Loading...
HomeMy WebLinkAboutLog099 i Glacier Page 1 of 1 Stacie Hoskins From: Mark Buehrer [mark@2020engineering.com] Sent: Wednesday, July 05,2006 11 :36 AM To: Mamdouh H. EI-Aarag Cc: Stacie Hoskins; Mike Asmundson; Richard Benson Subject: Discovery Bay Golf Club - Approval for Suitability of a LOSS Importance: High Attachments: DOH letter-2.27.06.pdf Hello Mamdouh, I hope this finds things going well for you... I understand that the Jefferson County's project review manager, Stacie Haskins, has a question for you regarding the proposed LOSS. We would greatly appreciate if you could contact Stacie at your earliest convenience to answer any questions she may have regarding your letter and review of our preliminary engineer's design report. To assist your effort, I have attached your review/approvalletter, dated February 27, 2006. Here is Stacie's contact information... SIaeu~ c/6~ Development Services Manager. DRD Jefferson County Department of Community Development 621 Sheridan Street Port Townsend. WA 98368 Phone 360-379-4463 Fax 360-379-4451 shoskins@co.jefferson.wa.us Thanks! Mark Mark S. Buehrer, PE, Director 2020 ENGiNEERING, Inc. www.2020engineering.com Office/Delivery Address: 700 Dupont Street Bellingham, WA 98225 Mail Address: P.O. Box 1621 Bellingham, WA 98227 Ph: (360) 671-2020 Fax: (360) 671-0322 "To provide simple economic solutions to complex environmental issues...to meet future needs." LOG ITEM # q9 Page ( ot~ 7/26/2006 . ~ February 27, 2006 STATE Of WASHINGTON DEPARTMENT OF HEALTH OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY lSOO'Wt'st fourth Awnue, Suire 403 Spobne, w.ultingroo 99204-1656 Mark Buehrer, P.E. 2020 ENGINEERING, Inc. P.O. Box 1621 Bellingham, W A 98227 ~ite(SoiJs) ~ .,..DiIec)v..-y ~y Q>>IfCottrse ProposedI:Jarge'6D~Site SysteIIllmpronments'.Jefta son. Cou:nty Dear Mr. Buehrer: It was a pleasure to meet with yo.u at Discovery Bay Golf Course on February 21,2006. The primary purpose of the visit was to evaluate the suitability of the soils for sewage treatment upgrade at the proposed location. We observed fourteen (14) test pits at the site. The test pits evaluated ,.~ to vary across the site but typically ~ to consist of varying depths of sandy loam and loamy medium sand overlaying clay loam. Based on these observations and.the soil logs emailed to our office on February 23, 2006, we generally characterize the soils in area "A" (as shown in sheet 3 of 4) as loamy medium sand. The soil.isclassified as ''Type 3" in Washington State. The maximum allowable loading rate is 0.8 gallons per day per square foot. I We recommend avoiding the areas where test pits indicate shallow depths of loamy medium sand. Based on your design ptopOSalin the preliminary design report dated February 2006, the site appears to be suitable for the proposed LOSS. The design must be submitted to this office for review and approval prior to construction. After construction is complete, but before thedrainfield is covered., a representative from this office must inspect the installation and conduct a pressure test. If you have any questions, please feel fteetoeall. Sincerely, ~O-~ $-y", . Mamdouh H. EI-Aarag,P.E. Environmental Engineer Large. On-Site ,Systems Phone: 509-456-2754 Fax: 509-625-5357 E-MaiI:MatndolJ.h.El-~.wa.gOV cc: Jeff(ll'SOll County Health: Mike Deeney, Creative Design Solutions LOG ITEM # gcr Page 2-. otz. 0 .......