Loading...
HomeMy WebLinkAbout120722 WSDOT releases quarterly performance report for September 2022 (Gray Notebook 87)________________________________ ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you are not expecting them. ________________________________ Hello, The September 2022 edition of WSDOT’s quarterly performance report (Gray Notebook 87) <https://wsdot.wa.gov/sites/default/files/2022-12/gray-notebook-Sep22.pdf> is now available online. While numerous performance measures are reported throughout the Gray Notebook, highlights from this issue include: * Annual traffic fatality crashes on Washington public roads increased 15.5% from 574 in 2020 to 663 in 2021, while serious injury crashes increased 20.4% from 2,428 in 2020 to 2,924 in 2021 * The percentage of deck area on WSDOT-owned bridges in poor condition increased from 6.7% in June 2021 to 7.4% in June 2022 * In the third quarter of 2022, Incident Response teams provided an estimated $22.3 million in economic benefit by reducing the effects of incidents on drivers * Washington State Ferries completed 34,221 (97.6%) of its 35,050 regularly scheduled trips in the first quarter of fiscal year 2023 * WSDOT built 88 stormwater treatment and flow control facilities in fiscal year 2022, and prevented 1,748 cubic yards of sediment from reaching water bodies * A Connecting Washington project and was operationally complete during the fifth quarter of the 2021-2023 biennium (July through September 2022) * WSDOT advertised 36 of 47 Pre-existing Funds projects in the fourth quarter of the 2021-2023 biennium Gray Notebook editions can be accessed at the Gray Notebook archive page <https://wsdot.wa.gov/about/accountability/gray-notebook/gray-notebook-archives> . Feel free to share this message with staff and colleagues and, if you have comments and suggestions, please contact Sreenath Gangula, Assistant Director, Performance Management, at (360) 705-6888 (Sreenath.Gangula@wsdot.wa.gov <mailto:Sreenath.Gangula@wsdot.wa.gov> ) or Joe Irwin, Performance Reporting Manager, at (360) 705-6879 (Joe.Irwin@wsdot.wa.gov <mailto:Joe.Irwin@wsdot.wa.gov > ).