Yes, each notice board is $8.00 for a total of $48.00
Zoe Ann
-----Origina1 Message-----
From: James parker [mai1to:jparker@jeffpud.org]
Sent: Tuesday, January 17, 2006 10:17 AM
To: Zoe Ann Lamp
Subject: RE: Beckett Point - Conversion
Thanks I will be by later. Do you need more money?
Jim
-----Origina1 Message-----
From: Zoe Ann Lamp [mai1to:z1amp@co.jefferson.wa.us]
Sent: Tuesday, January 17, 2006 9:54 AM
To: James parker
Subject: RE: Beckett Point - Conversion
Jim,
The notices are ready for you to pick up. I'll leave them in the
"Pick-up" Basket at the front desk along with the 6 additional signs.
Sincerely,
Zoe Ann Lamp
Associate Planner
Jefferson County
Department of Community Development
621 Sheridan Street
Port Townsend, WA 983'68
Phone: 360-385-9406
Fax: 360-379-4473
-----Origina1 Message-----
From: James parker [mai1to:jparker@jeffpud.org]
Sent: Friday, January 13, 2006 9:24 AM
To: Zoe Ann Lamp
Subject: RE: Beckett Point - Conversion
Zoe I will be by on Tuesday.
1
_____.!:R-- -$.
Got DOH's response to plans. They have a couple of questions
for the engineers that probably have to be answered by you, in
particular status of SEPA and conformity with land use. Please see
items 2 and 3 below.
Do you have that data? Does something else need to be done?
Design Review Comments - Beckett Point Fishing Club
Proposed Large On-Site System - Jefferson County
Dear Mr. Moren:
The engineering report and plans for the above referenced project
received in this office on August 11, 2005 have been reviewed. The
following comments should be addressed in your next submittal.
General Comments:
1. Please provide any written agreements between the Beckett Point
FisDerman's Club and the Jefferson County PUD No.1 to own, operate and
maintain the LOSS system.
2. Provide documentation to show that the total project has
received approval under SEPA.
3. Please provide documentation of compliance with local zoning,
platting, and 'building requirements as they relate to sewer utilities.
4. The contractor must be approved as a septic system installer for
Jefferson County. Please include a note on the Plans addressing this
requirement.
5. The construction of this LOSS should be observed by the Engineer
to assure that construction is in accordance with the approved design.
Please include a list of inspections that you will make during
construction.
Thanks
Jim
-----Original Message-----
From: Zoe Ann Lamp [mailto:zlamp@co.jefferson.wa.us]
Sent: Thursday, January 12, 2006 2:50 PM
To: James parker
Subject: RE: Beckett Point - Conversion
Jim,
We discussed the project today in the staff meeting. John Nisbet
(Nisbet Timber phone: 732-7700) has been talking to Greg Ballard
(planner in our office) about the Forest Practices Application. The
information from parametrix covers everything I need. John doesn't have
to submit anything else. No additional fees are needed at this time
because the PUD already paid for SEPA and the review can be covered
under the main project.
Looks like we're on schedule for the Notice of Application to be printed
in the January 18th edition of the Leader.
2
ifJ.. .-~-,..,,-
"",^ ^~<>=~~7i;(~..v,
You'll want to come in and get the signs before Wednesday. Our office
is closed for MLK Day on Monday, Jan. 16th.
Cara will have the notice ready to pick up on Tuesday afternoon.
please let me know if you have any questions.
Sincerely,
Zoe Ann Lamp
Associate Planner
Jefferson County
Department of Community Development
621 Sheridan Street
Port Townsend, WA 98368
Phone: 360-385-9406
Fax: 360-379-4473
-----Original Message-----
From: James parker [mailto:jparker@jeffpud.org]
Sent: Monday, January 09, 2006 10:16 AM
To: Zoe Ann Lamp
Subject: RE: Beckett Point - Conversion
Thanks I forwarded your message to parametrix, so you may here from them
Jim
-----Original Message-----
From: Zoe Ann Lamp [mailto:zlamp@co.jefferson,wa.us]
Sent: Monday, January 09, 2006 10:02 AM
To: James parker
Subject: RE: Beckett Point - Conversion
Jim,
Looks like the conversion was discussed in the pre-application
conference. It was discussed that the forest conversion was going to be
completed prior to the submission of a permit for the improvements. I
just mentioned this project to another planner in the office. He said
that John Nesbitt is working on it but he hasn't turned it in yet.
Stacie Hoskins, Greg Ballard, Al Scalf and I will be getting together
this week to discuss the project.
Sorry, I had hoped to get it noticed this week but with this coming up I
won't be able to. I will let you know the results of the meeting.
Sincerely,
Zoe Ann Lamp
Associate Planner
3
, ,.J:i,?-:.~--,,;,'-'-~'-
~ {'j L
~"'"""'''''''P,,,,,",,,;,'''''''~;,~<.,,,..''',;~:,,,,,
Jefferson County
Department of Community Development
621 Sheridan Street
Port Townsend, WA 98368
phone: 360-385-9406
Fax: 360-379-4473
-----Original Message-----
From: James parker [mailto:jparker@jeffpud.org]
Sent: Monday, January 09, 2006 9:00 AM
To: Zoe Ann Lamp
Subject: RE: Beckett Point - Conversion
Zoe:
I was not aware of the requirement, what is necessary to make the
conversion?
Jim
-----Original Message-----
From: Zoe Ann Lamp [mailto:zlamp@co.jefferson.wa.us]
Sent: Monday, January 09, 2006 8:28 AM
To: James parker
Cc: Ross Goodwin (E-mail)
Subject: Beckett Point - Conversion
I was reviewing Beckett Point Sanitary Sewer System Improvements case
with Stacie Hoskins. As we were going through everything we realized
Beckett Point has not addressed the conversion of the 5 acres drainfield
area from forested land to non-forestry use. What has happened on this?
Please advise.
Sincerely,
Zoe Ann Lamp
Associate Planner
Jefferson County
Department of Community Development
621 Sheridan Street
Port Townsend, WA 98368
Phone: 360-385-9406
Fax: 360-379-4473
-----Original Message-----
From: James parker [mailto:jparker@jeffpud.org]
Sent: Friday, January 06, 2006 3:33 PM
To: Zoe Ann Lamp
4
'17-
,,~, '" '~--',~'i~,'~'~~'.' "-"5"
Subject: RE: Comments on Quilcene Water System and Beckett Point
Probably just as well to pay for 6 more.
will be by. Thanks for your help.
Just let me know when and I
Jim
-----Original Message-----
From: Zoe Ann Lamp [mailto:zlamp@co.jefferson.wa.us]
Sent: Friday, January 06, 2006 3:30 PM
To: James parker
Subject: RE: Comments on Quilcene Water System and Beckett Point
Jim,
I have been working on Beckett Point most of the day trying to complete
the information necessary to notice it. I have not had a chance to
review the Quilcene Water Project. Looks like it will be Monday before
I'll be able to look at it.
After looking at the Beckett Point project I'd like it noticed in 7
locations. Because this is a shoreline application it will need to be
up for 30 days. Do you have enough signs left over from other projects
or do you need to pick up more? You paid for one with the application.