150 75 37 tained. Such separation may consist of logs, a tree or hedge row, or other prominent physical marking approved by the Administrator. ii. Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall remain in place prior to and during approved construction activities. The signs shall contain the following statement: "Wetland & Buffer - Do Not Remove or Alter Existing Native Vegetation." iii. In the case of short plat, long plat, binding site plan, and site plan approvals under this Code, the applicant shall include on the face. of any such instrument the boundary of the wetland and its buffer. iv. The applicant may also choose to dedicate the buffer through a conservation easement or deed restriction that shall be recorded with the Jefferson County.. Auditor. Such easements or restrictions shall, however, use the forms approved by the Prosecuting Attomey. (5) Buffers - Standard Requirements. The following buffer provisions shall apply: i. Buffer areas shall be required to provide sufficient separation between the designated wetland and the adjacent proposed project. . ii. The appropriate width of the wetland buffer shall be determined by either: application of the standard buffer widths set forth below in Table 3-4; or by variations to the standard buffers as allowed in Sections 3.6.9(d)(6), 3.6.9(d)(7), or 3.6.9(d)(8), below. iii. Buffers shall remain naturally vegetated except where the vegetation has been disturbed, inva~~:~i~ ~?'t'desirable Wetland Category Notes: 1. These buffers are one part of the comp~te requirements necessary to qualify for a waiver. See Section 3.6.9.d.2 above. 2. These are not staOdard weUand buffers: they are optional buffers for cases when a delineation is not made. These minimum waiver buffers, shown in Table 3-3, are 1.5 times the standard buffer widths identified in this section. If a single-family residence, building envelope, or setback line in a subdivision is proposed to be closer to the weUand than the distance identified in the table, a weUand delineation report must be performed. 3. The same opportunities for exemption from delineation shall apply to uncategorized weUands. The Department of Community Development shall be responsible for determining the weUand category. 4. The following shall not be located within the distances identified in the table: 1) single-family residences and all accessory structures and uses; 2) subdivision building envelopes and setback lines. (3) Drainage and Erosion Control. An applicant submitting a project application shall also submit, and have approved, a drainage and erosion control plan as specified in this Section. The plan shall discuss, evaluate and recommend methods to minimize sedimentation of designated wetlands during and after construction. (4) Buffer Marking. Upon approval of the delineation report the location of the outer extent of the wetland buffer shall . be marked in the field as follows: i. A permanent physical separation along the upland boundary of the wetland buffer area shall be installed and permanently main- Unified Development Code Section 3 . Land Use Districts ." ."''''''~_A'''~'-'~'-'''';.'---f1 lt~",d~", SECTION 3 . LAND USE DISTRICTS Table 3-4. Wetland Category species (e.g., noxious weeds), or would substantially benefit from the increased diversity of introduced species. Where buffer disturbance has occurred during construction, replanting with native vegetation shall be required. Minor pruning of vegetation to enhance views and removal of undesirable species (e.g., alders) may be permitted by the Administrator on a case-by-case basis. iv. All buffers shall be measured perpendicularly from the wetland boundary as surveyed in the field. ' Standard wetland buffer widths shall be as established in Table 3-4. Standard Buffer Widths for Wetlands Standard Buffer Width Department demonstrates anyone of the following through appropriate documentation: i. A larger buffer is necessary to maintain viable populations of existing species. ii. The wetland is used by species listed by the Washington State Department of Wildlife as endangered, threatened, or sensitive, or has documented priority species or habitats or essential or outstanding poten- . tial habitat for those species, or has unusual nesting or resting sites (e.g., heron rookeries and raptor nesting trees). iii. The adjacent land is susceptible to severe landslide or erosion, and erosion control measures will not effectively prevent adverse wetland impacts. iv. The adjacent land has minimal vegetative cover or slopes greater than forty-five (45) percent. (8) Averaging Buffer Widths. The Administrator may modify the standard wetland buffer widths set forth in this section by averaging. Buffer width averaging shall be allowed only when an individual or firm meeting the criteria of Subsection 3.6.100)(2) demonstrates all of the following to the satisfaction of the Administrator: i. Width averaging will not adversely impact the wetland functional values. ii. The total area contained within the wetland buffer after averag- ing is not less than that contained within the standard buffer prior to averaging. iii. The standard buffer width has not been reduced by more than twenty-five (25) percent. e. Non..compensatory Enhancement. Non- compensatory enhancement are those wetland enhancement projects which are conducted solely to increase the functions and values of an existing wetland and which are not required to be conducted pursuant to the.. mitigation requirements of Section v. I II III IV 150 ft 100 ft SOft 25ft 3-32 (6) Reducing Buffer Widths. The Administrator may reduce the standard wetland buffer widths, when the project applicant demonstrates both of the following to the satisfaction of the Administrator: i. Standard wetland buffer width averaging as set forth in this section is unfeasible. ii. The project application includes a buffer enhancement plan using native vegetation which sub- stantiates that an enhanced buffer will improve the functional attributes of the buffer to provide additional protection for func- tions and values. Increasing Buffer Widths. The Administrator may increase the standard wetland buffer widths when a larger buffer is necessary to protect wetland functions and values based on local conditions. This determination shall be made only when the (7) \ d/(;~ Unified Development Code Section 3 . Land Use Districts l~q SECTION 3 · lAND USE DISTRICTS. 3.6.9.1, below. There are two types of non- compensatory enhancement (1) Type 1 Non-Compensatory Enhancement. Type 1 non- compensatofy enhancement projects involve the filling, draining, or excavating of a regulated wetland. All applications for Type 1 non- compensatofy enhancement projects shaI be accompanied by an enhancement plan prepared in accordance with subsections (1)i-.Ii, below, which demonstrates that the proposed activities wiI result in an increase In wetland functions and values. I. The enhancement plan must.be submitted for review and approval by the AdminisIrator. Ii. The enhancement plan must either be prepared by a qualified wetlands consultant or accepted In writing by the U.S. FISh and Wildlife Service, the Washington Department of FISh and Wildfife, or the Washington Department of Ecology. (2) Type 2 Non-Compensatory Enhancement. Type 2 n0n- compensatory enhancement projects Involve wetland alterations that do not Include the filling, draining, or excavating of a regulated wetland. Such projects might involve the removal of non-native plant species or the planting of native plant species. All applications for Type 2 non- compensatofy enhancement projects shaH be accompanied by an enhancement plan prepared In accordance with subsections (2)i-.lii, below, which demonstrates that the proposed activities wiI result'ln an Increase in wetland functions and values. - - i. . The enhancement plan shaH be submitted for review and approval by the Administrator; Ii. The enhancement plan must Include a detailed description of the activity including the following Information: A. The goal of the enhance- ment project; B. What plants, if any, will be removed or planted; C. How the activity will be conducted, including the type(s) of tools or machin- ery to be used; and O. The qualifications of the Individual who wiI be conducting the enhance- ment activity. . iii. The enhancement plan must either be prepared by a qualified wetlands consultant or accepted '. in writing by the U.S. FISh and Wddlife Service, the Washington Department of FISh and Wildlife, or the Washington Department of Ecology. f. Mitigation. The overaU goal of mitigation shaI be rio net loss of wetland function, value, and acreage. (1) Mitigation Sequence. Mitigation. includes avoiding, minimizing, or compensating for adverse impacts to regulated wetlands or their buffers. When a proposed use or development activity poses potentially significant adverse Impacts to a regulated Wetland or Its buffer, the preferred sequence of mitigation as defined below shaH be followed. unless the applicant demonstrates that an overriding public benefit would warrant an exception to this preferred sequence. I. Avoiding the inpact altogether by not taking a certain. action. or parts of actions on that portion of the site which contains the regulated wetland or Its buffer; ii. Minimizing inpacts by limiting the degree or magnitude of the action and Its Implementation; iii. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment; iv. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; or v. Compensating for the impact by replacing, enhancing, or provid- Unified Development Code Section 3 . Land Use Districts 3-33 ",:?C",...,:.......-.:.,...."....,,:M~'"'.......,. IJ:D .~ SECTION 3 . lAND USE DISTRICTS ing substitute resources or environments. (2) Compensatory Mitigatlon-General Requirements. As a condition of any permit or other approval allowing alteration which results in the loss or degradation of regulated weUands, or as an enforcement action pursuant to Section 10 of this Code, compensatory mitigation shaD be required to offset impacts resulting from the actions of the app&cant or any Code violator. i. Except persons exempt under this Section, any person who alters or proposes to alter regulated wetlands shaD restore or create areas of weiand equivalent to or larger than those altered in order to compensate for wetland losses. The following Table 3-5 specifies the ratios that apply to creation or restoration which is in-kind, on-site, and is accomplished prior to or concurrenUy with alteration: Table 3-5. Required Replacement RatIos for Compensatory Wetland Mitigation. Wetland Category Replacement Ratio(1) 6:1 I II or III . Forested . Saub-SIvub . Emergent 3:1 2:1 2:1 1.25:1 IV Note: 1. The first number In the ratio specifies the aaeage of weUands to be created, and the second number specifies the aaeage of wetlands proposed to be altered or lost The replacement ratios are derived from Department of Ecology Publication No. 97-112 (1998): -....ow Ecology Regulates WeUands." 2. Enhancement of existing weUands, may be considered as compensation; but above ratios must then be doubled. _ 3. Compensation must be completed prior to wetland destruction, where possible. 4. Compensatory mitigation must follow an approved compensatory mitigation plan pursuant to this section, with the replacement ratios as speclfied above. 5. Compensatory mitigation must be conducted on property which will be protected and managed to avoid further development or degradation. The applicant or Code violator must provide for long-term preservation of the compensation area. 6. The applicant shall demonstrate sufficient scientific expertise, supervisory capability, and financial resources, Including bonding, to cany out the project. The applicant must demonstrate the capability for monitoring the site and maklng cooeclions if the project fails to meet projected goals. (3) Compensatory Mitigation - Type, location, and TIming. i. . Priority wiD be given to in-kind, on-site compensation if feasible and if the wetland to be lost has a moderate to high functional value. Ii. When the wetland to be impacted is of a limited functional vaJue and is degraded, compensation may be of the weUand community type most likely to succeed with the highest functional value possible. Iii. Out-of-kind compensation may be allowed when out-of-kind replacement wiD best meet identified goals (for example, replacement of historically diminished wetland types). Where out-of-kind replacement is accepted, greater acreage replacement ratios may be required to compensate for lost functional values. iv. OIf-site compensation can be allowed only if: A On-site compensation is not feasible due to hydrology, soKs, waves, or other factors; B. On-site compensation is not practical due to probable adverse Impacts from surrounding land uses; C. Potential functional values at the site of the proposed restoration are significantly greater than the lost wetland functional values; or D. OIf-site compensation will be conducted in accordance with Section 3.6.9.f(4) (Cooperative Compensation Projects). 3-34 Unified Development Code Section 3 . Land Use Districts ,~nded by Ordinance No. 05-0428-03 a..~i v. SECTION 3 . LAND USE DISTRICTS vi. Except in the case of cooperative compensation projects, off-site compensation must occur within the same watershed where the wetland loss occurs, provided that Category-IV wetlands may be replaced outside of the watershed if there is no reasonable technical alternative. The stormwater storage function provided by Category-IV wet- lands must be provided for within the design of the development project Except in the case of cooperative compensation pro- jects, in selecting compensation sites applicants must pursue locations in the following order of preference: A Filled, drained, or cleared sites which were formerly wetlands and where appro- priate hydrology exists; and B. Upland sites, adjacent to wetlands, if the upland is significantly disturbed and does not contain a mature forested or shrub com- munity of native species, and where the appropriate natural hydrology exists. Construction of compensation projects must be timed to reduce impacts to existing wildlife and flora. Construction must be timed to assure that grading and soil movement occurs during the dry season. Planting of vege- tation must be specifically timed to the needs of the target species. Cooperative Compensation Projects. The County may encourage, facilitate, and approve cooperative projects where one or more applicants, or an organization with demonstrated capability, may undertake a compensation project if it is demonstrated that Creation of one or several larger wetlands may be preferable to many small wetlands; vii. (4) i. Unified Development Code Section 3 . Land Use Districts Amended by Ordinance No. 04-0422-02 ii. The group demonstrates the organizational and fiscal capability to act cooperatively; iii. The group demonstrates that long term management of the compensation area can and will be provided; and iv. There is a clear potential for success of the proposed com- pensation at the identified compensation site. Conducting compensation as part of a cooperative process does not reduce or eliminate the required replacement ratios outlined in this Section. 3.6.10 Special Reports. a. Waivers. The Administrator many waive the requirement for a special report wh~ an applicant demonstrates all of the follOWIng: (1) The proposal involved ~n not af!ect the environmentally sensitive area In a manner contrary to the goals, purposes and objectives of this Code. (2) The minimum protection standards required by this section are satisfied. b. General Contents. (1) Scale Map and Written Report. Special reports for environmentally sensitive areas shall include a scale map of the development proposal site and a written report. (2) Impacts Assessment. The special report shall identify and characterize any critical area as a part of the larger development proposal site, assess impacts of the development proposal on any environmentally sensitive areas on or adjacent to the development . proposal site, and assess the im~~cts of any alteration proposed for a cntical area. (3) Protection Mechanisms. The special report shall propose adequate protection mechanisms that may include mitigation, maintenance and monitoring plans, and performance surety. (4) Preparer - Proof of Qualifications. Special reports shall includ~ d?cu- mentation certifying the qualIfications of the preparer. c. Consultants. (1) Retaining Consultants. Jefferson County may retain cons~ltants to assist in the review of Special reports 3-35 LQ~ -""~ ,<:3:: ' ',"" SECTION 3 . lAND USE DISTRICTS outside the range of staff expertise. The applicant shall pay for the costs of retaining said consultants. d. Responsibility. (1) General. Special reports shall include documentation certifying the qualifica- tions of the preparer. (2) Determining Accuracy and Sufficiency. The Administrator shall verify the accuracy and sufficiency of all special reports. (3) Nonacceptance of Inaccurate or Insufficient Reports. If the Admini- strator finds that a special report does not accurately reflect site conditions, or does not incorporate appropriate protection mechanisms, the Admini- strator shall issue a report citing evidence (e.g., soil samples, weD log data, etc.) that demonstrates where the special report is insufficient or in error. The applicant may then either revise the special report and submit another special report. or appeal the administrative determination pursuant to this Code. . e. Aquifer Recharge Area Report. (1) General. Aquifer Recharge Area Reports serve as the primary means for Jefferson County to verify the accuracy of its Critical Aquifer Recharge Area map and to determine specific aquifer protection measures to be applied to prevent significant adverse groundwater quality impacts. (2) Aquifer Recharge Area Report Content An initial evaluation shall be made by a qualified groundwater scientist/engineer. The Aquifer Recharge Area Report shall include: i. A detailed description of the project, including all processes and other activities which have the potential for contaminating groundwater. Ii. A hydrogeologic evaluation which Includes, at a minimum: A. A description of the hydrogeologic setting of the aquifer region; B. Site location, topography, drainage, and surface water bodies; C. Soils and geologic units underlying the site; 3-36 \ l~~ (3) D. Groundwater characteristics of the area, including flow direction and gradient, and existing groundwater quality; E. The location and charac- teristics of wells and springs within one thousand (1,000) feet of the site; F. An evaluation of existing groundwater recharge, and; G. A discussion and evaluation of the potential impact of the proposal upon groundwater recharge. iii. A contaminant transport analysis for the uppermost groundwater supply aquifer assuming an accidental sptll or release of project specific contaminants or on-site sewage. discharge, or both if applicable; Iv. A discussion and evaluation that details available on-site spill response and containment equipment, employee spill response training, and emer- gency service coordination measures; v. Proposed beSt management practices to minimize exposure of permeable surfaces to potential pollutants and to prevent degradation of ground- water quality; and;. vi. Requirements for a monitoring program with financial guarantees/assurances that the monitoring program will be implemented. Professional Qualifications. The minimum qualifications for ground- water scientists and engineers performing groundwater and con- taminant transport evaluations and preparing Aquifer Recharge Area Reports shall be established pursuant to acceptable industry standards for training and experience and as established by the State of Wash- ington in the Washington Admini- strative Code or by statute. County Review. Reports shall be forwarded to the Jefferson County Environmental Health Division for technical review. The Environmental (4) UnifieJj Development Code Section '5 - Land Use Districts ~ed by OrdilUlnce No. 07-1224-01 SECTION 3 . lAND USE DISTRICTS Health Division shall review the Reports within thirty days of receipt to determine their adequacy. The County may request additional information in order to determine the adequacy of the Reports. The Administrator shall determine appropriate conditions as identified in the Report to mitigate proposed land uses. The Administrator shall be authorized to collect fees necessary to recover costs associated with processing and review of Aquifer Recharge Area Reports. implementation of the protection standards contained in this section, and administration of the general provisions of the Aquifer Recharge Area provisions of this Code. Such fees win be incorporated into the Jefferson County Fee Schedule. f. Drainage and Erosion Control Plan. (1) General. This plan shall address best management practices which are physical, structural or managerial practktes, that when used singly or in combination, prevent or reduce pollution of water. (2) Qualifications of the Preparer. Drainage and erosion control plans shall be prepared by a licensed professional engineer, except for small parcel erosion control plans. (3) Information Requirements. The design standards and information requirements for submission of drainage and erosion control plans shall be established in accordance with the Department of Ecology's Stormwater Management Manual currently adopted by Jefferson County. g. Geotechnical Report. (1) General. This report shall include a description of the geology of the site, conclusions and recommendations regarding the effect of geologic conditions on the proposal, and opinions and recommendations on the suitability of the site to be developed. (2) Qualifications of the Preparer. Geotechnical reports shall be prepared by a licensed geotechnical engineer, a professional geologist, or a licensed professional engineer knowledgeable in regional geologic conditions with professional experience in landslide, erosion, or seismic hazard evaluation. (3) Information Requirements. i. A description of the geologic setting of the region, based upon readily available data, including: A. Site location and topography; B. Soils and geologic units underlying the site; and C. The location and charac- teristics of springs within one thousand (1,000) feet of the site. ii. An evaluation of the potential impact of the proposal upon existing geological hazards. iii. A discussion and evaluation of the potential impact of the proposal upon existing geological hazards. iv. Recommendations on appro- priate protection mechanisms, if necessary, to minimize the risk of erosion or landslide. h. Grading Plan. (1) General. This plan shall identify the proposed development project including the movement of material onsite, along with the proposed and existing contours of the site, and cross-sections thereof. (2) Qualifications of the Preparer. Grading plans shall be prepared by a licensed professional engineer or an indMdual with at least three years experience in the preparation of grading plans who is knowledgeable of Unified Development Code Section 3 . Lond Use Districts Amended by Ordinance No. 04.0422-02 3-37 ).6;~.a~ SECTION 3 . lAND USE DISTRICTS soil conditions and geology in Jefferson County. (3) Information Requirements. i. A description of the general vicinity of the proposed site. ii. The property limits and accurate contours of existing ground and detaOs of terrain and area drainage. iii. Umiting dimensions, elevations of finish contours to be achieved by the grading, and proposed drainage channels and related construction. Iv. Detailed plans of all surface and subsurface drainage devices, walls, cribbing, dams and other protective devices to be c0n- structed with, or as a part of, the proposed work together with a map showing the drainage areas and the estimated runoff of the areas served by any drains. v. The location of any buildings or structures on the property where the work is to be performed and the location of any buildings or structures on land of adjacent owners that are within fifteen (15) feet of the property or which may be affected by proposed grading operations. vi. A discussion and evaluation of the. potential impact of the proposed grading upon desig- nated critical areas. vii. Recommendations on appro- priate protection mechanisms, if necessary, to prevent degrada- tion of designated aitical areas and to ensure public safety. i. Habitat Management Plan (1) General. This report shall Identify how the development impacts of the proposed project will be mitigated. The Washington Department of Fish and Wildlife Priority Habitat aM Species Management Recommendations shall be the basis for this report. (2) Qualifications of the Preparer. Habitat management plans shall be prepared by persons who have a minimum Qf a Bachelor's Degree in Wildlife or Fisheries Habitat Biology, or a related degree in a biological field from an accredited college or university with a minimum of four years experience as a practicing fish or wildlife habitat biologist. (3) Information Requirements. i. A map(s) prepared at an easily readable scale, including the following infonnation: A. The location of the proposed development site, !ncluding property limits; B. The relationship of the site to surrounding topographic and cultural features; C. The nature and density of the proposed development or land use change; D. Proposed building locations and arrangements; and E. ~e boundaries of forested areas. ii. A legend that includes the following" information: A. A complete and accurate legal description as pre- scribed by the triggering application fonn (the description shall include the total acreage of the parcel); B. TdJe, scale and. north arrows; C. Date, including revision dates, if applicable; and D. Certificates by a professional biologist as appropriate. iii. A report that contains the following infonnation: A. A description of the nature, density and intensity of the proposed development in sufficient detaO to allow analysis of such land use change upon Identified fish and wildlife habitat; B. The applicant's analysis of the effect of the proposed development, activity or land use change upon the fish or wildlife species 3-38 \ l.