Loading...
HomeMy WebLinkAboutLog015 . . . :;-t'~._~L~\.. TRAFFIC REpORT \ i LOG ITE~/! r:! \ f \ o ~ l\~. # Page . TRAFFIC IMPACT ANALYSIS DISCOVERY BAY GOLF CLUB JEFFERSON COUNTY, WASHINGTON . April 2005 Prepared for: WeFore, LLC Washington Engineering . GERALYN REINAKI, P.E. 1319 DEXTER AVENUE NOKI1I, SUITE 103 SEAITLE, WASHINGTON 98109 (206) 285-9035 LOG ITE~'iA # Paco" or ~~ ft,.J';~ IJ_~ ..1 ....-_. TRAFFIC IMPACT ANALYSIS DISCOVERY BAY GOLF CLUB JEFFERSON COUNTY, WASHINGTON j""', ;- -'--,-~:~--- - - -~:-- I .- ': ), --------, Iii I Ii 1 : i MAY 1 1 2005 I t~!J ~ \ H JUr'RSOi;j('QUNn--.' ~~:p f:.Qf-.~Orvlfv';UNITY OEVELOPIVtEN r . . April 2005 Prepared for: WeFore, LLC Washington Engineering . GERALYN REINAKl', RE. 1319 DEXTER AVENUE NOKrH, SUITE 103 SEAITLE, WASHINGTON 98109 (206) 285-9035 LOG ITEM # page_3_ Of_Il.L .' . . TRAFFIC IMPACT ANALYSIS DISCOVERY BAY GOLF CLUB JEFFERSON COUNTY, WASHINGTON Introduction/Executive Summary The purpose of this analysis is to summarize the anticipated transportation impacts resulting from the development of a 48-lot Planned Rural Residential Development (pRRD) in Jefferson County. The site is located southwest of Port Townsend, lying between Cape George Road and South Discovery Road, and north of the southerly intersection of these two roads. This report has reviewed the current traffic conditions in the vicinity of the site, the proposed action, and its impact to the transportation system. The proposed PRRD would generate approximately 460 new daily trips, 48 of which would occur during the PM peak hour. Access to the PRRD is proposed from one location along Cape George Road and from two new accesses intersecting South Discovery Road. Intersections analyzed as part of this assessment are currently operating at acceptable levels of service and would continue to do so upon completion of the proposed project, with build out projected to occur sometime in 2009. Specific details on the project and the analysis of its impacts can be found in the subsequent sections of this traffic analysis. In general, the conclusion of this study is that the impact to the transportation system will be minimal upon build-out of this project-;- Background/Project Description The proposed action is a Planned Rural Residential Development (pRRD) on an approximate I99-acre site, which includes a golf course. The site is located on the Quimper Peninsula approximately five miles southwest of Port Townsend in unincorporated Jefferson County. The PRRD is seeking to develop 48 new single-family residential units, and includes the renovation of an existing I8-hole public golf course. The golf course is called the Discovery Bay Golf Club (formerly known as Chevy Chase). The proposed PRRD project also includes additional recreational features such as the extension (approximately 1. 8 miles of new trail) of the Larry Scott Trail to Cape George Road, and a public dog park. The site is an odd-shaped parcel located east of Cape George Road and west of Discovery . Road, and north of where these two roadways intersect. The majority (32) of the lots will LOG ITEM \ \ , # I Page--'{_of ,v'~f - 9 2005 _,.~__~~,(::~,l~_,~~. , . . . be located on the western portion of the property and take access from Cape George Road. Sixteen (16) lots will be located near the northeastern comer of the property and take access from Discovery Road at two locations. Each proposed lot within the plat will be accessed from new private roadways, with an emergency access providing a connection between the elongated cul-de-sacs located at the ends of each of the two main interior roadways. No direct access to either Discovery Road or Cape George Road from any individual lot is proposed. The development of the PRRD will also include the relocation of the existing golf course access road approximately 175 feet northwest of its present location. The intent is to combine residential and golf course access for added safety and improved intersection sight distance conditions. The major state highways in the area are SR-19 and SR-20, to the east of the site. SR-19 is the preferred route to Kitsap, Pierce and King counties, while SR-20 tends to provide access to Port Townsend as well as to SR-101 to the south, which serves the western and southern Olympic Peninsula. Jefferson County's comprehensive plan refers to Cape George Road, Discovery Road, and Four Comers Road as rural minor collectors. The remainder of this report analyzes the impacts of this proposed PRRD development combined with the present traffic volumes on adjacent roadways and intersections within the area. A vicinity map of the area is shown on Figure 1 and a reduced copy of the site plan has been attached. Existing Conditions The proposed residential subdivision will primarily impact Discovery Road and Cape George Road, with lesser impacts to SR-20. The following describes these roadways, existing traffic volumes, and current operating conditions. 1. Roadways Cape George Road is a rural minor collector that connects to Discovery Road at both its origin and terminus. The roadway is approximately 20-22 feet wide with little to no shoulders, open ditches, and has a distinctly rural character as it meanders through the area, commonly knows as the Quimper Peninsula. The roadway is characterized by both its horizontal and vertical curvature, typical of rural Jefferson County roadways. The posted speed is 40 mph between the south Discovery Road intersection and the Cape George Wye, increasing to 50 mph from the Wye to the approach to the north Discovery Road intersection where the speed drops to 35 mph. The curve and approach to the intersection of Cape George Road with Discovery Road south of the golf course is posted with a 25-mph advisory speed. The adjacent land is primarily platted single-family residential in varying rural zoning designations ofRR1:5 to RR1:20, including the Chevy LOG ITEM " I 2 # Page S of .1Y -92005 'C.',,< . Chase Beach Cabins, which are small rural recreational cabins for overnight rental located along Cape George Road across from the golf course. Traffic on Cape George Road is required to stop at both of its intersections with Discovery Road. Discovery Road is also a rural minor collector that connects to SR- 20 at Mill Road approximately 3.5 miles to the north of the project and at Four Comers Road approximately 1.2 miles to the south. Discovery Road's alignment is relatively straight towards the northern end and tends to follow the terrain throughout its length. The roadway is typically 20-22 feet wide with little to no shoulders south of the southerly Cape George Road intersection, with 3-6 foot paved shoulders north thereof. The posted speed on Discovery Road is 35 mph north of the northerly Cape George Road intersection dropping to 25 mph near the Mill Road/SR-20 intersection, 35 mph south of the southerly Cape George Road intersection, with a 40 mph speed in between the two intersections. The adjacent land is primarily platted single-family residential in varying rural zoning designations of RRl:5 to RRl:20 Traffic on Discovery Road is required to stop at its intersection with SR-20/Four Comers Road and at Mill Road. Left-turn storage has been installed at the Olympic Boulevard intersection in the Adelma Beach area. . SR-20 is a state highway connecting to Port Townsend and the ferry terminal to the north and SR-IOl to the south. The roadway is 22-24 wide with 3-6 paved shoulders. Left-turn storage lanes have been provided at critical intersections such as Mill Road, which is also signalized. The posted speed is 40 mph north of Mill Road, increasing to 50 mph south thereof. Some commercial activity has developed along the SR-20 corridor on the approach to the Port Townsend city limits, with extensive commercial development within the City. 2. Traffic Volumes Weekday PM peak hour traffic counts were conducted for this assessment at the intersections of Cape George Road/Discovery Road (South), Cape George Road/Golf Course Access, Discovery Road/Four Comers Road/SR-20, and Discovery Road/Mill Road. The weekday PM peak hour (the highest 6O-minute interval between 4:00 and 6:00 PM) is typically considered the most critical time period with respect to the traffic volumes on the adjacent streets. The peak hour volumes for this analysis were manually counted on Thesday, March 8th and include the through and turning movements on all approaches to the intersections. These volumes are shown on Figure 2. The PM peak hour counts indicate relatively low volumes on Discovery Road and Cape George Road, with higher traffic volumes along SR-20. . Daily traffic volumes along the adjacent roadways were provided by the Washington State Department of Transportation (WSDOT) and Jefferson County and are also shown on Figure 2. The WSDOT and Jefferson County counts are primarily from the year 2003, LOG ITEM 3 # Page C. of MAY - 9 2005 . with one Jefferson County count from 2002. 3. Level of Service Capacity analyses for the PM peak hour were conducted at Cape George Road/Discovery Road (South), Cape George Road/Golf Course Access, Discovery Road/Four Comers Road/SR-20, and Discovery Road/Mill Road in order to determine the current level of service. All of these intersections are controlled by stop signs on the minor approaches. "Level of service" is a common term used in the 'fraffic Engineering profession that is defined as a qualitative measure describing operational conditions within a traffic stream, and its perception by motorists and/or passengers. These conditions are usually described in terms of such factors as speed and travel time, freedom to maneuver, traffic interruptions, comfort and convenience, and safety. Six levels of service are designated, ranging from" A" to "F", with level of service" A" representing the best operating conditions and level of service "F" the worst. Jefferson County has indicated that level of service "C" is considered acceptable in the rural areas of the County, with the exception of certain tourist corridors such as SR-20, where level of service "0" is acceptable. . Calculations for the level of service analyses were conducted using the Mc'Ihms Highway Capacity Software version 4.ld based on the 2000 Highway CaDaciry Manual. The following table shows the current levels of service for the critical movements on the approaches. The critical movements are typically those movements that are controlled by a stop or yield sign, or left-turn movements from the major street. Calculations for the level of service analyses have been attached. The manual traffic counts described earlier were used in these analyses. TABLE 1 EXISTING LEVELS OF SERVICE NORTH- SOUTH- EASr- WESr- BOUND BOUND BOUND BOUND OVERALL Cape George Road! LOS A LOS A Discovery Road (South) 7.4 sec. N.A. 9.2 sec. N.A. N.A. Cape George Road/Golf LOS A LOS A LOS A LOS A Course Access 7.4 sec. 7.4 sec. 8.6 sec. 9.5 sec. N.A. Discovery Road/Four LOS A LOS A LOS B LOS C Comers/SR-20 7.7 sec. 7.7 sec. 14.8 sec. 15.6 sec. N.A. Discovery Road/ LOS B LOS C LOS A Mill Road 10.5 sec. 18.9 sec. N.A. 7.5 sec. N.A. N.A. - not applicable (i.e., calculation not provided for specific analysis or no volume recorded during the peak hour) . 4 LOG ITEM # Page ,,_of MAY - 9 2005 - . Where: WS Delav A < 10 seconds B > 10 & < 15 seconds C > 15 & < 25 seconds D > 25 & < 35 seconds E > 35 & < 50 seconds F > 50 seconds (for unsignalized intersections) Table 1 shows the level of service results for the PM peak hour indicating that all of the critical movements at the intersections are currently operating at level of service "C" or better. 4. Traffic Accidents Traffic accidents records along Cape George Road and Discovery Road were obtained from Jefferson County. The data is from January 2002 through December 2004. The following table summarizes the accident frequency and severity along the roadway sections and at the intersections for this time period. . LOG ITEM '\ 'i . # Page It. f -- MAY - 9 .'001) __0 -. - 5 . . . TABLE 2 ACCIDENT HISTORY Accident TYpe Property Location/Year Dam32e Iniurv Fatalitv Total Cape George Road: Between Discovery Road (South) (MP 7.55) and MP 6.50 2002 1 0 0 1 2003 0 1 0 1 2004 0 1 0 1 Discovery Road: At Jacob Miller Road CMP 0.299) 2002 0 0 0 0 2003 0 0 0 0 2004 3 0 0 3 At 2nd Street eMP 0.430) 2002 0 0 0 0 2003 0 0 0 0 2004 1 0 0 1 At Florence Street (MP 0.67) 2000 0 0 0 0 2001 0 0 0 0 2002 0 1 0 1 At Cape George Road (North - MP 0.69) 2002 0 1 0 1 2003 0 1 0 1 2004 0 1 0 1 Between Cape George Road (North) and Cape George Road (South) (MP 0.69 & 3.62) 2002 2 1 0 3 2003 2 3 0 5 2004 1 0 0 1 At Cape George Road (South - MP 3.62) 2002 0 0 0 0 2003 0 0 0 0 2004 1 0 0 1 Between Cape George Road (South) and SR-20 (MP 3.62 & 4.84) 2002 2 0 0 2 2003 1 2 0 3 2004 1 0 0 1 Along Cape George Road, all of the accidents involved vehicles leaving the roadway. Along Discovery Road, 11 of the 15 non-intersection collisions involved vehicles leaving LOG ITEM # MAY - 9 2005 6 Page_Zf_of . . . the roadway for various reasons (curve/crossing the centerline), with the remaining four collisions involving out of control vehicles or striking an object. The intersection collisions along Discovery Road consisted of leaving the roadway (4 of 9), entering at an angle (3 of 9), with one left-turn collision and one bicycle-related collision. 5. Non-Motorized Facilities Pedestrian/bicycle facilities are currently non-existent in the immediate vicinity of the site. The relatively low volume of traffic on the roadways in the area lends them to reasonably safe travel for bicyclists, although the roadways must be shared with motorized traffic. It is not expected that sidewalks will be common due to the rural nature of the area. 6. Transit Facilities Jefferson Transit is responsible for providing bus service in Jefferson County. Bus routes #1, #6, #7, and #8 provide the closest transit service to the site. Route #1 travels between Port Townsend and Brinnon/Quilcene via SR-20 and Center Road through the Tn-Area. Route #6 provides service between Port Townsend and the Tri-Area via SR-20 and Rhody Drive. Route #7 provides service from Port Townsend to Port Ludlow and Poulsbo via SR-20 and Oak Bay Road. Route #8 provides service between Port Townsend and Sequim along SR-20 and SR-lOl. Route #1 provides weekday only service, while Routes #6 and #7 provide daily service, and Route #8 provides weekday and Saturday service. All of these routes have a bus stop at the Four Comers Store, which is the closest bus stop to the site. Project Traffic The development of the PRRD will generate new traffic onto the adjacent transportation system. The following sections summarize the impacts associated with the proposed action. 