Stacie Hoskins
From: Mark Buehrer [mark@2020engineering.com]
Sent: Wednesday, July 05,2006 11 :36 AM
To: Mamdouh H. EI-Aarag
Cc: Stacie Hoskins; Mike Asmundson; Richard Benson
Subject: Discovery Bay Golf Club - Approval for Suitability of a LOSS
Importance: High
Attachments: DOH letter-2.27.06.pdf
Hello Mamdouh,
I hope this finds things going well for you...
I understand that the Jefferson County's project review manager, Stacie Haskins, has a question for you
regarding the proposed LOSS. We would greatly appreciate if you could contact Stacie at your earliest
convenience to answer any questions she may have regarding your letter and review of our preliminary
engineer's design report. To assist your effort, I have attached your review/approvalletter, dated
February 27, 2006.
Here is Stacie's contact information...
SIaeu~ c/6~
Development Services Manager. DRD
Jefferson County Department of Community Development
621 Sheridan Street
Port Townsend. WA 98368
Phone 360-379-4463
Fax 360-379-4451
shoskins@co.jefferson.wa.us
Thanks!
Mark
Mark S. Buehrer, PE, Director
2020 ENGiNEERING, Inc.
www.2020engineering.com
Office/Delivery Address:
700 Dupont Street
Bellingham, WA 98225
Mail Address:
P.O. Box 1621
Bellingham, WA 98227
Ph: (360) 671-2020
Fax: (360) 671-0322
"To provide simple economic solutions to complex environmental issues...to meet future needs."
LOG ITEM
# q9
Page ( ot~
7/26/2006
.
~
February 27, 2006
STATE Of WASHINGTON
DEPARTMENT OF HEALTH
OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY
lSOO'Wt'st fourth Awnue, Suire 403
Spobne, w.ultingroo 99204-1656
Mark Buehrer, P.E.
2020 ENGINEERING, Inc.
P.O. Box 1621
Bellingham, W A 98227
~ite(SoiJs) ~ .,..DiIec)v..-y ~y Q>>IfCottrse
ProposedI:Jarge'6D~Site SysteIIllmpronments'.Jefta son. Cou:nty
Dear Mr. Buehrer:
It was a pleasure to meet with yo.u at Discovery Bay Golf Course on February 21,2006. The
primary purpose of the visit was to evaluate the suitability of the soils for sewage treatment
upgrade at the proposed location. We observed fourteen (14) test pits at the site.
The test pits evaluated ,.~ to vary across the site but typically ~ to consist of varying
depths of sandy loam and loamy medium sand overlaying clay loam. Based on these observations
and.the soil logs emailed to our office on February 23, 2006, we generally characterize the soils in
area "A" (as shown in sheet 3 of 4) as loamy medium sand. The soil.isclassified as ''Type 3" in
Washington State. The maximum allowable loading rate is 0.8 gallons per day per square foot.
I
We recommend avoiding the areas where test pits indicate shallow depths of loamy medium sand.
Based on your design ptopOSalin the preliminary design report dated February 2006, the site
appears to be suitable for the proposed LOSS.
The design must be submitted to this office for review and approval prior to construction. After
construction is complete, but before thedrainfield is covered., a representative from this office
must inspect the installation and conduct a pressure test. If you have any questions, please feel
fteetoeall.
Sincerely,
~O-~ $-y", .
Mamdouh H. EI-Aarag,P.E.
Environmental Engineer
Large. On-Site ,Systems
Phone: 509-456-2754
Fax: 509-625-5357
E-MaiI:MatndolJ.h.El-~.wa.gOV
cc: Jeff(ll'SOll County Health:
Mike Deeney, Creative Design Solutions
LOG ITEM
# gcr
Page 2-. otz. 0
.......