$5 - Unified Development Code Section 3 . Land Use Districts ~St6. SECTION 3 . LAND USE DISTRICTS identifled by the Washington Department of Fish and Wildlife within the identified priority habitat, utilizing the management guidelines; C. A plan by the applicant that shall explain how any adverse impacts created by the development will be mitigated. /' iv. Possible mitigating measures that may include, but are not limited to: A. Establishment of buffer zones; B. Preservation of critically important plants and trees; C. Limitation of access to habitat area; D. Seasonal restriction of con- struction activities; and E Establishing a timetable for periodic review ofthe plan. j. Wetland Delineation Report. (1) General. This report shall be required when a proposed development encroaches upon a designated wetland or its buffer, and shall be used to identify the boundaries and dassification of the designated wetland. (2) Qualifications of the Preparer. Wetland delineation reports shall be prepared by either a biologist with wetlands expertise, or an individual or finn who has been certified by the United States Army Corps of Engineers, Region 10, to perfonn wetland delineations. (3) Information Requirements. i. A map(s) prepared at an easily readable scale, including the following infonnation: A. Wetland boundaries; B. Sample site and sample transects; C. Boundaries of forested areas; and D. Boundaries of wetland classes if multiple classes exist. ii. A legend that includes the following infonnation: A. A complete and accurate legal description . as pre- scribed by the triggering application fonn (the description shall include the total acreage of the parcel); B. Title, scale and north arrows; C. Date, including revision dates, if applicable; and D. Certificates by a pro- fessional biologist as appropriate. iii. A report that contains the following infonnation: A. A discussion of the delineation methods and results, with special empha- sis on technique used from the Washington State Wetlands Identification and Delineation Manual, March 1997, or as amended hereafter; B. A description of relevant site infonnation acquired from the National Wetlandlnven- tory maps and the Soil SUIVey for Jefferson County; C. The acreage of each wetland on the site, based on the survey, if the acreage will impact the buffer size detennination or the project design; and D. All completed field data sheets numbered to cor- respond to each sample site. E. Project cross sections, both before and after completion, in relation to the surface elevation of the wetland must be indicated for proposed activities which involve cutting or filling operations within the wetland or its proposed buffer. Unified Development Code Section 3 . Land Use Districts 3-39 .JQ~, CdS! SECTION 3 . LAND USE DISTRICTS F. Classification of the wetland in accordance with the standards adopted in this Section and a detailed written analysis of the existing regulated wetland including: vegetation com- munities classified per the U.S. Fish and Wildlife Service Classification of Deepwater Habitats (1979); species composition of vegetation communities, including presence and percent cover; existing soils; and existing hydro- logic conditions including inflow/outflow, source of water within the system, relative water quality, and seasonal changes in hydro- logy, if applicable. G. A detailed analysis of wildlife species use of the wetland and its buffer. H. A detailed analysis of the existing wetland buffer including species compo- sition and percent coverage, whether the buffer is disturbed or not, and the functional value of the buffer in relation to the regulated wetland. I. If the development activity would eliminate all or part of a regulated wetland then a detailed compensatory miti- gation plan as outlined in Section 3.6.10.j(4), below must be provided. (4) Mitigation Plan Contents. All wetland restoration, creation, and enhance- ment projects required by this Code, either as a condition of project approval or as the result of an enforcement action, shall follow a mitigation plan prepared by a qualified specialist as defined herein and conducted in accordance with the requirements described in this Code. The applicant or violator must receive written approval of the mitigation plan by the Administrator prior to com- mencement of any wetland restoration, creation, or enhancement activity. 3.6.11 Airport Essential Public Facility District (A). a. Purpose. The purpose and intent of this section is to regulate land uses within the MAirport Essential Public Facility" overlay district in . order to encourage orderly economic development in a manner compatible with airport operations and adjacent properties and to protect existing general aviation public use airports from conflicting or incompatible adjacent land uses or activities. b. Designation. The overlay district (see Official Comprehensive Plan Map) applies to all Port of Port Townsend owned property within the Jefferson County International Airport (JCIA). The JCIA is a general aviation airport that provides recreational, business, flight training, charter and air taxi services and other uses. c. Allowable and Prohibited Uses. All new development within the Jefferson County Intemational Airport shall be restricted to uses which are clearly identified as aviation support facilities or aviation related . development. (1) Aviation Support Facilities. Aviation Support Facilities are those uses which directly support flight operations and the operation of the Jefferson County Airport, and include, but are not limited to: . i. Passenger service terminals, including food service; ii. Navigational aids; iii. Runway aprons; iv. Terminal buildings; v. Hangars; vi. Fuel storage facilities; vii. Operations/maintenance facilities; viii. Automobi.le parking. (2) Aviation Related Development: Aviation Related Development are those uses which are reliant upon the airport for their businesses, which include but are not necessarily limited to: i. Aircraft repair facilities; 3-40 Unified Development Code Section 3 . Land Use Districts .15:1 lJ.:~ procedures shall be exempt. (20) Building codes. The adoption by ordinance of all codes as required by the state Building Code Act (chapter 19.27 RCW). (21) Adoption of noise ordinaDces. The adoption by counties/cities of resolutions, ordinances, rules or regulations concerned with the control of noise which do not differ from regulations adopted by the department of ecology under chapter 70.107 RCW. When a county/city proposes a noise resolution, ordinance, rule or regulation, a portion of which differs from the applicable state regulations (and thus requires approval of the department of ecology under RCW 70.107.060(4)), SEPA compliance may be limited to those items which differ from state regulations. (22) Review and c~t actions. Any acti vi ty where one agency reviews or comments upon the actions of another agency or another department within an agency shall be exempt. (23) utilities. The uti1ity-rela~ed actions listed below shall be exempt, except for installation, construction, or alteration on lands covered by water. The exemption includes installation and construction, relocation when required by other _h, gov.ernmental bodies, repair, replacement ,maintenance-r operation or alteration that does not change the action from an exempt c:)..ass. (a) All communications lines, including cable TV, but not including communication towers or +elay stations. (b) All storm water, water and sewer facilities, lines, equipment, hookups or appurtenances including, utilizing or related to lines eight inches or less in diameter. (c) All electric facilities, lines, equipment or appurtenances, not including substations, with an associated voltage of 55,000 volts or less; and the overbuilding of existing distribution lines (55,000 volts or less) with transmission lines (more than 55,000 volts); and the undergrounding of all electric facilities, lines, equipment or appurtenances. (d) All natural gas distribution (as opposed to transmission) lines and necessary appurtenant facilities and hookups. (e) All developments within the confines of any existing electric substation, reservoir, pump station or well: Provided, That additional appropriations of water are not exempted by this subsection. (f) Periodic use of chemical or mechanical means to maintain a utility or transportation right of way in its design condition: Provided, That chemicals used are approved by the Washington state department of agriculture and applied by licensed personnel. This exemption shall no~ apply to the use of chemicals within watersheds that are controlled for the purpose of drinking water quality in accordance with WAC 248-54-660. (g) 'All grants of rights of way by agencies to utilities for use for distribution (as opposed to transmission) purposes. (h) All grants of franchises by agencies to utilitie~~ (i) All disposals of rights of way by utilities. (24) Batural resources management. 'In: addition to the other WAC (9/10/03 10:03 AM) [ 87 ] """"'<'''--'~-'''''-.,.::::?' ,JSg""..,~Q" SECTION 4 . PERFORMANCE AND USE-SPECIFIC STANDARDS (4) Within three (3) days after termination of any temporary outdoor use permit, such use shall be abated and all structures, signs and evidence of such use removed. The Administrator may require a cash bond be posted by the applicant upon application to defray the cost of cleanup and repair of the property should the applicant fail to do so; and (5) Temporary outdoor use permits not exercised within one hundred eighty (180) days of issuance shall be null and void. 5. In addition to any other remedy provided by this Section, at any time when such temporary outdoor use is operated in violation of required conditions of this section, or otherwise found to constitute a nuisance, the County may revoke the temporary outdoor use permit. The permittee shall be given notice of and an opportunity to contest the revocation prior to a final determination. If, in the opinion of the Administrator, the violation poses a life, health, or safety threat, the use permit may be revoked immediately, and the permittee shall be given the opportunity to request consideration and/or appeal. 6. Where any provision of this Section 4.38, Temporary Outdoor Uses,is in conflict with Chapter 8.20 JCC, Public Assemblies, the provisions of Chapter 8.20 JCC shall control. . 4.39 Temporary Festivals. 1. Temporary Festival. A temporary festival is generally defined as any musical, cultural, or social event conducted in an indoor or outdoor site or facility that is of a duration of more than one (1) month out of any 12-month period, and attracts two hundred fifty (250) or more people in anyone (1) day. For the purposes ofthis Section, each week during which the temporary festival operates for two or more days shall be considered a full week. 2. The temporary festivals are allowed, subject to a conditional use permit, unless otherwise regulated by the requirements and provisions of Chapter 8.20 JCC, Assemblies. 3. Temporary festivals are subject to the following regulations: a. Those regulations specified above for temporary outdoor events; b. Operators of temporary festivals shall submit a part of the application for conditional use permit written plans of operation describing those means and methods to be employed Unified Development Code Section 4 . Performance and Use-Specific Standards to minimize impacts to neighboring parcels resulting from the temporary festival, including traffic, litter, trespass, vandalism, property damage, and sanitation. c. The provisions of Chapter 8.20 JCC, Assemblies, where applicable. 4. Violations. In addition to any other remedy provided by this Chapter, at any time when such temporary festival is operated in violation of required conditions. of this Section or a conditional use permit, or otherwise found to constitute a nuisance, the County may revoke the conditional use permit. The permittee shall be given notice of and an opportunity to contest the revocation prior to a final determination. If, in the opinion of the Administrator, the violation poses a life, health or safety threat, the use permit may be revoked immediately, and the permittee shall be given the opportunity to request consideration and/or appeal. 5. Where any provision of this Section 4.39, Temporary Festivals, is in conflict with Chapter 8.20 JCC, Public Assemblies, the provisions of Chapter 8.20 JCC shall control. 4.40 Utility Developments, Minor. 1. Minor Utility Development. Minor utility developments include utility developments designed to serve a small local community, are not manned and would be considered normal utility services for the area, including but not limited to: a. Electrical generating facilities less than ten (10) megawatts in output; b. Electrical distribution and transmission lines less than 115 kV; c. Electrical substations; d. Water and sewer pipelines; e. Pipelines for petroleum or petroleum products with an inside diameter less than six (6) inches or less than five (5) miles in length; f. Pipelines for natural gas, synthetic natural gas, or liquid propane gas with an inside diameter less than twelve (12) inches or less than five (5) miles in length; 2. The following standards apply to all. minor utility developments: a. Utility developments shall comply with the goals and policies of the Comprehensive Plan and the requirements of the Shoreline Master Program; b. New utility distribution lines shall be placed underground wherever reasonable and practical. Undergrounding of existing lines in the course of routine maintenance and 4-29 .:~L~1'~~"':d~~ ... SECTION 4 . PERFORMANCE AND USE-SPECIFIC STANDARDS replacement is encouraged where practi- cable, particularly where such under- grounding would enhance recognized scenic and open space areas and resources; c. Environmental impacts resulting from installation or maintenance of utilities and utility facilities shall be avoided or minimized. Where no feasible alternative to the impact exists, and mitigation is not feasible, appropriate compensating measures should be developed; d. Utilities and transportation facilities shall be installed in the same rights-of-way when the effect will be to reduce the adverse impacts on the physical environment; e. Extension of community sewerage lines outside of existing areas shall be allowed only if: (1) The extension is demonstrated to be necessary to remedy existing or potential groundwater contamination problems or to correct existing or impending health hazards, as determined by the County Health Official; or (2) The extension is to provide sewage collection and treatment service to a public elementary or secondary school; and f. Routine maintenance and replacement of wired utility transmission and distribution lines and poles within existing rights-of-way, where environmentally sensitive areas are not present and where exempt from SEPA and Shoreline Master Program review, are authorized without further permit application and development approval, provided that such construction and activities shall comply with applicable performance and development standards of this Code. g. It shall be the affirmative duty of the applicant who proposes a minor utility development to determine if any state or federal permits or licenses are necessary and then to obtain those permits or licenses at their own expense. 4.41 Utility DevelopmentS, Major. 1. Major Utility Developments. Major utility developments include utility development designed to serve a broader community or regional area, or are manned, including but not limited to: a. Electrical generating facilities greater than ten (10) megawatts in output; 4-30 b. Electrical transmission lines exceeding 115 kV; c. Pipelines for petroleum or petroleum products with an inside diameter of six (6) inches or greater and exceeding five (5) miles in length; d. Pipelines for natural gas, synthetic natural gas, or liquid propane gas with an inside diameter of twelve (12) inches or greater and exceeding five (5) miles in length; e. Other similar utility or energy facilities not meeting the definition of a minor utility development. 2. The following standards apply to all major utility developments: a. The need for the particular location proposed. shall be demonstrated by the applicant to the satisfaction of the Approval Authority, including a full accounting of altemative locations and sites; b. The physical and economic impacts of such facilities shall be evaluated, and measures to mitigate these impacts provided; and c. Development shall comply with the require- ments of Section 4.22, Industrial Uses - Standards for Site Development. d. It shall be the affirmative duty - of the applicant who proposes a major utility development to determine if any state or federal permits or licenses are necessary and then to obtain those permits or licenses at their own expense. 4.42 Veterinary Clinics or Hospitals. 1. Veterinary clinics or hospitals are subject to the following standards: a. Current construction, maintenance and operation standards of the American Animal Hospital Association shall apply at all times; b. Boarding and grooming of animals, other than that incidental to medical and surgical care, shall be allowed subject to meeting the provisions. for commercial animal kennels and shelters in Section 4.6 of this UDC; and c. Development shall comply with the require- ments of Section 4.22 Industrial Uses - Standards for Site Development; including requirements for off-street parking, visual screening, and landscaping. .~L._~ ~/&O . ,~ .._ Unified Development Code Section 4' Performance and Use-Specific Standards JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450. 360/379-4451 Fax www.co.jefferson.wa.uslcommdevelopment Master Permit Application Project Description (indude separate sheets as necessary): MLA: Tax Parcel Number: Site Address and/or Directions to Property: Property Owner{s) of Record: Telephone: Mailing Address: Applicant/Agent (if different from owner): Telephone: Mailing Address: Property Size: (acres/square feet) Fax: emait: Fax: email: What kind of Permit? (Check each box that applies) o Building o Demolition Penn it o Single Family o Garage Attached I Detached o Manufactured Home o Modular o Commercial * o Change of Use o Address o Propane o Allowed "Yes" Use Consistency Analysis o Stonnwater Management o Site Plan Approval Advance Detennination (SPAAD) * o Temporary Use o Wireless Telecommunication * o Forest Practices ActIRe\ease of Six-Year Moratorium * Ifa uite a Pre - icatJon Conference ** R uites a Pre-A lication Conference Please identify any other local, state or federal permits required for this proposal, if known: o Road Approach o Variance (Minor, Major or Reasonable Economic Use) o Conditional Use [C(a), C(d), or C] ** o Discretionary "0" or Unnamed Use Classification o Special Use (Essential Public Facilities) ** o Boundary Une Adjustment o Short Plat ** o Binding Site Plan ** o Long Plat ** o Planned Rural Residential Development (PRRD)/Amendments ** o Plat Vacation/Alteration ** o Shoreline Master Program ExemptionlPennit Revisions ** o Shoreline Management Substantial Development ** o Shoreline Management Variance o Comprehensive PlanlUOCJLand Use District Map Amendment o Jefferson County Shoreline Master Program Amendment I hereby designate OWNER SIGNATURE DESIGNATION OF AGENT to act as my agent in matters relating to this application for pennit(s). Date: By signing this application form, the owner/agent attests that the information provided herein, and in any attachments, is true and correct to the best of his, her or it's knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in this pennit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liabilities, judgments, court costs, reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit 1 further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and.any required later inspections. Access and right of entry to this property shan be requested and shaI1 occur only during regular business hours. Signature: Date: The action or actions Applicant win undertake as a result of the issuance of this permit may negatively impact upon one or more threatened or endangered species and could lead to a potential "take" of an endangered species as those terms are defined in the federal law known as the "Endangered Species Acf' or "ESA. " Jefferson County makes no assurances to the applicant that the actions 1hat will be undertaken because this permit has been issued will not violate the ESA. Any individual, group or agency can file a lawsuit on behalf of an endangered species regarding your action(s) even if you are in compliance with the Jefferson County development code. The Applicant acknowledges that he, she or it holds individual and non-transferable responsibility for adhering to and complying with the ESA. The Applicant has read this disclaimer a~ si.Q!l~..~n~..9a~it~w. Signature: Date: .d~~ G:\permitCenter\FORMS\DRD FORMS\Master Permit Application 7-8-04.doc OWNER BULDER STATEMENT The signer of this statement does hereby certify that they are the Owners of the parcel referenced herein, that they are not licensed contractOls and that they will be assuming the responsibility of the General Contractor for the proposed project. . Signature: Date: GENERAL CoNTRACTOR OR MANUFACTURED HoME INSTALlER: PHONE: ( ) EMAlL: WAINS NUMBER PHONE ( EMAIL FAX: ( MAILING ADDRESS: CoNTRACTOR'S LICENSE NUMBER: AACHITECTIENGINEER: MAILING ADDRESS: FAX: ( Project Type: o New o Addition o AlterationlRemodel o Repair o Demolition Frame Type: o Wood o Steel o Concrete o Masonry o Other: Bathrooms: Existing: Proposed: Total: Shoreline: Type of Sewage Disposal: o Sewer o Community System o Individual System SEP Permit # Water Supply: o Private well 0 Two Party o Public Name of System: Bank Height: Type of Heat: Bedrooms: Existing: Proposed: Total: Setback: If this Is a Commercial Prolect you must answer the followina: Number of Parking Spaces: Current: Proposed: Number of ADA Parking Spaces: Number of occupants Oncludes owners, tenants, employees, etc) Current Proposed IBC Occupancy: IBC Type of construction: Will you have Food Service? Yes I No If this Is a Prooane Tank and/or Aopliance Installation Dermit. mark all items below that aDDlv: o Underground Tank 0 Above ground Tank Size of Propane Tank: o Heat Stove 0 Cook Stove 0 Woodstove 0 Fireplace Insert 0 Hot Water Tank 0 Pellet Stove 0 Other Is this aopliance belna Installed In a Manufactured I Mobile Home? Yes I No When applying for a permit to Install a propane tank you must also submit a site plan showing all of the buildings, all property lines, tank location and size, distances from the propane tank to all property lines, buildings and septic system components, Inc/udin the teSelVe atea. Main Floor 2 Floor 3 Floor Mezzanine: Heated Basement Unheated Basement Other Unheated Garage/Carport Decks Other ESTIMATED COST (REQUIRED) -Fair market value of aII/abor and materials foundation to finish G:\PennitCenter\FORMS\DRD FORMS\Master Pennit Application 7-8-04.doc .. ..r~. JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450.800/831-2678.360/379-4451 Fax Conditional Use Permit Purpose The purpose of the conditional use permit process is to provide flexibility in the application of the use regulations contained in the Unified Development Code (UDC) in order to accommodate uses that may be appropriate in an established district under certain circumstances, but inappropriate in the same district under other circumstances. The Conditional Use Application is a supplement to the Master Land Use Permit Application Form. Conditional use approval may involve either a Type II or Type III review process under the UDC. depending on the specific type of use. No conditional use permit can be granted unless consistency with the performance standards of Section 4, the development standards of Section 6, the procedural requirements of Section 8.4, and the approval criteria of Section 8.8, and other applicable requirements of the UDC have been satisfied. Types of Conditional Uses Conditional uses are typed and identified in Table 3-1 of the UDC, or may be classified as such by the Administrator pursuant to Section 3.2 of the UDC. There are three broad types of conditional uses identified in the UDC. Conditional r'C"] Use: Proposed uses that require a discretionary approval process and a public hearing before the Hearing Examiner. Applications for uses listed as a "c" in Table 3-1 of the UDC are processed according to the procedures for Type III land use decision established in Section 8.4 of the UDC. Conditional Administrative r'C(a)"] Use: Proposed uses that require approval by the Administrator but do not require a public hearing. Applications for uses listed as an administrative conditional use permit (Le" "C(a)") in Table 3-1 of the UDC are processed according to the procedures for Type II land use decisions established in Section 8.4 of the UDC. Conditional Discretionary r'C(d)] Use: Proposed uses that, at a minimum, require approval by the Administrator but that, at the discretion of the Administrator, may be referred to the Hearing Examiner for a public hearing and final decision. Applications for uses listed as discretionary conditional use permits (Le" "C(d)") in Table 3-1 of the UDC are, at a minimum, processed according to the procedures for Type II land use decisions established in Section 8.4 of the UDC. However, pursuant to Section 8.8.4(b), the Administrator may on a case-by-case basis refer a discretionary conditional use permit application to the Hearing Examiner to be processed according to the procedures for Type III land use decisions. In order to refer a "C(d)" application to the Hearing Examiner, the Administrator must make one of the following findings: · In the exclusive, discretionary judgment of the Administrator, the application involves potentially significant issues relating to location, design, configuration, and potential impacts to surrounding properties and the community that can be more appropriately considered and addressed through a public hearing before the Jefferson County Hearing Examiner; or · In the exclusive, discretionary judgment of the Administrator, the application seeks approval of a use involving complex legal issues necessitating special expertise in the decision-maker. Process Step 1 - Pre-Application Conference: A pre-application conference is required for all conditional use permits. Conceptual plans, county requirements, future permit requirements, etc., and answers to related questions are discussed at the conference. Information provided by Department of Community Development staff helps the applicant to prepare a better application and potentially decreases code-related questions and time required for formal review. Step 2 - Determination of Completeness: Following submittal of your application, county staff will make a determination within 28 days as to whether your application is substantially complete. Step 3 - Formal Application Review and Decision: Following the determination of completeness, a final decision must be made by the county within 120 calendar days. The final decision may be made by either the Administrator (for all "C(a)" and certain "C(d)"*uses) or the Hearing Examiner (for all "c" and certain"C(d)" uses) depending on the type of conditional use. Public hearings before the Hearing Examiner are required for all .C. uses and may be required for certain .C(d)" uses. In all conditional use permit cases the decision may be appealed. CONomONAL USE APP.OOC REV. 1/612004 Page 1 , '''''':~:7h3~"'.~~t .~ ~" Approval Criteria Your conditional use application will be evaluated on the basis of the criteria listed in the relevant section of the Jefferson County Unified Development Code (see UDC Section 8.8.5), and in some instances, inspection of the property. The county may approve or approve with modifications an application for a conditional use permit (Le., uses listed in Table 3-1 as "C(a), .. "C(d)" or "Cj Qnly if all of the following criteria are satisfied: · The conditional use is harmonious and appropriate in design, character and appearance with the existing or intended character and quality of development in the vicinity of the subject property and with the physical characteristics of the subject property; · The conditional use will be served by adequate infrastructure including roads, fire protection, water, wastewater disposal, and storm water control; · The conditional use will not be materially detrimental to uses or property in the vicinity of the subject parcel; . The conditional use will not introduce noise, smoke, dust, fumes, vibrations, odors, or other conditions or which unreasonably impact existing uses in the vicinity of the subject parcel; . The location, size, and height of buildings, structures, walls and fences, and screening vegetation for the conditional use will not unreasonably interfere with allowable development or use of neighboring properties; · The pedestrian and vehicular traffic associated with the conditional use will not be hazardous to existing and anticipated traffic in the vicinity of the subject parcel; · The conditional use complies with all other applicable criteria and standards of this Code and any other applicable local, state or federal law; and more specifically, conforms to the standards contained in Sections 4 and 6 of this Code; . The proposed conditional use will not result in the siting of an incompatible use adjacent to an airport or airfield; . The conditional use will not cause significant adverse impacts on the human or natural environments that cannot be mitigated through conditions of approval; . The conditional use has merit and value for the community as a whole; . The conditional use is consistent with all relevant goals and policies of the Jefferson County Comprehensive Plan; and · The public interest suffers no substantial detrimental effect. Consideration shall be given to the cumulative effect of similar actions in the area. In instances where all of the above findings cannot be made, the application shall be denied. The County, in accordance with section 8.8.6 of the UDC, may impose additional conditions on a particular use if it is deemed necessary for the protection of the surrounding properties, the neighborhood, or the general welfare of the public. The county may add conditions which: . Increase requirements in the standards, criteria or policies established by the UDC; . Stipulate an exact location for the conditional use on the subject property as a means of minimizing hazards to life, limb, property damage, erosion, landslides or traffic; . Require structural features or equipment as a means of minimizing hazards to life, limb, property damage, erosion, landslides or traffic; or . Contain restrictions or provisions deemed necessary to establish parity with uses permitted in the same zone with respect to avoiding nuisance generating features in matters of noise, odors, air pollution, wastes, vibration, traffic and physical hazards. Approval of the conditional use is effective for three (3) years from the date of original approval. If a building permit has not been issued within the three (3) year period, the conditional use approval will expire. Minor modifications to a previously approved conditional use may be approved subject to the provisions of Section 8.8.9 of the UDC. CONDITIONAL USE APP.DOC REV. 1/6/2004 \\o{ Page 2 'r-b ~G . , JEFFERSON COUNTY department of community development 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450 . 