1. Trio Generation The proposed PRRD would generate new traffic onto the adjacent roadways. The lTE TriD Generation Manual (published by the Institute of Transportation Engineers, 2003, -rn. Edition) is typically used to estimate the number of trips expected to be generated by a development. Land Use Code 210, Single-Family Detached Housing, best represents the proposed use. Thble 2 shows the estimated number of trips for the PRRD using the average trip rates, with the number of lots as the independent variable.fLOG ITEM # Page I" of 7 -t_ \ MAY - 9 2005 . TABLE 3 ESTIMATED WEEKDAY TRIP GENERATION DISCOVERY BAY GOLF COURSE (48 roTS) Time Period Trio Rate In Out Total Daily 9.57 trips/lot 230 229 459 AM peak 0.75 trips/lot 9 27 36 PM peak 1. 0 1 trips/lot 30 18 48 The number of trips shown in Thble 3 is likely higher than will actually occur, since it is expected that the majority of the residents of the PRRD will be retirees or "empty- nesters". The demographic will likely be similar to the Port Ludlow community where trip generation rates have been monitored for the past decade and show a lower trip rate than typical suburban or urban subdivisions. Thus, the values shown in Thble 3 are conservative and represent a "worst-case" scenario. 2. Trip Distribution! Assia:nment . The new traffic generated by the development of the property will be distributed onto the adjacent county roads and then onto the state highways. The trips from the project will initially be distributed onto Cape George Road and Discovery Road and then dispersed onto the other arterials and highways depending on their ultimate destination or origin. Figure 3 shows the estimated daily trip distribution by percent and volume for the PRRD. The trip distribution is based on an examination of the transportation system and available recreational, school, shopping, and employment opportunities in the area, and the peak hour counts conducted at intersections in the area for this study. It should be noted that these values are approximate and may vary from day to day depending on the needs and desires of the future residents of the development. It is estimated that approximately 45 % of the traffic will be destined to/from the northeast, 10% to the south, and 40% to the east! southeast, with 5 % local traffic. . Figures 4 and 5 show the trip assignment to the various roadways during the AM and PM peak hours. These figures show the impact upon the various roadways resulting from the development of the proposed PRRD. It is expected that the majority of the traffic on the westerly side of the PRRD will travel to and from the south along Cape George Road since it provides a shorter and faster route to Port Townsend and SR-20 than traveling to the north on Cape George Road. A review of the figures shows that the project would have its greatest impacts on Cape George Road and Discovery Road. I # LOG ITEM PagS_l/_Of - - 8 MAY - 9 2~01 . 3. Traffic Volumes The proposed PRRD is expected to be completed and occupied in 2009. Figures 6 and 7 show the projected daily and PM peak hour traffic volumes for the year 2009 with and without the project trips. Jefferson County has completed extensive analysis to predict traffic growth rates on the roadways within the County as part of their Transportation Plan. These rates were based on historical housing and traffic growth rates and forecast housing growth to produce the estimated traffic growth rates. The County's data showed that the growth rates on the roadways near PRRD ranged from 1.00% to 2.76% annually, with most of the adjacent roadways in the 2.0% to 3.0% range. The applicable annual growth rates were applied to the existing daily and peak hour traffic volumes to estimate the future (2009) volumes. These volumes account for miscellaneous background growth in the area over the next four to five years, at which time the PRRD is expected to be complete and occupied. . The "without project" conditions are the volumes shown on Figure 6. The trips associated with the proposed project were added into the volumes shown on Figure 6 to produce the volumes shown on Figure 7. (Note: the volume projections represent a conservative estimate since traffic associated with the proposed PRRD would already be included in the County's growth forecasts. Therefore, a "worst-case scenario" has been reviewed. ) 4. Level of Service Level of service calculations were conducted again for the four locations previously reviewed. It was assumed for purposes of analysis that no changes in the geometric conditions at the intersections would occur over the next four to five years, with the exception of the Cape George Road/Golf Course Access. The golf course access would be relocated to the new site access that will serve the 32 lots on the westerly portion of the PRRD and is incorporated into the "with project" conditions. The results of the future conditions with and without the project trips are shown in Thble 4, based on the peak hour volumes shown on Figures 6 and 7. LOG ITEM \ " . # Pags_LLof .v' 'r 9 . . TABLE 4 FUTURE LEVELS OF SERVICE 2009 WITHOUT NORTH- SOUTH- EASf- WEST- PRomCf BOUND BOUND BOUND BOUND OVERALL Cape George Road/ LOS A LOS A Discovery Road (South) 7.4 see. N.A. 9.3 see. N.A. N.A. Cape George Road/Golf LOS A LOS A LOS A LOS A Course Access 7.4 see. 7.4 see. 8.7 see. 9.6 see. N.A. Discovery Road/Four LOS A LOS A LOS C LOS C Comers/SR-20 7.8 see. 7.7 see. 15.7 see. 16.8 see. N.A. Discovery Road/ LOS B LOS C LOS A Mill Road 11.0 see. 22.4 see. N.A. 7.5 see. N.A. ::;:::;:;:;:;:;:::::::::;:;:::::;:;:::;:;:;:;:;:;:;:;:::;:;:;:;:;::: ..................................................... 1IIIIIIilllllll:i~III:I~:::I:jllli,I:IIIII'i,j;i:il"~11111::1: . ..... . ..... .. 11~llllll::i~~lll;~I:IIIII~:ililll;;llli:;111111!~:ii~~::: .................................. 2009 WITH .................................. .................................................................... .................................................................... i::!:i~i:i:i:i:i:i~l:::::1:i:i~~:i~i~l~ii::i~l:i1i~i~i11:i:i~l!~i: ~~~ ~~~~1~ ~~ ~ ~~~1 ~~~1 i1~~~ ~~~i~~ 1~~ ~I I~~~1~1~~j~~~1 ~1~~1ii~~ I ::::::::::::::::::::::::::::::::::::::::::::;::::::::=::;:::::::::: PRomCf !~IIi~~~~i~~I~I~~~~~~I~ ~ ~~ ~~~~~~ ~~~~ ~~~~~~~~~ ~~~ ~~~~j .................................. .................................................................... .................................. .................................. .................................. ........................ ........ ..... ......................... ...... .......................... Cape George Road/ LOS A LOS A Discovery Road (South) 7.5 see. N.A. 9.6 see. N.A. N.A. Cape George Road/Golf LOS A LOS A Course Access. N.A. 7.5 see. N.A.. 9.5 sec. N.A. Discovery Road/Four LOS A LOS A LOS C LOS C Comers/SR-20 7.8 see. 7.7 see. 16.2 see. 17.7 see. N.A. Discovery Road/ LOS B LOS C LOS A Mill Road 11.2 sec. 24.4 sec. N.A. 7.5 sec. N.A. N.A. - not applicable (i.e., calculation not provided for specific analysis or no volume recorded during peak hour) · - revised access location Where: WS Dela A < 10 seconds B > 10 & < 15 seconds C > 15 & < 25 seconds D > 25 & < 35 seconds E > 35 & < 50 seconds F > 50 seeonds (for unsignalized intersections) , , I The results of the capacity analyses for the future conditions show only minor increases in delay from the existing conditions at the intersections, with delay increasing on the critical movements from 0.0 to 5.5 seconds. 5. Non-Motorized Facilities As noted earlier, pedestrian and bicycle facilities are currently non-existent in the immediate vicinity of the site and the roadways must be shared with motorized traffic . until such time when additional shoulder width or trails are constructed. The developers 10 LOG ITEM # Page t~ of . of this project are including an extension of the Larry Scott Trail, which borders the site on the north, to Cape George Road at the southern extreme. This extension includes approximately 1.8 miles of new, privately owned and constructed trails that will be available for public use and will provide a significant addition to the non-motorized facilities in the area. 6. Site AccesslNeed for Turn Storaee The current site plan shows access to the project from Cape George Road and Discovery Road. No direct access to individual lots will be provided from either of these roads in order to minimize potential conflict points. One of the PRRD accesses from Discovery Road is located across from Snagstead Way, with the second access located just under 600 feet south thereof. This second access will be constructed on an existing maintenance service road and culvert crossing. The PRRD access to Cape George Road will be located about 175 feet north of the existing golf course access. The posted speed on both roads is 40 mph. The ten lots served by the southerly access along Discovery Road will be connected to the 32 lots accessed from Cape George Road through a 16- foot wide gravel road limited to emergency access. . The proposed project's residential roads will be designed per Jefferson County and PRRD standards to serve the lots. All proposed roads will be private, as well as gated for controlled access. The estimated peak hour site trips at these accesses are shown on Figure 8. A level of service analysis was completed for the access to Cape George Road as noted in the previous section. This access will serve the largest number of lots plus the existing golf course. The level of service analysis indicated this highest volume access would operate at level of service" A". No further capacity analyses were completed for the two lower volume accesses along Discovery Road since it can reasonably be assumed that they would also operate at level of service "A". The need for turn storage along Cape George Road and Discovery Road was also reviewed. The need for left- and right-turn storage at these locations was reviewed using Figures 91O-8a and 910-11 from the WSDOT Design Manual (figures have been attached). Based on the anticipated volume of turns at either of these roadways, neither left- nor right-turn storage is recommended. Intersection sight distance measurements at the accesses will be submitted by Washington Engineering with the engineering plans. LOG ITEM \ . \ # Pags-tLOf - " r - - 11 . Project Impacts/Recommendations The proposed development of the Discovery Bay Golf Club PRRD will generate just under 460 trips per day, 48 of which will occur during the PM peak hour. The PRRD will have its greatest impacts on Cape George Road south of the PRRD access and on Discovery Road. The traffic volumes on the County roads in the immediate area are currently low, and only small increases are projected in the area, which includes traffic associated with the proposed PRRD. SR-20 carries the majority of traffic in the area and is the roadway where the highest growth is expected to occur, much of it due to tourist! seasonal impacts. The levels of service at the intersections in the area will drop slightly over the next few years as a result of both the background traffic growth and development of the PRRD. The unsignalized intersections reviewed in this assessment are projected to operate at level of service "C" or better. The PRRD accesses are also expected to operate at acceptable levels of service due to the existing and future low traffic volumes traveling through these intersections. . The level of service standard on rural County arterials is "C", with LOS "D" in urban areas and along tourist corridors. Thus, the acceptable LOS in the area of the proposed PRRD would be "C", with the exception of "D" along SR-20. As noted above, the anticipated levels of service at the un signalized intersections in the area will be "C" or better, which is acceptable. The Jefferson County Transportation Element has also noted that the existing roadway capacity based on daily volume for the County minor collectors adjacent to the project are all currently at level of service "B", and the 2009 projected daily volumes noted on Figure 7 are also well below the daily capacity for the recommended LOS standard (i.e. 7400 AUT on Cape George Road and Discovery Road). The accident history for the roadways adjacent to the PRRD did not indicate any high accident locations for the period reviewed. The additional traffic resulting from the development of the proposed action will result in an increased potential for accidents. However, this does not mean that there will automatically be an increase in the number or rate of accidents. A review of the WSDOf turn lane storage requirements indicate that neither left- nor right-turn storage is needed at any of the site accesses. Neither Cape George Road nor Discovery Road adjacent to the project meets current County (or AASHW) standards. Increases in background traffic will result in traffic volumes exceeding the 1500 AUT threshold where 22 feet of pavement with 6 foot paved shoulders are required. (Most of the minor collectors in Jefferson County do not meet this standard unless they have been recently upgraded.) While the proposed project will contribute to this increase in daily traffic volumes, it will not be the sole contributor. . # LOG ITEM Pa~ ~of 12 ___ l.j!\ \1-. . Roadway construction per the current County standards should be provided within the PRRD. Due to the limited off-site impacts associated with the project, no mitigation measures would necessarily be required. . . LOG ITEM # Page~Of 13 - , . FIGURES/ATTACHMENTS . LOG ITEM \ , . # Page_l.=7-of 14 . . NORTH Project Site ') II v, C>w~ ' ~I,- '-'" c: ~'18 v L.UKe Q.. ~ OidTort Tow~send Rd, OLD FORT TOWNSEND STATE pARK '.. \i . Discovery St. .0 Cerr ../ Pl. 00 Jl- . .0 o o : 0 . · . L.. . : m \ .0 . . . . . . . . . . . :'. ?:l ,...