360/379-4451 Fax Conditional Use Application IMLA# PROJECT/APPLICANT NAME: The purpose of the conditional use permit process is to provide flexibility in the application of the use regulations contained in the Unified Development Code (UDC). No conditional use permit can be granted unless consistency with the performance standards of Section 4, the development standards of Section 6, the procedural requirements of Section 8.4, and the approval criteria of Section 8.8, and other applicable requirements of the UDC have been satisfied. Approval of the conditional use is effective for three (3) years from the date of original approval. If a building permit has not been issued within the three (3) year period, the conditional use approval will expire. The following questions will assist in the evaluation of the conditional use request 1. Describe the reauested conditional use. 2. Explain how the conditional use is harmonious and appropriate in design, character and appearance with the existing or intended character and aualitv of develooment in the vicinity and with the ohvsical characteristics of the subiect orooertv. 3. Describe the infrastructure including but not limited to roads, fire protection, water, wastewater disposal, and stormwater control which will serve the reauested conditional use. 4, Describe the location. size. and heiaht of buildinas structures, sianaae walls and fences, and screening veaetation for the use. 5. Describe any noise, smoke, dust, fumes, vibrations, odors, outdoor lights or other impacts will be generated by the conditional use. 6. Describe the oedestrian and vehicular traffic and Darkina area associated with the conditional use. CONDITIONAL USE APP,DOC REV. 11612004 Page 3 -..."".. """"ll-~'''.'''''~''~''':'~'--~- "...CrJS"....fid$$ .. 7. Will the proposed conditional use result in the sitina of an incompatible use adiacent of an airport or airfield? > 8. Are there any significant adverse impacts on the human and natural environments caused directly by the conditional use? If yes, can these imoacts be mitiaated? 9. Describe how granting the conditional use will not be materially detrimental to uses or property in the vicinity of the subject parcel. 10. Describe how arantina the conditional use will not be substantially detrimental to the public interest. 11, Does the conditional use have merit and value for the community as a whole? 12. Describe how the conditional use complies with all other applicable criteria and standards of the Unified Development Code (UDC) and any other applicable local, state or federal law; and more specifically, conforms to the standards contained in Sections 4 and 6 of the UDC. 13. Describe how the conditional use is consistent with all relevant goals and policies of the Jefferson County Comprehensive Plan. ACKNOWlEDGEMENT By signing the application form, the applicant/owner attests that the information provided herein is true and correct to the best of hislher knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. (APPLICANT OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) rNOTE: Representative authorization is required if application is not signed by the Owner.] CONDITIONAL USE APP.DOC REV.1/6I2OO4 \ Page 4 lle~ g<l ./ JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450 . 800/831-2678 . 360/379-4451 Fax http://www.co.jefferson.wa.us/commdevelopmenV Shoreline Substantial Development Permit (SDP), SDP Exemption, Shoreline Conditional Use and Shoreline Variance The shoreline permit application information and instruction material is designed to help you understand the basics of how freshwater and saltwater "shorelines" (as defined below) are regulated in Jefferson County and the steps for acquiring shoreline permits or permit exemptions for activity within shoreline jurisdiction. Familiarizing yourself with this information before applying will facilitate a timely and well-informed decision on your application. In most cases, you will need to complete, sign and submit the Pre-Application Conference request form first. Department of Community Development (Department) staff will provide you the Master Land Use Application (MLA), Joint Aquatic Resources Permit Application (JARPA), and other required application materials at the Pre-Application Conference and explain in greater detail the shoreline review process for your proposal. The project planner will assist you throughout the process and remain your County point of contact for information regarding the status of your shoreline, Building, and other related permits. About Shoreline Permits The goal of the Washington State Shoreline Management Act (SMA) of 1971 is ''to prevent the inherent harm in an uncoordinated and piecemeal development of the state's shorelines" (RCW 90.58.020). The SMA and Section 5 of the Jefferson County Unified Development Code (UDC)-the Jefferson County Shoreline Master Program (SMP)-regulate use and development along the shorelines of Jefferson County. Shoreline jurisdiction (a.k.a., shorelines) includes all marine waters, streams with a mean annual flow greater than 20 cubic feet per second, lakes larger than 20 acres, and upland areas called "shore lands" 200 feet landward from the edge ("ordinary high water mark" or "floodway," whichever is greater) of these waters. In addition, shoreline jurisdiction includes wetlands and river deltas hydrologically associated with the above-defined waters, and all wetlands within the 100-year floodplain. See SMP Appendix A for a list of jurisdictional lakes, rivers, and creeks in Jefferson County. Any person who wishes to undertake "substantial development" within shoreline jurisdiction must first apply for a Substantial Development Permit (SDP). Development is defined as "a use consisting of the construction or exterior alteration of structures; dredging; drilling; dumping; filing; removal of any sand, gravel, or minerals; bulkheading; driving of piling; placing of obstructions; or any project of a permanent or temporary nature which interferes with the normal public use of the surface of the waters overlying lands subject to the act at any stage of water level" (WAC 173-27-030(6)). Examples of development regulated under the SMP include the construction or installation of houses, gazebos, decks, docks, stairs, fences, stormwater tightlines, bulkheads, roads, culverts, etc., regardless of the need for a Building Permit. Certain developments are considered "exempt" (listed in WAC 173-27-040 and codified in SMP 3.40) from the SDP requirement. Any person who wishes to undertake "exempt development" within shoreline jurisdiction must first apply for an SDP Exemption. To say that a development is "exempt" under the SMP means only that it is exempt from the requirement to obtain an SDP. Exemption from SDP requirements does not mean that the development is exempt from the provisions of the SMP or the SMA. The SOP Exemption may contain conditions to ensure that the activity is consistent with the SMA, SMP, and other sections of the UDC. Each shoreline is characterized by an environment designation, which under the current SMP are Aquatic, Natural, Conservancy, Suburban, Urban, or a combination of these. The Classification Table (SMP 4.40) sets forth permitted, conditional and prohibited uses within the various shoreline environment designations. An application is categorized in this way as a Primary Use SDP, Secondary Use SDP, or Shoreline Conditional Use. If an element of the proposal varies from the policies and performance standards of the SMP, a Shoreline Variance will also be required. Be advised that "exempt development" may require review under the State Environmental Policy Act (SEPA), be processed as a Conditional Use depending on the environment designation, and/or be accompanied by a Shoreline Variance according to the specifications of the proposal. The Washington Department of Ecology (DOE) shares responsibility for administering the SMA with local government 0N AC 173-27). Shoreline Conditional Use Permits and Variances must be submitted to DOE for review after issuance by the local government. DOE has 30 days to approve, approve with conditions, or disapprQy~",tl1.f;Lagtip9. Barring appeal, Shoreline SDPs and SOP Exemptions issued by the local government represent the finaldeCisioA under shoreline review. SHORELINE APP.DOC REV. 5/29102 . ., _"."~_M'.''''''_~'., "~"".s; dl~-l." ,~_"Q Page 1 ( '- Process Step 1 - Pre-Application Conference Required (Optional for SOP Exemptions): A Pre-Application Conference (Pre- App.) is required for an SOP, Conditional Use, and Variance and is optional but strongly encouraged for many types of SOP Exemptions. The Department may require a Pre-App. for an SOP Exemption application that is not categorically exempt from review under SEPA or otherwise presents complex review issues. Conceptual plans, County requirements, necessary permits, etc., and answers to related questions are discussed at the Pre-App., which may occur either at the Department or at the project site, when possible in the company of the Area Habitat Biologist representing the Washington Department of Fish and Wildlife (WDFW), if Hydraulic Project Approval (HPA) is also required (see WAC 220-110-010). Staff will provide you with the required application forms at the Pre-App. If your application does not require a Pre-App., those forms are found at the Department and on the Department website. The JARPA is also found on-line at this URL: http://www.ecy.wa.gov/programslsealpac/jarpa.html. and the SEPA Environmental Checklist at this URL: http://www.ecy.wa.gov/programsJsealsepailorms..htm. We recommend that you develop and submit a "Conceptual Design," as described in the Pre-App. request form, before completing the JARPA and final plan designs. Your project proposal may be influenced by the Pre-App., which is intended to identify early in the process elements of your proposal that may be in conflict with Jefferson County policies, ordinances, and performance standards. Remedying these issues before applying for a permit saves times and fosters a smoother permit process. Step 2 - Determination of Completeness: Following submittal of your application, which will include the MLA; JARPA; location map, plan view site plan, and cross-sectional drawing as described in the one-page "Guidance for Completion of Drawings" included among the JARPA instructions; and the SEPA Environmental Checklist (if necessary, see WAC 197- 11-800 for categorical exemptions); staff will make a determination within 28 days as to whether your application is complete. You may be required to submit additional information within a specified time period. Step 3 - Formal Application Review, Public and Agency Comment Period, and Decision: Following the determination of completeness, a final decision must be made by the County within 120 calendar days, though typically the timeframe is shorter. There are instances, however, when the "clock" is stopped to obtain additional information or pursue studies relevant to project review. The specific process to be followed is determined by the Permit Type as established in UDC Table 8-1. In summary, shoreline review is categorized in this fashion in Table 8-1: · Type I: SOP Exemptions, though SOP Exemptions that are not categorically exempt from SEPA review are processed as a Type II decision due to public notice requirements related to SEPA review (see UDC 8.10 for SEPA implementation) · Type II: Primary Use SOP · Type III: Secondary Use SOP, Shoreline Conditional Use Permit, Shoreline Variance Public notice requirements are detailed in UDC Section 8. In general, public and agency comment periods for shoreline permits are 30 days (UDC 8.3.8.b). For Type II permits, following the comment periOd the Department renders a decision, subject to appeal. For Type III permits, following the comment period the Department schedules an Open Record Public Hearing, after which the Hearing Examiner renders a written decision, subject to appeal, within 10 working days. Shoreline decisions are transmitted to DOE per WAC 173-27-130. For Shoreline Conditional Use Permits and Shoreline Variances, DOE has 30 days to approve, approve with conditions, or disapprove the action. DOE.will notify the applicant of the concurrence decision and, if approved, work may begin after a 21-day appeal period, unless an appeal is made to the Shoreline Hearings Board. SOPs issued by the local government represent the final decision under shoreline review, barring appeal under the UDC or to the Shoreline Hearings Board within 21 days after DOE receives the transmittal. SOP Exemptions can only be appealed to Superior Court. UDC 8.5 and 8.10.12 (SEP A) outline the local appeal process. SOP Exemptions expire in one year. For Shoreline SOPs, Conditional Use Permits, and Variances, permitted activities must be commenced within two years (with the possibility of a one-year extension) and authorization to conduct permitted development activities expires in five years (with the possibility of a one-year extension). See WAC 173-27-090. Step 4 - Building Permit and other permits/approvals may be required: It is important to note that many shoreline permits and SOP Exemptions require a Building Permit before construction may commence. The shoreline approval is a land use approval only. The Building Permit application may be submitted concurrently with the shoreline application or after shoreline approval is acquired. The project planner will assist the applicant in determining whether a Building Permit anellor other County permits, such as a Storm water Management Permit, are required. Permits or approvals from other agencies may also be required, such as HPA from WDFW, authorization from the Washington Department of Natural Resources for use of state-owned aquatic lands, Army Corps of Engineers (CaE) Section 404 or 10 permit, or Endangered Species Act consultation. The JARPA is intended for multi-agency review and begins with a check box for other aquatic resources permits or approvals required for the proposal. The project planner will assist you in determining what is required by other agencies, but it is ultimately the responsibility of the applicant to ensure that all necessary permits and approvafs are acquired. The Department generarry forwards the JARPA and other application-materialS to agencies with jurisdiction during the project review process. You may be contacted directly by those agencies and asked to provide additional information. We will help coordinate multi-agency review as much as. possible, SHORELINE APP.DOC REV. 5129102 tla<f> :56. Page 2 Approval Criteria and Permit Conditions Your shoreline application will be evaluated on the basis of the information you provide, the criteria listed in the relevant section of the SMP and other applicable sections of the UDC, including the provisions for environmentally sensitive areas. Shoreline use and development must also be consistent with the SMA and the Jefferson County Comprehensive Plan. Section 4 of the SMP describes the shoreline environment designations and project classifications (SOP and Conditional Use), including relevant review criteria. Section 5 outlines policies and performance standards for various uses and development within shoreline jurisdiction. Section 7 provides criteria for review of Variances. If your proposed use or development is not listed in the Classification Table (4.40), it will be processed as a Conditional Use. The Department or the Hearing Examiner may place conditions on your shoreline permit or SOP Exemption in order to ensure consistency with the SMA, SMP, UDC and the Comprehensive Plan. Permit conditions may also be established as a result of SEPA review. At times, a multi-agency review process may result in a request to the applicant for additional information based on the permit or approval process of another agency with jurisdiction. Information, mitigation measures, or permit conditions found in studies, permits or approvals required by other agencies may become permit conditions in Jefferson County permits granted to the applicant. Where to Find More Information The UDC is found at the Department or on-line at this URL: http://www.co.jefferson.wa.us/commdevelopmenV. The current SMP is Section 5 of the UDC. A July 2000 draft SMP is also found on-line at the URL above. Jefferson County will update the SMP within the next few years, using the July 2000 draft as a framework. Until such time as the SMP is updated through a public participation and legislative process, the 1989 SMP with amendments remains in effect. All County codes may be viewed or purchased at the Department. Other useful information may be found on-line: · DOE Shorelands & Wetlands (http://www.ecy.wa.gov/programs/sealshorelan.html) · State Permit Assistance Center (http://www.ecy.wa.gov/programs/sealpac/index.htmlor call 1-800-917-0043) · Washington Administrative Code (http://slc.leg.wa.gov/wacbytitle.htm then click Title 173 WAC for DOE) · WDFW Hydraulic Project Approval (http://www.wa.gov/wclfw/hab/hpapage.htm) · US Army Corps of Engineers Seattle District (http://nws.usace.army.miVreg/reg.htm) COMMONLY REQUESTED INFORMATION ABOUT SHORELINE USE AND DEVELOPMENT Single-Family Residence Construction in Shoreline Jurisdiction or near Marine Shorelines SDP EXEMPTION, REQUIRED APPLlCA TION FORMS, AND STORMWA TER MANAGEMENT PROVISIONS SMP 3.402.5 provides that construction by an owner, lessee, or contract purchaser of a single-family residence for the owner's or owner's family's use is considered "exempt development" under certain provisions. Projects of this nature in shoreline jurisdiction require a written SOP Exemption along with the Building Permit and other applicable Jefferson County approvals. Generally, a JARPA form will not be required to accompany the MLA form in order to make a complete application for proposed construction of a single-family residence in shoreline jurisdiction that meets the criteria of SMP 3.402.5. Please note that there are special stormwater management provisions for construction within 500 feet of any marine shoreline, pursuant to UDC 3.6.5.c(3) Seawater Intrusion Areas. Refer to the Stormwater Calculation Sheet and UDC 6.7 Stormwater Management Standards for more information about the stormwater management requirements for residential construction near marine shorelines. Generally, if the UDC Administrator concurs that stormwater infiltration is not "practicable" and. a tightline stormwater runoff utility that terminates at or near the marine shoreline is included in the development application, a JARPA will be required along with the MLA and other application materials. SEPA review and HPA from WDFW may also be required depending on the specifications of the proposal. Additionally, a Drainage and Erosion Control Plain may be required even if the development falls below the threshold levels found in UDC 6.7 if there are environmentally sensitive areas on the parcel (see UDC 3.6.4 et seq., 6.6.4, 6.7, the Stormwater Management Permits information sheet, and the section below concerning removal of vegetation along marine shorelines). RESIDENTIAL DEVliLOPMENT SETBACKS FROM THE ORDINARY HIGH WATER MARK OR TOP OF BANK SMP 5.160 Residential Development governs residential setbacks. Performance Standard #10 of that section states, "The standard setback for residential structures, including common appurtenant structures such as garages and workshops, shall be thirty (30) feet or one (1) foot for each foot of bank height, whichever is greater. This setback shall be measured from the bank's edge when the bank height exceeds 10 feet. When the bank's height is less than 10 feet, the setback shall be measured from the ordinary high water mark. The setback shall not exceed 100 feet." Refer to SMP 5.160 for additional provisions related to residential development in shoreline jurisdiction. Please note that recommendations found in geotechnical reports prepared pursuant to UDC 3.6.7 Geologically Hazardous Areas may extend the required ~uilding setback beyond that of the standard shoreline setback p~e~rl~bYSM,P 5.160. SHORELINE APP.OOC REV. 5129102 l~ 1-"d'Sg Page 3 Removal of Vegetation and Other Land-Disturbing Activities along Marine Shorelines UDC 3.6.4 addresses environmentally sensitive areas, among which are fish and wildlife habitat areas (FWHAs). FWHAs include marine shorelines per UDC 3.6.8.a, in that Type 1 waters include all marine waters of the state and at this time marine shorelines provide primary association habitat for Federal and State-listed endangered, threatened, and sensitive species (Le., Puget Sound Chinook, Hood Canal Summer Chum, and/or CoastaVPuget Sound Bull Trout). Among the provisions in UDC 3.6.8 Fish and Wildlife Habitat Areas, are general prohibitions related to the alteration of FWHAs or their buffers (UDC 3.6.8.f)-including clearing, grading, and removing vegetation-regardless of whether a permit is required for the activity or not. Additionally, there are protection standards (UDC 3.6.8.g) that address drainage and erosion control, grading, vegetation retention, and buffers for activities on parcels that contain a designated FWHA or its buffer. UDC 3.6.8.g(5) states that FWHAs shall have buffers and building setb!icks established. The FWHA buffer for marine shorelines is 30 (thirty) feet, which is the minimum "standard setback for residential structures" in the SMP (see previous paragraph). The buffer/setback is measured from the ordinary high water mark or the top of the bank for banks that exceed to feet invert'lCaf height Please note thaHand-disturbing activity in the 30:.foot marine shoreline buffer, including the removal of vegetation, may occur only with Department approval under specific circumstances. If the marine shoreline parcel in question also contains a geologically hazardous area-such as an erosion, landslide, or seismic hazard area-additional protection standards apply (UDC 3.6.7(b)), including the provision that excavation, grading and earthwork construction regulated in UDC 3.6.7 shall only be allowed from April 1 to November 1, unless the applicant demonstrates that such activities would not result in impacts contrary to the protection requirements therein. Landslide hazard area buffer widths are determined pursuant to UDC 3.6.7(b)(6) and, in general, a geotechnical report prepared by a qualified professional is required for a complete development application pursuant to UDC 3.6.7(b)(9). For more information on this topic, refer to DOE Publication 93-31, "Vegetation Management: A Guide for Puget Sound Bluff Property Owners." DOE offers property owner guides on its website, including a "Vegetation Management Guide" (http://www.ecy.wa.gov/programs/sea/pubs/93-31/intro.html). a guide to "Slope Stabilization and Erosion Control Using Vegetation" (http://www.ecy.wa.gov/programs/sea/pubs/93-30/intro.html). a guide to "Surface Water and Groundwater on Coastal Bluffs" (http://www.ecy.wa.gov/programs/sea/pubs/95-107/intro.html). and a guide entitled, "At Home with Wetlands: A Landowner's Guide" (http://www.ecy.wa.gov/programs/sea/pubs/90031/index.html). Call DOE Publications at (360) 407-7472 or visit the DOE website to order hard copies of these or other DOE publications. Shore Defense Works Shore defense works must comply with the SMP and the UDC section on environmentally sensitive areas (3.6.4-3.6.10). Banks, bluffs, and shorelines may be stabilized only under certain circumstances and when applicants demonstrate that bioengineering solutions are infeasible and that bank stabilization will result in the maintenance of fish habitat or improved water quality (UDC 3.6.8.e(4)). "Soft-bank protection" methods are generally preferred over "hard-bank protection" methods by regulatory agencies, including Jefferson County. Among soft-bank protection methods are biotechnical bank stabilization and bioengineering, where vegetation is planted specifically to address erosion and slope stability; the placement and fastening of large wood along the toe of a bank to retain sediments and absorb wave energy; and beach nourishment projects, where sediment is artificially added to the beach to re-create the natural beach conditions that have a certain amount of built-in erosion protection. Hard-bank protection methods include seawalls and wood and riprap bulkheads. For more information on bank protection methods, please refer to DOE Publication #00-06-012, "Alternative Bank Protection Methods for Puget Sound Shorelines," May 2000, and the DOE property owner guides cited above. Pre-Existing Uses and Development Shoreline uses or developments that pre-date the SMA or the Jefferson County SMP are called "pre-existing." If the use of a development is consistent with the SMP, permits are only required if new development is proposed. If the use of a pre-existing development is proposed to be changed, the new use must be consistent with the SMP. If the proposed new use is a Conditional Use in the SMP, a Conditional Use Permit is required whether or not new development is proposed. "Legal nonconforming" describes those uses or structures legally constructed or established prior to the effective date of the applicable SMP provisions that do not conform to present shoreline management rules or policies. Legal nonconforming use and development is regulated pursuant to WAC 173-27-080. Generally, such "grandfathered" use and development may continue as long as it is not enlarged, intensified, increased, or altered in any way that increases its nonconformity. Nonconforming uses are considered abandoned if they are discontinued for more than twelve consecutive months or for twelve months during any two-year period. Any subsequent use must conform to the requirements of the SMA and SMP and cannot be changed to another nonconforming use or moved any distance within the shorelines of the state. It is sometimes important to distinguish between a nonconforming structure with a conforming use and a nonconforming use. Please contact the Department for more information about sp~cificp(eiexisting use or development. [end] SHOREliNE APP.DOC REV. 5129102 \ \1Q is~ Page 4 I.' ;.. AGENCY USE ONLY Agency Reference #: Circulated by: Date Received:_ (local govt. or agency) .. lWl \0 I am applying for a Fish Habitat Enhancement Project per requirements of RCW 75.20.350. You must submit a copy of this completed JARPA application form, and the (Fish Habitat Enhancement JARPA Addition) to your local Government Planning Department and Washington Department of Fish & Wildlife Area Habitat Biologist on the same day. NOTE: LOCAL GOV'TS - You must submit any comments on these projects to WOFW within 15 working days. JOINT AQUATIC RESOURCES PERMIT APPUCATION FORM (JARPA) (for use in Washington State) PLEASE TYPE OR PRINT IN SLACK INK ... ... Based on the instructions provided, I am sending copies of this application to the following: (check all that apply) o Local Govemment for shoreline: 0 Substantial Development 0 Conditional Use 0 Variance 0 Exemption 0 Revision o FlOodplain Management 0 Critical Areas Ordinance o Washington Department of Fish and Wildlife for HPA o Washington Department of Ecology for 401 Water Quality Certification Nationwide Permits (to Regional office-Federal Permit Unit) o Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification o Corps of Engineers for: 0 Section 404 0 Section 10 permit o Coast Guard for Section 9 Bridge Permit o US Fish & Wildlife Service or National Marine Fisheries Service for Endangered Species Act (ESA) Consultation SECTION A . Use for all permits covered by this application. Be sure to ALSO complete Section C (Signature Block) for all permit applications. 