(, . . . . . i2 . PROJECT VICINITY MAP FIGURE 1 LOG ITEM Geralyn Reinart, P,E. 1319 Dexter Ave. N.. #103 Seattle, WA. "'- . .~,,<?,\~/~)~ '~'.' ~.'o;.C , \JI"'" C. '?"V.. - \,\" - ?\(" S(i>-\'\\.\:. ~ () ~ ~ ~ o Discovery Bay Golf Course Jefferson County, WA, " ~ Wo \ I Page F-1 63 1+4 68 105 03/08/05 ~ 65 4:30-5:30 ~ 96 40 ~ 259 26 163 t-113 139 . . NORTH (N.T.S.) 41 0+10 40 --L o 0 (6 '+0 .,.- .. .,. --- .. ... ......... ... .,. ,..,- " ./ / 6 ./ / , \ Project Site , , / , , . / "- DISCO~ "\ 'f:R 'r B ~'r - ...... ~, , . 2'--1' <, '-, . 30 20 59~ " 39 40 30---1 70 I . -._~-... ~ "-- - ---~ ~-.~ "'- . Geralyn Reinart, P.E. 1319 Dexter Ave. N..1I103 Seattle, WA. EXISTING DAILY & PM PEAK HOUR VOLUMES FIGURE 2 LOG ITEM Page--L1-oL Discovery Bay Golf Course Jefferson County, WA. Page F-2 . . . (Loc I) '5% \., DISc (2~~ \ OYl:R r8~r . NORTH (N.T.S.) Project Site ./ ,/ . \ " , , / , , / ,.-... .. .-..... ... ... .......... ... ..."""" '. ,/ " /', , -- ---.--"" / / " ,/ " ,/ , ,/ ,/ ,.,., \ , " \ , , " \ - ---.. ~, , - \ r:, "- "- , / ESTIMA TED DAILY TRIP DISTRIBUTION/ASSIGNMENT FIGURE 3 LOG ITEM Geralyn Reinart, P,E. 1319 Dexter Ave, N,. #103 Seattle. WA. Discovery Bay Golf Course Jefferson County. WA. u Page <{,o of \ , Page F-3 . ~ NORTH (N.T.S.) "-... .- ---. .. -- " .. .. / '. ./ " I" . -- / , , / , , / , ,/ ,/ ./ / . \ , , , , \ Project Site r- . , \ / , , ........ . / , , \ 1 Disc .........'\~ , , '-.. OYER ' 0 \ )-" 8-4,.... - -- ;'\, . ..... , ~ \ , '-.. / ", .... , I M . Geralyn Reinart, P.E. 1319 Dexter Ave. N.. #103 Seattle, WA. ESTIMA TED AM PEAK HOUR TRIP ASSIGNMENT' FIGURE 4 # LITG ITEM p- age _ Z-1 of - Discovery Bay Golf Course Jefferson County, WA. Poge F-4 - . . . 1 DiSC '-"\~ OVI:~ ,1 r- 8-4 r . NORTH (N.T.S.) Project Site ",- ... ' --- - .. " ,.. , ",.",. "', /' /,', , / / , I / / / / -" /' / . \ , I \ r- , , \ / " '- I , , \ , , " \ . -.. ~, , . I"C, '- " , I ESTIMA TED PM PEAK HOUR TRIP ASSIGNMENT FIGURE 5 LOG ITEM :If Page~2.- of - - Geralyn Reinart. P,E. 1319 Dexter Ave, N.. #103 Seattle. WA. Discovery Bay Golf Course Jefferson County. WA. \ i Page F-5 '- D/SCO~ -,\ 'f:R'rl3 . ~'r 116 t'--n 106 44 r 2B6 29 1 80 ~124 153 --- - - - - - '- - - /' " ,/ " . . NORTH (N.T.S.) 45 0+1 0 44 --L o 0 ~ 6 '+0 / 6 " 69 1+4 74 / / ,/ / , , \ " Project Site , , 228 31 +44 21 153 --L 12 74 (137 108 +76 42 116 20 10+31 157 / , ' . / - -- ~, , - 58 25-1 33 22 65~ . '\ 44 I 43 33~ 77 rC, '- . 2009 ESTIMATED DAILY & PM PEAK HOUR VOLUMES (WITHOUT PROJECT) FI'i~ ,VEM Discovery Boy Golf Course Jefferson County, WA. Page F-6 Geralyn Reinart, P.E, 1319 Dexter Ave. N., #103 Seattle, WA. Page -z,,""-~_ of 44 119 t'-- 72 106 47 (297 31 191 ~130 161 ....-..---,-........" ./ . . NORTH (N.T.S.) (Revised access location) 46 t'--Z / 69 17 ~23 92 / , , / ./ / . \ " Project Site , , 228 31.-A-44 - t 21 153 ~ 12 86 (1 49 117+83 42 116 22 13+31 160 I , , . I , D/SCO~ "\ 'f:R 'r' 8-4 'r' . ..... ~, , . 70 34 --1 36 27 76~ '" , 49 I 49 43~ 92 <, '- Geralyn Reinart, P,E. 1319 Dexter Ave. N.. #103 Seattle, WA. 2009 ESTIMATED DAILY & PM PEAK HOUR VOLUMES (WITH PROJECT) FI[GURE 7 OG ITEM Page ~~oL, Discovery Boy Golf Course Jefferson County, WA. Poge F-7 . . . . . NORTH (N.T.S.) .~0 0' ~ CJ .0 0"1 Q' 2 -0 0::: ~ ;00> Q 0>0,.. .90> ..p~ ESTIMA TED PM PEAK HOUR SITE ACCESS TRIPS FIGURE 8 LOG ITEM Geralyn Reinart, P,E. 1319 Dexter Ave. N., #103 Seattle, WA. " Discovery Bay Golf Course Jefferson County, WA. Page F-8 Page 2,r of - . KEY: ~ Below curve, storage not needed for capacity. >iJ N:1tNe curve, further anaIy8is recommended. . " i "\ I~ \ M t\'/ " II 1\ 1200 1100 1000 900 800 :;::- - > :I: C J 700 600 , 500 400 \"2} " \, 25 20 15 10 5 % Total DHV Turning Left (single turning movement) /t~~/3D,P ,. \~-) ,.,''--.....~-'~ " I G~.QS::- "1 \ (1) DHV is total volume from both directions, {-... " (- \. ~ "'(>:r..'----- ,J \':-" ,':" -....:?E.:-. \ f\ (2) Speeds are posted speeds, ~,A, K\. ~ \ '> Q-..ol.-G'- -s \ Left-Turn Storage Guidelines (Two-Lane, Unsignalized) ") Figure 91 D-!J.a LO~ rTJ::~!1 . Design Manual M 22-01 January 2005 # Page.....?de..... of - Intersections At Grade Page 910-19 -' f'.' r' '; f.,- r- " " , MAY - 9 ')f)(li; 100 80 Consider right-turn lane (5) G.I E ::J o > c: loo... ::J ..... I ..... .c: 0) a:: ~ 40 o ::c .::0: n G.I 0..-- /'20 I / Consider right-turn pocket or taper (4) GO Radius only (3) r----. \ ~ / C;~'$;F ct(' '~\,O ~'- i~~r" , I] '100) ! " ' ' ~)' ~~~ S~ \""~ i \, ',- 200 300 400 500 Peak Hour Approach Volume (DDHV) (1) \'-0 \..!,;,' \ \:2~d{. \. ) v'"" ,~., '\ 600 700 Notes: (1) For two-lane highways, use the peak hour DDHV (through + right-turn). For multilane, high speed highways (posted speed 45 mph or above), use the right-lane peak hour approach volume (through + right-turn). I (2) When all three of the following conditions are met, reduce the right-turn DDHV by 20. The posted speed is 45 mph or less. The right-turn volume is greater than 40 VPH, (3) See Figure 910-1 for right-turn corner design. (4) See Figure 910-12, for right-turn pocket or taper design. (5) See Figure 91 0-1~ for right-turn lane design. (6) For additional guidance, see 910.07(2) in the text. The peak hour approach volume (DDHV) is less than 300 VPH. . Right-Turn Lane Guidelines (6) Figure 910-11 LOG ITEM Intersections At Grade Page 910-30 # Page-1...~ of Design Manual M 22-01 January 2005 ,\ , , ,.1 HCS2000: Unsignalized Intersections Release 4.1d .Analyst: Agency/Co.: Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Discovery Jurisdiction: Jefferson County units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Cape George Rd North/South Street: Discovery Road Intersection Orientation: NS TWO-WAY STOP CONTROL SUMMARY 11'\ ...........-.r' oJ IJI' J 'I. 9 :1 \J IVI '" \ gr Rd. Study period (hrs): 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration .upstream Signal? Minor Street: Approach Movement 30 40 0.76 0.76 39 52 3 Undivided Southbound 4 5 6 L T R 30 23 0.78 0.78 38 29 / 1 0 TR No Eastbound 10 11 12 L T R 20 39 0.74 0.74 27 52 0 0 0 / No / 0 0 LR o 1 LT No Westbound 789 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 Flared Approach: Exists?/storage Lanes Configuration Approach Movement Lane Config Delay, NB 1 LT v (vph) C (m) (vph) v/c 95% queue length Control Delay .LOS Approach Delay Approach LOS 39 1528 0.03 0.08 7.4 A Queue Length, and Level of SB Westbound 478 9 Service Eastbound 10 11 LR 12 LOG ITEM # Page-Zt--Of 79 929 0.09 0.28 9.2 A 9.2 A - 'I . HCS2000: Unsignalized Intersections Release 4.1d GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 \. ,\ i (:l )()f Ir Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: gr Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Discovery Rd. Jurisdiction: Jefferson County units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Cape George Rd North/South Street: Discovery Road Intersection Orientation: NS Study period (hrs): 0.25 . Major Street Movements Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? Vehicle Volumes and Adjustments 1 2 345 L T R L T 6 R 30 0.76 10 39 3 Undivided 40 0.76 13 52 30 0.78 10 38 / o 1 LT 1 0 TR No No 23 0.78 7 29 Minor Street Movements 11 T 7 L 8 T 9 10 R L 20 0.74 7 27 0 / 0 o Volume Peak Hour Factor, PHF Peak-IS Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 Flared Approach: Exists?/storage RT Channelized? Lanes . Configuration LR Pedestrian Volumes and Adjustments 13 14 15 16 Movements Flow (ped/hr) o o o o 12 R 39 0.74 13 52 0 No / o # LO~ 'TEA" "I IV, 1'"'\\- '-age .~ ~/_of -- ; , \ ; I , MAY - 9 ?005 Lane Width (ft) Walking Speed (ft/sec) . Percent Blockage 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: 52 o 1700 1700 1 Worksheet 4-Critical Gap and Follow-up Time Calculation . Critical Gap Calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 7.1 6.2 t(c,hv) 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 P(hv) 3 0 0 t(c,g) 0.20 0.20 0.10 0.20 0.20 0.10 Grade/l00 0.00 0.00 0.00 0.00 0.00 0.00 t(3,lt) 0.00 0.70 0.00 t (c, T) : I-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2-stage 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 t(c) I-stage 4.1 6.4 6.2 2-stage FOllow-Up Time Calculations Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(f,base) 2.20 3.50 3.30 t ( f, HV) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 P(HV) 3 0 0 t (f) 2.2 3.5 3.3 .worksheet 5-Effect of Upstream Signals Computation I-Queue Clearance Time at Upstream Signal Movement 2 Movement 5 V(t) V (l,prrOGvl(l'EEM V(l,prot) # Page .60 V prog of '-.i _H'~_...~_ '>--,'CC- _~..__-._. , ' '.-- Total Saturation Flow Rate, s (vph) Arrival Type . Effective Green, g (see) Cycle Length, C (see) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(q1) g(q2) g(q) MAY - 9 'l1)()l5 Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t(a) (see) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result p(2) p(5) .p(dOm) p (subo) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) (1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II P (1) P (4) P (7) P (8) P (9) p(10) p(ll) p(12) Computation 4 and 5 Single-Stage Process Movement 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R 67 182 52 v c,x s Px .v c,u,x C r,x C plat,x LOG IT:=^A --.., Two-Stage Process # Page~Cf - 7 8 10 11 ,/ ,'1 ~j Stage1 Stage2 Stage1 Stage2 Stage1 Stage2 Stage1 Stage2 . ~(C,x) P(x) V(c,u,x) 1500 C(r,x) C(plat,x) ~A AY - 9 ~00" Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor St. 9 12 conflicting Flows Potential capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. 1. 00 52 1021 1. 00 1021 0.95 1. 00 step 2: LT from Major St. 4 1 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. . Maj L-Shared Prob Q free st. Step 3: TH from Minor St. 1. 00 67 1528 1. 00 1528 0.97 0.97 1. 00 8 11 conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvrnnt Movement Capacity Probability of Queue free st. 1. 00 0.97 1. 00 0.97 1. 00 1. 00 step 4: LT from Minor St. 7 10 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvrnnt Movement Capacity 1. 00 0.97 0.98 0.93 182 812 1. 00 0.97 791 Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance step 3: TH from Minor st. 8 11 .part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvrnnt Movement Capacity Probability of Queue free St. LOG ITEM # Page -32.- of . ---- --=... . . \ i Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity V. ,\ 'I - q )r\l\~ Part 3 - Single stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.97 1. 00 0.97 Result for 2 stage process: a y C t Probability of Queue free st. 1. 00 1. 00 Step 4: LT from Minor St. 10 7 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. 1, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.97 0.98 0.93 182 812 1. 00 0.97 791 Results for Two-stage process: a y C t Worksheet 8-Shared Lane Calculations 791 . Movement 7 8 9 10 11 12 L T R L T R I - LU\.:J , I t:M 27 52 # 791 1021 Page 929 ~ 3._ of ; ;- Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) Worksheet 9-Computation of Effect of Flared Minor Street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 791 1021 Volume 27 52 Delay Q sep Q sep +1 round (Qsep +1) n max C sh 929 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LT LR v (vph) 39 79 C(m) (vph) 1528 929 vlc 0.03 0.09 . 95% queue length 0.08 0.28 Control Delay 7.4 9.2 LOS A A Approach Delay 9.2 Approach LOS A Worksheet II-Shared Major LT Impedance and Delay p(oj) v(il) , v(i2) , s (il) , s ( i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 0.97 1. 00 52 0 2 or 5 1700 3 or 6 1700 0.97 7.4 1 0.2 lanes \ \ , . LOG ITEM # Page--3~of !J!.\ 0{ - 0 )( q~ , i "-/. /- HCS2000: Unsignalized Intersections Release 4.1d Analyst: gr Agency/Co.: Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Golf Course Acc Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Golf Course Access/Aldrich Rd. North/South Street: Cape George Rd. Intersection Orientation: NS Study period (hrs): . TWO-WAY STOP CONTROL SUMMARY \ , :tn t... 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R 6 0.75 8 o Southbound 4 5 6 L T R 1 40 0 0.57 0.57 0.57 1 70 0 7 / 0 1 0 LTR No Eastbound 10 11 12 L T R 0 0 1 0.25 0.25 0.25 0 0 4 0 0 0 0 / No / 0 1 0 LTR Volume 1 63 4 Peak-Hour Factor, PHF 0.81 0.81 0.81 Hourly Flow Rate, HFR 1 77 4 Percent Heavy Vehicles 3 Median Type/Storage Undivided RT Channelized? Lanes 0 1 0 Configuration LTR . Upstream Signal? No Minor Street: Approach Westbound Movement 7 8 9 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage Lanes 0 Configuration 0 0 0.75 0.75 0 0 0 0 0 No 1 0 LTR Delay, NB 1 LTR Approach Movement Lane Config v (vph) C (m) (vph) v/c 95% queue length Control Delay . LOS Approach Delay Approach LOS 1 1524 0.00 0.00 7.4 A Queue SB 4 LTR Length, and Level of Westbound 789 LTR Service Eastbound 10 11 LTR 12 1 1486 0.00 0.00 7.4 A 4 998 0.00 0.01 8.6 A 8.6 A 8 812 0.01 0.03 9.5 A 9.5 A # LOG ITEM ,... rag~3_g_~of ~ . HCS2000: Unsignalized Intersections Release 4.1d GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com 1/ Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Golf Course Acc Jurisdiction: Jefferson County units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Golf Course Access/Aldrich Rd. North/South Street: Cape George Rd. Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments 12345 L T R L T 6 R . Maj or Street Movements Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? 1 63 0.81 0.81 o 19 1 77 3 Undivided 010 LTR No 4 1 40 0.81 0.57 0.57 1 0 18 4 1 70 7 / o 0.57 o o o 0 1 0 LTR No 9 10 11 12 R L T R 0 0 0 1 0.75 0.25 0.25 0.25 0 0 0 1 0 0 0 4 0 0 0 0 0 No / No / 0 1 0 LTR Minor Street Movements 7 L 8 T Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage RT Channelized? Lanes .configuration 6 0.75 2 8 o o 0.75 o o o o o 1 LTR Pedestrian Volumes and Adjustments 13 14 15 16 LOG lTEiv, # page_3-<.e_ of Movements Flow (ped/hr) :'"'\., o o o - o . . . Lane Width (ft) Walking Speed (ft/sec) Percent Blockage 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o , , I if '~ Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Flow vph Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 77 70 4 0 1700 1700 1700 1700 1 1 Shared In volume, maJor th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: Worksheet 4-critical Gap and Follow-up Time Calculation critical Gap Calculation Movement 1 4 L L t(c,base) t(c,hv) P(hv) t(c,g) Grade/l00 t(3,lt) t (c, T) : 4.1 1. 