1. APPLICANT MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX # " an agent is acting for the applicant during the permit process, complete #2. 2. AUTHORIZED AGENT MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX # 3. RELATIONSHIP OF APPLICANT TO PROPERTY: 0 OWNER 0 PURCHASER 0 LESSEE 0 OTHER: . NAME, ADDRESS. AND PHONE NUMBER OF PROPERTY OWNER(S). IF OTHER THAN APPLICANT: . LOCATION (STREET ADDRESS. INCLUDING CITY. COUNTY AND ZIP CODE. V\lHERE PROPOSED ACTIVITY EXISTS OR WILL OCCUR) LOCAl GOVERNMENT WITH JURISDICTION (CITY OR COUNTY) WATERBODY TRIBUTARY OF It'vRIA # % SECTION GOVERNMENT LOT SHORELINE DESIGNATION LATITUDE & LONGITUDE IF KNOWN: TAX PARCEL NO: ONING DESIGNATION DNR STREAM TYPE. IF KNOWN ~.'..'...c--.ru... '.-.... ........-,. -.......&.. = ~.? ~"-:'w__~,.,_ ,- -.,... , ,.m -.""'. .'" ,", ~, _!tl....<l - -- ."E"~' _'.-"M.U. JARPA, Revised 12/98, contact Ecology's Permit-AssistaJ}ce Center for latest version, 360/407-7037 Page 1 of4 6. DESCRIBE THE CURRENT USE OF THE PROPERTY, AND STRUCTURES EXISTING ON THE PROPERTY. IF AN'( PORTION OF THE PROPOSED ACTIVITY IS ALREADY COMPLETED ON fHIS PROPERTY, INDICATE MONTH AND YEAR OF COMPLETION. . , IS THE PROPERTY AGRICUL TURAllAND? 0 YES 0 NO ARE YOU A USDA PROGRAM PARTICIPANT? DYES ONO \. a. DESCRIBE THE PROPOSED CONSTRUCTION AND/OR Fill OORK FOR THE PROJECT THAT YOU WANT TO BUILD THAT NEEDS AQUATIC PERMITS: COMPLETE PlANS AND SPECIFICATIONS SHOULD BE PROVIDED FOR ALL OORK WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE. INCLUDING TYPES OF EQUIPMENT TO BE USED. IF APPLYING FOR A SHORELINE PERMIT, DESCRIBE ALL OORK WITHIN AND BEYOND 200 FEET OF THE ORDINARY HIGH WATER MARK ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED. 7b. DESCRIBE THE PURPOSE OF THE PROPOSED OORK AND 'MiY YOU WANT OR NEED TO PERFORM IT AT THE SITE. PLEASE EXPLAIN AN'( SPECIFIC NEEDS THAT HAVE INFLUENCED THE DESIGN. ! 7c. DESCRIBE THE POTENTIAl IMPACTS TO CHARACTERISTIC USES OF THE WATER BODY. THESE USES MAY INCLUDE FISH AND AQUATIC LIFE, WATER QUAlITY, WATER SUPPLY, RECREATION. and AESTHETICS. IDENTIFY PROPOSED ACTIONS TO AVOID, MINIMIZE, AND MITIGATE DETRIMENTAL IMPACTS, AND PROVIDE PROPER PROTECTION OF FISH AND AQUATIC LIFE. ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED. LZ~..,;;;~( PREPARATION OF DRAWlNCS: SEE SAMPLE DRAWINGS AND GUIDANCE FOR COMPLETING THE DRAWINGS. ONE SET OF ORIGINAL OR GOOD QUAUTY REPRODUCIBLE DRAWINGS ~BE ATiACHED;~NQTB-APPllGANTS ARE ENCOURAGED TO SUBMIT PHOTOGRAPHSOF'!':IE~~el'SI'fl:.' ,BUT lliESE DO}NOT SUBSTITUTE FOR DRAWINGS. THE CORPS OF ENt1INEERS7iNl!R:~RIiHfEfiW'RE DRAWINGS ON 1-112 X 11 INCH SHEETS. LARGER DRAWINGS_V ..c~ilcQb.n/:;... tsnnnER AGENOES. . -... , , l..~.,Ig>,<\...Revised t2l9~comacr;Ecology's Permit Assistance Center for latest version. J60/401~7U3T Is. WILL THE PROJECT BE CONSTRUCTED IN STAGES? DYES ONO PROPOSED STARTING DATE: ESTIMATED DURATION OF ACTIVITY: R CHECK IF ANY STRUCTURES WILL BE PLACED: o WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH OR TIDAl WATERS; AND/OR OWATERWARD OF MEAN HIGH WATER LINE IN TIDAL WATERS 10. WILL FILL MATERIAL (ROCK, FILL, BULKHEAD, OR OTHER MATERIAl) BE PLACED: \ 0 WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH WATERS? o WATERWARD OF THE MEAN HIGHER HIGH WATER FOR TIDAl WATERS? 1,. WILL MATERIAl BE PLACED IN WETLANDS? IF YES: IF YES, VOLUME (CUBIC YARDS) /AREA {ACRES IF YES, VOLUME (CUBIC YARDS) AREA (ACRES) DYES ONO A IMPACTED AREA IN ACRES: B. HAS A DELINEATION BEEN COMPLETED? IF YES, PLEASE SUBMIT WITH APPLICATION. C. HAS A WETLAND REPORT BEEN PREPARED? IF YES, PLEASE SUBMIT WITH APPLICATION. DYES ONO DYES ONO D. TYPE AND COMPOSITION OF FILL MATERIAl (E.G.. SAND, ETC.): E. MATERIAl SOURCE: F. LIST AlL SOIL SERIES (TYPE OF SOIL) LOCATED AT THE PROJECT SITE, & INDICATE IF THEY ARE ON THE COUNTY'S LIST OF HYDRIC SOILS. SOILS INFORMATION CAN BE OBTAINED FROM THE NATURAl RESOURCES CONSERVATION SERVICE (NRCS): 12. WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? IF YES, IMPACTED AREA IS _ ACRES. DYES ONO 13. WILL EXCAVATION OR DREDGING BE REQUIRED IN WATER OR WETLANDS? IF YES: o YES ONe A VOLUME: {CUBIC YARDS)/AREA (ACRES) B. COMPOSITION OF MATERIAl TO BE REMOVED: C. DISPOSAl SITE FOR EXCAVATED MATERIAl: D. METHOD OF DREDGING: 14. HAS THE STATE ENVIRONMENTAl POLICY ACT {SEPAl BEEN COMPLETED? SEPA LEAD AGENCY: SEPA DECISION: DNS, MONS. EIS, ADOPTION, EXEMPTION SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WOFW AS REQUIRED FOR A COMPLETE APPLICATION DYES DNO DECISION DATE (END OF PERIOD): 15. LIST OTHER APPLICATIONS, APPROVAlS, OR CERTIFICATIONS FROM OTHER FEDERAl, STATE OR LOCAl AGENCIES FOR ANY STRUCTURES, CONSTRUCTION, DISCHARGES, OR OTHER ACTlVmES DESCRIBED IN THE APPLICATION (I.E., PRELIMINARY PLAT APPROVAl, HEAlTH DISTRICT APPROVAl, BUILDING PERMIT, SEPA REVIEW, FEDERAl ENERGY REGULATORY COMMISSION LICENSE (FERC), FOREST PRACTICES APPLICATION, ETC.) AlSO INDICATE WHETHER WORK HAS BEEN COMPLETED AND INDICATE AlL EXISTING WORK ON DRAWINGS. TYPE OF APPROVf.L ISSUING AGENCY IDENTIFICATION NO. DATE OF APPLICATION DATE APPROVED COMPLETED? 16. HAS ANY AGENCY DENIED APPROVAL FOR THE ACTIVITY DESCRIBED HEREIN OR FOR ANY ACTIVITY DIRECTLY RELATED TO THE ACTMTY DESCRIBED HEREIN? 0 YES 0 NO IF YES, EXPLAIN: L1J.. ~" . ~.... - '.-JARP~, Revised 12198, contact Ecology's Perl1!J!..i\.ssistance Cefir~r (QrJatesLVetsion, 360/407-7037 Pa~e-3-of<4' u~ . SECr/ON B - Use for Shoreline and Corps of Engineers permits onlv: 7. TOTAl COST OF PROJECT. THIS MEANS THE FAIR MARKET VALUE OF THE PROJECT. INCLUDING MATERIALS. lABOR, MACHINE RENTALS, ETC. 18. LOCAL GOVERNMENT WITH JURISDICTION: 9. FOR CORPS, COAST GUARD. AND DNR PERMITS, PROVIDE NAMES. ADDRESSES. AND TELEPHONE NUMBERS OF ADJOINING PROPERTY O\NNERS, LESSEES, ETC.. PlEASE NOTE: SHOREUNE MANAGEMENT COMPUANCE MA.Y REQUIRE ADDITIONAL NOTICE - CONSUL T YOUR LOCAL GOVERNMENT. NAME ADDRESS PHONE NUMBER erml' covered by this a lication . APPLICATION IS HEREBY MADE FOR A PERMIT OR PERMITS TO AUTHORIZE THE ACTNlTIES DESCRIBED HEREIN. I CERTIFY THAT I AM FAMILIAR WITH THE NFORMATION CONTAINED IN THIS APPLICATION, AND THAT TO THE BEST OF MY KNOWlEDGE AND BELIEF, SUCH INFORMATION IS TRUE, COMPLETE, AND CCURATE. I FURTHER CERTIFY THAT I POSSESS THE AUTHORITY TO UNDERTAKE THE PROPOSED ACTIVITIES. I HEREBY GRANT TO THE AGENCIES TO WHICH IS APPLICATION IS MADE, THE RIGHT TO ENTER THE ABOVE-OESCRIBED LOCATION TO INSPECT THE PROPOSED, IN-PROGRESS OR COMPLETED INORK. I AGREE TO START INORK ONlY AFTER AlL NECESSARY PERMITS HAVE BEEN RECEIVED. SIGNATURE OF APPLICANT OR AUTHORIZED AGENT I HEREBY DESIGNATE TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR PERMIT(S). I UNDERSTAND THAT IF A FEDERAl PERMIT IS ISSUED, I MUST SIGN THE PERMIT. SIGNATURE OF APPLICANT DATE SIGNATURE OF lANDO\NNER (EXCEPT PUBLIC ENTITY lANDO\NNERS. E.G. DNR) THIS APPLICATION Mllll BE SIGNED BY THE APPLICANT AND THE AGENT, IF AN AUTHORIZED AGENT IS DESIGNATED. 18 U.S.C 51001 provides that: Wloever. in any mamer within the jurisdiction of any department or agency of the United States knowingly falsifIeS, conceals. or covers up by any Irick. scheme, or device a material fact or makes any false, ficlijious, or fraudulent statements or representations or makes or uses any false writing or document knaNing same to contain any false. fICtitious. or fraudulent statement or entry. shall be fined not more than $10,000 or imprisoned not more than 5 years or both. COMPLETED BY LOCAL OFFICIAL A. Nature of the existing shoreline. (Describe type of shoreline, such as marine, stream, lake, lagoon, marsh, bog, swamp, flood plain, floodway, delta; type of beach, such as accretion, erosion, high bank, low bank, or dike; material such as sand, gravel, mud, clay, rock, riprap; and extent and type of bulkheading, if any:) B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade level, indicate the approximate location of and number of residential units, existing and potential, that will have an obstructed view: C. If the application involves a conditional use or variance, set forth in full that portion of the master program which provides that the proposed use may be a conditional use, or, in the case of a variance, from which the variance is being sought: These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs, please contact the appropriate agency in the instructions. L1.'f ~S( JARPA, Revised 12/98, contact Ecology'sl>ermitAs$istance Center for latest version, 360/407-7037 Page 4 of 4 JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street . Port Townsend. Washington 98368 360/379-4450 . 3601379-4451 Fax http://www.co.jefferson.wa.uslcommdevelopmentl Stormwater Calculation Worksheet I MlAt PROJECT/APPlICANT NAME: DETERMINING STORMWATER MANAGEMENT REQUIREMENTS: This stonnwater caJcuIation wor1csheet should be completed first to classify the proposal as "small: "medum,. or'1arge: The size detennines whether a Stonnwater Site Plan is requll9d in conjunction with a stand-alone stonnwater management pennit application, building pennit application, or other land use approval application that involves stonnwater review. The basic infonnation wi! also be helpful for completing a Stonnwater Site Plan, if requll9d. ... Size of parcel acres PARCEL SIZE n.E.. SITE) hi acre contains 43,560 square feel Multiply the acreage by this figure. Size of parcel in square feet sq/ft Land-disturbfng activity is any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and non-vegetative) and/or the existing soil topography. Land disturbing activities include, but are not limited to clearing, grading, fiDing, excavation, and compaction associated with stabilization of structures and road construction. Native vegetation is vegetation comprised on plant species, other than noxious weeds, that are indigenous to the coastal region of the Pacific Northwest and which reasonably could have been expected to naturaJly occur on the site. Examples include species such as Douglas fir, westem hemlock, western I9d cedar, alder, big-leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; herbaceous plants such as swon:f fem, foam flower, and fireweed. LAND DISTURBING AcnVITY. CONVERSION OF NATIVE VEGETATION. AND VOLUME OF CUTIFILL Calculate the total area to be cleared, graded, filled, excavated, and/or compacted for proposed development project. Include in this calculation the area to be cleared for: Construction site for structures sq/ft Drainfield, septic tank, etc. sqlft WeB, utilities, etc. sq/ft Driveway, parking, etc. sq/ft Lawn, landscaping, etc. sqlft Other compacted surface, etc. sq/ft Total Land Disturbance sq/ft [over] ston'IMmer calc worl<sheet - REV. 1011J2003 Answer the following two questions related to conversion of native vegetation: Does the project convert * acres or more of native vegetation to lawn or landscaped areas? Circle: Yes No Does the project convert 2 * acres or more of native vegetation to pasture? Circle: Yes No Indicate Total Volumes of Proposed: Cut Fin (culyd) l7~ b~ 1 Impervious surface is a hard surface that either prevents or retards the entry of water into the soil manUe as under natural conditions prior to developmenl A hard surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphaJt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces which similarly impede the natural infiltration of stormwater. STORMWATER CALULATIONS -IMPERVIOUS SURFACE NEW Total New EXISTING $QIft Structures (aU roof area) $QIft $QIft Sidewalks $QIft $QIft Patios $QIft $QIft Solid Decks $QIft (without infiltration below) $QIft Driveway $QIft $QIft Other $QIft ~ Total Existing ~ Structures (all roof area) Sidewalks Patios Solid Decks (without infiltration below) Driveway Other TOTAL NEW + TOTAL EXISTING" sqllt "This amount will be used to check total lot coverage. The following questions will help determine whether the proposed project is considered development or redevelopment. DEVELOPMENT Y. REDEVELOPMENT Divide the total ex/slina impervious surface above by the size of the parcel and convert to a percentage: % Does the site have 35% or more of existina impervious surface? Circle: Yes No FURTHER INSTRUCTIONS: If the answer is yes, the proposal is considered redevelopment and the attached Figure 2 should be used to determine the applicable Minimum Requirements. If the answer is no, the proposal is considered new development and the attached figure 1 shOuld be used. At this juncture, the applicant should refer to the applicable Flow Chart to detennine the Minimum Requirements for stonnwater management. DCD staff will help verify the classification of the project and the application requirements. For proponents of "smalr projects who must comply only with Minimum Requirement #2-construction Stonnwater PoUution Prevention-an additional submittal is not required. The proponent Is responsbIe for employing the 12 Elements to control erosion and prevent sediment and other pollutants from leaving the site during the consbuction phase of the project. Pick up the Construction Stormwater Pollution Prevention (SWPP) Best Management Practices (BliPs) Packet. Proponents of "medium- projects-those that must meet only Minimum Requirements 11 1hrough ,5-and for "1arge-projects-thosethat must meet an 10 Minimum Requirements-are required to submit a Stonnwater Site Plan. DCD has prepared a submittal template of a Stonnwater Site Plan, principally for rural residential projects. Complete the template in the Stonnwater Site Plan Instructions and Submittal Template or prepare a Stomiwater Site Plan using the step-by-step guidance in the Stonnwatef Management Manual. APPUCANT SIGNATURE By signing the Stonnwater Calculation Worksheet, I as the applicant/owner attest that the infonnation provided herein Is true and correct to the best of my knowledge. I also certify 1hat this application is being made with the full knowledge and consent of aH owners of the affected property. - (LANDOWNER OR AlJTHORlZED REPRESENTATIVE SIGNATURE) (DATE) stomwvater calc WOlksheel- REV. 1C11/2003 \1v d--S~ 2 If. JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450 . 3601379-4451 Fax htlp:/lwww.co.jefferson.wa.uslcommdevelopmentl Stormwater Site Plan Instructions and Submittal Template "Medium" and "Large" Projects [Includes Construction Stormwater Pollution Prevention Plan (SWPPP) and Permanent Stormwater Control Plan] The submittal template for a Stormwater Site Plan has been developed from information presented in the Department of Ecology 2001 Stormwater Management Manual for WestemWashington (Manua!), which is the set of stormwater management standards for new development and redevelopment in Jefferson County. The Stormwater Site Plan, Minimum Requirement #1 in the Manual, is the comprehensive report containing all of the technical information and analysis necessary to evaluate a proposed new. development or redevelopment for compliance with stormwater requirements. A Stormwater Site Plan is required for all "medium" and "large" projects. (For background information, refer to the Stormwater Management Information Sheet.) The Stormwater Site Plan includes a Construction Stormwater Pollution Prevention Plan (SWPPP - Minimum Requirement #2) that addresses sediment and erosion control during construction and a Permanent Stormwater Control Plan that addresses stormwater on the project site in its developed condition through dispersion, infiltration, or, if necessary, flow control and/or treatment facilities. The steps for preparing and the content of a Stormwater Site Plan are summarized below and more fully described in Chapter 3 of Volume I of the Manual. The attached submittal template is intended to be a format applicable to typical rural residential construction. For these cases, completion and submittal of the template results in a complete land use application. THE TWO MAIN COMPONENTS OF A STORMWATER SITE PLAN I. Construction Stormwater Pollution Prevention Plan A Construction Stormwater Pollution Prevention Plan (SWPPP) is a document that describes the potential for pollution problems on a construction project and which explains and illustrates the measures to be taken to control these problems. The basis for requiring a SWPPP, the twelve elements required to be in a SWPPP, the suggested step-by step procedure to follow, and the suggested Best Management Practices (BMPs) to follow, are all described in Volume II of the Manual. A SWPPP consists of two sections, a narrative and the drawings. A description of the contents of the narrative and the drawings sections, and checklists for each of these sections, are in Section 3.3 of Volume II. For typical rural residential projects, DCD provides a Construction Stormwater Pollution Prevention (SWPP) Best Uanagement Practices (SUPs) Packet to assist with the preparation of the Construction SWPPP. II. Permanent Stormwater Control Plan A Permanent Stormwater Control Plan is a document that describes the basis for, and the means of implementing, permanent Best Management Practices (BMPs) for flow control and treatment facilities after the project is completed. The content of a Permanent Stormwater Control Plan is described in Section 3.1.5 of Volume I of the Manual. The permanent BMPs and facilities for flow control and treatment are described in Volumes III, IV, and V of the Manual. The submittal template is intended for rural residential projects that can fully disperse or infiltrate stormwater. The template may not be appropriate or sufficient for applications involving larger or more complex projects. stonnwater site plan template - rev. 1 M/2003 .. INSTRUCTIONS To prepare a Stormwater Site Plan, follow the steps outlined below, complete the Stormwater Site Plan template, sign and submit together with the Master Land Use Application (MLA). This information may also be provided on other diagrams, plans, studies, or attachments submitted with the project application. If so, please indicate such on this supplemental permit application. As the template is designed mostly for rural residential development, it may not be as useful for a larger project as an independently prepared Stormwater Site Plan. For any particular project, the Administrator may waive specific submittal requirements determined to be unnecessary for review of the application. Note: Prior to filling out the submittal template, read through these steps for preparing a Stormwater Site Plan. Preliminary or draft versions of the indMduaJ components may be helpful in the case that redesigning an original layout would result in a proposal that has less environmental impacts and is significantly simpler in terms of meeting stormwaterrequirements. For example, if the proposal can utilize the "full dispersion" BMP (T5.30 in the ManuaQ, there is no need to provide for flow control or flow treatment on the site. For more information on the easiest way to meet stormwater requirements, refer to the "Low Impact Development" Information Sheet. .BMPs used during the construction phase and that are included in the Construction SWPPPmay aiso.beuseful as elements of the Permanent Stormwater Control Plan. STEP 1: COLLECT AND ANAL VZE INFORMATION ON EXISTING CONDITIONS Collect and review information on existing site conditions, including topography, drainage pattems, soils, ground cover, critical areas, adjacent areas, existing development, existing stormwater facilities. The Jefferson County website provides an Internet Map Server (IMS) function (http://www.co.jefferson.wa.us). If available, a Development Review Division (DRD) planner may be able to assist you in collecting this information. Analyze the information to determine site limitations, including: · Areas with high potential for erosion and sediment deposition (based on soil properties, slope, etc.); · Locations of sensitive and critical areas (e.g., vegetative buffers, wetlands, steep slopes, floodplains, geologically hazardous areas, streams, susceptible aquifer recharge areas, etc.); and · The natural receiving waters to which the stormwater runoff either directly or eventually discharges. This information will be useful in site design and in the. completion of the Permanent Stormwater Control Plan and Construction SWPPP. STEP 2: PREPARE PREUMINARY DEVELOPMENT LAYOUT Based upon the analysis of existing site conditions, locate the buildings, driveways;'roads;"parking'lots,~nd landscaping features for the proposed development. Consider the following points when laying out the site: · Fit development to the terrain to minimize land disturbance; contine construction activities to the least area necessary and away from critical areas; · Preserve areas with natural vegetation (especially forested areas) as much as pOSSIble; · On sites with a mix of soil types, locate impervious areas over less permeable soil (e.g., till) and try to restrict development over more porous soils (e.g., outwash); · Cluster buildings together; · Minimize impervious areas; and · Maintain and utilize the natural drainage pattems. The preliminary development layout will assist in determining threshold discharge areas for calculating whether size thresholds under Minimum Requirements #6, #7, and #8 (for 'arge" projects) are exceeded and as a basis for the drawings and maps required for the Stormwater Site Plan. _ter site plan t~ate - rev. llV1l2OO3 "J \1~ ~,2 STEP 3: PERFORM AN OFF-SITE ANALYSIS This step is for 'arge" projects (i.e., adding 5,000 square feet or more of new impervious surface, converting o/.t acres of pervious surfaces to lawn or landscaped areas, or converting 2 Y.z acres of forested area to pasture) at the discretion of the UDC Administrator. See Section 2.6.2 of the Manual for more information. STEP 4: REVIEW THE APPUCABLE MINIMUM REQUIREMENTS The Stormwater Calculation Worksheet is a required submittal for all development and redevelopment land use applications. Completing the Worksheet helps determine the broad category of the proposal-"smaII," "medium," or 'arge" project-and the applicable Minimum Requirements. "Smalr projects need to meet Minimum Requirement #2 only. "Medium" projects need to meet Minimum Requirements #1 through #5. "large" projects need to meet all the Minimum Requirements, #1 through #10. The Minimum Requirements are as follows: 1. Preparation of Storm water Site Plans (Chapter 3 of Manual) 6. Runoff Treatment 2. Construction Stormwater Pollution Prevention 7. Flow Control 3. Source Control of Pollution 8. WeUands Protection 4. Preservation of Natural Drainage Systems and Outfalls 9. Basin/Watershed Planning 5. On-site Stormwater Management 10. Operation and Maintenance The Manual provides descriptions and instructions in Volume I, Chapter 2. Information sheets, application materials, and DRD planners can help describe the Minimum Requirements to applicants. Note: "Large" projects, as part of meeting Minimum Requirements #6 - Runoff Treatment - and #7 - Row Control, are compared to Table 2.1 and Table 2.2 in the Manual to determine whether on-site stormwater management BMPs are sufficient or treatment facilities or flow control facilities are required. The flow control determination may necessitate use of the Western Washington Hydrology Model managed by the Department of Ecology. Consult Sections 2.5.6 and 2.5.7 of Volume I, Chapter 2 of the Manual for more information. Again, the easiest way to meet stormwater requirements is to design the project so that natural drainage is preserved, impervious surface is limited, and full dispersion (BMP T5.30) is implemented. By using 'ow impact development" techniques in the site design, the need for treatment and flow control facilities is eliminated, simplifying preparation of the Stormwater Site Plan and often the site construction process itself. For more information on these techniques, consult the "Low Impact Development" Information Sheet. STEP 5: PREPARE A PERMANENT STORMWATER CONTROL PLAN Select stormwater control BMPs and facilities that will serve the project site in its developed condition. The selection process is presented in Volume I, Chapter 4. After consideration is given to how selected BMPs and facilities fit within and serve the entire preliminary development layout, the designer may want to reconsider the site layout to reduce the need for construction of facilities or the size of the facilities by reducing the amount of. impervious surfaces created and increasing the areas to be left undistUrbed. The Permanent Stormwater Control Plan should contain the following sections (Section 3.1.5 of Volume I, Chapter 3): · Existing Site Hydrology (Le., the behavior of water on the site-above, below, and on the ground) · Developed Site Hydrology (special requirements for projects and threshold discharge areas within projects that requirement treatment and flow facilities) · Performance Standards and Goals · Flow Control System · Water Quality System · Conveyance System Analysis and Design Essentially, in terms of site hydrology, the developed condition of the site should match the pre-developed condition, with is forested land cover (unless reasonable, historic information is provided that indicates the site was prairie prior to settlement). For 'arge" projects, totals of impervious surfaces, pollution-generating impervious surfaces, and poUution generating pervious surfaces must be tabulated for each threshold discharge area for which on-site BMPs are the sole stormwater management approach. stormwater site plan terrplate - rev. 1011/2003 3 12~ a&r STEP 6: PREPARE A CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) The Construction SWPPP for projects adding or replacing 2,000 square feet of impervious surface or more or clearing 7,000 square feet or more (i.e., "medium" or 'arge" projects), must contain sufficient information to demonstrate to the UDC Administrator that the potential pollution problems have been adequately addressed for the proposed project. An adequate Construction SWPPP includes a narrative and drawings. The narrative is a written statement to explain and justify the pollution prevention decisions made for a particular project. The narrative contains concise information conceming existing site conditions, construction schedules, and other pertinent items that are not contained on the drawings. The drawings and notes describe where and when the various BMPs should be installed, the performance the BMPs are expected to achieve, and actions to be taken if the performance goals are not achieved. There are 12 Elements that must be considered in the development of a Construction SWPPP, unless site conditions render that element unnecessary and the exemption from that element is clearly justified in the narrative. The 12 Elements cover the general water quality protection strategies for limiting site impacts during construction and are described in detail in Section 2.5.2, Volume I of the Manual. The 12 Elements of Minimum Requirement #2, Construction Stormwater Pollution Prevention, are: 1. Mark Clearing Umits 5. Stabilize Soils 9. Control Pollutants 2. Establish Construction Access 6. Protect Slopes 10. Control De-watering 3. Control Row Rates 7. Protect Drain Inlets 11. Maintain BMPs 4. Install Sediment Controls 8. Stabilize Channels and Outlets 12. Manage the Project For ease of use, the Stormwater Site Plan submittaJ template below includes a section that lists the 12 Elements and provides the opportunity to include sufficient information for rural residential and other relatively simple Construction SWPPPs. For more complex projects, a separate narrative and set of plans may be preferred or required. Volume II of the Manual is dedicated to Construction Stormwater Pollution Prevention. A step-by-step BMP selection process and a complete description of the BMPs applicable to each element is provided in Chapters 3 and 4. Additionally, oeD provides a Construction Stormw~ter Pollution Prevention (SWPP) Best Management Practices (BMPs) Packet that summarizes the 12 Elements and excerpts from the Manual sample sediment and erosion control measures for typical rural residential development. The Packet should prove useful for completing the Construction SWPPP component of the submittal template. On construction sites that infiltrate all stormwater runoff, the primary consideration in the preparation of the Construction SWPPP is the protection of the infiltration facilities from fine sediments during the construction phase and protection of ground water from other pollutants. On construction sites that discharge to surface water, the primary consideration in the preparation of the Construction SWPPP is compliance with the State Water Quality Standards. The step-by-step procedure outlined in Volume II, Section 3.2 is recommended for the development of these Construction SWPPPs. STEP 7: COMPLETE THE STORMWATER SITE PLAN The Stormwater Site Plan encompasses the entire submittal to Jefferson County in conjunction with a land use or building permit application. The following documents or sections should be included: . Project Overview . Existing Conditions Summary · Off-site Analysis Report (if required; usually for 'arge" projects) · Permanent Stormwater Control Plan · Special Reports and Studies (such as soil testing, wetland delineation, etc., if applicable) · Other Permits (approvals required by other regulatory agencies that include stormwater management conditions) · Operation and Maintenance Manual (for each flow control and treatment facility, if applicable) · Bond Quantities Worksheet (for performance bond or other financial guarantee for proper construction and operation of construction site BMPs and permanent drainage facilities, if required) The submittaJ template below is designed for rural residential and other relatively small or simple projects. For larger and more complex projects-particularly those that involve stormwater treatment and/or flow control-more information may be required and an independent Stormwater Site Plan may be the preferable submittal format. STEP 8: CHECK COMPLIANCE WITH ALL APPLICABLE MINIMUM REQUIREMENTS A Stormwater Site Plan as designed and implemented should specifically fulfill all Minimum Requirements applicable to the project. The applicant should review to check that these requirements are satisfied and that all information provlded is true and correct prior to signing and submitting the Stormwater Site Plan. (The signature box appears at the end of the submittal template.) stormwater site plan terT1llate - rev. 10r'1/2003 4 \ \~ 'j?;~ JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450.360/379-4451 Fax http://www.co.jefferson.wa.us/commdevelopment/ IMLA# PROJECT/APPUCANT NAME: Please answer all of the following questions to the best of your ability. Where the question calls for depiction on a site map, the applicant may choose to either incorporate the elements into the general plot plan for the Master land Use Application or to submit a separate stormwater site plan map. Project Overview 1. Describe the proposed developed conditions of the site. Indicate position and relative size of proposed improvements on the site map. Existing Conditions Summary 2. Describe the existing topography. Indicate contours on the site map. 3. Describe the existing vegetation. Indicate native vegetation areas on the site map. 4. Describe the existing soils. Indicate soil type on the site map. 5. Describe the existing site hydrology (i.e., drainage; behavior of water on the site-above, below, and on the ground). Indicate existing stormwater drainage to and from the site on the site map. Depict separate drainage basins on the site map, if applicable, and indicate acreage of each. 6. Describe any excess levels of noise generated by the proposed use or activity: stormwater site plan template - rev. 1lY112OO3 5 n~.~L8:Z=_~-" ...;?~ 7. Describe significant geographic features and critical areas (i.e., environmentally sensitive areas such as wetlands, streams, steep slopes, etc.) on the site. Indicate location on the site map. 8. Describe the general vicinity of the site, including adjacent land uses and structures, utilities, roads, and sensitive/critical areas (streams, weUands, lakes, steep slopes, etc.). Permanent Stormwater Control Plan This portion of the Stonnwater Site Plan consists of the selection and installation .of the appropriate stonnwater control BMPs and facUities to remain in place after construction of the project is completed. "Medium" size projects are required to have the totals calculated of all impervious surfaces, pollution-generating impervious surfaces, and pollution-generating pervious surfaces to verify that the thresholds for treatment facilities and flow control facUities are not exceeded. 9. Describe the developed site hydrology, as proposed. Indicate whether stonnwater will be fully dispersed (i.e., per BMP T5.30 in the Manual) or, if not, what types of stonnwater flow control will be utilized for the site or specific threshold discharge areas within the site. Locate these facilities on the site plan and differentiate proposed facUities from existing facilities. 10. If the project requires the use of stonnwater treatment facilities, describe the types of stonnwater treatment facilities proposed for use on the site. Locate these facilities on the site plan and differentiate proposed facilities from existing facilities. [This is nonnally for 'arge" projects or projects that involve the potential for dispersion of contaminants.) 11. Describe the performance goals and standards applicable to the project. . 12. Describe the flow control system. s1e>rmwater site plan template - ffN. 10/112003 \'itl ;),.5~ 6 13. Describe the water quality system. 14. Describe the conveyance system analysis and design. 15. Describe the source of fill material, physical characteristics of fill material, and deposition of excess material. 16. Proposed methods of placement and compaction consistent with the applicable standards on Appendb( Chapter 33 of the Uniform Building Code. 17. Describe the proposed surfacing material. 18. Describe methods for restoration of the site. 19. An Operation and Maintenance Manual is required for each flow control and treatment facility. [This is normally required for "large" projects only and only those for which facilities are required to control flow or treat runoff.] If included, list the Manuals here. 20. Ust here and include any special reports or studies conducted to prepare the Stormwater Site Plan. . 21. Ust other necessary permits and approvals as required by other regulatory agencies. If those permits or approvals include conditions that affect the drainage plan or contain more restrictive drainage-related requirements, describe those conditions or restrictions here. stormwater site plan template - rev. 10/1/2003 7 -.-.-'.-,."--'''''''':'''-''''_<'0.'''''''' IfJ''''~&f CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) The Construction SWPPP addresses sediment and erosion control during construction. The BMPs indicated by the applicant in the template that follows must be installed on the ground during all construction phases of the project. The proponent is responsible for preventing sediment and erosion impacts to environmentaRy sensitive areas and off-site areas. Consult the Construction Stormwater Pollution Prevention (SWPP) Best Management PracUces (BMPs) Packet for guidance, particularly with rural residential development. SECTION 1- CONSTRUCTION SWPPP NARRATIVE 1. Construction Stormwater Pollution Plan Elements. Describe how each of the Construction SWPPP elements has been or will. be addressed. Identify the type and location of BMPs used to satisfy the required element. If an element is not applicable to the proposal, justify in writing. Descriptions of the 12 Bements are found at section 2.5.2 of the Manual (beginning on page 2-15). 12 Required Elements - Construction SWPPP 1. Mark Clearing Umits. 2. Establish Construction Access. 3. Control Flow Rates. 4. Install Sediment Controls. 5. Stabilize Soils. 6. Protect Slopes. 7. Protect Drain Inlets. stonnwater site plan template - rev. 11W112OO3 \g:l,L ~S~ 8 , 12 Required Elements - Construction SWPPP (continued) 8. Stabilize Channels and Outlets. 9. Control Pollutants. 10. Control De-Watering (the act of pumping groundwater or stormwater away from an active construction site). 11. Maintain Best Management Practices (BMPs). ,. 12. Manage the Project. 2. Adjacent Areas. a. Description of the adjacent areas that may be affected by site disturbance (e.g., streams, lakes, wetlands, residential areas, roads). , b. Description of the downstream drainage path leading from the site to the receiving body of water (minimum distance of 400 yards). 3. Environmentally Sensitive Areas. a. Description of environmentally sensitive areas that are on or adjacent to the site. Slonnwater site plan template - rev. 1011/2003 9 .......'.fS'..... Jsr /.,."..... , b. Description of special requirements for working in or near environmentally sensitive areas. 4. Erosion Problem Areas. Description of potential erosion problems on site in the context of the characteristics of the on-site soils (e.g., erodibility, settleability, penneability, depth, texture, soil structure). 5. Construction Phasing. a. Construction sequence b. Construction phasing (if proposed) 6. Construction Schedule. Wet season is October 1 through April 30 (page 2-21 of the Manual). I. Provide a proposed construction schedule. II. Wet Season Construction Activities. a. Proposed wet season construction activities. b. Proposed wet season construction activities for environmentally sensitive areas. 7. Financial/Ownership Responsibilities. a. Identify the property owner responsible for the initiation of bonds and/or other financial securities. b. Describe bonds and/or other evidence of financial responsibility for liability associated with erosion and sedimentation impacts. 8. Engineering Calculations. Provide Design Calculations on a separate sheet for the following, if applicable. a. Sediment PondslTraps. b. Diversions. c. Waterways. d. RunotflStonnwater Detention Calculations s~ site plan tElf1lllate - rev. 1MI2003 l 10 \.81.e . (} i)~ SECTION 11- EROSION AND SEDIMENT CONTROL PLAN Sediment and erosion control measures may be depicted on the master land use application plot plan, a stormwater site plan, and/or a separate Construction SWPPP site plan. This is a checklist to ensure that the following are depicted on a site plan: 1. General. a. Vicinity Map b. Jefferson County Approval Block c. Erosion and Sediment Control Notes 2. Site Plan. a. Legal description of subject property. b. North arrow. c. Indicate boundaries of existing vegetation (e.g., tree lines, pasture areas, etc.). d. Identify and label areas of potential erosion problems. e. Identify FEMA base flood boundaries and Shoreline Management boundaries (if applicable). f. Show existing and proposed contours. g. Indicate drainage basins and direction of flow for individual drainage areas. h. Label final grade contours and identify developed condition drainage basins. i. Delineate areas that are to be cleared and graded. j. Show all cut and fill slopes indicating top and bottom of slope catch lines. 3. Conveyance Systems. a. Designate locations for swales, interceptor trenches, or ditches. b. Show all temporary and permanent drainage pipes, ditches, or cut-off trenches required for erosion & sediment control. c. Provide minimum slope and cover for all temporary pipes or callout pipe inverts. d. Shows grades, dimensions, and direction of flow in all ditches, swales, culverts and pipes. e. Provide details for bypassing off-site runoff around disturbed areas. f. Indicate locations and outlets of any dewatering systems. 4. Location of Detention Best Management Practices (BMPs). Identify location of detention BMPs. 5. Erosion and Sediment Control Facilities. a. Show the locations of sediment trap(s), pond(s), pipes and structures. b. Dimension pond berm widths and inside and outside pond slopes. c. Indicate the trap/pond storage required and the depth, length, and width dimensions. d. Provide typical section views through pond and outlet structure. e. Provide typical'details of gravel cone and standpipe, and/or other filtering devices. f. Detail stabilization techniques for outletlinlet. g. Detail controVrestrictor device location and details. h. Specify mulch and/or recommended cover of berms and slopes. i. Provide rock specifications and detail for rock check dam(s), if applicable. j. Specify spacing for rock check dams as required. k. Provide front and side sections of typical rock check dams. I. Indicate the locations and provide details and specifications for silt fabric. m. Locate the construction entrance and provide a detail. 6. Detailed Drawings. Any structural practices used that are not referenced in the Ecology Manual should be explained and illustrated with detailed drawings. 7. Other Pollutant BMPs. Indicate on the site plan the locations of BMPs to be used for the control of pollutants other than sediment (e.g., concrete wash water). 8. Monitoring Locations. Indicate on the site plan the water quality sampling locations to be used for monitoring water quality on the construction site. Sampling stations should be located upstream and downstream of the project site. stormwater site plan template - rev. 10/112003 /8:,1. d5r 11 Stonnwater Site Plan Changes If the designer wishes to make changes or revisions to the originaUy approved Stonnwater Site Plan, the proposed revisions shall be submitted to DCD prior to construction. The submittal shall include substitute pages that include all proposed changes, revised drawings showing any structural changes, and any other supporting information that explains and supports the reason for the change. Final Corrected Plan Submittal If the project included construction of conveyance systems, treatment facilities, flow control facilities, or structural source control BMPs (not standard on-site stonnwater management BMPs), the applicant shaR submit a final corrected plan ("as-builtsj when the project is completed. These should be engineering drawings (stamped by a licensed cMI engineer) that accurately represent the project as constructed. APPUCANT SIGNATURE By signing the Construction SWPPP worksheet, I as the applicant/owner attest that the infonnation provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of aU owners of the affected property. (lANDOWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) THIS SPACE MAY BE USED FOR ADDITIONAL NOTES, IF NEEDED: Sl~er site plan lllfl'lllate - fiN. 1M/2003 L .., ,Un, \ <&~ . > ~ S<6 12 Jefferson County Department Of Community Development STORMWATER MANAGEMENT HANDOUT Select definitions from the 2001 Department of Ecology S'IorImPaterManagement ManllaJ for Western Washington. 2.3 Definitions Related to Minimum Requirements A full listing and definition of stormwater-related words and phrases that are used in this manual is given in the glossary. A few of the key definitions are listed here for ease in understanding the requirements that follow. · ArteriIll- A road or street primarily for through traffic. A major arterial connects an Interstate Highway to cities and counties. A minor arterial connects major arterials to collectors. A collector connects an arterial to a neighborhood.. A collector is not an arterial. A local access road connects individual homes to a collector. · Effective Impervious surface - Those impervious surfaces that are connected via sheet flow or discrete conveyance to a drainage system. Impervious surfaces on residential development sites are considered ineffective if the runoff is dispersed through at least one hundred feet of native vegetation in accordance with BMP T5.30 - ''Full Dispersion,>> as described. in Chapter 5 of V olume V. · Highway - A main public road connecting towns and cities · Impervious surface - A hard surface area that either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A hard surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to, roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads,.packed earthen materials, and oiled, macadam or other surfaces which similarly impede the natural infiltration of stormwater. Open, uncovered retention/detention facilities shall not be considered 8:8 impervious surfaces for purposes of determining whether the thresholds for application of minimum requirements are exceeded. Open, uncovered retention/detention facilities shall be considered impervious surfaces for purposes of runoff modeling. 2-4 Volume 1- Minimum Technical Requirements (4,ugust 2001 i .~ ... ". ",.,. '~_..~ /fl, ,.Q". · Land disturbing IIctivity - Any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and non- vegetative) and/or the existing soil topography. Land disturbing activities include, but are not limited to clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction shall also be considered a land disturbing activity. Vegetation maintenance practices are not considered land-disturbing activity. · . Mllintentlnce - Repair and maintenance includes activities conducted on currently serviceable structures, facilities, and equipment that involves no expansion or use beyond that previously existing and results in no significant adverse hydrologic impact. It includes those usual activities taken to prevent a decline, lapse, or cessation in the use of structures and systems. Those usual activities may include and . replacement of disfunctioning facilities, including cases where environmental permits require replacing an existing stIucture with a different type stIucture, as long as the functioning characteristics of the original stIucture are not changed. One example is the replacement of a collapsed, fish blocking, round culvert with a new box culvert under the same span, or width, of roadway. For further details on the application of this manual to various road management functions, please see Section 2.2. · NtItive l'egetlltion - Vegetation comprised of plant species, other than noxious weeds, that are indigenous to the coastal region of the Pacific Northwest and which reasonably could have been expected to naturally occur on the site. Examples include trees such as Douglas Fir, western hemloc~ western red cedar, alder, big-leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; and herbaceous plants such as sword fern, foam flower, and fireweed. · New development - Land disturbing activities, including Class N - general forest practices that are conversions from timber land to other uses; structural development, including construction or installation of a building or other structure; creation of impervious surfaces; and subdivision, short subdivision and binding site plans, as defined and applied in Chapter 58.17 RCW. Projects meeting the definition of redevelopment shall not be considered new development. · PoUution-genertding impervious surfllce (PGIS) - Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include diose which are subject to: vehicular use; industrial activities (as further defined in the glossary); or storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall. Erodible or leachable materials, wastes, or chemicals are those August 2001 Volume 1- Minimum Technical Requirements 2-5 \:\Q ~5~ , . substances which, when exposed to rainfall, measurably alter the physical or chemical characteristics of the rainfall runoff. Examples include erodible soils that are stockpiled, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, and garbage dumpster leakage. Metal roofs are also considered to be PGIS unless they are coated with an inert, non-leachable material (e.g., baked-on enamel coating). A surface, whether paved or not, shall be considered subject to vehicular use if it is regularly used by motor vehicles. The following are considered regularly-used surfaces: roads, unvegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unfenced fire lanes, vehicular equipment storage yards, and airport runways. .The following are not considered regularly-used surfaces: paved bicycle pathways separated from and not subject to drainage from roads for motor vehicles, fenced firelanes, and infrequently used maintenance access roads. · Pollution-generating pervious surfaces (pGPS) - Any non- impervious surface subject to use of pesticides and fertilizers or loss of soil. Typical PGPS include lawns, landscaped areas, golf courses, parks, cemeteries, and sports fields. · Pre-developed condition - The native vegetation and soils that existed at a site prior to the influence of Euro-American settlement. The pre- developed condition shall be assumed to be a forested land cover unless reasonable, historic information is provided that indicates the site was prairie prior to settlement. · Project site - That portion of a property, properties, or right of way subject to land disturbing activities, new impervious surfaces, or replaced impervious surfaces. . · Receiving waters - Bodies of water or surface water systems to which surface runoff is discharged via a point source of stormwater or via sheet flow. · Redevelopment - On a site that is already substantially developed (i.e., has 35% or more of existing impervious surface coverage), the . creation or addition of impervious surfaces; the expansion of a building footprint or addition or replacement of a structure; structural development including construction, installation or expansion of a building or other structure;; replacement of impervious surface that is not part of a routine maintenance activity; and land disturbing activities. 2-6 (--"-, Volume 1- Minimum Technical Requirements """~..., .."'-"-;~\ ~ "T':'-A&gust 2001 ., ";'12~"-d~, · Reploced impervious surface - For structures, the removal and replacement of any exterior impervious surfaces or foundation. For other impervious surfaces, the removal down to bare soil or base comse and replacement. · Site - The area defined by the legal boundaries of a parcel or parcels of land that is (are) subject to new development or redevelopment. For road projects, the length of the project site and the right-of-way boundaries define the site. · Source control BMP - A structure or operation that is intended to prevent pollutants from coming into contact with stormwater through physical separation of areas or careful management of activities that are sources of pollutants. This manual separates source control BMPs into two types. Structural Source Control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater. Operational BMPs are non-structural practices that prevent or reduce pollutants from entering stormwater. See Volume N for details. · Threshold Discharge Area - An onsite area draining to a single natural discharge location or multiple natural discharge locations that combine within one-quarter mile downstream (as determined by the shortest flowpath). The examples in Figure 2.1 below illustrate this definition. The purpose of this definition is to clarify how the thresholds of this manual are applied to project sites with multiple discharge points. EIMlpIeof. PnljIcISII willa. ............ Dlld.,.... ........ n..IIoId....... AIw ~: ".~:'~:.;..:: .! ~.,~ "._0'(/ . J>.~:..' .~....: ~7-..,': . .~.~!o~:-r,-. ." . .~" . ~:"':::".-oa_'" '. :'. >.... . .-..~ . " . "he. .... ...:..m.:,=.. . j.~/..~~ ".~,.' -. :It ---, ! '- ........ ; ~ .. LOCIIioll ! ... :~ NIIuIaI J! ~ DiIdJeIve i \ LClCIIIona f \ ; . ! ~ .; \ i ~ \ ~, ; : .''': I KNh~Mm~_________~____~__ (shortest low pe1h) ..; *..; e--. of. JInlfect SI8 willi"""" ........ ~......... 1IlI'MhGId at ell.... AnI! '\.. '\ '\ ., e-.pe.ofa PNject.. willi ............. Dfld ............. '11lfMbotd a.dIaI.. ~ ,/ / I , . . Figure 2.1 Threshold Discharge Areas August 2001 Volume 1- Minimum Technical Requirements 2-7 \ \'\~ .~<& ~ l' JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450.800/831-2678.360/379-4451 Fax STATE ENVIRONMENTAL POLICY ACT ENVIRONMENTAL CHECKLIST Purpose of checklist: The State Environmental Policy Act (SEPA), Chapter 43.21 C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all. proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Jefferson County uses this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. Answer each question accurately and carefully, to the best of your ability. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. The county can assist you in filling out your checklist. Some questions ask about governmental regulations, such as zoning, shoreline and landmark designations. Answer these questions if you can. If you have problems, Jefferson County can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impacts. C:\W1NDOWS\TEMP\sepa info form_FINAL.doc 1019/01 I'iJ . .;;&' STATE ENVIRONMENTAL POLICY ACT ENVIRONMENTAL CHECKLIST ., CASE # The State Environmental Policy Act (SEPAl, RCW43.21 C, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts 'from your proposal; reduce or avoid impacts from the proposal, if it can be done; and help the agency decide whether an EIS is required. PROPONENT: ADDRESS: TELEPHONE: (home) (business) AUTHORIZED REPRESENTATIVE/CONTACT: ADDRESS: TELEPHONE: (home) (business) DIRECTIONS This checklist asks you to describe some basic information about your proposal. The questions apply to the entire proposal, including those phased over a period of time or on separate parcels of land. Answer each question accurately and completely to avoid unnecessary delays in processing this checklist. If you do not know an answer, write "unknown," or if a question does not apply, write "not applicable." Answers to some questions may require special expertise or technical assistance from qualified persons. The cost of obtaining such information is the responsibility of the proponent. Attach any additional information (reports, studies, maps, illustrations, leases, permits, etc.) that may further describe the proposal or be required by Jefferson County. Contact the Jefferson County Development Review Division for assistance in completing the checklist and for information on the administrative procedures for its processing. PLEASE PRINT IN INK OR TYPE EACH ANSWER. DO NOT WRITE IN THE AREA DESIGNATED "EVALUATION." PROPOSAL AND PROPERTY DESCRIPTION PROPOSED PROJECT DESCRIPTION (include all factors that will give an accurate understanding of its scope and purpose): /9'/ ,.."