00 3 1-stage 2-stage I-stage 2-stage 0.00 0.00 0.00 4.1 t(c) 4.1 1. 00 7 0.00 0.00 0.00 4.2 7 L 7.1 1. 00 o 0.20 0.00 0.00 0.00 1. 00 7.1 6.5 1. 00 o 0.20 0.00 0.00 0.00 1. 00 6.5 8 T 9 R 10 L 7.1 1. 00 o 0.20 0.00 0.00 0.00 1. 00 7.1 11 T 6.5 1. 00 o 0.20 0.00 0.00 0.00 1. 00 6.5 12 R 6.2 1. 00 o 0.10 0.00 0.00 0.00 0.00 6.2 Follow-Up Time Calculations Movement 1 4 L L t(f,base) t(f,HV) P(HV) t (f) 2.20 0.90 3 2.2 2.20 0.90 7 2.3 7 L 3.50 0.90 o 3.5 4.00 0.90 o 4.0 Worksheet 5-Effect of Upstream Signals 6.2 1. 00 o 0.10 0.00 0.00 0.00 0.00 6.2 8 T 9 R 10 L 3.50 0.90 o 3.5 Computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) 3.30 0.90 o 3.3 11 T 4.00 0.90 o 4.0 0....... . ""~v 12 R 3.30 0.90 o 3.3 _Of Movement S V(t) V(l,prot) V prog ..",. \.../",< \ \,i . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (see) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) \ I Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t (a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event periods Result . P (2) P (5) p(dom) p(subo) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) (1 ) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p(l) P (4) p(7) P (8) P (9) p(10) p(ll) p(12) 1 4 7 8 9 10 11 12 L L L T R L T R 70 81 155 153 79 153 155 70 ~p LOG ITEM 71" Page-3%' of - --. 8 10 11 Computation 4 and 5 Single-Stage Process Movement . v c,x s Px V c,u,x C r,x C plat,x 7 Two-Stage Process . . . Stagel Stage2 Stagel Stage2 Stagel Stage2 Stagel Stage2 V(c,X) s P(x) V(c,u,x) 1500 1500 C(r,x) C(plat,x) Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. step 2: LT from Major st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. Maj L-Shared Prob Q free St. step 3: TH from Minor st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. Step 4: LT from Minor st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1500 1500 9 12 79 987 1. 00 987 1. 00 70 998 1. 00 998 1. 00 4 1 81 1486 1. 00 1486 1. 00 1. 00 70 1524 1. 00 1524 1. 00 1. 00 8 11 153 742 1. 00 1. 00 741 1. 00 155 741 1. 00 1. 00 740 1. 00 7 10 155 816 1. 00 1. 00 1. 00 0.99 812 153 819 1. 00 1. 00 1. 00 1. 00 818 step 3: TH from Minor St. Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance 8 11 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free ~t. LOG ITEM # PagS-39 of - -- - '\ , I Part 2 - Second Stage . Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 153 742 1. 00 1. 00 741 155 741 1. 00 1. 00 740 Result for 2 stage process: a y C t Probability of Queue free St. 741 1. 00 740 1. 00 Step 4: LT from Minor st. 7 10 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt . Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 155 816 1. 00 1. 00 1. 00 0.99 812 153 819 1. 00 1. 00 1. 00 1. 00 818 Results for Two-stage process: a y C t . Movement Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) 7 L 8 T 9 R 8~OG ITEM :1:1: -, Page~Or- 11 12-- T R 812 Worksheet 8-Shared Lane Calculations 10 L 8 812 o 741 812 o 987 o 818 o 740 998 4 998 Worksheet 9-Computation of Effect of Flared Minor Street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 812 741 987 818 740 998 Volume 8 0 0 0 0 4 Delay Q sep Q sep +1 round (Qsep +1) n max C sh 812 998 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LTR LTR LTR LTR v (vph) 1 1 8 4 C(m) (vph) 1524 1486 812 998 vlc 0.00 0.00 0.01 0.00 . 95% queue length 0.00 0.00 0.03 0.01 Control Delay 7.4 7.4 9.5 8.6 LOS A A A A Approach Delay 9.5 8.6 Approach LOS A A Worksheet I1-Shared Major LT Impedance and Delay Movement 2 Movement 5 p(oj) 1. 00 1. 00 v (il) , Volume for stream 2 or 5 77 70 v(i2) , Volume for stream 3 or 6 4 0 s (il) , Saturation flow rate for stream 2 or 5 1700 1700 s (i2) , Saturation flow rate for stream 3 or 6 1700 1700 P*(oj) 1. 00 1. 00 d (M, LT) , Delay for stream 1 or 4 7.4 7.4 N, Number of major street through lanes 1 1 d(rank,l) Delay for stream 2 or 5 0.0 0.0 . LOG ITEM # Page_~Lof '\ , HCS2000: Unsignalized Intersections Release 4.1d .Analyst: Agency/co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: SR-20/Discovery Rd. Jurisdiction: WSDOT/Jefferson County Units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Discovery Rd/Four Corners Rd North/South Street: SR-20 Intersection Orientation: NS TWO-WAY STOP CONTROL SUMMARY gr Study period (hrs): 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration .upstream Signal? Minor Street: Approach Movement 10 0.82 12 9 Undivided Southbound 4 5 6 L T R 42 145 29 0.87 0.87 0.87 48 166 33 4 / 0 1 0 LTR No Eastbound 10 11 12 L T R 111 0.82 135 30 0.82 36 o 1 LT No 1 R No Westbound 789 L T R Volume 38 66 19 11 69 18 Peak Hour Factor, PHF 0.90 0.90 0.90 0.77 0.77 0.77 Hourly Flow Rate, HFR 42 73 21 14 89 23 Percent Heavy Vehicles 4 4 4 7 7 7 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes 0 1 0 0 1 0 Configuration LTR LTR Approach Movement Lane Config Delay, NB 1 LT v (vph) C(m) (vph) v/c 95% queue length Control Delay LOS ~pproach Delay Approach LOS 12 1333 0.01 0.03 7.7 A Queue 5B 4 LTR Length, and Level of Westbound 789 LTR Service Eastbound 10 11 LTR 12 48 1394 0.03 0.11 7.7 A 126 491 0.26 1. 01 14.8 B 14.8 B \ 'I .u 7r 136 476 0.29 1.17 15.6 C 15.6 L<.9G ITEM Page _ <(2, of --- ~ v.../ ~ 9 2005 - r n~.. :.)f-\:. ~..:: . HCS2000: Unsignalized Intersections Release 4.1d GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: gr Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: SR-20/Discovery Rd. Jurisdiction: WSDOT/Jefferson County Units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Discovery Rd/Four Corners Rd North/South Street: SR-20 Intersection Orientation: NS study period (hrs): 0.25 Vehicle Volumes and Adjustments . Major Street Movements 1 2 3 4 5 L T R L T Volume 10 111 30 42 145 Peak-Hour Factor, PHF 0.82 0.82 0.82 0.87 0.87 Peak-15 Minute Volume 3 34 9 12 42 Hourly Flow Rate, HFR 12 135 36 48 166 Percent Heavy Vehicles 9 4 Median Type/Storage Undivided / RT Channelized? No Lanes 0 1 1 0 1 0 Configuration LT R LTR Upstream Signal? No No Minor Street Movements 7 8 9 10 11 L T R L T Volume 38 66 19 11 69 Peak Hour Factor, PHF 0.90 0.90 0.90 0.77 0.77 Peak-15 Minute Volume 11 18 5 4 22 Hourly Flow Rate, HFR 42 73 21 14 89 Percent Heavy Vehicles 4 4 4 7 7 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / RT Channelized? Lanes 0 1 0 0 1 0 . Configuration LTR LTR 6 R 29 0.87 8 33 12 R 18 0.77 6 23 7 No / Movements LOG ITEM Pedestrian Volumes and Adjustments 13 14 15 16 \1 - 9 ?oor; Flow (ped/hr )# Page () o o o , .. j(',(; erg, of . . . Lane Width (ft) Walking Speed (ft/sec) Percent Blockage Prog. Flow vph S2 Left-Turn Through S5 Left-Turn Through 12.0 4.0 o 12.0 4.0 a 12.a 4.0 a 12.0 4.0 o Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph r.::: (.. ,\ i I \ u_..~ " --......,.',., , f, MAY - 9 2005 Distance to Signal feet Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: Movement 2 135 o 1700 1700 1 Worksheet 4-critical Gap and Follow-up Time Calculation critical Gap Calculation Movement 1 4 L L t(c,base) t(c,hv) P (hv) t(c,g) Grade/lOa t(3,lt) t (c, T) : 4.1 1. 00 9 I-stage 2-stage I-stage 2-stage 0.00 0.00 0.00 4.2 t(c) 4.1 1. 00 4 0.00 0.00 0.00 4.1 Follow-Up Time Calculations Movement 1 4 L L t(f,base) t(f,HV) P(HV) t(f) 2.20 0.90 9 2.3 2.20 0.90 4 2.2 7 L 7.1 1. 00 4 0.20 0.00 0.00 0.00 1. 00 7.1 7 L 3.50 0.90 4 3.5 8 T 6.5 1. 00 4 0.20 0.00 0.00 0.00 1. 00 6.5 8 T 4.00 0.90 4 4.0 Worksheet 5-Effect of Upstream Signals 9 R 6.2 1. 00 4 0.10 0.00 0.00 0.00 0.00 6.2 9 R 3.30 0.90 4 3.3 10 L 7.1 1. 00 7 0.20 0.00 0.00 0.00 1. 00 7.2 10 L 3.50 0.90 7 3.6 Computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) LOG ITEM V prog # Page~t(:(_of Movement 5 166 33 1700 1700 1 11 T 6.5 1. 00 7 0.20 0.00 0.00 0.00 1. 00 6.6 11 T 4.00 0.90 7 4.1 12 R 6.2 1. 00 7 0.10 0.00 0.00 0.00 0.00 6.3 12 R 3.30 0.90 7 3.4 Movement 5 V(t) V(l,prot) . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (see) Cycle Length, C (see) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) \ , M i.\ V - q 1005 Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V (t) V (1, prot) Movement 5 V (t) V (1, prot) alpha beta Travel time, t(a) (see) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result 0.000 0.000 p(2) p(5) . p(dom) p(subo) Constrained or unconstrained? Proportion unblocked for minor movements, p(x) ( 1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p(l) P (4) p(7) P (8) P (9) P (10) P (11) p(12) Computation 4 and 5 Single-Stage Process Movement Two-Stage Process 1 4 7 8 9 10 11 12 L L L T R L T R 199 171 493 454 135 502 473 182 # LOG ITEM Page _ lJ..L 0'- 8 10 11 \ --, V c,X s Px . V C,U,x C r,x C plat,x 7 stage 1 Stage2 Stage 1 Stage2 Stage1 Stage2 Stage1 Stage2 . ~(C,x) P(x) V(c,u,x) 1500 1500 1500 1500 \ I C(r,x) C(plat,x) ~ if'. Worksheet 6-Impedance and Capacity Equations Step 1: RT from Minor St. 9 12 Conflicting Flows Potential capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. 135 909 1. 00 909 0.98 182 848 1. 00 848 0.97 step 2: LT from Major st. 4 1 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. . Maj L-Shared Prob Q free st. Step 3: TH from Minor st. 171 1394 1. 00 1394 0.97 0.96 199 1333 1. 00 1333 0.99 0.99 8 11 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. 454 499 1. 00 0.95 475 0.85 473 482 1. 00 0.95 459 0.81 Step 4: LT from Minor st. 7 10 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 493 483 1. 00 0.77 0.82 0.80 386 502 472 1. 00 0.81 0.85 0.83 392 Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance Step 3: TH from Minor St. 8 11 .part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. LOG ITEM # Page_~~_ol . Part 2 - Second stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Result for 2 stage process: a y C t Probability of Queue free st. Step 4: LT from Minor st. Part 1 - First stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt ~ Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity Results for Two-stage process: a y C t Worksheet 8-Shared Lane Calculations . Movement Volume (vph) lOG ITrl-? A Movement Capacity (vph) # ~~6 Shared Lane Capacity (vph~'- Par!>;::), ~ -.,.1: .... -.;...., _v , 7 L ------. 454 499 1. 00 0.95 475 475 0.85 7 493 483 1.00 0.77 0.82 0.80 386 386 8 T 9 R 73 475 476 21 909 10 L 14 392 473 482 1. 00 0.95 459 459 0.81 502 472 1. 00 0.81 0.85 0.83 392 392 11 T 89 459 491 \ i '(1\ I~ 10 12 R 23 848 Worksheet 9-Computation of Effect of Flared Minor street Approaches .Movement 7 L 8 T 9 R 10 L 11 T 12 R 386 42 475 73 909 21 392 14 459 89 848 23 C sep Volume Delay Q sep Q sep +1 round (Qsep +1) \ I : I n max C sh SUM C sep n C act 476 r,4 91 -' ")( II; Worksheet la-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LT LTR LTR LTR v (vph) 12 48 136 126 C(m) (vph) 1333 1394 476 491 vlc 0.01 0.03 0.29 0.26 .95% queue length 0.03 0.11 1.17 1. 01 Control Delay 7.7 7.7 15.6 14.8 LOS A A C B Approach Delay 15.6 14.8 Approach LOS C B Worksheet 11-Shared Major LT Impedance and Delay Movement 2 Movement 5 p(oj) 0.99 0.97 v(il) , Volume for stream 2 or 5 135 16.6 v(i2) , Volume for stream 3 or 6 0 33 s (il) , Saturation flow rate for stream 2 or 5 1700 1700 s (i2) , Saturation flow rate for stream 3 or 6 1700 1700 P*(oj) 0.99 0.96 d(M,LT) , Delay for stream 1 or 4 7.7 7.7 N, Number of major street through lanes 1 1 d(rank,l) Delay for stream 2 or 5 0.1 0.3 . LOG ITEM # Page -ift.-oL HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY .Analyst: Agency/Co. : Date Performed: 3/19/05 Analysis Time Period: pm peak Intersection: Discovery Road/Mill Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Mill Road North/South Street: Discovery Road Intersection Orientation: EW gr \ \ Road ,I ,r Study period (hrs): 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Eastbound 2 3 T R No / Westbound 4 5 6 L T R 163 0 96 0.85 0.85 0.85 191 0 112 0 / 0 1 0 LTR No Southbound 10 11 12 L T R 65 40 0.91 0.91 71 43 1 1 0 / 0 1 LT Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration .upstream Signal? Minor Street: Approach Movement Undivided No Northbound 789 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage Lanes Configuration 26 0.74 35 1 o 113 0.74 152 1 1 0 TR De I a y , EB 1 Queue WB 4 LTR Length, and Level of Service Northbound Southbound 7 8 9 10 11 TR LT Approach Movement Lane Config 12 v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS ~pproach Delay Approach LOS 191 1636 0.12 0.40 7.5 A 187 837 0.22 0.85 10.5 B 114 371 0.31 1. 28 18.9 C 10.5 B 18.9 C ,-- # L.U~ II EM "7 Page_~_o,---_ . . . HCS2000: Unsignalized Intersections Release 4.1d ,:~ i\ f - 9 'l()05 GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency/Co. : Date Performed: 3/19/05 Analysis Time Period: pm peak Intersection: Discovery Road/Mill Road Jurisdiction: Jefferson County units: U. S. Customary Analysis Year: existing Project ID: Discovery Bay Golf Course East/West Street: Mill Road North/South Street: Discovery Road Intersection Orientation: EW study period (hrs): 0.25 Vehicle Volumes and Adjustments 1 2 3 4 5 6 L T R L T R 163 0 96 0.85 0.85 0.85 48 0 28 191 0 112 0 Undivided / Major Street Movements Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? Minor Street Movements 7 L Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage RT Channelized? Lanes Configuration 0 1 0 LTR No No 8 9 10 11 12 T R L T R 26 113 65 40 0.74 0.74 0.91 0.91 9 38 18 11 35 152 71 43 1 1 1 1 0 0 No / / 1 0 0 1 TR LT Movements Pedestrian Volumes and Adjustments 13 14 15 16 Flow (ped/hr) o o o ,,....~ '-V\.:J II EM # Pags_sc> of - o / X ,_ --, , . Lane width (ft) Walking Speed (ft/sec) Percent Blockage ~ "--..--...--....--.- ~ " ;' f') ;. C...., \ } \\ 1 i: "I . 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o ,I' "I - 9 2005 Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 5 Movement 2 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: o 112 1700 1700 1 Worksheet 4-Critical Gap and Follow-up Time Calculation . critical Gap Calculation Movement 1 4 L L t(c,base) 4.1 t(c,hv) 1. 00 1. 00 P(hv) 0 t(c,g) Grade/100 t(3,lt) 0.00 t(c,T): 1-stage 0.00 0.00 2-stage 0.00 0.00 t (c) I-stage 4.1 2-stage Follow-Up Time Calculations Movement 1 4 L L 7 8 9 10 11 12 L T R L T R 6.5 6.2 7.1 6.5 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1 1 1 1 0.20 0.20 0.10 0.20 0.20 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 6.5 6.2 7.1 6.5 t(f,base) t(f,HV) P(HV) t(f) 0.90 2.20 0.90 o 2.2 7 L 8 9 10 11 12 T R L T R 4.00 3.30 3.50 4.00 0.90 0.90 0.90 0.90 0.90 1 1 1 1 4.0 3.3 3.5 4.0 0.90 . Worksheet 5-Effect of Upstream Signals Computation I-Queue Clearance Time at Upstream signal Movement 2 V(t) V(l,prot) V prog )/ - /~ '~,,........ Movement 5 Vr.(i;.1 V(l,prot) uG ITFI\A # Page~l of -~ -- "- . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g (q) " \ 'r;( I~ Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t (a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result . p(2) P (5) P ( dom) p(subo) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) ( 1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p (1) p(4) P (7) P (8) P (9) P (10) p(ll) p(12) Computation 4 and 5 Single-Stage Process Movement 1 L 4 L 7 L 8 9 10 11 12 T R L T R 494 0 532 438 " LOG ITEM 1+ Pags_15z.- of - 10 11 . V c,X s PX V C,u,X o C r,x C plat,x 7 8 Two-Stage Process x.--. stage 1 Stage2 stage 1 Stage2 Stagel Stage2 stage 1 Stage2 . V(c,x) s P(x) V(c,u,x) 1500 C(r,x) C(plat,x) Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor St. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. step 2: LT from Major st. . Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. Maj L-Shared Prob Q free st. step 3: TH from Minor st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. step 4: LT from Minor St. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity o 1088 1. 00 1088 0.86 o 1636 1. 00 1636 0.88 0.88 494 478 1. 00 0.88 418 0.92 1. 00 0.79 0.84 0.84 o 9 4 8 7 step 3: TH from Minor st. Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance . Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due Movement Capacity Probability of Queue free st. Factor to Impeding mvmnt 8 o \ I ,f" l 12 1. 00 1. 00 1 1. 00 1. 00 11 438 514 1. 00 0.88 450 0.90 10 532 460 1. 00 0.80 0.85 0.73 335 11 # LOG ITEM Page~ _of --- . Part 2 - Second Stage Conflicting Flows Potential capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Result for 2 stage process: a y C t Probability of Queue free St. Step 4: LT from Minor st. Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt . Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity Results for Two-stage process: a y C t Worksheet 8-Shared Lane Calculations . Movement 7 L Volume (vph) Movement Capacity (vph) LOG ITEM Shared Lane Capacity (VPh)# Page___-t~of 494 478 1. 00 0.88 418 418 0.92 7 1. 00 0.79 0.84 0.84 8 T 9 R 35 418 152 1088 837 10 L 71 335 371 \i 438 514 1. 00 0.88 450 450 0.90 532 460 1. 00 0.80 0.85 0.73 335 335 11 T 43 450 \ i ,r,\ I~ 10 12 R Worksheet 9-Computation of Effect of Flared Minor Street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 418 1088 335 450 Volume 35 152 71 43 Delay Q sep Q sep +1 round (Qsep +1) n max ,r)!11 C sh 837 371 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LTR TR LT v (vph) 191 187 114 C(m) (vph) 1636 837 371 v/c 0.12 0.22 0.31 .95% queue length 0.40 0.85 1. 28 Control Delay 7.5 10.5 18.9 LOS A B C Approach Delay 10.5 18.9 Approach LOS B C Worksheet II-Shared Major LT Impedance and Delay p(oj) v(il) , v(i2) , s (il) , s (i2) , P* (oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 1. 00 0.88 0 112 2 or 5 1700 3 or 6 1700 0.88 7.5 1 0.9 lanes . LOG ITEM # Pags_S-Lof . HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY \ \ Analyst: gr Agency/co.: Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Discovery Rd. Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West street: Cape George Rd North/South Street: Discovery Road Intersection orientation: NS study period (hrs): 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration . Upstream Signal? Minor Street: Approach Movement . 33 0.76 43 3 Undivided Southbound 4 5 6 L T R 33 25 0.78 0.78 42 32 / 1 0 TR No Eastbound 10 11 12 L T R 22 43 0.74 0.74 29 58 0 0 0 / No / 0 0 LR 44 0.76 57 o 1 LT No Westbound 7 8 9 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 Flared Approach: Exists?/Storage Lanes Configuration Approach Movement Lane Config Delay, NB 1 LT v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 43 1519 0.03 0.09 7.4 A Queue Length, and Level of SB Westbound 478 9 Service Eastbound 10 11 LR 12 r~ 1-- - I . I I # LOG ITEM - ----.. '-age~_of --- 87 917 0.09 0.31 9.3 A 9.3 A . HCS2000: Unsignalized Intersections Release 4.1d GERALYN REINART, P.E. 'f 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency/Co.: Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Discovery Rd. Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West Street: Cape George Rd North/South Street: Discovery Road Intersection Orientation: NS Study period (hrs): 0.25 .Major Street Movements Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/storage RT Channelized? Lanes Configuration Upstream Signal? Vehicle Volumes and Adjustments 1 2 3 4 L T R L 5 T 6 R 33 0.76 11 43 3 Undivided 44 0.76 14 57 33 0.78 11 42 25 0.78 8 32 / 1 0 TR No 9 10 11 12 R L T R 22 43 0.74 0.74 7 15 29 58 0 0 0 / No / 0 0 LR o 1 LT No Minor Street Movements 8 T 7 L Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 Flared Approach: Exists?/Storage RT Channelized? Lanes .configuration Movements Flow (ped/hr) Pedestrian Volumes and Adjustments 13 14 15 16 ,,,- # ~VI...:7ITEM Page~ -- ---- o o o o ...--.~ ,.- , ': 'il . Lane width (ft) Walking Speed (ft/sec) Percent Blockage 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o :) "'I(lh Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: 57 o 1700 1700 1 Worksheet 4-Critical Gap and Follow-up Time Calculation . Critical Gap Calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 7.1 6.2 t(c,hv) 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 P(hv) 3 0 0 t (c, g) 0.20 0.20 0.10 0.20 0.20 0.10 Grade/l00 0.00 0.00 0.00 0.00 0.00 0.00 t(3,lt) 0.00 0.70 0.00 t(c,T): I-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2-stage 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 t (c) I-stage 4.1 6.4 6.2 2-stage Follow-Up Time Calculations Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(f,base) 2.20 3.50 3.30 t ( f, HV) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 P(HV) 3 0 0 t (f) 2.2 3.5 3.3 . Worksheet 5-Effect of Upstream Signals computation I-Queue ctocffTEMe at Upstream Signal Movement 2 Movement 5 # V(t) V(l,prot) V(t) V(l,prot) V prog Faye-5i-or _ ~( -.' -~~ . . . \ Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g (q) Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t(a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result p(2) P (5) p(dom) p (subo) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) ( 1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p(l) P (4) p(7) P (8) P (9) P (10) p(11) P (12) Computation 4 and 5 Single-Stage Process Movement 1 4 7 8 9 10 11 12 L L L T R L T R 74 201 58 # LOG ITEM Page S 1 of 8 10 11 I""'--~ ",,:;y V c,x s Px V c,u,x C r,x C plat,x TW0-Stage Process 7 stagel Stage2 Stage 1 Stage2 stage 1 Stage2 Stage1 Stage2 .~(C,x) P(x) V(c,u,x) 1500 \ Iv I ' C(r,x) C(plat,x) Worksheet 6-Impedance and Capacity Equations Step 1: RT from Minor St. 9 12 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. 1. 00 58 1014 1.00 1014 0.94 1. 00 Step 2: LT from Major st. 4 1 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. eMaj L-Shared Prob Q free st. step 3: TH from Minor st. 1. 00 74 1519 1. 00 1519 0.97 0.97 1. 00 8 11 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. 1. 00 0.97 1. 00 0.97 1. 00 1. 00 Step 4: LT from Minor st. 7 10 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.97 0.98 0.92 201 792 1. 00 0.97 770 Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance step 3: TH from Minor st. 8 11 ~art 1 - First stage ~onflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due Movement Capacity Probability of Queue Factor to Impeding LOG ITEM # Page &0 of mvmnt - __ free st. I :~-- \ . Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity M II I Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.97 1. 00 0.97 Result for 2 stage process: a y C t Probability of Queue free st. 1. 00 1. 00 Step 4: LT from Minor st. 7 10 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt . Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.97 0.98 0.92 201 792 1. 00 0.97 770 Results for Two-stage process: a y C t 770 Worksheet 8-Shared Lane Calculations . Movement 7 8 L T , Qr" '"T'r-1Il " - ""' I I L-I\II 9 R 10 L 11 T 12 R Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) # Page ~( of 29 770 58 1014 917 Worksheet 9-Computation of Effect of Flared Minor Street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 770 1014 Volume 29 58 Delay Q sep Q sep +1 round (Qsep +1) n max C sh 917 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LT LR v (vph) 43 87 C(m) (vph) 1519 917 v/c 0.03 0.09 .95% queue length 0.09 0.31 Control Delay 7.4 9.3 LOS A A Approach Delay 9.3 Approach LOS A Worksheet II-Shared Major LT Impedance and Delay p(oj) v (il), v (i2) , s (il), s (i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 0.97 1. 00 57 0 2 or 5 1700 3 or 6 1700 0.97 7.4 1 0.2 lanes . LOG ITEfVi # Page~'===-Of - ~",.-., -'~. -~\ i HCS2000: Unsignalized Intersections Release 4.1d eAnalyst: Agency / Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Golf Course Ace Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West street: Golf Course Access/Aldrich Rd. North/South Street: Cape George Rd. Intersection Orientation: NS TWO-WAY STOP CONTROL SUMMARY gr If study period (hrs): 0.25 Major street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage Lanes 0 Configuration Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/storage RT Channelized? Lanes Configuration Upstream Signal? eMinor Street: Approach Movement 1 69 0.81 0.81 1 85 3 Undivided southbound 4 5 6 L T R 1 44 0 0.57 0.57 0.57 1 77 0 7 / 0 1 0 LTR No Eastbound 10 11 12 L T R 0 0 1 0.25 0.25 0.25 0 0 4 0 0 0 0 / No / 0 1 0 LTR 4 0.81 4 010 LTR No Westbound 7 8 L T 9 R 6 0.75 8 o o 0.75 o o o o 0.75 o o No 1 LTR o Approach Movement Lane Config Delay, NB 1 LTR v (vph) C(m) (vph) v/c 95% queue length Control Delay LOS ~;pproach Delay "Approach LOS 1 1515 0.00 0.00 7.4 A Queue SB 4 LTR Length, and Level of Westbound 789 LTR Service Eastbound 10 11 LTR 12 1 1475 0.00 0.00 7.4 A 8 794 0.01 0.03 9.6 A 9.6 La A # G ITE~A Pag~ 4 990 0.00 0.01 8.7 A 8.7 A 'i"'....,..,.,..-~ '. _.~~ .....,..,......~-',. . HCS2000: Unsignalized Intersections Release 4.1d GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency / Co . : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Golf Course Acc Jurisdiction: Jefferson County units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West Street: Golf Course Access/Aldrich Rd. North/South Street: Cape George Rd. Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments 1 2 345 L T R L T 6 R . Major Street Movements Volume Peak-Hour Factor, PHF Peak-IS Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? 1 69 0.81 0.81 o 21 1 85 3 Undivided 4 0.81 1 4 1 0.57 o 1 7 44 0.57 19 77 / o 1 LTR No o 0.57 o o o Minor Street Movements Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage RT Channelized? Lanes . Configuration 010 LTR No 7 8 L T 6 0 0.75 0.75 2 0 8 0 0 0 0 9 R o 0.75 o o o 10 L o 0.25 o o o / 11 T o 0.25 o o o o o 1 LTR No o 1 LTR o Pedestrian Volumes and Adjustments 13 14 15 16 Movements 12 R 1 0.25 1 4 0 No / o ..lj LOG J/1==A if ~ -.*, p~~ -;;;J..... ~ - __of --- Flow (ped/hr) o 0 0 0 ':-- '. '.~~' \ . . Lane Width (ft) Walking Speed (ft/sec) Percent Blockage 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o . \ \ Iv bY Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 85 77 4 0 1700 1700 1700 1700 1 1 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: Worksheet 4-critical Gap and Follow-up Time Calculation Critical Gap Calculation Movement 1 L 4 L 7 L 7.1 1. 00 o 0.20 0.00 0.00 0.00 1. 00 7.1 7 L 3.50 0.90 o 3.5 6.5 1. 00 o 0.20 0.00 0.00 0.00 1. 00 6.5 8 T 4.00 0.90 o 4.0 8 T 9 R 10 L 7.1 1. 00 o 0.20 0.00 0.00 0.00 1. 00 7.1 10 L 3.50 0.90 o 3.5 . Worksheet 5-Effect of Upstream Signals Computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) t(c,base) t(c,hv) P(hv) t (c, g) Grade/l00 t(3,lt) t (c, T) : 4.1 1. 00 3 4.1 1. 00 7 0.00 0.00 0.00 4.1 0.00 0.00 0.00 4.2 I-stage 2-stage I-stage 2-stage t (c) 6.2 1. 00 o 0.10 0.00 0.00 0.00 0.00 6.2 11 T 6.5 1. 00 o 0.20 0.00 0.00 0.00 1. 00 6.5 12 R 6.2 1. 00 o 0.10 0.00 0.00 0.00 0.00 6.2 FOllow-Up Time Calculations Movement 1 4 L L t(f,base) t(f,HV) P(HV) t (f) 2.20 0.90 3 2.2 2.20 0.90 7 2.3 9 R 3.30 0.90 o 3.3 11 T 12 R 4.00 3.30 0.90 0.90 o 0 4:u.0 L()303/TEM 'r Page..h.r of - ''''---,.- Movement 5 V(t) V(l,prot) V prog . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t (a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result . P (2) p(5) p(dom) p(subo) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) ( 1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p (1) p(4) p(7) P (8) P (9) P (10) P (11) p(12) Computation 4 and 5 Single-Stage Process Movement 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R 77 89 170 168 87 168 170 77 V c,X s Px V C,u,X . C r,x C plat,x LO~ I~r-Jt " # '. .....'VI Pa~ """""'.....~.,-- Two-Stage Process 7 8 10 11 stage 1 Stage2 Stage 1 Stage2 Stagel Stage2 Stagel Stage2 . ~(c,X) P (x) V(c,u,x) 1500 1500 C(r,x) C(plat,x) Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Step 2: LT from Major st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. . Maj L-Shared Prob Q free st. step 3: TH from Minor st. conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. step 4: LT from Minor st. Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 87 977 1. 00 977 1. 00 89 1475 1. 00 1475 1. 00 1. 00 168 728 1. 00 1. 00 727 1. 00 170 798 1. 00 1. 00 1. 00 0.99 794 1500 1500 \ I 9 12 77 990 1. 00 990 1. 00 4 1 77 1515 1. 00 1515 1. 00 1. 00 8 11 170 727 1. 00 1. 00 726 1. 00 7 10 168 800 1. 00 1. 00 1. 00 1. 00 799 Step 3: TH from Minor St. Worksheet 7-Cornputation of the Effect of Two-stage Gap Acceptance 11 8 . Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free St. # LOG ITEI\t1 Pa~ ---. '\ Part 2 - Second Stage . Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1 i\ Part 3 - Single stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 168 728 1. 00 1. 00 727 170 727 1. 00 1. 00 726 Result for 2 stage process: a y C t Probability of Queue free st. 727 1. 00 726 1. 00 step 4: LT from Minor st. 7 10 Part 1 - First stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity . Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 170 798 1. 00 1. 00 1. 00 0.99 794 168 800 1. 00 1. 00 1. 00 1. 00 799 Results for Two-stage process: a y C t 794 .Movement Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) 7 L 9 R 79Sl0G ITEM II tt Page_taf-of 11 12 T R Worksheet 8-Shared Lane Calculations 8 T 10 L 8 794 o 727 794 o 977 o 799 o 726 990 4 990 r_ \ / \ ~, Worksheet 9-Computation of Effect of Flared Minor street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 794 727 977 799 726 990 Volume 8 0 0 0 0 4 Delay Q sep Q sep +1 round (Qsep +1) n max C sh 794 990 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LTR LTR LTR LTR v (vph) 1 1 8 4 C(m) (vph) 1515 1475 794 990 v/c 0.00 0.00 0.01 0.00 .95% queue length 0.00 0.00 0.03 0.01 Control Delay 7.4 7.4 9.6 8.7 LOS A A A A Approach Delay 9.6 8.7 Approach LOS A A Worksheet I1-Shared Major LT Impedance and Delay Movement 2 Movement 5 p(oj) 1. 00 1. 00 v(il) , Volume for stream 2 or 5 85 77 v(i2) , Volume for stream 3 or 6 4 0 s (il) , Saturation flow rate for stream 2 or 5 1700 1700 s (i2) , Saturation flow rate for stream 3 or 6 1700 1700 P*(oj) 1. 00 1. 00 d(M,LT) , Delay for stream 1 or 4 7.4 7.4 N, Number of major street through lanes 1 1 d(rank,l) Delay for stream 2 or 5 0.0 0.0 \ \ . LOG ITEM # Page .of r-- \ ,/' \ - \ ---\, HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: gr Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: SR-20/Discovery Rd. Jurisdiction: WSDOT/Jefferson County Units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West Street: Discovery Rd/Four Corners Rd North/South Street: SR-20 Intersection Orientation: NS Study period (hrs): . Major Street: Vehicle Approach Movement 1 L Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration . Upstream Signal? Minor Street: Approach Movement '\ \ 0.25 Volumes and Adjustments Northbound 2 3 T R 116 0.82 141 Southbound 4 5 6 L T R 44 153 31 0.87 0.87 0.87 50 175 35 4 / 0 1 0 LTR No Eastbound 10 11 12 L T R 12 76 20 0.77 0.77 0.77 15 98 25 7 7 7 0 / No / 0 1 0 LTR 10 0.82 12 9 Undivided 31 0.82 37 o 1 LT No 1 R No Westbound 789 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage Lanes 0 Configuration Delay, NB 1 LT 12 1320 0.01 0.03 7.8 A 42 0.90 46 4 Queue SB 4 LTR 50 1386 0.04 0.11 7.7 A 74 21 0.90 0.90 82 23 4 4 0 No 1 0 LTR Length, and Level of Westbound 789 LTR Service Eastbound 10 11 LTR 12 Approach Movement Lane Config v (vph) C (m) (vph) v/c 95% queue length Control Delay .LOS Approach Delay Approach LOS 151 455 0.33 1. 44 16.8 C 16.8 C 138 474 0.29 1. 20 15.7 C 15.7 C , G f""'\ · -.-.... - . - '-' / I C,v, ..--- # PagS-1eLOf " - \-=--- \ . HCS2000: Unsignalized Intersections Release 4.1d GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS \ , Analyst: gr Agency/co.: Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: SR-20/Discovery Rd. Jurisdiction: WSDOT/Jefferson County Units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West Street: Discovery Rd/Four Corners Rd North/South Street: SR-20 Intersection Orientation: NS Study period (hrs): 0.25 . Major street Movements Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? Vehicle Volumes and Adjustments 1 2 3 4 5 6 L T R L T R 10 116 31 44 153 31 0.82 0.82 0.82 0.87 0.87 0.87 3 35 9 13 44 9 12 141 37 50 175 35 9 4 Undivided / No 0 1 1 0 1 0 LT R LTR No No Minor Street Movements 7 L Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage RT Channelized? Lanes . Configuration 42 0.90 12 46 4 o 8 9 10 11 12 T R L T R 74 21 12 76 20 0.90 0.90 0.77 0.77 0.77 21 6 4 25 6 82 23 15 98 25 4 4 7 7 7 0 0 No / No / 1 0 0 1 0 LTR LTR o o '# LOG ITEM Page ~':Lo ~f - --- Pedestrian Volumes and Adjustments 13 14 15 16 Movements Flow (ped/hr) o o ~- . Lane Width (ft) Walking Speed (ft/sec) . Percent Blockage Prog. Flow vph , \ 12.0 4.0 o 12.0 4.0 o Mt 12.0 4.0 o 12.0 4.0 o Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. .-' --Distance Speed to Signal mph feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: Movement 2 Movement 5 141 175 0 35 1700 1700 1700 1700 1 1 Worksheet 4-critical Gap and Follow-up Time Calculation .critical Gap Calculation Movement 1 4 L L t(c,base) t(c,hv) P(hv) t(c,g) Grade/100 t(3,lt) t (c, T) : 4.1 1. 00 9 I-stage 2-stage I-stage 2-stage 0.00 0.00 0.00 4.2 t(c) 4.1 1. 00 4 0.00 0.00 0.00 4.1 7 8 9 10 11 12 L T R L T R 7.1 6.5 6.2 7.1 6.5 6.2 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 4 4 4 7 7 7 0.20 0.20 0.10 0.20 0.20 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 7.1 6.5 6.2 7.2 6.6 6.3 Follow-Up Time Calculations Movement 1 4 L L t(f,base) t(f,HV) P(HV) t(f) 2.20 0.90 9 2.3 2.20 0.90 4 2.2 7 8 9 10 11 12 L T R L T R 3.50 4.00 3.30 3.50 4.00 3.30 0.90 0.90 0.90 0.90 0.90 0.90 4 4 4 7 7 7 3.5 4.0 3.3 3.6 4.1 3.4 Worksheet 5-Effect of Upstream Signals .computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) V prog Movement 5 V (t) lY(0lGPPPe:IVl .u u" Page~, of ---.. Total Saturation Flow Rate, s (vph) Arrival Type eEffective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g (q) Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t(a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result P (2) P (5) ep(dOm) p (subo ) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) ( 1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II P (1) P (4) P (7) P (8) P (9) P (10) P (11) P (12) Computation 4 and 5 Single-Stage Process Movement 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R V c,X s Px 210 178 519 475 141 528 494 192 ev C C c,u,x LO~ ITr=AA .. a....... r,x plat,x # Paos_ ?L Two Sta~e Process ^~ -. -- - 7 8 10 11 Stage1 Stage2 Stage1 Stage2 Stage1 Stage2 Stagel Stage2 .:(C,X) P(x) V(c,u,x) 1500 :'500 1500 ... - r ,....., .......J U U C(r,x) C(plat,x) Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor St. 9 12 141 902 1. 00 902 0.97 192 837 1. 00 837 0.97 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. Step 2: LT from Major St. 4 1 178 1386 1. 00 1386 0.96 0.96 210 1320 1. 00 1320 0.99 0.99 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. ~Maj L-Shared Prob Q free St. Step 3: TH from Minor St. 8 11 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. 475 485 1. 00 0.95 460 0.82 494 469 1. 00 0.95 445 0.78 step 4: LT from Minor St. 7 10 519 464 1. 00 0.74 0.80 0.78 360 528 453 1. 00 0.78 0.83 0.81 367 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance step 3: TH from Minor st. 8 11 .part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due Movement Capacity Probability of Queue Factor to Impeding mvmnt LOG ITEM # Page_~o,- .VL - free S-:. Part 2 - Second stage e Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement capacity 475 485 1. 00 0.95 460 494 469 1. 00 0.95 445 Result for 2 stage process: a y C t Probability of Queue free St. 460 0.82 445 0.78 Step 4: LT from Minor st. 7 10 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt 4ItMovement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity \ I I hit Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 519 464 1. 00 0.74 0.80 0.78 360 528 453 1. 00 0.78 0.83 0.81 367 Results for Two-stage process: a y C t 360 361..OG IT .1, EM ff Page-21 of 11 12 T R Worksheet 8-Shared Lane Calculations eMovement 7 L 8 9 10 T R L 82 23 15 460 902 367 455 -, .,.>'- ~. 98 445 474 25 837 Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) 46 360 Worksheet 9-Computation of Effect of Flared Minor street Approaches eMovement 7 8 9 10 11 12 L T R L T R C sep 360 460 902 367 445 837 Volume 46 82 23 15 98 25 Delay Q sep Q sep +1 round (Qsep +1) n max C sh 455 474 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LT LTR LTR LTR v (vph) 12 50 151 138 C(m) (vph) 1320 1386 455 474 v/c 0.01 0.04 0.33 0.29 ~5% queue length 0.03 0.11 1. 44 1. 20 ontrol Delay 7.8 7.7 16.8 15.7 LOS A A C C Approach Delay 16.8 15.7 Approach LOS C C Worksheet II-Shared Major LT Impedance and Delay Movement 2 Movement 5 p(oj) 0.99 0.96 v(il) , Volume for stream 2 or 5 141 175 v(i2) , Volume for stream 3 or 6 0 35 s (il), Saturation flow rate for stream 2 or 5 1700 1700 s (i2) , Saturation flow rate for stream 3 or 6 1700 1700 P* (oj) 0.99 0.96 d (M, LT) , Delay for stream 1 or 4 7.8 7.7 N, Number of major street through lanes 1 1 d(rank,l) Delay for stream 2 or 5 0.1 0.3 e LOG ITEM # Page_ ?5 _of :..A HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY eAnalyst: Agency/Co. : Date Performed: 3/19/05 Analysis Time Period: pm peak Intersection: Discovery Road/Mill Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West Street: Mill Road North/South Street: Discovery Road Intersection Orientation: EW gr ,I Road iV'.~ I Study period (hrs): 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Eastbound 2 3 T R No / Westbound 4 5 6 L T R 180 0 106 0.85 0.85 0.85 211 0 124 0 / 0 1 0 LTR No Southbound 10 11 12 L T R 72 44 0.91 0.91 79 48 1 1 0 / 0 1 LT Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes configuration Upstream Signal? eMinor Street: Approach Movement Undivided No Northbound 7 8 9 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage Lanes Configuration 29 0.74 39 1 o 124 0.74 167 1 1 0 TR Delay, EB 1 Queue WB 4 LTR Length, and Level of Service Northbound Southbound 7 8 9 10 11 TR LT Approach Movement Lane Config 12 211 1636 0.13 0.44 7.5 A 206 809 0.25 1. 01 11. 0 B 127 332 0.38 1. 74 22.4 C v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS eAPproach Delay Approach LOS 11.0 B 22.4 C LO~ 'TE~.A # Page_~oL . HCS2000: Unsignalized Intersections Release 4.1d GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency/co.: Date Performed: 3/19/05 Analysis Time Period: pm peak Intersection: Discovery Road/Mill Road Jurisdiction: Jefferson County ,~ Units: U. S. Customary Analysis Year: 2009 w/out project Project ID: Discovery Bay Golf Course East/West Street: Mill Road North/South street: Discovery Road Intersection Orientation: EW Study period (hrs): 0.25 . Major Street Movements Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream signal? Vehicle Volumes and Adjustments 1 2 3 4 5 L T R L T 6 R Undivided 180 0 0.85 0.85 53 0 211 0 0 / 0 1 LTR No 9 10 11 R L T 124 72 44 0.74 0.91 0.91 42 20 12 167 79 48 1 1 1 0 No / 0 0 1 TR LT No , . I 106 0.85 31 124 o Minor Street Movements 8 T 12 R 7 L Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage RT Channelized? Lanes . Configuration 29 0.74 10 39 1 o 1 Pedestrian Volumes and Adjustments 13 14 15 16 Movements Flow (ped/hr) o o o o / LOG 'TeA If '# '"'~- I Q~~-:L?_Of ~ -- --.1t, " i I Lane Width (ft) Walking Speed (ft/sec) Percent Blockage 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o M/' ~ . Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: o 124 1700 1700 1 Worksheet 4-Critical Gap and Follow-up Time Calculation . critical Gap Calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 6.5 6.2 7.1 6.5 t(c,hv) 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 P(hv) 0 1 1 1 1 t(c,g) 0.20 0.20 0.10 0.20 0.20 0.10 Grade/l00 0.00 0.00 0.00 0.00 0.00 0.00 t(3,lt) 0.00 0.00 0.00 0.00 0.00 t (c, T) : I-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2-stage 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 t(c) 1-stage 4.1 6.5 6.2 7.1 6.5 2-stage Follow-Up Time Calculations Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(f,base) 2.20 4.00 3.30 3.50 4.00 t(f,HV) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 P(HV) 0 1 1 1 1 t (f) 2.2 4.0 3.3 3.5 4.0 . Worksheet 5-Effect of Upstream Signals - Computation 1-Queue Clearance Time at Upstream Signal - :---.ot Movement 2 Movement 5 ------ V (t) V(l,prot) V(t) V(l,prot) V prog <i . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) MF'/ - Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t(a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result 0.000 0.000 . p(2) P (5) p(dom) p (subo) Constrained or unconstrained? Proportion unblocked for minor movements, p(x) ( 1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p(l) p(4) p(7) p(8) P (9) p(10) p(11) p(12) Computation 4 and 5 Single-Stage Process Movement 1 4 7 8 9 10 11 12 L L L T R L T R 0 546 0 587 484 # LOG ITEM Page~oT - ----... 8 10 11 --------- C~- V c,X s Px . : :::'X C plat,x Two-Stage Process 7 Stage1 Stage2 Stagel Stage2 Stage1 Stage2 stage 1 Stage2 . V(c,X) s P(x) V(c,u,x) 1500 o o C(r,x) C(plat,x) Worksheet 6-Impedance and Capacity Equations Step 1: RT from Minor st. 9 12 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free st. o 1088 1. 00 1088 0.85 1. 00 1. 00 step 2: LT from Major st. 4 1 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. . Maj L-Shared Prob Q free st. Step 3: TH from Minor St. o 1636 1. 00 1636 0.87 0.86 1. 00 1. 00 8 11 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of'Queue free St. 546 447 1. 00 0.86 385 0.90 484 484 1. 00 0.86 417 0.88 step 4: LT from Minor st. 7 10 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvrnnt Movement Capacity 1. 00 0.76 0.82 0.82 587 423 1. 00 0.77 0.83 0.70 296 Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance step 3: TH from Minor st. 8 11 . Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due Bovement Capacity Pro~ability of Queue I ()~ '-""_p - I , CIV/ '\ I Factor to Impeding mvmnt # Page_~Of - --- MAY - 9 ')(/\Ik free st. i, U' " . <- ';.~;,,( i :\'.~: ._.~'"'~~--- ---~....~ - \""--.. \- .---. \ . . ~.__,,__~_.,___~._ -."--"-0<;:.--' "_."""'-'"~--". ._--.< t'" ...,. ;~.~<; r;.:':" ....' , if' ;\ i Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity MAY )ll(\~ Part 3 - Single stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 546 447 1. 00 0.86 385 484 484 1. 00 0.86 417 Result for 2 stage process: a y C t Probability of Queue free st. 385 0.90 417 0.88 Step 4: LT from Minor st. 7 10 Part 1 - First Stage conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.76 0.82 0.82 587 423 1. 00 0.77 0.83 0.70 296 Results for Two-stage process: a y C t Worksheet 8-Shared Lane Calculations 296 . Movement 7 L 8 T 9 10 11 12 R L T R 167 79 48 1088 296 417 809 332 '-:7'~7 Volume (vph) LOG ITEM Movement Capacity (vph) # Shared Lane Capacity (vphL- f'RCQ t'i _I: _, ,~,_v, ~ 39 385 Worksheet 9-Computation of Effect of Flared Minor street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 385 1088 296 417 Volume 39 167 79 48 Delay Q sep Q sep +1 MAY - 9 ')0(11 round (Qsep +1) n max C sh 809 332 " SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LTR TR LT v (vph) 211 206 127 C(m) (vph) 1636 809 332 v/c 0.13 0.25 0.38 . 