._. Page 1 of 1D dSf PROPERTY AND AREA DESCRIPTION: I Address: Legal (from property tax statement): Lot: Block: Subdivision: Tax Parcel: Quarter Sections: Section: Township: N Range: WM Tax Number: Land Area (dimensions): Describe the location, physical characteristics, and extent of land area to be affected: include all factors that will give an accurate understanding of the property and its environment: SCHEDULE (beginning and ending dates of the proposal, including phases): OVERALL PLAN (describe future additions, expansions, or related activities or plans by others that may affect the proposal) : REQUIRED APPROVALS (all local, state, and federal approvals required for the completion's of this proposal and if any approvals are pending that are related to the proposal): ENVIRONMENTAL DATA (any existing or proposed environmental information such as studies or documents related to the proposal): l~ \l:~ Page 2 of 10 ENVIRONMENTAL COMMENTS EARTH EVALUATION 1. Check the item that describes the site: otlat Orolling Ohilly Osteep slopes Omountainous Oother: 2. What is the steepest slope on the site: Identify the approximate percent of the slope: 3. What general types of soils are found on the site (sand, gravel, peat, muck) ? If you know the classification of agricultural soils, specify them and note any prime farmland: - 4. Are there surface indications or a history of unstable soils in the immediate vicinity? If so, describe them: 5. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Identify the source of the fill: 6. Could erosion occur as a result of clearing, construction, or use? If so,generallydescribe it: 7. About what percent of the site would be covered with impervious surfaces after construction of the project (that is, asphalt or buildings)? 8. Describe proposed measures to reduce or control erosion or other impacts to the earth, if any: AIR EVALUATION 9. What types of emiSSions to the air, if any, would result from the proposal during construction and when the project is completed (dust, car odors, industrial wood smoke)? Generally describe and give approximate quantities, if known: 10. Are there any off-site sources of emissions or odors that may affect your proposal? If so, generally describe them: ....~b I .. ,." Page 3 of 10 d:;f AIR (continued) EV ALUA TION 11. Describe proposed measures to reduce or control emissions or other impacts to the air, if any: WATER EVALUATION Surface Water 12. Is there any surface water body on or in the immediate vicinity of the site, including year-round or seasonal streams, salt waters, lakes, ponds, and wetlands? If yes, describe the type and provide names. If appropriate, state what stream or river it flows into: - 13. Will the project require any work over, in, or adjacent to the described waters (within 200 feet)? If yes, describe the work and attach available plans: 14. Estimate the amount of fill and dredge material that would be placed or removed from the surface waters or wetlands and indicate the area of the site that would be affected. Identify the source of the fill material: . 15. Will the proposal require surface water withdrawals or diversions? Give a general description and identify the purpose and approximate quantities, if known: 16. Does the proposal lie within a 100-year flood plain? If so, note the location on the site plan: 17. Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge: Ground Water EVALUATION 18. Will ground water be withdrawn or will water be discharged to groundwater? Give a general description and identify the purpose and approximate quantities, if known: Page 4 of 10 lO(l Ground Water (continued) EV ALUA TION 19. Describe the waste material that would be discharged into the ground from septic tanks or other sources, if any (domestic sewage; industrial wastes and chemicals contained; agricultural wastes). Describe the general size of the system; the number of such systems; the number of houses to be served, if applicable, or the number of animals or humans the system(s) is expected to serve: Water Run-Off EVALUATION (includino storm water) 20. Describe the source of run-off, including storm water. Describe the method of collection and disposal, if any, including any known quantities. Where will this water flow? Will this water flow into other waters? If so, describe it: . - 21. Could waste materials enter ground or surface waters? If so, generally describe how: 22. Describe proposed measures to reduce or control surface, ground, and run-off water impacts, if any: PLANTS EVALUATION 23. Check the types of vegetation found on the site; Deciduous tree: Oalder Omaple Eispen Oother: Evergreen tree: Dfir Ocedar Opine Oother: OShrubs OGrass OPasture OCrop/Grain Wet Soil Plants: Ocattail Obuttercup Obulrush Oskunk cabbage Oother: Water Plants: Owater lily Oeelgrass Omilfoil Oother: Other: 24. What kind and amount of vegetation would be removed or altered? 25. List threatened or endangered species known to be on or near the site: 26. Describe the proposed landscaping, use of nature plants, or other measures to preserve or enhance vegetation on the site, if any: li<f a$(f Page 5 of 10 ANIMALS EVALUATION 27. Check any birds and animals that have been observed on or near the site or are known to be on or near the site: Birds: Dhawk Dheron Deagle Dsongbirds Dother: Mammals: Ddeer Dbear Delk Dbeaver Dother: Fish: Dbass Dsalmon Otrout Dherring Dshellfish Dother: 28. List any threatened or endangered species to be on or near the site: 29. Is the site part of a migration route? If so, how? - 30. Describe proposed measures to preserve or enhance wildlife, if any: ENERGY AND NATURAL RESOURCES EVALUATION 31. What kinds of energy (electric, natural gas, oil, wood stove, solar) would be used to meet. the completed project' s energy needs? Describe whether it would be used for heating, manufacturing, etc.: 32. Would the project affect the potential use of solar energy by adjacent properties? If so, generally describe the affect: 33. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: ENVIRONMENTAL HEALTH EVALUATION 34. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe the hazards: 35. Describe special emergency services that might be required: . 36. Describe proposed measures to reduce or control environmental health hazards, if any: \C{.~ ll,~~ Page 6 of 10 NOISE 37. What types of noise exist in the area that may affect your project (traffic, equipment, operation)? 38. What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (construction, traffic, operation) ? Indicate what hours noise would come from this site: 39. Describe proposed measures to reduce or control noise impacts, if any: - LAND AND SHORELINE USE 40. What is the current use of the site and adjacent properties? . 41. Has the site been used for agriculture? If so, describe the use: 42. Describe any structures on the site: 43. Will any structures be demolished? If so, what structures? . 44. What is' the current comprehensive plan or community development plan designation of the site? Identify the plan: 45. If applicable, what is the current Shoreline Master Program designation of the site? 46. Has any part of the site been classified as an " environmentally sensitive" area? If so, specify the pa'rt: 47. Approximately how many people would reside or work in the completed project? 48. Approximately how many people would the completed project displace? 49. Describe proposed measures to avoid or reduce displacement impacts, if any: 20<7 ~~ Page 7 of 10 . LAND AND SHORELINE USE (continued) EV ALUA TlON 50. Describe proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: HOUSING EVALUATION 51. Approximately how many units would be provided, if any? Indicate whether the housing is high, middle, or low income: 52. Approximately how many units, if any, would be eliminated? Indicate whether the housing is high, middle, or low income: 53. Describe proposed measures to reduce or control housing impacts, if any: - AESTHETICS EVALUATION 54. What is the tallest height of any proposed structure(s), not including antennas? What is the principal exterior building material(s) proposed? 55. What views in the immediate vicinity would be altered or obstructed? 56. Describe proposed measures to reduce or control aesthetic impacts, if any: LIGHT AND GLARE EVALUATION 57. What type of light or glare would the proposal produce? What time of the day would it mainly occur? 58. Could light or glare from the finished project be a safety hazard or interfere with views? 59. What existing off-site sources of light or glare may affect your proposal? 60.- Describe proposed measures to reduce or control light and glare impacts, if any: RECREATION EVALUATION 61. What designate and informal recreational opportunities are in the immediate vicinity? 20\ .1S'l> Page 8 of 10 RECREATION (continued) EVALUATION 62. Would the proposed project displace any existing recreational uses? If so, describe the displacement: 63. Describe the proposed measures to reduce or control impacts on recreation, including recreational opportunities to be provided by the project or proponent, if any: HISTORICAL AND CULTURAL PRESERVATION EVALUATION 64. Are there any places or objects listed on or proposed for national, state, or local preservation registers known to be on or next to the site? If so, generally describe them: .- 65. Generally describe any landmarks or evidence of historic, cultural, archaeological, or scientific importance known to be on or next to the site: . . 66. Describe proposed measures to reduce or control impacts, if any: TRANSPORTATION EVALUATION 67. Identify public streets and highways serving the site and describe the proposed access to the existing street system. Show on the site plat. 68. Is the site currently served by public transit? If no, what is the approximate distance to the nearest transit stop? 69. How many parking spaces would the completed project have? How many would the project eliminate? 70. Will the proposal require any new roads, streets, or improvements to existing roads or streets, not including driveways? If so, generally - describe them, indicating whether they are public or private: . 71. Will the project use water, rail, or air transportation, or occur in the immediate vicinity of these facilities? If so, generally describe the use: 2a..Z d.G<f Page 9 of 10 . TRANSPORTATION (continued) EVALUATION 72. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur: 73. Describe proposed measures to reduce or control transportation impacts, if any: PUBLIC SERVICES EV ALUA TION 74. Would the project result in an increased need for public services (fire protection, police protection, health care, schools)? If so, generally describe the results: - - 75. Describe proposed measures to reduce or control direct impacts on public services, if any: UTILITIES EVALUATION 76. Check which utilities are currently available at the site: Owater Oelectricity Onatural gas o refuse service Otelephone Oseptic system Osanitary sewer Oother: 77. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity that might be needed: ACKNOWLEDGMENT I acknowledge that all information provided in this checklist and all attached material is true and correct to the best of my knowledge. I understand the lead agency is relying on this information to make its decision. In addition, I understand that review under SEPA does not constitute approval or a proposal; compliance with local, state, and federal regulations applicable to the proposal shall constitute approval. (Check with appropriate agencies to determine what approvals are required.) SEPA approval is based on the information I have provided. If found inaccurate, approval could be withdrawn. By signing the application form, the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liabilities, judgments, court costs, reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's e'!lployees, representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. (authorized signature) (date) /FEE RECEIPT# CHECK# INITIALS DATE I h:\home\plncntr\infoplng\sepa,doc 01/00 293 '''$ Page 10 of 10 ..1,~ Stacie Hoskins From: Sent: To: Subject: Michael Moren [mmoren@parametrix.com] Monday, October 18, 20049:12 AM Stacie Hoskins Beckett Point project - Figure 3 B 1820009P04T04F. 05BW.pdf Stacey, I have attached Figure 3 to go with Figures 1, 2, and 4 for the Beckett Point Sanitary Improvements project. My supervisor is currently in a meeting. As soon as I talk to him regarding the possible October dates for the Pre-Application Conference, I will let you know. Please call me in the meantime if you have any questions. Thank you, Mike Moren Parametrix, Inc. 5700 Kitsap Way, Suite 202 Bremerton, WA 98312-2234 mmoren@parametrix.com p: (360) 850-5320 f: (360) 479-5961 1 ~or ;lSt I I I I I I r+ I I I \+ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \+ \ \ \ \ \ + \ I>: \ ::> \ 12 \ ~ \ U \+ i ~ \ ~ \ w I . + + + + + + + + + <:) d CD .... + + + + + + + + + + + + + + + + + + + + + + + + + + CJ.o~ + + + + + + + + + + + + + + + d5:f a. I'll 'E::E -Gl 0.. II.. .- M rn Gl='t; ... j Gl j ~'[ u..1DII.. Ii) >:: Z ~ U F III a. >::W ZIIl ~~ ~:;; ~~ ,,0 zU F... Ill... x!i w~ X' 0 I>: X' a. a. 0 ~ I>: a. Z a. 0 ~ F >:: ;!: Z III ;!: a. '" a. ::> '" a. ::> 0 a. Z 0 ::> Z 0 ::> I>: 0 " I>: I>: " w w 0 0 Z Z ::> ::> o 00 >:: I>: < '" I>: ~ ~ I>: 0 W ... Z ... ::> ::> 0 lD I>: 0 " Z 1>:1>: < ~~ F Zw ~ ::>1Il Ow f- WI>: 0 Ill::> f: o III a. III Ow 0 1>:1>: II> a. a. ! 0 ... >- W ~ ;;: Z " ;;: ~O I>: 0 (j~ 0 "F w III ~~ 0 a. 0 x< I>: wa. a. D ~ :I: " :;: >- I>: < Z 15 I>: o ~ r I s ~~Iii lC ~ i <1z ~ E :;! :! U II '" Do 0 .. :~ Stacie Hoskins From: Sent: To: Cc: Subject: Stacie Hoskins Tuesday, October 19,20047:12 AM 'Michael Moren' Randy Marx; Jim Pearson RE: Beckett Point project Hi Mike, We're confirmed for October 29, 2004 at 10:00 am for the Beckett Point sewage system pre- application. See you then, Stacie L. Hoskins Associate Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 Phone 360-379-4463 Fax 360-379-4451 shoskins@co.jefferson.wa.us -----Original Message----- From: Michael Moren [mailto:mmoren@parametrix.com] Sent: Monday, October 18, 2004 1:16 PM To: Stacie Hoskins Subject: RE: Beckett Point project - Figure 3 Stacie, Oct. 29th would also be the best date in October for us. Thank you, Mike Moren Parametrix, Inc. 5700 Kitsap Way, Suite 202 Bremerton, WA 98312-2234 mmoren@parametrix.com p: (360) 850-5320 f: (360) 479-5961 Phone 360-379-4463 Fax 360-379-4451 shoskins@co.jefferson.wa.us 1 20b clSt Page 1 of 2 Stacie Hoskins From: Randy Marx Sent: Monday, October 18, 2004 9:11 AM To: Stacie Hoskins Subject: RE: JC PUD#1 pre-application sounds ok to me... Please confirm Randy -----Original Message----- From: Stacie Hoskins Sent: Monday, October 18, 2004 9:04 AM To: Jim Pearson; Randy Marx Subject: RE: JC PUD#l pre-application How about Friday 10/29 in the morning, say 10 am? -----Original Message----- From: Jim Pearson Sent: Monday, October 18, 2004 8:59 AM To: Stacie Hoskins; Randy Marx Subject: RE: JC PUD#l pre-application I'll be gone on 10/22, just back on 10/26 AM, and in a meeting on 10/27. Got some other dates? 10/26 or 10/27 PM? 10/28 or 10/29? -----Original Message----- From: Stacie Hoskins Sent: Monday, October 18, 2004 8:55 AM To: Randy Marx; Jim Pearson Subject: JC PUD# 1 pre-application Hi Randy & Jim, I have a pre-application request from Parametrix for JC PUD #1 to build a central low pressure sewer collection system (LPSS), Large on-site septic (LOSS), and pressure drainfield systems for the Beckett Point development. It appears the area proposed is currently completely forested and pipes will need to go within the wetland buffer. I'll route information packets to you today. Are you available Friday, Oct 22 at 11am, Tuesday, Oct 26 at 10 am or Wednesday, Oct 27 at 10 am for their pre-application? Thanks, Stacie Stacie L. Hoskins Associate Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 Phone 360-379-4463 Fax 360-379-4451 ~o7 ~ 10/18/2004 Stacie Hoskins From: Sent: To: Subject: Michael Moren [mmoren@parametrix.com] Monday, October 18, 2004 1: 16 PM Stacie Hoskins RE: Beckett Point project - Figure 3 Stacie, Oct. 29th would also be the best date in October for us. Thank you, Mike Moren parametrix, Inc. 5700 Kitsap Way, Suite 202 Bremerton, WA 98312-2234 mmoren@parametrix.com p: (360) 850-5320 f: (360) 479-5961 >>> "Stacie Hoskins" <shoskins@co.jefferson.wa.us> 10/18/2004 10:09:41 AM >>> Thanks Mike. As it looks now, I'm trying for Friday Oct 29th at 10 am, but I still need Public Works to confirm. I'll let you know. Stacie Stacie L. Hoskins Associate Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 Phone 360-379-4463 Fax 360-379-4451 shoskins@co.jefferson.wa.us 1 dog-.. ~a Page 1 of 2 Stacie Hoskins From: Stacie Hoskins Sent: Monday, October 18, 2004 10:25 AM To: Randy Marx Subject: RE: JC PUD#1 pre-application Friday, October 29, 2004 at 10 am it is then. Thanks guys. "'5 -----Original Message----- From: Randy Marx Sent: Monday, October 18, 2004 9: 11 AM To: Stacie Hoskins Subject: RE: JC PUD#l pre-application sounds ok to me... Please confirm Randy -----Original Message----- From: Stacie Hoskins Sent: Monday, October 18, 20049:04 AM To: Jim Pearson; Randy Marx Subject: RE: JC PUD#l pre-application How about Friday :'0/29 in the morning, say 10 am? -----Origina I flJessage----- From: Jim Pearson Sent: Mon(~:cY, October 18, 2004 8:59 AM To: Stacie: ioskins; Randy Marx Subject: r.=:: JC rUDit1 pre-application I'll be gone 10/22, j'Jst back on 10/26 AM, and in a meeting on 10/27. Got some other dates? 10/26 or 10/27 PM? 10/28 or 10/29? -----Original Message----- Fro : ::tac:e Hoskins Sent: r,10nday, October 18, 2004 8:55 AM T~: -. ":ldy Marx; Jim Pearson Sub~:.:ct: JC PUD#l pre-application Hi RJndy & kn, I have a pre-application request from Parametrix for JC PUD #1 to build a central low pressui-e sewer collection system (LPSS), Large on-site septic (LOSS), and pressure drai ,fi~,ld systems for the Beckett Point development. It appears the area proposed is ( , n~" cOinpletely forested and pipes will need to go within the wetland buffer. 1'1'. '- ~2; Formation packets to you today. Arc ,:":(.1 a\'ailJble Friday, Oct 22 at llam, Tuesday, Oct 26 at 10 am or We ilLS( "V, Oct 27 at 10 am for their pre-application? Thai,~s, Stc,c,C cJo1. .~<f:. 10/1812004 Page 1 of 1 Stacie Hoskins From: Stacie Hoskins Sent: Monday, October 18, 2004 8:55 AM To: Randy Marx; Jim Pearson Subject: JC PUD#1 pre-application Hi Randy & Jim, I have a pre-application request from Parametrix for JC PUD #1 to build a central low pressure sewer collection system (LPSS), Large on-site septic (LOSS), and pressure drainfield systems for the Beckett Point development. It appears the area proposed is currently completely forested and pipes will need to go within the wetland buffer. I'll route information packets to you today. Are you available Friday, Oct 22 at llam, Tuesday, Oct 26 at 10 am or Wednesday, Oct 27 at 10 am for their pre-application? Thanks, Stacie Stacie L. Hoskins Associate Planner Jefferson County Department of Community Development 621 Sheridan Street Port Townsend. WA 98368 Phone 360-379-4463 Fax 360-379-4451 shos ki ns@co.jefferson.wa.us ~L{ Q?0<f 10/18/2004 r-} ...\ JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT ..\.\) \~ I t OCT - 8 2fV\j .\..1, , .. t \. 621 Sheridan Street. Port Townsend. Washington 98368 360/379-4450' 800/831-2678 .360/379-4451 Fax Pre-Application Conference The Jefferson County Unified Development Code (UDC) requires that before an application is made for all Type II and Type III project applications and Type I applications proposing impervious surfaces of ten thousand (10,000) square feet or more and/or non-single family structures of five thousand (5,000) square feet or more, a pre-application consultation must be held. The consultation includes preliminary review and administrative assistance. This service does not include extensive field inspection or correspondence. Pre-application consultation does not limit subsequent administrative review. At the conference, Department of Community Development personnel shall provide the applicant with: (1) A list of the requirements for a completed application; (2) A general summary of the procedures to be used to process the application; (3) The references to relevant code provisions or development standards that may apply to the approval of the application; and (4) A list of any applicable hourly review fees that may be charged by one or more County agencies upon the filing of a project permit application with the County. Discussions at the conference or the information provided by the staff shall not bind or prohibit the County's future application or enforcement of all applicable laws and regulations. No statements or assurances made by County representatives shall in any way relieve the applicant of his or her duty to submit an application consistent with all relevant requirements of County, state and federal codes, laws, regulations and land use plans. NAME: Jefferson County Public Utility District No.1 MAILING ADDRESS: PO Box 929, Port Hadlock, WA 98339 REPRESENTATIVE: N/A Parametrix, Inc. (WORK) (360) 385-5800 Contact: Mike Moren, Project Engineer TELEPHONE: (HOME) MAILING ADDRESS: 5700 Kitsap Way~ Suite 202 Bremerton, WA 98312 TELEPHONE: (HOME) N/A (WORK) (360) 377-0014 1. Please answer all questions on this form completely. 2. Attach a sketch of the Conceptual Design for the proposed use or activity, showing the following information: a. Vicinity sketch; b. North arrow and scale; c. Property boundaries and identification of land uses on adjacent properties; d. Means of ingress and egress; e. Property/lot drainage; f. Possible locations of sewage disposal and water supply systems; g. Location of utility easements; and h. Proposed location of buildings, including setbacks to property boundaries. 3. Attach payment of the applicable fee, as set forth in the Jefferson County Fee Ordinance. PRE.APP CONFERENCEDOC REV. 04/2212003 Page 1 fJI..2,- .d.~t Property Description General Location: Approximately six miules southwest of Port Townsend, Washington, west of the intersection of Cape George Road and Beckett Point Road. Legal Description (from Property Tax Statement): P ILot 1 & TL Tax B1 37.15 CH Parcel No. Lot 2 & 3 9-Digit Parcel Number (from Property Tax Statement): Parce I No. 002231001 and 002242003 Total Acreage: 92 (Approx.) Zone: 1 : 20 % Lot Coverage: 0.004% Section 24, Township 30N, Range 2W Applicant: DOwner D Contract Purchaser D Lessee Rl Other Jefferson County PUD No. 1 Project Description To abandon individual on-site septic treatment systems and provide a central low pressure sewer r community of Beckett Point, Washington. Property Owner (name and mailing address): Beckett Po i nt Fi sherman I s Club c/o Patty Sah li nger 890 Beckett Point Road, Port. Townsend, WA 98368 Standard Disclosure Information provided to a prospective applicant during the pre-application consultation is based on County regulations in effect at the time of the pre-application consultation. Revised or new Countv reaulations could affect a future development application. A pre- application consultation does not vest a future development application. By signing the application form, the applicanUowner attests that the information provided herein is true and correct to the best of their knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. Any material falsehood or any omission of a material fact made by the applicanUowner with respect to this application packet may result in this permit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liabilities, judgments, court costs, reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. This right of entry shall expire when the County (through the Administrator or the Administrator's repres tives) concludes the application has complied with all applicable laws and regulations. Access and rig~~. ntry to the a icant' pro erty shall be requested and shall occur only during regular business hours. (SIGNATURE) '8 Oct ~) I hereby designate Mike Moren, Parametr i x, I nc. OOofe",~~,~ L, A . , (LANDOWNER SIGNATURE) ~ to act as my agent in matters related to this pre-application 0!71o~ (DATi) r r ~\ j! II \ OCT - 8 "" "i. t PRE-APP CONFERENCE.DOC REV. 04/22/2003 oU3 dbt Page 2 r . ~\ j' [~ I IJ : r. OCT - 8 Parametrix ENGINEERING. PLANNING. ENVIRONMENTAL SCIENCES 5700 KITSAP WAY, SUITE 202 BREMER TON, WASHINGTON 98312-2234 T. 360 -377.0014 F. 360.47905961 V\.''W\\'".parametrix.rom October 8, 2004 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, W A 98368 Re: Request for Pre-Application Conference for Beckett Point Community Large On-Site Septic System Project Dear Sir/Madam: Parametrix, Inc. (Parametrix) has been retained by the Jefferson County Public Utility District No. 1 (PUD No.1) to design two large on-site septic (LOSS) systems for the shoreline community of Beckett Point, Washington. The purpose of this letter and its enclosures is to request a Pre-Application Conference with the Jefferson County Department of Community Development (DCD) to discuss the project and its permitting requirements. Beckett Point is located approximately six miles southwest of Port Townsend, Washington, on the east side of Discovery Bay, and consists mainly of recreational beach houses (see enclosed Figures 1 and 2). The Beckett Point Fisherman's Club owns the property and individual lots are leased. There are approximately 100 existing residences, full or part time. Most of the residences are located on a large sand spit. Currently, sewage treatment is provided by individual septic systems that are in questionable condition on the sand spit. During 2003, the Washington State Department of Health - Office of Food Safety and Shellfish Programs, conducted a shoreline survey of the Discovery Bay shellfish growing area. Although no "Direct Impact" or "Indirect Impact" sources of pollution were identified on or around Beckett Point, the survey did identify many parcels with on-site septic systems and labeled these as a "Potential Source" of pollution due to their age, soils, and close proximity to the shoreline. The report recommended that Beckett Point be placed on the "Concerned Status" for point source contamination. It is the intent of Parametrix to design two independent community LOSS systems, under the Washington State Department of Health - LOSS Division (DOH) jurisdiction, to replace the existing individual septic systems. Sewage would be collected and conveyed by low-pressure sewer systems (LPSS) to a series of large septic tanks. The LPSSs will each consist of several small underground sewage grinder pump stations located mainly within the beach area. Sewage will be transported to the septic tanks through small-diameter, two or three inch pressure pipelines. LPSSs of this type have been used in many communities adjacent to both fresh and marine water bodies, and have much less of an environmental impact than traditional gravity sewer systems. From the septic tanks, effluent will be pumped to large pressure drainfields located in a forested area on the eastern portion of the property above the beach community. The drainfields, located at least 600 feet horizontally from the nearest shoreline, will greatly reduce the potential for contamination of shellfish near the Beckett Point community. The enclosed Figure 3 identifies the approximate locations of the proposed pump stations, pressure pipelines, septic tanks and drainfields as well as the Ordinary High Water (OHW) mark. Typical drawing sections of the underground grinder pump stations, utility tr~nqhe~and drainfield dosing tanks are shown in Figure 4. rif't a~ OCT - 8 October 8, 2004 Page 2 The Rural and Natural Resource Land Use and Zone Designations and Shoreline Designation Overlay map of Jefferson County identified the entire shoreline around Beckett Point as a "Suburban" designation. The pump stations and pressure pipelines in the beach area will be located within the existing Beckett Point Road right-of-way. No construction activities will be located within ordinary high waterline. A Wetlands Delineation and Ranking Report for the Beckett Point community was prepared by Pacific Rim Aquatic Environmental Sciences of Port Townsend, Washington in August, 2000. The report identified and delineated a palustrine Class II wetland in the beach area, requiring a 50-foot buffer for low intensity land uses. The wetland and 50-foot buffer boundaries are shown on Figure 3. Some pressure pipeline will be laid within this buffer - within the existing Beckett Point Road - however, no construction activities will occur within the wetland. Underground Horizontal Directional Drilling (HDD) will be used to install some sections of the pressure pipelines to avoid conflicts with the wetland. Parametrix has also obtained information from the Washington State Department of Fish and Wildlife (WDFW) on Priority Habitats and Species in the project area. Great Blue Heron and Bald Eagle habitat have been identified near the project area. It is anticipated that this may have an impact on the timing of construction, and a Bald Eagle Management Plan may have to be prepared. Further coordination with the WDFW will be necessary as part of the permitting process. Should you have any questions, please feel free to contact me at (360) 850-5320. Sincerely, P ARAMETRIX Mike Moren Project Engineer Enclosures cc: Jim Parker, Jefferson County PUD No. I C: \Documents and SettingsVim ParkerILocal Settings\Temporary Internet Files\OLKIAB\L-Jeff Co Pre-application 09-09-04 email.doc 0-15 0&. ~o ;p z .. o .. ~ z1> ~ ~ "UlJl"T1 ~ ~ cC. CD" ,.. C o CD .., __CD s;~ o 0 5'5' ~.. s: III " '" <", -;:0 QO Zc... -m -10 -<-I ~. ~ Vb ,(7 t:- )>2/ 0 z of> )> () OC 8 r- o Iz ~ 0-1 (J) - 00 ~z s: > "U l. &[{P ~t' ~o ~ Z 3 ~ Z1> ~.. f': .. m 0 ~ I '''D ;um 00 "1:i !lJ=1 :;I" ,-0 ZZ m-i " 0; I m '" '" ,. Z ci> i2 c '" "to!! O(DCC "'C ~ E; III III III ::l.::tt\) '<" DJO o -. c: a :l Q. AI ~ r- m (;) m I ~ I ocr ... 