95% queue length 0.44 1. 01 1. 74 Control Delay 7.5 11.0 22.4 LOS A B C Approach Delay 11. 0 22.4 Approach LOS B C Worksheet II-Shared Major LT Impedance and Delay p(oj) v (il), v(i2) , s (il) , s (i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 1. 00 0.87 0 124 2 or 5 1700 3 or 6 1700 0.86 7.5 1 1.0 lanes . "-- \-- -- # LOG ITEM _ Page~o'-- 'c' --- HCS2000: Unsignalized Intersections Release 4.1d Analyst: gr Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Discovery Rd. Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: 2009 with project Project ID: Discovery Bay Golf Course East/West Street: Cape George Rd North/South Street: Discovery Road Intersection Orientation: NS Study period (hrs): e TWO-WAY STOP CONTROL SUMMARY \ I! 1041 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/storage RT Channelized? Lanes Configuration e Upstream Signal? Minor Street: Approach Movement 43 49 0.76 0.76 56 64 3 Undivided Southbound 4 5 6 L T R 36 34 0.78 0.78 46 43 / 1 0 TR No Eastbound 10 11 12 L T R 27 49 0.74 0.74 36 66 0 0 0 / No / 0 0 LR o 1 LT No Westbound 789 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 Flared Approach: Exists?/Storage Lanes Configuration Approach Movement Lane Config Delay, NB 1 LT Queue Length, and Level of SB Westbound 4 7 8 9 Service Eastbound 10 11 LR 12 v (vph) C(m) (vph) v/c 95% queue length Control Delay eLOS Approach Delay Approach LOS 56 1500 0.04 0.12 7.5 A 102 880 0.12 0.39 9.6 A 9.6 A LaG iTE/VI # Page~Of ---- . ; I MAY '('I Ii e GERALYN REINART, P.E. HCS2000: Unsignalized Intersections Release 4.1d 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency/Co.: Date Performed: 3/16/05 Analysis Time period: pm peak Intersection: Cape George Rd/Discovery Rd. Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: 2009 with project Project ID: Discovery Bay Golf Course East/West Street: Cape George Rd North/South Street: Discovery Road Intersection Orientation: NS Study period (hrs): 0.25 ~MajOr street Movements Vehicle Volumes and Adjustments 1 2 345 L T R L T 6 R 43 0.76 14 56 3 Undivided 49 0.76 16 64 36 0.78 12 46 34 0.78 11 43 Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? / Minor Street Movements 7 L 8 T 9 R 1 0 TR No 10 11 12 L T R 27 49 0.74 0.74 9 17 36 66 0 0 0 / No / 0 0 LR o 1 LT No Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 Flared Approach: Exists?/Storage RT Channelized? Lanes eCOnfigUration Flow (ped/hr) o o o o L()~ ,.......-. # -- · I CiV/ r-.. ___ Idge~-or---- -----, Movements Pedestrian Volumes and Adjustments 13 14 15 16 .~ , Lane width (ft) Walking Speed (ft/sec) e Percent Blockage 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o ;~AY - Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicle~ Movement 2 Movement 5 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: 64 o 1700 1700 1 Worksheet 4-critical Gap and Follow-up Time Calculation ecritical Gap Calculation Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(c,base) 4.1 7.1 6.2 t(c,hv) 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 P(hv) 3 0 0 t(c,g) 0.20 0.20 0.10 0.20 0.20 0.10 Grade/l00 0.00 0.00 0.00 0.00 0.00 0.00 t(3,lt) 0.00 0.70 0.00 t (c, T) : l-stage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2-stage 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 t (c) I-stage 4.1 6.4 6.2 2-stage Follow-Up Time Calculations Movement 1 4 7 8 9 10 11 12 L L L T R L T R t(f,base) 2.20 3.50 3.30 t(f,HV) 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 P(HV) 3 0 0 t(f) 2.2 3.5 3.3 eworkSheet 5-Effect of Upstream Signals computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) v rrog , ; .. <:' Movement 5 V (t).u YJC?)(!i!ffrEM 'IT PagS-XLot Total Saturation Flow Rate, s (vph) Arrival Type e Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) MA Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t(a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result 0.000 0.000 P (2) P (5) ep(dOm) p (subo) Constrained or unconstrained? Proportion unblocked for minor movements, p(x) (1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p(l) P (4) P (7) P (8) P (9) P (10) p(11) p(12) Computation 4 and 5 Single-Stage Process Movement Two-stage Process 1 4 7 8 9 10 11 12 L L L T R L T R 89 244 68 .. LOG ITEM ff Page_A of c__ ~ 8 10 11 ,,, c::::~\ V c,x s Px ev c,u,x C r,x C plat,x 7 Stagel Stage2 Stage 1 Stage2 Stagel Stage2 Stagel Stage2 e:(C,X) P(x) V(c,u,x) 1500 \ \ C(r,x) C(plat,x) i'lif-\ Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor St. 9 12 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. 1. 00 68 1001 1. 00 1001 0.93 1. 00 Step 2: LT from Major st. 4 1 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. eMaj L-Shared Prob Q free St. Step 3: TH from Minor St. 1. 00 89 1500 1. 00 1500 0.96 0.96 1.00 8 11 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. 1. 00 0.96 1. 00 0.96 1. 00 1. 00 step 4: LT from Minor St. 7 10 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.96 0.97 0.91 244 749 1. 00 0.96 721 Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance Step 3: TH from Minor St. 8 11 epart 1 - First stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. l,) -- " c-:' # LOG ITEM Pa~ ----- Part 2 - Second Stage e Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Result for 2 stage process: a y C t Probability of Queue free St. Step 4: LT from Minor St. Part 1 - First stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt 4ItMovement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity Results for Two-stage process: a y C t Worksheet 8-Shared Lane Calculations 1. 00 0.96 1. 00 7 1. 00 0.96 0.97 0.91 \ Vi 1. 00 0.96 1. 00 10 244 749 1. 00 0.96 721 721 11 T 12 R eMovement 7 L 8 T 9 R 10 L . - Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) LUG ITEM # Pag~ .,-~~f - '. ..-,.. --- 36 721 66 1001 880 Worksheet 9-Computation of Effect of Flared Minor street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 721 1001 Volume 36 66 Delay Q sep Q sep +1 round (Qsep +1) n max C sh 880 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LT LR v (vph) 56 102 C (m) (vph) 1500 880 v/c 0.04 0.12 . 95% queue length 0.12 0.39 Control Delay 7.5 9.6 LOS A A Approach Delay 9.6 Approach LOS A Worksheet II-Shared Major LT Impedance and Delay p(oj) v(il) , v (i2), s (il), s (i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 0.96 1. 00 64 0 2 or 5 1700 3 or 6 1700 0.96 7.5 1 0.3 lanes . # LOG ITEM Page~ol \ \ - '-=-~) -- HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY \ \ eAnalyst: Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Site Access Jurisdiction: Jefferson County units: U. S. Customary Analysis Year: 2009 with project Project ID: Discovery Bay Golf Course East/West street: Golf Course/Site Access North/South Street: Cape George Rd. Intersection Orientation: NS gr \1 b: IVi Study period (hrs): 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments N'orthbound 2 3 T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration eupstream Signal? Minor Street: Approach Movement 69 0.81 85 Undivided 1 0 TR No Westbound 7 8 L T 23 0.81 28 Southbound 4 5 6 L T R 2 44 0.57 0.57 3 77 7 / 0 1 LT No Eastbound 10 11 12 L T R 9 R Volume 17 Peak Hour Factor, PHF 0.75 Hourly Flow Rate, HFR 22 Percent Heavy Vehicles 0 Percent Grade (%) 0 Flared Approach: Exists?/Storage Lanes 0 configuration LR 1 0.75 1 o o No / / o Service Eastbound 10 11 Delay, NB 1 Queue SB 4 LT Length, and Level of Westbound 789 LR Approach Movement Lane Config 12 23 816 0.03 0.09 9.5 A 9.5 A I ~G ,.,.....-.. ~ .~ '-' I I L.IV, # '-. ,......c. - \ "'- " Pag;~4D~of v (vph) C (m) (vph) v/c 95% queue length control Delay eLOS Approach Delay Approach LOS 3 1446 0.00 0.01 7.5 A \ \ MAl - .r..,. ._.,.~......... _.......... ~~....... . ,-,. ..~ r ::;' ~.,' _., , \ \ e GERALYN REINART, P.E. MAY HCS2000: Unsignalized Intersections Release 4.1d - 9 ,r 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: Cape George Rd/Site Access Jurisdiction: Jefferson County Units: U. S. Customary Analysis Year: 2009 with project Project ID: Discovery Bay Golf Course East/West Street: Golf Course/Site Access North/South Street: Cape George Rd. Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments e Maj or Street Movements 1 2 3 4 5 6 L T R L T R Volume 69 23 2 44 Peak-Hour Factor, PHF 0.81 0.81 0.57 0.57 Peak-15 Minute Volume 21 7 1 19 Hourly Flow Rate, HFR 85 28 3 77 Percent Heavy Vehicles 7 Median Type/Storage Undivided / RT Channelized? Lanes 1 0 0 1 Configuration TR LT Upstream Signal? No No Minor Street Movements 7 8 9 10 11 12 L T R L T R Volume 17 1 Peak Hour Factor, PHF 0.75 0.75 Peak-15 Minute Volume 6 0 Hourly Flow Rate, HFR 22 1 Percent Heavy Vehicles 0 0 Percent Grade (% ) 0 0 Flared Approach: Exists?/storage No / / RT Channelized? Lanes 0 0 eCOnfigUration LR Flow (ped/hr) o o o o .. LOG 1'7"1=11. J'i tf ~;v, Pn~ ~.~..;; - .'L- of -- ---..... Movements Pedestrian Volumes and Adjustments 13 14 15 16 . Lane Width (ft) Walking Speed (ft/sec) Percent Blockage 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o 12.0 4.0 o l' ; I' .. ,"--.-_.-,.-..~ ~-,--~,--'''' "'-' "~'-''''-~',=,~,'''''''.-_. "....-- f'.... :"":..... r:--;' :', ,\ \ M/1V Prog. Flow vph Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: 77 o 1700 1700 1 Worksheet 4-Critical Gap and Follow-up Time Calculation . Critical Gap Calculation Movement 1 L 4 L 7 L 8 T 9 R 10 L 11 T 12 R 1. 00 1. 00 t(c,base) t(c,hv) P(hv) t(c,g) Grade/l00 t(3,lt) t (c, T) : 4.1 1. 00 7 1-stage 2-stage 1-stage 2-stage 0.00 0.00 0.00 0.00 0.00 4.2 t(c) 7.1 1. 00 o 0.20 0.00 0.70 0.00 1. 00 6.4 1. 00 0.20 0.00 0.00 1. 00 6.2 1. 00 o 0.10 0.00 0.00 0.00 0.00 6.2 1. 00 0.20 0.00 0.00 1. 00 1. 00 0.20 0.00 0.00 1. 00 0.10 0.00 0.00 0.00 Follow-Up Time Calculations Movement 1 4 L L 7 L 8 T 9 R 10 L 11 T 12 R t(f,base) t(f,HV) P(HV) t (f) 0.90 0.90 2.20 0.90 7 2.3 3.50 0.90 o 3.5 0.90 3.30 0.90 o 3.3 0.90 0.90 . Computation Worksheet 5-Effect of Upstream Signals I-Queue Qlea;r..;l.nc:;..e_~tme LU\.j , I EIVI # 0,,-- ~ - · ,",,~v_ ~U, V prog at Upstream Signal Movement 2 V (t) V (1, prot) 'i'"' \ ~ " ~\) Movement 5 V(t) V(l,prot) '\ I . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g(q) M II" ~ Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t(a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result p(2) p(5) p(dom) p(subo) Constrained or unconstrained? 0.000 0.000 . Proportion unblocked for minor movements, p(x) (1 ) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II P (1) p(4) p(7) P (8) P (9) P (10) P (11) p(12) Computation 4 and 5 Single-Stage Process Movement C r,x C plat,x 1 4 7 8 9 10 11 12 L L L T R L T R 113 182 99 :ff LOG ITEM Paae---1L ~ .;-J ~ of .~ 8 10 11 V c, x s Px V C,u,X . Two-Stage Process 7 . . . Stagel Stage2 Stage 1 Stage2 Stage1 Stage2 stage 1 Stage2 V(c,x) s P(x) V(c,u,x) \ I 1500 r, MAY C(r,x) C(plat,x) Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor st. 12 9 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. 99 962 1. 00 962 1. 00 1. 00 1. 00 Step 2: LT from Major st. 4 1 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Maj L-Shared Prob Q free st. 113 1446 1. 00 1446 1. 00 1. 00 1. 00 1. 00 step 3: TH from Minor st. 8 11 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement capacity Probability of Queue free st. 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 step 4: LT from Minor st. 7 10 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement capacity 182 812 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 810 Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance step 3: TH from Minor St. 8 11 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Cap. Adj. factor due Movement Capacity Probability of Queue Factor to Impeding mvmnt LOG ITEM # Pa-a"~ Q '-I ';;'-'-)-1_ of --- free st. ~~, . Movement . . \ i Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity ;\'~j Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 1. 00 1. 00 1. 00 Result for 2 stage process: a y C t Probability of Queue free St. 1. 00 1. 00 Step 4: LT from Minor st. 7 10 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 182 812 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 810 Results for Two-stage process: a y C t 810 Worksheet 8-Shared Lane Calculations 7 L 9 R 12 R 10 L 8 T 11 T Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) LOG ITEM # PaOA -<lL v1 --- 22 810 1 962 816 . , r~.. ._' '. .,' Worksheet 9-Computation of Effect of Flared Minor street Approaches . Movement 7 L 8 T 9 R 10 L 11 T 12 R C sep Volume Delay Q sep Q sep +1 round (Qsep +1) 810 22 962 1 \ I n max C sh SUM C sep n C act 816 MLlY .f Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LT LR v (vph) 3 23 C(m) (vph) 1446 816 v/c 0.00 0.03 . 95% queue length 0.01 0.09 Control Delay 7.5 9.5 LOS A A Approach Delay 9.5 Approach LOS A Worksheet II-Shared Major LT Impedance and Delay p(oj) v(il) , v(i2) , s (il) , s (i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 1. 00 1. 00 77 0 2 or 5 1700 3 or 6 1700 1. 00 7.5 1 0.0 lanes . # LOG ITEM Page ((t." - -I-r__of ---, .r-, \\...-.--, -\ HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY eAnalyst: Agency/Co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: SR-20/Discovery Rd. Jurisdiction: WSDOT/Jefferson County Units: U. S. Customary Analysis Year: 2009 with Project ID: Discovery Bay Golf East/West Street: Discovery North/South Street: SR-20 Intersection Orientation: NS gr project Course Rd/Four Corners Rd Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Northbound 2 3 T R '\ I l~ t' Study period (hrs): 0.25 Southbound 4 5 6 L T R 44 153 31 0.87 0.87 0.87 50 175 35 4 / 0 1 0 LTR No Eastbound 10 11 12 L T R 12 83 22 0.77 0.77 0.77 15 107 28 7 7 7 0 / No / 0 1 0 LTR Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration ~upstream Signal? Minor Street: Approach Movement 13 0.82 15 9 Undivided 116 0.82 141 31 0.82 37 Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/storage Lanes 0 Configuration o 1 LT No 1 R Delay, Queue Length, and Level of Approach NB SB Westbound Movement 1 4 7 8 9 Lane Config LT LTR LTR v (vph) 15 50 164 C(m) (vph) 1320 1386 446 v/c 0.01 0.04 0.37 95% queue length 0.03 0.11 1. 67 Control Delay 7.8 7.7 17.7 LOS A A C eAPproach Delay 17.7 Approach LOS C No Westbound 789 L T R 42 0.90 46 4 86 0.90 95 4 o 21 0.90 23 4 No 1 LTR o 'f" " _ \\ C-~ '.',--,..-' Service Eastbound 10 11 12 LTR 150 470 0.32 1. 36 16.2 C 16.2 C I Or- r- # '-J ; , t::.1V/ Pa~ -,-,_of --- . \ I HCS2000: Unsignalized Intersections Release 4.1d MAv - GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL (TWSC) ANALYSIS Analyst: gr Agency/co. : Date Performed: 3/16/05 Analysis Time Period: pm peak Intersection: SR-20/Discovery Rd. Jurisdiction: WSDOT/Jefferson County units: U. S. Customary Analysis Year: 2009 with project Project ID: Discovery Bay Golf Course East/West Street: Discovery Rd/Four Corners Rd North/South Street: SR-20 Intersection Orientation: NS Study period (hrs): 0.25 . Major Street Movements Vehicle Volumes and Adjustments 12345 L T R L T Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? Minor street Movements 13 116 0.82 0.82 4 35 15 141 9 Undivided 7 L 42 0.90 12 46 4 011 LT R No 8 T 86 0.90 24 95 4 o o 1 LTR 31 0.82 9 37 No 9 R 21 0.90 6 23 4 No o 44 0.87 13 50 4 10 L 12 0.77 4 15 7 / 153 0.87 44 175 / o 1 LTR No 11 T 83 0.77 27 107 7 o o 1 LTR Volume Peak Hour Factor, PHF Peak-IS Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage RT Channelized? Lanes . Configuration Movements Pedestrian Volumes and Adjustments 13 14 15 16 Flow (ped/hr) o o ~ '~ o o 6 R 31 0.87 9 35 o 12 R 22 0.77 7 28 7 No / o , ,.... - . ....'-'~ , , I:::M # Page~[ of - - - Lane Width (ft) Walking Speed (ft/sec) ePercent Blockage 0, \ : I 12.0 12.0 12.0 12.0 4.0 4.0 4.0 4.0 MAY __ ("I If 1(\' ,I 0 0 0 0 Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Flow vph Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: Movement 2 Movement 5 141 175 0 35 1700 1700 1700 1700 1 1 Worksheet 4-critical Gap and Follow-up Time Calculation ecritical Gap Calculation Movement 1 4 7 8 9 10 L L L T R L t(c,base) t(c,hv) P(hv) t(c,g) Grade/l00 t(3,lt) t (c, T) : 4.1 1. 00 9 I-stage 2-stage I-stage 2-stage 0.00 0.00 0.00 4.2 t(c) 4.1 1. 00 4 0.00 0.00 0.00 4.1 7.1 1. 00 4 0.20 0.00 0.00 0.00 1. 00 7.1 6.5 1. 00 4 0.20 0.00 0.00 0.00 1. 00 6.5 6.2 1. 00 4 0.10 0.00 0.00 0.00 0.00 6.2 7.1 1. 00 7 0.20 0.00 0.00 0.00 1. 00 7.2 11 T 6.5 1. 00 7 0.20 0.00 0.00 0.00 1. 00 6.6 12 R 6.2 1. 00 7 0.10 0.00 0.00 0.00 0.00 6.3 Follow-Up Time Calculations Movement 1 4 L L t(f,base) t(f,HV) P(HV) t(f) 2.20 0.90 9 2.3 2.20 0.90 4 2.2 7 L 3.50 0.90 4 3.5 8 T 4.00 0.90 4 4.0 9 R 3.30 0.90 4 3.3 10 L 3.50 0.90 7 3.6 11 T 4.00 0.90 7 4.1 12 R 3.30 0.90 7 3.4 eworksheet 5-Effect of Upstream Signals Computation l-Queue[CA~arance Time at Upstream Signal uG ITEM Movement 2 # V (t) V (1, prot) r a.~(";; _~_ or V prog \ \. ,. \-,.,..... Movement 5 V(t) V(l,prot) \ . \ . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(q1) g(q2) g(q) MAY Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V(t) V(l,prot) alpha beta Travel time, t (a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result . P (2) P (5) p(dom) p(subo) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) (1) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II p (1) P (4) P (7) P (8) P (9) p(10) p(11) p(12) Computation 4 and 5 Single-Stage Process Movement Two-Stage Process 1 4 7 8 9 10 11 12 L L L T R L T R 210 178 531 481 141 540 500 192 ..u LOG ITEM 'IT' P-'a~ _. a.,)c_b of ---- 8 10 11 V C,x s Px V C,U,x . C r,x C plat,x 7 Stage1 Stage2 Stagel Stage2 Stage1 Stage2 stage 1 Stage2 . V(c,x) s 1500 1500 1500 1500 P(x) V(c,u,x) '\ . I C(r,x) C(plat,x) /4 Worksheet 6-Impedance and Capacity Equations step 1 : RT from Minor st. 9 12 Conflicting Flows 141 192 Potential Capacity 902 837 Pedestrian Impedance Factor 1. 00 1. 00 Movement Capacity 902 837 Probability of Queue free st. 0.97 0.97 step 2 : LT from Major St. 4 1 Conflicting Flows 178 210 Potential Capacity 1386 1320 Pedestrian Impedance Factor 1. 00 1. 00 Movement Capacity 1386 1320 Probability of Queue free St. 0.96 0.99 . Maj L-Shared Prob Q free st. 0.96 0.99 Step 3 : TH from Minor St. 8 11 Conflicting Flows 481 500 Potential Capacity 482 466 Pedestrian Impedance Factor 1. 00 1. 00 Cap. Adj. factor due to Impeding mvmnt 0.95 0.95 Movement Capacity 456 441 Probability of Queue free St. 0.79 0.76 Step 4 : LT from Minor st. 7 10 Conflicting Flows 531 540 Potential Capacity 456 445 Pedestrian Impedance Factor 1. 00 1. 00 Maj. L, Min T Impedance factor 0.72 0.75 Maj. L, Min T Adj. Imp Factor. 0.78 0.81 Cap. Adj. factor due to Impeding mvmnt 0.76 0.79 Movement Capacity 344 350 Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance step 3: TH from Minor St. 8 11 . Part 1 - First stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. \ # LOG ITEM Pa~ v""-~of ---~ . . . , I Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 481 482 1. 00 0.95 456 500 466 1. 00 0.95 441 Result for 2 stage process: a y C t Probability of Queue free st. 456 0.79 441 0.76 Step 4: LT from Minor St. 10 7 Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity Results for Two-stage process: a y C t Worksheet 8-Shared Lane Calculations Movement 7 L Volume (vph) Movement Capacity (vph) Shared Lane Capacity (vph) 46 344 531 456 1. 00 0.72 0.78 0.76 344 344 8 T 9 R 95 456 446 23 902 10 L 15 350 540 445 1. 00 0.75 0.81 0.79 350 350 11 T 12 R . . . Worksheet 9-Computation of Effect of Flared Minor street Approaches Movement 12 R 7 L 8 T 9 R 10 L 11 T C sep Volume Delay Q sep Q sep +1 round (Qsep +1) 344 46 456 95 902 23 350 15 441 107 837 28 n max C sh SUM C sep n C act 446 470 Worksheet 10-Delay, Queue Length, and Level of Service Movement Lane Config 12 1 LT 8 LTR 9 10 11 LTR v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 4 LTR 7 15 1320 0.01 0.03 7.8 A 50 1386 0.04 0.11 7.7 A 164 446 0.37 1. 67 17.7 C 17.7 C 150 470 0.32 1. 36 16.2 C 16.2 C Worksheet II-Shared Major LT Impedance and Delay Movement 2 Movement 5 p(oj) v(il) , v(i2) , s (il), s (i2), P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation 0.99 141 o 1700 1700 0.99 7.8 1 0.1 stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream 2 or 5 stream 3 or 6 0.96 175 35 1700 1700 0.96 7.7 1 0.3 lanes LOG ITEM # Page.J:..s.- of MAV , ,I l( . . . HCS2000: unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY Analyst: gr Agency/Co. : Date Performed: 3/19/05 Analysis Time Period: pm peak Intersection: Discovery Road/Mill Road Jurisdiction: Jefferson County units: U. S. customary Analysis Year: 2009 with project Project ID: Discovery Bay Golf Course East/West Street: Mill Road North/South street: Discovery Road Intersection Orientation: EW Study period (hrs): 0.25 Major Street: Vehicle Approach Movement 1 L Volumes and Adjustments Eastbound 2 3 T R Westbound 4 5 6 L T R 191 0 106 0.85 0.85 0.85 224 0 124 0 / 0 1 0 LTR No Southbound 10 11 12 L T R 72 47 0.91 0.91 79 51 1 1 0 / / 0 1 LT Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? Undivided No Minor Street: Approach Movement Northbound 789 L T R Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage Lanes Configuration 130 0.74 175 1 31 0.74 41 1 o No 1 0 TR Delay, EB 1 Length, and Level of Service Northbound Southbound 7 8 9 10 11 TR LT 12 Queue WB 4 LTR Approach Movement Lane Config v (vph) C (m) (vph) v/c 95% queue length Control Delay LOS Approach Delay Approach LOS 224 1636 0.14 0.47 7.5 A 216 793 0.27 1.11 11.2 B \ \ 130 313 0.42 1. 96 24.4 C 24.4 C Ml-\ ( - j LOG ,-riro.t # Pag~3 --t~'f- of _-._ _._~t" ~ - ~ I~,:,: .~,\. \."___1 HCS2000: Unsignalized Intersections Release 4.1d . GERALYN REINART, P.E. 1319 DEXTER AVE. NORTH, SUITE 103 SEATTLE, WA 98109 ~ ". , , I , , MAY - 9 T,( -< lJ;" _AC,,,. ',""",'_C""''''>~_'''''.'''''''''~'_'. ......~".~~ Phone: E-Mail: 206-285-9035 trafficsignals@msn.com Fax: 206-285-6345 TWO-WAY STOP CONTROL(TWSC) ANALYSIS Analyst: gr Agency/Co. : Date Performed: 3/19/05 Analysis Time Period: pm peak Intersection: Discovery Road/Mill Road Jurisdiction: Jefferson County units: U. S. Customary Analysis Year: 2009 with project Project ID: Discovery Bay Golf Course East/West Street: Mill Road North/South street: Discovery Road Intersection Orientation: EW Study period (hrs): 0.25 . Maj or Street Movements Vehicle Volumes and Adjustments 12345 L T R L T 6 R Volume Peak-Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage RT Channelized? Lanes Configuration Upstream Signal? Undivided 191 0 0.85 0.85 56 0 224 0 0 / 0 1 0 LTR No 9 10 11 R L T 130 72 47 0.74 0.91 0.91 44 20 13 175 79 51 1 1 1 0 No / 0 1 LT No 8 T 31 0.74 10 41 1 0 1 0 TR Minor Street Movements 7 L Volume Peak Hour Factor, PHF Peak-15 Minute Volume Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) Flared Approach: Exists?/Storage RT Channelized? Lanes . Configuration Pedestrian Volumes and Adjustments 13 14 15 16 Movements 106 0.85 31 124 12 R / # LOG ITEM Page_~} of - , --- o o Flow (ped/hr) o o Lane width (ft) Walking Speed (ft/sec) epercent Blockage Prog. Flow vph '-"--:.' ('.' i'\ ; \ " -"~ ~ .:;.~. .,. : l.,--.. 12.0 4.0 o 12.0 4.0 o MAY - 9 ')(Jrh 12.0 4.0 o 12.0 4.0 o Upstream Signal Data Sat Arrival Green Cycle Flow Type Time Length vph sec sec Prog. Speed mph Distance to Signal feet S2 Left-Turn Through S5 Left-Turn Through Worksheet 3-Data for Computing Effect of Delay to Major Street Vehicles Movement 2 Movement 5 Shared In volume, major th vehicles: Shared In volume, major rt vehicles: Sat flow rate, major th vehicles: Sat flow rate, major rt vehicles: Number of major street through lanes: o 124 1700 1700 1 Worksheet 4-critical Gap and Follow~up Time Calculation ~ritical Gap Calculation ~ovement 1 4 L L t(c,base) t(c,hv) P(hv) t(c,g) Grade/100 t(3,lt) t (c, T) : 1. 00 4.1 1. 00 o 0.00 0.00 0.00 0.00 0.00 4.1 t (c) I-stage 2-stage I-stage 2-stage 7 8 9 10 11 12 L T R L T R 6.5 6.2 7.1 6.5 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1 1 1 1 0.20 0.20 0.10 0.20 0.20 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 0.00 6.5 6.2 7.1 6.5 Follow-Up Time Calculations Movement 1 4 7 L L L t(f,base) t(f,HV) P(HV) t(f) 0.90 0.90 8 9 10 11 12 T R L T R 4.00 3.30 3.50 4.00 0.90 0.90 0.90 0.90 0.90 1 1 1 1 4.0 3.3 3.5 4.0 2.20 0.90 o 2.2 Worksheet 5-Effect of Upstream Signals ~computation I-Queue Clearance Time at Upstream Signal Movement 2 V(t) V(l,prot) LOG ITEM V prog # Page_~<e.of Movement 5 V(t) V(l,prot) . . . Total Saturation Flow Rate, s (vph) Arrival Type Effective Green, g (sec) Cycle Length, C (sec) Rp (from Exhibit 16-11) Proportion vehicles arriving on green P g(ql) g(q2) g (q) \ \ MAY - ~ Computation 2-Proportion of TWSC Intersection Time blocked Movement 2 V(t) V(l,prot) Movement 5 V (t) V (1, prot) alpha beta Travel time, t(a) (sec) Smoothing Factor, F Proportion of conflicting flow, f Max platooned flow, V(c,max) Min platooned flow, V(c,min) Duration of blocked period, t(p) Proportion time blocked, p 0.000 0.000 Computation 3-Platoon Event Periods Result p(2) p(5) p(dom) p (subo) Constrained or unconstrained? 0.000 0.000 Proportion unblocked for minor movements, p(x) (1 ) Single-stage Process (2) (3) Two-Stage Process Stage I Stage II P (1) P (4) P (7) p(8) P (9) p(10) P (11) p(12) 1 4 7 8 9 10 11 12 L L L T R L T R 0 572 0 618 510 LOG ITEM # Pagel ~7 of ~ 8 10 11 Computation 4 and 5 Single-Stage Process Movement V c,X s Px V c,u,x C r,x C plat,x 7 Two-Stage Process . . . stage 1 Stage2 Stagel Stage2 stage 1 Stage2 Stage1 Stage2 V(c,X) s P(x) V(c,u,x) 1500 o o \ I C(r,x) C(plat,x) MAr .- ') Worksheet 6-Impedance and Capacity Equations step 1: RT from Minor st. 9 12 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. o 1088 1. 00 1088 0.84 1. 00 1. 00 Step 2: LT from Major st. 1 4 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Movement Capacity Probability of Queue free St. Maj L-Shared Prob Q free St. o 1636 1. 00 1636 0.86 0.85 1. 00 1. 00 step 3: TH from Minor st. 11 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Probability of Queue free st. 572 432 1. 00 0.85 368 0.89 8 510 468 1. 00 0.85 399 0.87 step 4: LT from Minor st. 10 7 Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.74 0.80 0.80 618 403 1. 00 0.76 0.81 0.68 275 step 3: TH from Minor st. Worksheet 7-Computation of the Effect of Two-stage Gap Acceptance 8 11 Part 1 - First Stage Conflicting Flows Potential capacity Pedestrian Impedance Cap. Adj. factor due Movement Capacity Probability of Queue Factor to Impeding mvmnt free st. f .,~ t...-.. .:__._o'-.....re \- LOG ITEM # Page~_Of '\ .\ . Part 2 - Second Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity MA' - Part 3 - Single stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity 572 432 1. 00 0.85 368 510 468 1. 00 0.85 399 Result for 2 stage process: a y C t Probability of Queue free St. 368 0.89 399 0.87 step 4: LT from Minor St. 10 7 . Part 1 - First Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 2 - Second stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Cap. Adj. factor due to Impeding mvmnt Movement Capacity Part 3 - Single Stage Conflicting Flows Potential Capacity Pedestrian Impedance Factor Maj. L, Min T Impedance factor Maj. L, Min T Adj. Imp Factor. Cap. Adj. factor due to Impeding mvmnt Movement Capacity 1. 00 0.74 0.80 0.80 618 403 1. 00 0.76 0.81 0.68 275 Results for Two-stage process: a y C t Worksheet 8-Shared Lane Calculations 275 . Movement 7 L 11 T 12 R I r'lr- I,-r-Il ~ "-"-', '''''; I i L....lvl Volume (vph) Movement Capacity (vph) # Shared Lane Capacity (VPhF)ag(:j'_l~ of 8 T 9 R 41 368 175 1088 793 10 L 79 275 313 51 399 Worksheet 9-Computation of Effect of Flared Minor street Approaches . Movement 7 8 9 10 11 12 L T R L T R C sep 368 1088 275 399 Volume 41 175 79 51 Delay Q sep Q sep +1 \ round (Qsep +1) i n max 313 MAY C sh 793 SUM C sep n C act Worksheet 10-Delay, Queue Length, and Level of Service Movement 1 4 7 8 9 10 11 12 Lane Config LTR TR LT v (vph) 224 216 130 C(m) (vph) 1636 793 313 v/c 0.14 0.27 0.42 . 95% queue length 0.47 1.11 1. 96 Control Delay 7.5 11.2 24.4 LOS A B C Approach Delay 11. 2 24.4 Approach LOS B C Worksheet II-Shared Major LT Impedance and Delay p(oj) v(il) , v (i2), s (il) , s (i2) , P*(oj) d(M,LT), Delay for stream 1 or 4 N, Number of major street through d(rank,l) Delay for stream 2 or 5 Volume for Volume for Saturation Saturation stream 2 or 5 stream 3 or 6 flow rate for flow rate for stream stream Movement 2 Movement 5 1. 00 0.86 0 124 2 or 5 1700 3 or 6 1700 0.85 7.5 1 1.1 lanes . # LOG ITEM Page_l1 <.') of - - --- ,:" , \c._' -,,'