8 ) ~ .. 3 ~ ;c _ _ _ _ _ !<h~I~~ITh_ 12 m l> ;0 z~ "'''' r6 ~ - =< en cn-om-o :?::C"TlC ~~E~ I>m< mZZ)> cnO-lC ~!!~ ~~~ -l?J:t c Z 8' 0 m r c '''' C'l I~~~ Z 0 m 1,1 r-"ll mrC s: OmZ "ll ~-IO '" -I F:~"ll )> mrC Z s: ;S; "ll rJl -I )> -I 5 -IlJI" Z '< CD -. I ()l>() -<" 'E. ~ cg O)>() -<" 0 mzo ~iJj -< ozo ~ffi u; r-<z ~ !. ~ )>-<2 ",g: l> ~~~ ",g: () 07"0 2 :c -- ~5~ '" '" '" :Ii rJl"ll-l>o S; ~ 0-< ~ CD 0 ?<m en l>m '" en m ~ en m () -. ?< -< ~:::::I B o - B 2 ::s Z < CD' ~ UI COi"di,L,1. _'__.~./~n'_ ","",c.'"~~^ -I I~O~~ en-l"ll ~~m mr-l ;U m Z n :E: -I -< ,~ "ll n 15 ~~ ~-I~ ~5z Z" in r o ",en l>C -<;0 ()" :cl> m() xm -;0 ~rn 2-< "'0 ;0 l> -< B 2 '" ~ ~ ~ ..-' ~ d> 8 <''''- ....OV11O \..~ "i6 0 6 ~~~~.;;J~1"i 8~ ~ -J Ili t"') I .. .~6'O~~~ V N~ '<"'0 N 0 OF ::> ~ '<'" r-Z N 00 N ~ . N tl')1- 81- ~g I- ~go 'It I- . 'ltl-tl') N> 0 g N>o:> NOr:: o . NO . O(,!).qo o 0:> 0""'" .., I- '" > o C> ~~~ .,,~ <~~ <t~ I'a-(~ q,,,~0' .'/~ ~-~~ lOt) -~-~ '\ ~ '\~ /,,"~ -;:;' ;:;- - '\ ~'\ '\ ~o '\;~ '\:;y ^~-C.y ,,~ ,,~ ~ "'->^C>t'y .......... 'tt t- zx -0 0< D..w co G :J:X ~ I-LaJ O~% LaJ 0% OJ Vl< ,~ ~cfO, y. 0" > v_,- ~~ 0 Y"'"o> ~ T Jj:~b ~ o ~ ..... zx -() ~~ CD ~ xx ~ t-LaJ o ::::>> z LLI 0% CD Ul< <" ~ <~v~ O(y' (9' -<q}Ota v~~'4' a :J ~ ... b <-' t, ~Ub, t:>~ ~ ~ ~~ t:> ::I: I-U z< -LU Om c.. I=~ LU:::J ~o uV) LU aJ Yv <<it (!) ~ ~ .ld - 85= _.;;I~ d a!;....~ 88F~ '1 t- Z -x 00 D..~ 5m ~t- OVl LaJLaJ ca~ --.. '110 t.t. '0 J -;~:~ >\ ...... t+-< o ...... a.> OJ) C\$ p.. ...... a.> ~ p.. ~ a.> Z -.:t o o N - 0'1 ~ o ...... o M 0'1 00 II 8 C"-. P- ~ S o o N o ...... o ...t:: P- ~ o ...t:: tI.l Q) .S::: .- ...... a.> I-< o ...t:: tI.l - a.> ...... .- tI.l -8 ~ tI.l ;::S d ~ d o tI.l I-< ~ <.j..j a.> ."? o ~ tI.l ~ LOG ITEr,,1 ~ # g ..L ;.s:::::- ~ P~'v)_22c C(~ Q) OJ) c:3 P-4 "<:t o o N -- 0\ ~ - - c..... o - III - LOG 'TE~ A - M 0\ 00 " o ...... c-. 0- ~ S o o N o ..... .8 e- o ..d tI) -- Q) ~ ..... ] o ~ Q) ..... ..... tI) {5 ~ tI) ;:l d ~ ~ o tI) I-< ~ 4-< Q) .~ 6' e.) r.ti ~ ~ ! Q) ~ P-4 ~ Z III # ~:ll:"~ ) "'1L ('f.~ . "''''. -og--- ..... c...... o ..... Q) CO cd p.. ..... Q) ~ p.. ~ z III ..q- o o N - 01 ~ o ..... N M 01 00 II 8 c-. ~ cd S o o N o ..... o ..s::: fr I-< o ..s::: tI.l - Q) s:: .- ..... Q) I-< o ..s::: tI.l - Q) ..... .- tI.l ~ ~ tI.l ;::l d ~ d o tI.l I-< ~ <+-< Q) LOG \TEf'A .~ o o cJi g. ~ ! 'l'" JJJ:: ridS&: ...... 4-< o ...... Q) 01) CIS t:l.. III ...... Q) ~ t:l.. ~ Q) z LOG ITE; 11 I;"~ ~., L1 ~ A C,fd5t r .....,;, '#~..L,;. --- "<:t o o ~ 01 ~ o ...... M M 01 00 II 8 C'-. 0- en CIS S o o N o - .8 fr I-< o ~ -- Q) ~ ..... ...... Q) I-< o ..c:: en -- Q) - .- en ~ ~ en ~ d ~ d o en I-< ~ <.j...j Q) .~ o' u en g- ~ ~ ...... c....... o ...... Q) OJ) C':l ~ [fJ ...... Q) ~ ~ ~ z 1I1 '=:t o o ~ 0'\ ~ o ...... '=:t M 0'\ 00 II Cl ..... t;'-. @- C':l S o o N o ..... ..8 fr I-< o .t:: CJ) --- Q) ~ .- ...... Q) I-< o .t:: CJ) Q) ..... .- CJ) ~ ~ CJ) ;::l d ~ d o CJ) I-< ~ C.j...j Q) LOG ITEZA .~ o' u rn ~ -E ':'-: ! # ~.~ J '1 ') (j c7. 'JC1? ffJ K<2O"-1_ ~ -.:t - 0 c..-. 0 0 ~ - 0\ Q) ~ 01} cd - p.. - lrl ~ 0\ 00 II 8 1:'-' IE cd S o o N o ..... o ..s::l e- o ..s::l rI.l -- Q) l::: ..... - Q) I-< .8 rI.l -- Q) ..... ..... rI.l ~ ~ rI.l ;:j d ~ s:i o rI.l I-< ~ (.j...; Q) III r~~'1 11< Cf~ ~..-- .~ o' (.) 00 ~ ~ ~ Q) ~ p.. ~ Q) Z LOG ITEr~ - ~ o - Q) ~ ~ [I] - Q) 0.0 ~ ~ ~ Q) z lIJ "<:t o o N - 0'\ N 25 - 1.0 ~ 0'\ 00 II 8 1:'-' 0- CI.l ~ S o o N o - o ,J::l fr I-< o ,J::l CI.l - Q) :::: ..... - Q) I-< o ,J::l CI.l - Q) - ..... CI.l ii ~ CI.l ;:j ~ ~ d o CI.l I-< ~ ~ Q) .- o' o en LOG ITE~A ~ 8- # ~ Pt.:; )~(p c~~~.E - <+-< o - a) 01) ro ~ [fl - a) gp ~ ~ a) z III -::t o o N - 0\ N - o - t'- M 0\ 00 II Q ...... C"-. IF ro S o o N o ..... o ..c: fr I-< o ~ - a) s::: ..... ] o ..c: 00 - a) ..... ..... 00 13 ~ 00 ;:i cd ~ d o 00 I-< ~ C+-i a) .- o' u 00 ~ ~ O{~! LOG ITErv1 # p~~3"aJ-l Map Output Page 1 of 1 o Legend Pan::e1s-H 2000 Aerial PhOtos Boundaries o ~CW't.y o Wtks Dor.s~ FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 2907:51 :142004 LOG ITE7A .l.f 11"'r P ",".m "=d$if .....' c~ ..., .'---- . http:// gisserverlservletlcom.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of 1 0 Legend Patalls-H ContotJl'S /'/ 10l'o:IICalIcu ;-/ 50 1'0:11 CalIcu Boundaries 0 ~Cou1tt 0 w_ 0 0lI15' CcuI'iiM FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:50:26 2004 LUG ITEr 11 ',~ ~ j ... ~~ ).~ I Ofd!2 http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 o ;~._~_""""""""_"" I ".. ;V' Legend Road System 0 Parcel&-H Contours /./ 10FClC/l~ ;./ saFClC/l~ Boundaries 0 ~COWly 0 We 0 otleI!' ~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:36:04 2004 LOG \TE~ ~1 .i',~ ',-:-' \ ~j 0 or dfZ. "~"::# {~,~,~ .'~ http:// gisserverlservletl com.esri.esrimap,Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output FEATURES NOT SURVEYED-JCPUD#1, PRE04.00035 Page 1 of 1 ,..--g' I I .. J..- 002242021002242'023' 0 -6'977100900\ I I 977100005 J,:::-- 002242001 , rIfI----,_ 917100916. I 917100!l()4 '- 917100911 002242018 977100902 '-:""-\"1-~977100911 LL 9771??oo1 917101004(.917100912, /7 .... .. .. .",...i.o. , I ""~:g.';:"~, 002242003 l".~-, ... ,/ ).' I j -<~42025 " J'I -f>" b~loo1, / 00221 4=2O~-;;: '-.;-,;./ ~-... I ............""""' H 1/ ........~'-J.. VULL84L,^^, - j:/ /...------.............. /; ( .'-. , .ll 00m1001 ) I I ~' /f \__... / 002242005 j# - I ~;;/ ~~002231oo1 ,. p r~'-______- ,.~002231oo1 <_e::'_----- ,r-- { l ._.".oo~'oo' .1 i~ //' ,/ ,\..~--.-- / .~....-/---- 002242003 4 ........ ptMdod by ~COOIly C<slr.tj ~ GIS I o pSfI 0 Legend Parcell;-H Landslide Ha:tam . SidM . HigI . t.I~ Si!Jll Boundaries 0 ~ COOlly 0 W:M: D 0Iler~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 2907:47:072004 Le..,.... ITr""l\A .... 1I,;J C.i' , . ., http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of1 o . Legend Parc:e1s-H SeiSmiC Ha%.atd Boundaries o ~CWll}r o WtktI DOlMr~ ~ . t.4~ ~ by ~C<:u\ly c-.. &rtiocls GIS I o 67511 FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:46:27 2004 LOG ITE~;;1 +~ 'Ii'" r'"~':} /}~;z.. c1~ .1 .,,,,, "!.;'J e:t::.J_ - http:// gisserverlserv 1etlcom.esri.esrimap.Esrimap ?ServiceN ame=ovmap&C1ient V ersion=4, O&F orm... 10/2912004 Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 G oou..- !oonoUOOll J ~.IpI:':-~_e:.n,c-lIIs..-GIS I ~ Legend Road System 0 ParcelS-H . 2000 Sham PhatolHi Shamtinlls-AlcS OOU<2003 ~ ~ ~ ~..... ~ Urlloo ~ s.t:utJM ~ I:Ibr;l ~ N..... . ~ ~ ~ N~ ;V Otu I BotJndaries 0 ~~ 0 w:tJs 0 Otu C<u\ies "',. FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:37:37 2004 LOG IT:::~.1 ,,~ ,",,- :'lld:33 c t '1 ~O" ~ 'f...-... ,$ .~_ "..", _..- .. --- - http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/2912004 Map Output I ~ I '{~~;~'4 ~=K142021 , 00224202'3 iOOU42OO1! I 9m~ ,.U,.. -----I' OOZ24:lOOt ./' 9T1t~.~ 91tl(;lOt;~ ''t, I /..... ~...~) j imlX>>16 / }, ~ 9T.~'00'it:J4 /"J ~.~ ~71~11 '\ oon4201a t oo:n42011 ./ml~(/// ,~--r---~ """'9;"/)0<,111",... i I........... /1n~.00901 .(9711;Jln.y, .;........ i71'lOOl112...' I gTf'&m~J ..-(/" \-071tOl()OO '>" '.n100vl.1 I \/"/ ,/',\ ~~:7O:'~ I 9r;;~:;::,~) r" "1l1~~~9 ~-?~ /t'1710'OOl't---'--'~~_"11101(i(lll:~ I I // I>' Otl22ot'2003/ ',~ ......., I' 1/ I ""'::>..""'''''' IJ/ r "I:<~ // I 0022"~IO I ,..,.~< /-', i,{ Imm4'ro",,,,,, /~/~''';::...... //1 ,'/ .."-JII ~ - /~/ ...........----........, .~/ I - ,t' ( "" Iii ;,;:? \",2>>",,, ') I I Ii ;,Y \'-., /' i 1"""'_ j/.._j I ' // I I I Ij ___ I 1 I /1-- .~~:::""'=;:-00223100'~~) i J II ~/ ""-'" I (I """'".. ~//. ~~-~ -. I ,;1 /;"_ Iii //00223100'/ I( ~;;/ // ~/ I .....-"".....-:::;' j ~-~toy~CIuIl)~_.s...-CIS I "'" Page 1 of1 0 Legend PatallS-H Streams ;V T)IIl<l9 ;V T)IIl<l5 ;V T)IIl<l4 ;V T)IIl<l3 ;V T)IIl<l2 ;V T)IIl<ll ;V I:l!I'O' Boundaries 0 ~CaRy '0 WtMc 0 1:l!I'O'~ FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 2907:41 :462004 LOG ITE~ ,1 # F\::: )d:3!f- ci:,)sf http:// gisserverlserv1et/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&C1ient V ersion=4. O&F orm... 10/29/2004 Map Output Page 1 of 1 FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 I I ' I<~-~-"_ 002242021001 m2023r- 0 ./971100!l08\ I 971100!l05 J~,002242001 I I '-....- 977100916 . I i 977100904 '- 977100911 002242018 9rit00002 "~_<I-.917100917 LL 9771??oo1 977101004~ ,977100912, ;. 97710100,ll...977101010'(,,.{ /,~~-917101009. '- 00221 if 1'<:>~42025 '/ ' .~ ~ ' -~~ 002231001 1/ 002242010. "-,-::: Legend ! i ~. ""T". 0 P."".... j/ 002242003 . I . wetlands Boundaries I ~cc..nt; ____002242003*0022420051 ----- --""---_ 002242003 '-~----1 ----------.. ------ ---. o o o Wllk:t: Ohlt~ 1 L1. ~ IT, ~ cc..nt; C<silrllI ~ GIS L o 67j.tl FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:44:28 2004 LOG ITE~i1 f"L," ") J:6S cf 'I (""'& -.-- ....... -~- http:// gisserverlservletl com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&ClientV ersion=4. O&F orm... 10/2912004 Map Output Page 1 of 1 FEATURES NOT SURVEYED..JCPUD#1, PRE04-00035 I I ' ,.C~'- 002:242021002:242.0231 G ,,(9ij1~\ I I mU)()OOS \~,002:242001 I ----.-- 9nUlOO16_ I /917100904 '-917100911 002:242018 977100s02--:..--..,-,--W7100917 ~ 9771??oo1 917101004( ,977100912, _:. 917101001 ~1710101()'(_.{ '././~ -917101009.>,. 0022/ ~r j '<:~;~4202S 1/ ....'i>~" 002231001 II' 002242010, .......;:: Legend I', ' ' ,,-~::.~~.> I),' i r'-+ 0 ParcelS-H ..::::::!,. 002242003 I FEMA. FIRMS I I ANI r:J -OO2:242003i. . .~-----.....'-... 002:M2003 ---J --- ------- --------- ---. .A . .)(500 .DirI<F Boundaries o D D ~C<uIl)' w*' DirI<F~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:47:44 2004 LC.3 ITE?A ~t1. P::-,~,~ C;;~ ~._. ~ _ K 'i,J ....~._.. http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovrnap&Client V ersion=4. O&Form... 10/29/2004 FEATURES NOT SURVEYED-JCPUD#1 PRE04-00035 . I /1 1.~~~2242021i22~4z023f- G 91i1C~)OO5 ~002242001 I .-",,,fln1Ooo"l\ I /977100\l()4 '- 917100011 002242018"-... 9ri1()()oo2""~1'917100017 t L 977100ll0f977101004k.911100012, -'911.i01001J.-L..!I1711l11l10'\.X n_ /;y' - 9171()10001~ '\. 002211j4~ j ":::::..~00:2242025 . /'."'... -" /l V 'l~.', 1001 I 002242010, .....<:~ <~''- /1 I 00:1242011 />/~" '::;,,:,:::;../ 002242003 r--+- f.,',.. I 'I 00223100:1 ) I , 1/; \~.,._/ GL 002242005, /,! I ,002.23100:1 ____ il LJ:::../ ------" 00:2242003 f. _~/ -"""'___"",--- ~ ----- "-... Map Output & ....~Irj--CtulttCenlral~GJS t o j2,51t Page 1 of 1 o Legend ParoelHi Critical Aquifer Red1arge Amas r::J . r::J . . r::J r::J r::J SlJSCwUNK SARPA" SlJSC SlJSC SARPA SARPA . UNK Boundaries -- Ctultt WtiIIs 0Ih:lr~ FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its lIection. Fri Oct 2907:48:152004 .f'.... ITC~.I1 l..~ _ ...;l i- i 'i I Ch3.lc(~~ http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output FEATURES NOT SURVEYED-JCPUD#1, PRE04-00035 7. '" .. --...~ ~--'_ 002242021002242023' 0 / f~OO!lOs\ I ~ v/ 91i 100005 J';:"'- 0022A2001 /' / c.---.... 9171ClOO16.. I V //917100!104 '-- 977100!l" 002242018 l 977U)og(rl"-/.-.:I"917100!l17 I I .w.' 9771??oo1 9171()1004'~, 977100!l12 , . 'h~)9771011x)1 J..J.JI1710flUO.".LLL- ~ /'1ii/ -''''''~,j~~2025 /. _. III1 l~r>" 002XU001 t 002242:0UI ~ ~" I l ..,,:.~ /I,.----<:":'::::!../ 002242003 IT I I" ~'0(1) I ~ ~/ 0022A~ .'i? - ~ /'/1. II 71. b' ~-=002:231001r---=f"'. ;;002231001 <f;tf" ~----- - ij 002:23100~ I ~;:;p 002242003 1 "4il1jJ$~lry~C<UllyCerllr.1ll~G1S , o 6751t o Legend Pan::e1S-H welllrChlOl'id9 Page 1 of 1 FOR INFORMATIONAL PURPOSES ONL Y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its collection. Fri Oct 29 07:48:40 2004 100",,_ "* bolt_ 100 and:;m * :;m at highar SIPZ PI. Risk S1l'Z . o o o o Ii"" Risk SlPZ CCaWIl S1l'Z Boundaries ~C<Ully w_ 0I00r~ LO"" ITr-" 1 ~ Ii- ..,. # 1.... . r~: ~.~_cl~o . -_..s_ http:// gisserverlservletJcom.esri.esrimap.Esrimap ?ServiceName=ovmap&Client V ersion=4. O&F orm... 10/29/2004 Map Output FEATURES NOT SURVEYED-JCPUD#1 PRE04-00035 Page 1 of 1 ..~~ '.'::- . -.........nrooou 1.'~1"'f1~"'" ';n~~.p 3fi.~, -~tj i~ ',.nl~~ - -- "1<:0-: ~ ''lmrotl;?''~OOIIH\ 00'n42O'l2 ~~ __" ....."i~t(l)9H'" ! .;,=~ \9n~~jj'ro1~~~'__ ~~_7;:~~.l -- \t1"l:r~t~! 9~~::;:I;)r,"~!~f9 tnlo100Ir----'-'"Olrlt}IOI1....l.--------"~:.ol~ 'j::;,- I ., '~<~-,-..<yjn4m1- .,<'.... i r:" 1- 1.2~ i : I I 00VAr022 I I ( I : I I I I~- ~" I ......-.....-..1"----- J........_"""""*"_OO.I "'" o . Legend Pal'Ol'lls-H Priority Habitats and Sp9deS Boundaries o o o ~ COUIlly Wda 0tJ0r~ FOR INFORMATIONAL PURPOSES ONL y- efferson County does not attest to the accuracy of the data contained herein and makes no warranty with respect to its correctness or validity. Data contained in this map is limited by the method and accuracy of its ollection. Fri Oct 29 07:43:24 2004 LOG ITE?1 # PC.~')J3j__cld.d http:// gisserverlservlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&ClientV ersion=4. O&F orm... 10/29/2004 Map Output "J'.; FEATURES NOT SURVEYED-JCPUD#1 PR '} 002242021002'242023 ,} ;,j 977.00008 ; 977.00905 ,002'242:001 ~ 977.00916 ... 977.00004 9771009n 00224~18 ~ . 977100!l02 977100917 ~ 9111??oo1 911101004 97710091:2 11 / / .m....; ~ 97!.~;g''''1 /l~ ~, ,/002231001 ,I! 002:24~10 j~ .",,,.m """".. I,l ~=;) L l ~.~ 002'242:005' /) , lJ/' o/l ~~~ ~002231001/ ...........-- -----.....--_002'242003 f l' ,/~'OO' .---~--.....-..... , (~~~// ~~ ~-.....;..--/ 4 M.ptMdcldby~COUt1l)' ~ ~G1S I Q, . 67:51t LOG ITErv1 ti.~'"'.>:;; "":~c~. http:// gisserver/servlet/ com.esri.esrimap.Esrimap ?ServiceN ame=ovma 'i Page 2 of2 Map Output .# 0 Legend P arcell>-H County Zoning . Ru!al~1:ti . Ru!al~ 1:10 Runl!~ 1~ . . H......,.~ . R~~iIrl . lil#1I ~ :~%:; U't.4 . U'C . Ru!al ViItga CdIbor . ~GC III ~cc 1m ~HC . Comm....aal fcre!lt . Ru!al fcre!lt . ~f~ ,,;( f'lJl~ ;:/; ~~ ALl~ :~:. !\irp::KlEPF ~~ Wasae Llgml EPF . MiIi'bry~ . P;td.S M:l R~ II NtIi:tWJ Fcre!lt . NolIilWII Pa!Io. :1 NolIilWII ~ W_ 8o:f<IS . LlPR.SitJj<l famiy . LlPR.SI'T","* . ..IPR....LlB:J'niy L1PR.Re5a1 Complex . MPR.ViItga Ca'1Ier ~ L1PIMlp"" Spac>:! . LlPR~ lliill!ill UGYL.c:r.r El<!s'J$. Rs. ......., ffilillill UGYLlod. El<!s'J$. Rs. .."..- lliill!ill UGYHigh El<!s'J$. Rs. ........ 11I1 UGYUtbItllil#1l ~ . UGYUtbItl Comm....aal ffilillill UGY\MiI<lt 0riI!I1b:l Comm....aal ..,.,., lliill!ill UGYPd:tic PorIT~UGi\ ~ H<ilR~ ~ ~R~ . Hal Zan!'ld Boundaries 0 ~ Ccur/l)' 0 W_ 0 CIItD'~ , - ,- " IT-"1 FOR INFORMATIONAL PURPOSES ONL Y_ L..V" ., t... Jefferson County does not attest to the accuracy of the data contained herein and makes no warran.iy with respect to its correctness or validity. Data contained in this map is limited by the method and accura.9Y~o.f'its" ,. collection. Fri Oct 29 07:49:12 2004 1""'",.,_;") aI-. 4 (_C(~ http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&ClientV ersion=4. O&F orm... 10/2912004 Cases BLD90-00009 MEYERS Application Received: 1/4/1990 Permit Issued/Case closed: 1/4/1990 studio with attached garage No findings, conditions, or pennissions found. XMP88-00065 CAPE GEORGE FISHERMANS C Application Received: 11/9/1988 Permit Issued/Case closed: Case Finaled: PROPOSAL: The project IS to move and secure floating logs in the Beckett Point Lagoon. The logs would be secured with cables and staples. No findings, conditions, or pennissions found. XMP99-00005 MOGA Application Received: 2/22/1999 Permit Issued/Case closed: Case Finaled: A tightline to the beach has been aesigned to convey stormwater to the beach created by development of the lot. No findings, conditions, or pennissions found. CASES, FINDING, CONDITIONS, PERMISSIONS FOR Parcel 002231001 Printed: October 12, 2004 Name Review Type Status C Case Finaled: P w Planner TVALIANT J PETERS CAROO-00323 BECKETT POINT FISHERMEN'S F Application Received: 7/18/2000 Permit Issued/Case closed: Case Finaled: 2/7/2003 picnic table cover No findings, conditions, or pennissions found. BLD98-00637 MOGA F Application Received: 10/6/1998 Permit Issued/Case closed: 2/24/1999 Case Finaled: 7/12/2001 single family residence 1.) ALL conditions of the critical area waiver must be met. 2.) The drain water tightline shall be installed within 30 days of the completion of the foundation pour. CAR96-00119 MOGA F L MARK Application Received: 8/16/1996 Permit Issued/Case closed: 3/23/1998 Case Finaled: 3/23/1998 Binding Advance Determination tor proposed single family residence. 1.) The subject property is located at Beckett Point Road, in Jefferson County, Washington. An application requesting a Binding Advance Determination for a four lot parcel was reviewed by Jefferson County Permit Center Staff. 2.) The application was reviewed by Jefferson County Permit Center staff on August 16, 1996 for the potential presence of critical areas regulated under the provisions of the Ordinance, and the following critical areas were confirmed as potentially present on the subject property: Bald Eagle Habitat Area, Fish and Wildlife Habitat Area, Seismic Hazard Area, and Shoreline. 3.) On September 23, 1996, a request was sent to Washington Department of Fish and Wildlife to determine if an eagle management plan was needed. Although wintering bald eagles use the subject property for perching sites, no active nests are located within a quarter mile of the parcel, therefore an eagle management plan is not required. 4.) A site inspection by Permit Center Staff was performed on October 1, 1996. 5.) Permit Center Staff found that surrounding the proposed building site on Lot 14 are densely vegetated areas. The vegetation is primarily native Pacific northwestern plants. The dominate vegetation includes: Douglas-fir (Pseudotsuga menziesii), madrona (Arbutus menziessii), ocean spray (Holodiscus discolor), common snowberry (Symphoricarpos albus), braken fern (Pteridium aquilinum), trailing blackberry (Rubus ursinus), baldhip rose (Rosa gymnocarpa) and salal (Gaultheria shallon). 6.) Several substantial snags (dead standing trees) are located on the subject property. The diameter at breast height (DBH) of each snag was measured by Permit Center staff; sizes averaged 27" DBH. These snags provide important wildlife habitat for species such as : bald eagle, kingfisher, and woodpecker. The root structure of the snags and the existing live vegetation provide slope stability to the shoreline bluff. 7.) Where a single dwellling unit is wihin 300 feet of 1 side of the proposed building site, the setback shall be the difference (average) between the required setback and that of the neighboring structure. 8.) Permit Center staff measured slopes with a clinometer, the site consists of a large hill which has an easment road to the northeast and the shoreline on the west side. Along the northeast boundary of the property the grade was 35%, and along the west boundary for approximately seventy-five (75) feet is a 25% grade until the shoreline bluff is reached which has a grade greater than 70%. 9.) These bluffs are considered unstable and are located in a landslide and seismic hazard area. The potential for an earthquake of a high magnitude occuring in western Washington in the near future is considered a high probability by regional experts. 10.) On June 13,1997, A geological report written by Gerald Thoresen, Consulting Geologist, was submitted to the Permit Center regarding the subject property. .,. ... ...... ... .. .....? .... 11.) Should the design of the storm water plan involve a tightline to the beach, the applicant wouldneedto,apply for a shoreline exemption permit. Pa.e 1 of 8:;:{Zj~::'-.;~ Cases Name Review TVDe Status Planner 12.1 Patios and decks shall be of slated wood designs, so as to allow water to drain and not to collect and concentrate water runoff. 13.) Native vegetation within the geological hazard setback area of 40 feet,from the top of the bluff, shall remain in its natural state or be suplemented with plantings of the suggested native vegetation. 14.) Vegetation retained on-site following completion of clearing for roadways, utilities and the like, may be cleared only if such clearing is absolutely necessary to complete the proposal (Note: This condition shall not be construed as allowing removal of native vegetation within a designated critical area or its associated buffer). 15.) All trees and understory lying outside of approved construction limits shall be retained during clearing for roadways and utilities. Understory damaged during approved clearing operations may, however, be pruned. 16.) Landslide hazard areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, replanting with native vegetation shall be required by the Critical Area Administrator. No alteration shall be made to the landslide hazard area or its associated buffer without prior authorization by the Critical Area Administrator. 17.) Based on the above findings and facts, any development activity upon this parcel shall submit for review and approval the following document: a revised Universal Plot Plan. A plot plan is required which indicates proposed building and septic sites with setback locations in reference to each other, adjacent property lines, and the shoreline. The plot plan submitted indicates a thirty (30) foot setback for the proposed structure. This is not an allowed setback and needs to be modified before the plot plan can be accepted. 18.) The applicant shall to the best extent possible, preserve existing large conifers and snags for priority species wildlife habitat. Selective limbing of trees is a preferred method if view windows and/or safety are an issue. 19.) The large conifer trees and snags shall be retained to the best extent possible for protection of wildlife habitat. Selective limbing of trees is a preferred method if view windows and/or safety are an issue. 20.) Per averaging the setback between the adjacent single family residence, and the recommended setback in the report submitted June 13, 1997 by Gerald Thorsen, Consulting Geologist; a minimum setback from the top of the shoreline bluff of forty (40) feet shall be established. 21.) The applicant shall develop and submit to the Permit Center for approval, a "Small Parcel Erosion Control Plan." (see enclosures). The subject permit will not be issued unless the applicant submits to the Permit Center, a copy of the "Small Parcel Erosion Control Plan". Once the subject permit has been issued, the applicant shall fully implement the provisions of the submitted "Small Parcel Erosion Control Plan", and contact the Permit Center to arrange a schedule of inspection for plan compliance. A Certificate of Occupancy will not be issued until the Permit Center verifies plan compliance. CAR99-00023 MOGA F L MARK Application Received: 10/6/1998 Permit Issued/Case closed: 2/21/1999 Case Finaled: 2/21/1999 Critical Area Review for proposed single family residence, in response to complaint COM98-0057. 1.) A complaint (#COM98-0057) regarding improper implementation of storm water control at the subject property was filed with the Permit Center on 9/25/98. Acting upon the above information, Jefferson County staff conducted a site inspection of the subject property on 10/7/98 and confirmed storm water control and Best Management Practices were not being implemented as required by conditions found in previously issued permits XMP98-0007, CAR96-0119 and SEP97-0286. 2.) Specifically, the conditions 1 through 11 as stated in document CAR96-0119, dated September 8,1997, required installation of a stormwater tightline to the beach, and compliance with the Small Parcel Erosion Control Plan submitted 2/26/98. 3.) The applicant was notified of this determination on October 21, 1998. 4.) The applicant responded to Jefferson County staff and stated that a construction crew was working on implementing the proper BMP's and installing a rock wall at the road and driveway entrance to correct the problem. 5.) Staff conducted a subsequent site inspection and confirmed that proper BMP's had been installed to correct the situation. 6.) The applicant shall implement fully the approved "Small Parcel Erosion Control Plan" dated 2/26/98. A Certificate of Occupancy will not be issued until the Permit Center verifies plan compliance. 7.) All construction activities, including the storage and preparation of materials, shall not encroach upon the designated geologically hazardous area, or its associated buffer. 8.) Clearing limits for roads, septic, water and stormwater utilities, and temporary erosion control facilities shall be clearly identified on site and inspected by the Critical Area Administrator, or their designee, prior to the commencement of any clearing activities. 9.) Clearing for roads and utilities shall remain within marked limits. 10.) No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures has been completed. 11 .) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer - Do not Remove or Alter Existing Native Vegetation." I d'l,(.~ Page 2 of8 Cases Name Review TVDe Status Planner 12.)' Landslide hazard areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, replanting with native vegetation shall be required by the Critical Area Administrator. No alteration shall be made to the landslide hazard area or its associated buffer without prior authorization by the Critical Area Administrator. 13.) Residential structures shall not exceed thirty-five (35) feet in height. 14.) Surface drainage shall not be directed across the face of a marine bluff, landslide hazard or ravine. If drainage must be discharged from a bluff to adjacent waters, it shall be collected above the face of the bluff and discharged to the water by tight line drain and provided with an energy dissipating device at the shoreline. A shoreline permit is required to discharge water at the shoreline. 15.) The applicant shall fully implement all conditions contained in the shoreline permit exemption dated 3/28/98 for the installation of a stormwater tight-line. The exemption permit expires 3/28/99. 16.) By agreement with AI Scalf, Jefferson County Shoreline Administrator, the tightline may be installed after the building foundation,for the single family residence, has been constructed. The tightline shall be installed within 30 days of completion of the foundation pour. 17.) All prior conditions contained in the signed waiver of CAR96-0119 shall be followed except where such conditions contradict those contained in this document (CAR99-0023), CAR99-0023 shall supercede CAR96-0119. COM98-00057 MOGA F Application Received: 9/25/1998 Permit Issued/Case closed: Case Finaled: 2/24/1999 Storm water plan and approved best management practices not being implemented. Neighbor is concerned that geohazard area is eroding. No findings, conditions, or pennissions found. COM99-00010 Application Received: 3/24/1999 Eagle nest located near property. below his property. No findings, conditions, or pennissions found. XMP98-00007 MOGA Application Received: 2/26/1998 Permit Issued/Case closed: 3/23/1998 tight line to beach for stormwater 1.) The proposal is consistent with Exemptons Section 3.402(1) of the Jefferson-Port Townsend Shoreline Management Master Program. A Small Parcel Erosion Control Plan has been submitted as part of this application. The proposal is for a stormwater outfall to extend down the base of a bluff for dispersal at an energy dissipator. The proponent shall notify the Jefferson County Permit Center, (360) 379-4450, Development Review Division 48 hours in advance prior to commencing construction in order to allow monitoring and ensure conformance with project conditions. The proponent shall comply with conditions as set forth in the Critical Area Waiver (CAR96-0119). No fill or other material may be placed in the waters or intertidal areas of Jefferson County. Work within the jurisdiction of the Shoreline Program other than as described above shall receive separate review from this office. Prior to commencing construction, proponent should contact the Washington State Department of Fisheries at (360) 895-4757 to determine whether this action is subject to the Washington State Hydraulics Code. This approval pertains to Jefferson-Port Townsend Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project. ZON03-00013 MLA03-00098 FORSTER Application Received: 3/4/2003 Permit Issued/Case closed: 4/10/2003 Site Plan Approval Advance Determination (SPAAD) 1.) The application was reviewed by the Jefferson County Department of Community Development staff on March 12, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Suburban Shoreline, Fish & Wildlife Habitat (Blue Heron), Wetlands, Seismic Hazard, Flood, Susceptible Aquifer Recharge Area, Coastal Seawater Intrusion Protection Zone (SIPZ). 2.) Washington State Department of Fish & Wildlife offered no comment on the application. The site is cleared, and the proposal will not conflict with blue heron habitat. 3.) The wetlands are located opposite Beckett Point Rd from the subject parcel. The Administrator determined the wetland buffer value is negated at the road. 4.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are g,ologieforrnatiol1S that contain sufficient saturated permeable material to yield significant quantities of water to wells arTd springs. A~Uifers serve as the source of drinking water within most of the rural portions of Jefferson County. .. '.'> .",J""M"~ c2'1$ .. ,... .... ....... Page 3 of 8 . . .. MOGA F Permit Issued/Case closed: Case Finaled: 3/25/1999 Backhoe working on property. Large amounts of debris/dirtltrees/slufflng off bluff A L MARK Case Finaled: 2.) 3.) 4.) 5.) 6.) 7.) 8.) 9.) I Case Finaled: A S HOSKINS Cases 5.} . 6.} 7.} 8.} Name Review TVDe Status Planner Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms. Buffers are areas that shall be maintained in their natural condition, however, minor pruning or alteration of vegetation may be permitted as long as the function and character of the buffer are not diminished. Among the native conifer species which may be used in buffers or for re-vegetation include, but are not limited to: Grand Fir (Aibes grandis), Sitka Spruce (Picea Sitchensis), Shore Pine (Pinus Contorta), Douglas Fir (pseudotsuga Menziesii), Western Red Cedar (Thuja Plicata), and Western Hemlock (Tsuga Heterophylla). Among native tree species which may be used includes: Vine Maple (Acer Circinatum), Big-Leaf Maple (Acer Macrophyllum), Red Alder (Alnus Rubra), Pacific Madrone (Arbutus Menziesii), Quaking Aspen (Populus Tremula), Black Cottonwood (Populus Trichocarpa), Bitter Cherry (Prunus Emarginata), Oregon White Oak (Quercus Garryana), Cascara (Rhamnus Purshiana), Pacific Willow (Saliz Lasiandra), and Scouler's Willow (Saliz Scouleriana). Among the native shrub species which may be used are: Sevice-Berry (Amalanchier Alnifolia), Red Osier Dogwood (Corn us Stolonifera) Salal (Gaultheria Shallon), Ocean Spray (Holodiscus Discolor), Indian Plum (Oemlaria Cerasiformis), Pacific Ninebark (Physocarpus Capitus), Red Flowering Currant (Ribes Sanguineum), Wild Rose (Rosa Nutkana), Swamp Rose (Rosa Pisocarpa), Willows (Salix ssp.), Red Elderberry (Sambucus Racemosa), Snowberry (Symphoricarpos Albus), Evergreen Huckleberry (Vaccinium Ovatum), Red Huckleberry (Vaccinium Parvifolium ). g.} Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer. 10.} The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet. 11.} All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials. 12.} Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 13.} To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 14.} VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is lntencted to be illustrative of the types of water conservation measures. ' ,L-_ cJlJ0 Page 4 of8 .:%8' Cases 15.)' 17.) 18.) 19.) 20.) 21.) 22.) 23.) 24.) 25.) 16.) Name Review TVDe Status Planner VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water. Flood proofing measures are to be used as required by the Jefferson County Flood Damage Prevention Ordinance. All new construction shall use construction methods which minimize flood damage. New construction shall have the lowest floor elevated to at least one foot above base flood elevation. Fully enclosed areas below the lowest floor that are subject to flooding are prohibited unless designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwater. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or must meet or exceed the following criteria: a. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. b. The bottom of all openings shall be no higher than one foot above grade. c. Openings may be equipt with screens, louvers, or other coverings or devices provided that they permit the automatic entry and exit of floodwater. All new construction shall: a. be anchored to prevent flotation, collapse, or lateral movement of the sturcture. b. be constructed with materials and utility equipment resistant to flood damage and potential damage to adjacent properties. c. be constructed using methods and practices that minimize flood damage. d. have structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. e. electrical, heating, ventilation, plumbing, air-conditioning equipment, and other service facilities shall be designed and/or otherwise elevated or located so as to prevent water from entering or accumulating within the components during conditions of flooding. Flood proofing of structures shall be provided by one or more of the following methods: a. Landfill: (Note: Landfills are not permitted in the f1oodway.) The placement of fill may be utilized to elevate the structure and must comply with the standards and policies of the Jefferson County Shoreline Master Program, if applicable. b. Pole, pier or piling construction: The use of poles, piers, or piles for the foundation of the structure may be used to allow the unrestricted flow of flood waters during periods at a base flood. The lowest floor must be one foot above the base flood level. c. Parallel Foundation Walls: Foundation walls may be designed and constructed to provide open spaces through which water can flow unrestricted to equalize pressure. In velocity flood situations, it is important that all foundation walls be parallel to the flow of the floodwaters. d. Extended Foundation Walls and Basements: (Note: Extended foundation walls and basements are not permitted in the f1oodway.) The lowest habitable floor of a residence may be constructed on foundation walls that extend above grade to one foot above the height of the base flood provided that residential construction complies with the requirment of Section 5.101 (2), "Residential Construction," regarding the design of enclosed areas. Utilities shall be designed as specified in Section 5.20 of Ordinance No. 18-1120-95. Upon submittal of a building permit application, the applicant must provide a flood elevation certificate. The standard setback for residential structures, including common appurtenant structures such as garages and workshops, shall be thirty (30) feet or one (1) foot for each foot of bank height, whichever is greater. This setback shall be measured from the bank's edge when the bank's height exceeds 10 feet. When the bank's height is less than 10 feet, the setback shall be measured from the ordinary high water mark. The setback shall not exceed 100 feet. ("HOC ',oN CJ.<{1 ~ Page 5 of8 Cases 26.)' 27.) 28.) 29.) 30.) Name Review TVDe Status Planner The proposal was reviewed against the site plan determination criteria of the Unified Development Code (Section 8.7). The criteria for approval is as follows: 1. The proposed site plan conforms to all applicable county, state, and federal land use, environmental and health regulations and plans, including but not limited to the following: The Jefferson County Comprehensive Plan and the provisions of the Unified Development Code. Staff comment: The application was reviewed for consistency under the provisions of the Unified Development Code, Comprehensive Plan, and Shoreline Master Program. The application was found in compliance with all ordinances pertaining to the proposed development. 2. Adequate provisions for utilities and other public services necessary to serve the needs of the proposed site plan have been demonstrated, including open spaces, drainage ways, roads, and other public ways, potable water, sewerage disposal, fire flow and other improvements. Staff comment: The proposal was not reviewed for open space as the parcel is approximately 3,167 square feet (0.072 7 acres) in size. This SPAAD has not been reviewed for adequacy of sewerage disposal. Jefferson County Department of Environmental Health commented on the application on March 18, 2003 and determined the 20 foot building setback from the road should be adequate to allow tanks and a driveway assuming the parcel connects to the future community drainfield. Environmental Health also noted no plans are currently before the county to install the community drainfield and the number of bedrooms allowed to connect is not known. PUD #1 completed a Water Availability Notification May 3, 2003 for Lot 35 of Beckett Point Beach Annex. This connection is required prior to building permit final sign off and would fulfill the requirements for potable water and fire flow. Beckett Point Rd is a county local access road. A road approach permit (RAP03-00049) was reviewed under this application. An address of 1024 Beckett Point Rd has been assigned to the parcel. The applicant shall adhere to the Washington State Department of Ecology Stormwater Management Manual for stormwater control. 3. The probable significant adverse environmental impacts of the proposed site plan, together with any practical means of mitigating adverse impacts, have been considered such that the proposal will not have an unacceptable adverse effect upon the quality of the environment, in accordance with the State Environmental Policy Act (SEPA) implementing the provisions contained within Section 8 of this Code and Chapter 43.21 C RCW. Staff comment: Single family residences are EXEMPT from the State Environmental Policy Act (SEPA). WAC 197-11-800(1 )(b)(i) identifies the construction of any residential structure of four (4) dwelling units. 4. Approving the proposed site plan will serve the public use and interest and adequate provision has been made for the public health, safety and general welfare. Staff comment: The proposal will not affect the public health, safety, and general welfare. Duration of Approval - Several of the included findings shall become conditions upon the submittal of a building and septic permit. The duration of approval of the Site Plan shall be effective for five (5) years from the date of original approval by the Administrator. If a building permit has not been issued within the five (5) year period, the Site Plan Approval Advance Determination (SPAAD) cannot be revived or extended except by new application that must meet all the existing criteria and conditions listed in this Section. Knowledge of the expiration date shall be the responsibility of the applicant. The county will not provide notification prior to expiration. Limitations of Approval - Approval of the site plan shall not guarantee the performance of specific site features or improvements (e.g. wells, septic systems, stormwater drainage facilities, etc.) and shall not be immune from changes in state or federal law which are enacted or have an effective date after the date of ths Site Plan Approval Advance Determination (SPAAD) and which may affect the performance and implementation of the site plan and associated use or activity. Any subsequent land division or boundary line adjustment of a parcel or lot which has received site plan approval advance determination under this Section 8.7 shall void such site plan approval and require a new site plan approval advance determination application. Approval of a site plan under this section does not constitute authority to comence any development or building activity until such time as final authorizing permits are issued (e.g., septic, wells, stormwater management, or building permit, etc.). Modification to an approved site plan may be required by the applicant and approved by the Administrator subject to the provisions for Type I decisions. (Please request a copy of Section 8.7 of the UDC for criteria pertaining to modifications). The applicant shall adhere to the Department of Ecology Stormwater Management Manual at~i",E:iofdeYf:llopment application. J A minimum of two (2) on-site parking spaces are required for the single family residence.i . .""0.', '.'. ',"""'?Y..',' .'," "'.. ".... ,.'...;....-c>',.". '." Maximum building height is 35 feet. ,<{CJ, .~.. ' Page 6 of8 Cases Name Review TVDe Status Planner 31.)' Total impervious surface coverage shall not exceed 25%. Impervious surface includes driveways, rooftops, concrete, etc. Pre-existing legal lots of record less than one acre in size in Rural Residential Districts are subject to the stormwater requirements in UDC Section 6.7 and must meet the "Area of Impervious Surface Coverage" to the maximum extent practicable as determined by the Administrator. 32.) Minimum setback from the parcel boundary adjacent to Beckett Point Rd is 20 feet. Minimum setback from Ordinary High Water Mark is 30 feet. Minimum side setbacks are 5 feet. . 33.) The revised site plan as submitted with the Site Plan Approval Advance Determination (SPAAD) application on March 18, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated February 2, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 34.) This approval is for a SPAAD only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 35.) THIS SPAAD IS ONLY VALID IF A COMMUNITY DRAINFIELD FOR BECKETT POINT IS INSTALLED AND MADE AVAILABLE TO LOT 35 OF BECKETT POINT SOUTH POINT BEACH ANNEX. THIS SPAAD APPROVAL SHALL BE CONSIDERED NULL AND VOID WITHOUT A SEWER CONNECTION. BLDOO-00471 BECKETT POINT FISHERMEN'S Application Received: 7/18/2000 Permit Issued/Case closed: 2/19/2003 Case Finaled: PICNIC TABLE COVER No findings, conditions, or permissions found. PREOO-00013 Application Received: 4/4/2000 Picnic Table Cover. No findings, conditions, or permissions found. PRJOO-00169 Application Received: 7/19/2000 Picnic Table Cover. No findings, conditions, or permissions found. R BECKETT POINT FISHERMEN'S Permit Issued/Case closed: 4/19/2000 Case Finaled: F J PETERS BECKETT POINT FISHERMEN'S Permit Issued/Case closed: Case Finaled: P PRE04-00035 JEFFERSON COUNTY PUD #1 Application Received: 10/12/2004 Permit Issued/Case closed: Case Finaled: CENTRAL LOW PRESSURE SEWER SYSTEM No findings, conditions, or permissions found. SDPOO-00017 BECKETT POINT FISHERMEN'S F J PETERS Application Received: 9/7/2000 Permit Issued/Case closed: 10/16/2000 Case Finaled: The proposal is to construct a log structure on a concrete slab to cover an eXisting picnic table in the playground area at Beckett Point. This proposal is exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800. 1.) Substantial progress towards comletion of the project shall be performed within two years of the issuance of the permit. 2.) Should the facility fail in the event of storms, earthquakes, tsunamis or other such events, the joint-owners shall be responsible for any debris which falls to the beach and within the waters of the State of Washington. Furthermore, the joint-owners shall provide for the removal of any structural debris from the beach as a result of this project. 3.) This approval pertains to Jefferson County Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project. 4.) Work within the shoreline jurisdiction other than as described in this permit application shall receive separate review from this Department. 5.) The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions. 6.) A building permit shall be obtained from the Jefferson County Department of Community Development prior to commencing construction. 7.) A building permit is required for this project. SEP97 -00286 MOGA F Application Received: 11/14/1997 Permit Issued/Case closed: 3/24/1998 Case Finaled: 2/5/1999 P S HOSKINS 1. ) 2.) 3.) 4.) This permit is granted based on the recorded NOTICE TO TITLE combining lots 11,12,13,14 of hill park addition to meet the minimum land area required under WAC 246-272 Onsite Sewage Code. NOTICE recorded 12/30/97 Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet. All components of the septic system are to be completely protected from vehicul~r traffic or mechanical disturbance. Protective barriers are required around drainfield. AN ANTI-SIPHON DEVICE MAY BE REQUIRED. Page 7 of8 J.l(~ ;J$t Name Review TVDe Status Planner TRENCH TO BE EXCAVATED TO A MINIMUM OF 24" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AS PER DESIGN. Compliance with the conditions of the signed Critical Area Waiver and the Binding Advanced Determination is required. AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM. Health Dept. required to observe pressure test, 48 hour notice to be given. 50 ft. setback from bank to be maintained WITH PRIMARY AND RESERVE DRAINFIELDS. Drainlines are to be installed along the natural contours. Contact designer prior to installation for staking of drainfield area. Dose counters and timmers are required in the control panel for drainfield components. Divert all sources of drainage including roof drains away from septic tank and drainfield area. Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required. Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site. XMP91-00002 CAPE GEORGE FISHERMAN'S ( A Application Received: 3/5/1991 Permit Issued/Case closed: 3/5/1991 Case Finaled: PROPOSAL: Proposal 1 IS to remove 220 feet of destroyed bulkhead southwest of an existing boat launch at Beckett Point and to construct 3 beach drift sills for beach restoration and erosion control. No findings, conditions, or permissions found. Cases 5.) . 6.) 7.) 8.) 9.) 10.) 11.) 12.) 13.) 14.) 15.) Page 80f8 , d{)O d$' Parcel Print Page 1 of 1 Parcel Number: 002231001 06/11/2004 OWner Mailing Address: BECKETT POINT ASHERMEN'S CLUB % DAVID G GOODING 242 TAYLOR ST PORT TOWNSEND WA 983685717 Site Address: Section: Qtr Section: Township: Range: Planning area: Sub Division: Land Use Code: 23 NE1/4 30N 2W Quimper (2) School District: Fire Dist: Tax Status: Tax Code: Port Townsend (50) Cape George (6) Taxable 161 7500 - RESORTS, R.V. PARKS A/V OF IMPS ASSIGNED SEPARATE #'S Property Description: S23 T30 R2W I LOT 1 & TL TAX B I 37.15CH I I ~ No Photo Available ( 8$1' ~ http://www.co.jefferson.wa.us/assessors/parcel/parcelprint.asp?PARCEL _ NO=002231 001 10/12/2004 Parcel Print Parcel Number: 002242003 OWner Mailing Address: BECKETT POINT ASHERMEN'S CLUB % DAVID G GOODING 242 TAYLOR ST PORT TOWNSEND WA 983685717 Site Address: Section: Qtr Section: Township: Range: Planning area: Sub Division: Land Use Code: 24 NW1/4 30N 2W Quimper (2) School District: Fire Dist: Tax Status: Tax Code: 06/11/2004 Port Townsend (50) Cape George (6) Taxable 161 IMPROVEMENTS CARRIED INDIV ON BECKETT POINT CARDS IMPS ONLY 8300 - FOREST LAND (designated) Property Description: S24 T30 R2W I LOT 2 & 3 I ~ No Photo Available Page 1 of 1 ,.,.J d$() ,ar=! http://www.co.jefferson.wa.us/assessors/parcel/parcelprint.asp?P ARCEL _ NO=002242003 10/1212004 Map Output Page 1 of3 Features not surve ed Parcel #s 002231001 & 002242003 ( "'J$'J" , a.:~ http:// gisserverlservlet/com.esri.esrimap.Esrimap ?ServiceN ame=ovmap&ClientV ersion=... 10/12/2004 >- 0:: 'lit H 0') :::J 0') CJ I.L.. "C :z I.L.. - c.J H 0 'lit 0 0 c.J c.J CD - en t- - (I) IJ) (Y) en w en "C IJ) 0 0 '- en :::E 0:: "C ...... (j) ~ c.J 0 :::J 0:: 0 <I: ...... "C C) C) a. :J .L:. .L:. .L:. <I: ..c c.J c.J :>- :z 0:: a. a. - - t- t- O CJ IJ) I"- CD I"- CD :::J :::J (I) (I) ...J I"- ...J (j) "C c.J IJ) c.J :::J 0 I c.J en CD en "C (0 C :::J :z (Y) :z CO - W CD W ...J c.J :::E 0') :::E 0:: 0 0:: W (0 W ::I: <I: ::I: en (!J :3:: N CD en H :z CJ H W I.L.. H X I.L.. ...J 0 (Y) <I: ID t- O t- O N t- t- <I: :z 0 en :z N :3:: :z x - H (!J W CJ N ...J H <I: 0 0:: en CJ 0:: t- O t- o. (!J 0 :z (Y) a. ...J :3:: 0 clS ::I: t- O >- 0 "C (Y) c.J t- x t- H <I: t- c.J t- IJ) t- t- (I) w :>- t- w C) ~ <I: t- O (Y) t- ~ (j) CO c.J 0 N 0:: (I) N 0 I"- c.J :J a. w 'lit 0 (!J en ...J (Y) W ...... - ID ~ N a. ID CO ...... 0 IJ) en :>- CJ I"- CJ N IJ) (Y) N ~ N c.J 0 W 0 ID CD CJ 'lit IJ) CJ (Y) I"- CJ CJ "C '- (0 l"- N c.J (I) IJ) :J) # c CJ ~ (I) '- 3 '- c.J ~ C (I) 0 ...... m w (I) (I) :J) (I) :J) ID .L:. (I) 0 co (I) "C > co f 0 '- '- a. 0 co a. '- 0 co x ...... c.J "C x j,Sf 8~t co en a. co co (I) t- t- x q... t- en co q... * * t- <I: ~ >- e::: ~ H 0') ::J 0') C u.. "C :z u.. - c.J H 0 ~ 0 0 c.J ~ - en - CD UJ (Y') en Cl en "C UJ W 0 0 '- t- ::E e::: "C +' (I) <I: c.J Cl ::J :z 0 (!) +' "C 0) 0) H :J ~ ~ ~ en <I: .c c.J c.J w :z Cl a. a. - - t- t- O 0 (Y') CD CD f"- CD ::J ::J CD CD .J f"- .J (I) "C c.J UJ c.J ::J 0 I c.J en CD en "C (0 c: ::J :z (Y') :z CO - W CD W .J c.J ::E 0') ::E e::: 0 e::: w (0 W :::I: <I: :::I: en (!) 3:: C\J en H :z 0 H W u.. H C\J u.. .J Cl ~ CD t- O t- Cl C\J t- <I: :z 0 en :z C\J 3:: :z x - H (!) W 0 C\J H <I: 0 e::: en 0 e::: (Y') 0 t- o. (!) 0 :z (Y') a. .J 3:: a ~ t- Cl >- 0 "C (Y') t- x t- H <I: t- c.J t- C\J t- t- CD w :>- t- w 0) ~ <I: t- o ~ t- ~ (I) co c.J Cl C\J e::: CD C\J 0 c.J :J a. w ~ 0 (!) en .J w +' - a:l ~ C\J a. a:l co +' 0 (Y') UJ en :>- a f"- a C\J C\J UJ ~ C\J ~ C\J c.J a w a a:l CD a ~ UJ a (Y') f"- a a "C '- (0 f"- C\J c.J CD UJ :::J) # c: a ~ CD '- 3 c.J ~ c: CD 0 +' W CD CD :::J) CD a:l ~ CD 0 co CD "C > 0 '- '- a. 0 co ( '- 0 co X +' c.J "C co en a. co .d6S J~ CD t- t- x q.. en co q.. * * t- <I: UDC CONSISTENCY REVIEW Project Planner: S HOSKINS Master#PRE04-00035 Review Type Proiect Description PRE04.00035 CENTRAL LOW PRESSURE SEWER SYSTEM Primary: JEFFERSON COUNTY PUD #1 PO BOX 929 PORT HADLOCK W A 98339 Site Address: 780 BECKETT POINT RD PORT TOWNSEND WA, 98368 BECKETT POINT FISHERMEN'S CLUB OWN % DAVID G GOODING 242 TAYLOR ST PORT TOWNSEND WA 983685717 PARAMETRIX REP ATTN: MIKE MOREN 5700 KITSAP WAY STE 202 BREMERTON WA 98312 Project Location: Parcel Numbers 002 231 001 & 002 242 003 in Section 23 & 24, Township 30, Range 02 West, WM, Located on Beckett Point Rd, Port Townsend, W A 98368 Parcel Number: 002231001 S-T -R: 23-30N-D2W Legal Description S23 T30 R2W LOT 1 & TL TAX B 37.15CH Flood District: Fire District: 6 Flood Map (FIRM) Panel No: 5300690135B School 50 COMP PLAN DESIGNATION:--U. J , ZIO COMMUNITY PlAN: UGA: W ATER SUPPLY UTILITY: Service Area [ ] Plot plan states "property line" [] Assesor's Map (Property lines on submitted plot plan must match the property lines as identified on the Assessor's 114 map) [] Legal Access to Property YES NO [] Parcel Tags or Scanned Documents YES NO [] ESA's: Special Reports~arby YES NO Shoreline ~~ NO R\>~ Stream Type ES NO l st 5 Fish & Wild1' ES NO ClA:~ ~~, ~~ ,("~ Wetlands: NO R~e~lanits.y €9 ~. c..~ Ql..,~ ~~~V, ~ro~1!fb1 I"C) ~ SeIsmIc: ES NO Landslide: NO I ( 'l.. 4':l ON ~~ Flood: NO ~~ f ~ :DO\-\-. Erosion: YES @ Aquifer Recharge Area:@NO ~~C ~ (,s\\J1:.~ ~~r~ SIPZ: none At Risk High Risk Coastal U Stonnwater site plan submitted: Yes No Forest Lands: YES NO Adjoining Forest Lands: [] Mineral Lands: YES NO [] Stonnwater: New Impervious Surface Land Disturbing Activity ESA's Stonnwater Req's: Min Req #2 Min Req #1 thru #5 Min Req #1 thru #10 Engineering Notice ProvisionslDisclosure: AiIport YES NO MRL YES NO Forest Lands YES NO Landscaping Required: Yes No Parldng Spaces Required NO 2 Other Building Height: 35' UBC Standard Impervious Surface covemge percentage: Resource Lands & Public: 10% Rural Residential: 25% Rural Industrial: Per UDC See 6.7 Rural Commercial: 60% Area of Building Coverage: 60% in Rural Industrial Lands only Total Building (s) Size: RYC: 20,000 SF CC: 5,000 SF NC: 7,500 SF GC: 10,000 SF All others: suqect to septic & water conslrairtslNore specified Setbacks: Front: Left Side: Right Side: Rear: Shoreline Setback: LSHA Setback: Road Oassification: ~ .f'.s\..rr t.J) (~lq~~c:\) Road Approach: EXISTING NOT REQ'D RAP SEP A Required: YES EXEMPT Flood Certificate: Existing Case(s) & Condition(s): Violations: Yes No Recorded Date of Subdivision: Plat Conditions: Lots/Require Declaration of Restrictive Covenant [] Site Visit conducted YES NO [ ] [ ] [ ] [ ] [ ] Total Acreagt 26 Land Use: 7500 Planning Area: 2 Zoning: MPR: PUD: Commercial/ RuraV Inholding [ [ [ ] [ ] [ ] [ ] [ ] Over 5yrs=UDC <5yrs=P1at Conditions on plat or Old Ordinance YES NO, submitted: YES NO AFN I asre'-"^' . r() d...;>a ... ADMIN: Setbacks entered in Permit Plan case N/A YES New Parcel Tags entered in Permit Plan N/A YES Special Reports Scanned N/A YES No parcel tags found for parcel Associated CASES status issued finaled description 002231001 XMP88-00065 P PROPOSAL: The project is to move and secure floating logs in the Beckett Point Lagoon. The logs would be secured with cables and staples. XMP99-00005 W A tightline to the beach has been designed to convey stormwater to the beach created by development of the lot. BLD90-00009 C 1/4/1990 studio with attached garage CAROO-00323 F 2/7/2003 picnic table cover COM98-00057 F 2/24/1999 Storm water plan and approved best management practices not being implemented. Neighbor is concerned that geohazard area is eroding. COM99-00010 F 3/25/1999 Eagle nest located near property. Backhoe working on property. Large amounts of debris/dirtltrees/sluffmg off bluff below his property. CAR96-00119 F 3/23/1998 3/23/1998 Binding Advance Determination for proposed single family residence. XMP98-00007 A 3/23/1998 tight line to beach for stormwater CAR99-00023 F 2/21/1999 2/21/1999 Critical Area Review for proposed single family residence, in response to complaint COM98-0057. BLD98-00637 F 2/24/1999 7/12/2001 single family residence PRJOO-00169 P Picnic Table Cover. PREOO-00013 F 4/19/2000 Picnic Table Cover. BLDOO-00471 R 2/19/2003 PICNIC TABLE COVER PRE04-00035 P CENTRAL LOW PRESSURE SEWER SYSTEM SDPOO-00017 F 10/16/2000 The proposal is to construct a log structure on a concrete slab to cover an existing picnic table in the playground area at Beckett Point. This proposal is exempt from review under the State Environmental Policy Act (SEP A) pursuant to WAC 197-11-800. SEP97 -00286 XMP91-00002 3/24/1998 3/5/1991 F A 2/5/1999 PROPOSAL: Proposa11 is to remove 220 feet of destroyed bulkhead southwest of an existing boat launch at Beckett Point and to construct 3 beach drift sills for beach restoration and erosion control. I is ":-1 ~ DEVELOPMENT REVIEW TIME SHEET JEFFERSON COUNTY pun #1 Date ~ I:\R_ML T _Case_CRMLA.rpt Time ~ 3:20-1.:40 Comments PRE04-00035 S HOSKINS ~I./ M\~ t"J1r--.L r~ ~ 1~oG o~ .-f~' / EZ ~g October 12, 2004