HomeMy WebLinkAboutLog112
~~~ r~ ~""" C\ ("~ t.tL c"ll
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360) 379-4450
POSTING INSTRUCTIONS
Please post the attached notice on a 2-foot by 3-foot board provided by this department in a conspicuous
location visible to vehicle traffic and pedestrians on or reasonably near the proposed
development by August 2, 2006.
The clear adhesive paper can be put over the notice after you mount it to protect it from the elements.
Additional notice boards may be required where the site does not abut a public road, for a large site that abuts
more than one (1) public road, or the Administrator determines that additional notice boards are necessary to
provide adequate public notice.
Notice boards shall be maintained in good and legible condition by the applicant during the notice period, be in
place at least fifteen (15) calendar days prior to the date of the hearing, and be removed within fifteen (15)
calendar days after the end of the notice period.
Complete the affidavit, have it notarized, and return it to this office within three (3) days of posting. If the
affidavit is not filed as required, any scheduled hearing or date by which the public may comment on the
application will be postponed in order to allow compliance with this notice requirement.
If you have any questions, please contact this office at (360) 379-4450.
M~ number: MLA05-00286
Proponent(s): WEFORE LLC
LOG ITEM
# lL'2./
Page I ot~
AFFIDAVIT OF POSTING PUBLIC NOTICE
JEFFERSON COUNTY UNIFIED DEVELOPMENT CODE
ORDINANCE #03-0702-01
State of Washington)
County of Jefferson)
I, , being duly sworn of oath say that I have posted one (1) public notice poster on or
near the site identified in the following development description:
PROPOSAL: Discovery Bay Golf Club Planned Rural Residential Development and Long Plat to subdivide 200+ acres into 48 lots
where minimum lot size is 0.30 acres, and maximum lot size is 2,1 acres. The applicant seeks to utilize the clustering provisions
and the maximum allowable bonus density of 20% per UDC 3.6.13, Planned Rural Residential Developments (PRRDs). Golf
Courses, septic drainfields and stormwater detention facilities are to be located within the reserve tract(s) totaling approximately
154 acres.
A traffic impact analysis, a wetland delineation, a supplemental vegetation and wildlife habitat report, a sanitary sewer report and a
stormwater management plan have been submitted with this application.
A Mitigated Determination of Non-Significance was issued August 2, 2006. This final determination is isuued pursuant to WAC
197-11-340(2)(1). Jefferson County has considered comments on its preliminary determination of nonsignificance, There is no
additional comment period. Any appeal of this determination on the basis of noncompliance with the provisions of Chapter 43.21 c
RCW (State Environmental Policy Act) must be submitted in writing before 4:30 PM, Wednesday, August 16, 2006 to the
Jefferson County Development Review Division (Jefferson County Permit Center, 621 Sheridan Avenue, Port Townsend, WA
98368) for consideration by the Jefferson County Hearing Examiner.
These two notices were posted in full compliance with UNIFIED DEVELOPMENT CODE on:
the
day of
,2006.
(Signature of person posting notice)
Subscribed and sworn to before me on this
day of
,2006.
Acknowledgement:
Notary Public in and for the State of Washington,
residing in , Washington.
My commission expires:
NOTARY STAMP
MLA Number: MLA05-00286
Proponent(s): WE FORE LLC
I:\F _MLT_HearExam_APO_U.rpt
LOG ITEM
#
Page ? _ ot.:5L
JEFFERSON COUNTY
NOTICE OF PUBLIC HEARING
TYPE III LAND USE APPLICATION
MLA05..00286
NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County Hearings Examiner on a
Type III Land Use Application.
APPLICANT:
WEFORE LLC
C/O MIKE ASMUNDSON
7377 E DOUBLE TREE RANCH
SCOTTSDALE AZ 85258
Application Received Date: May 9,2005
Application Complete Date: June 6, 2005
Application Notice Date: August 2, 2006
SITE ADDRESS AND PROJECT LOCATION: 7401 CAPE GEORGE RD
Parcel Numbers 001 304001-002,004,006-007 & 001 292005 & 001 293004,009-010 & 001 311
002, 005 & 001 322 007 & 999 200 401 thru 405, & 901 in Sections 29 thru 32, Township 30, Range
01 West, WM, Located at 7401 Cape George Rd, Port Townsend, WA 98368
PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES:
Discovery Bay Golf Club Planned Rural Residential Development and Long Plat to subdivide 200+
acres into 48 lots where minimum lot size is 0.30 acres, and maximum lot size is 2.1 acres. The
applicant seeks to utilize the clustering provisions and the maximum allowable bonus density of 20%
per UDC 3.6.13, Planned Rural Residential Developments (PRRDs). Golf Courses, septic
drainfields and stormwater detention facilities are to be located within the reserve tract(s) totaling
approximately 154 acres.
A traffic impact analysis, a wetland delineation, a supplemental vegetation and wildlife habitat
report, a sanitary sewer report and a stormwater management plan have been submitted with this
application.
A Mitigated Determination of Non-Significance was issued August 2, 2006. This final determination
is isuued pursuant to WAC 197-11-340(2)(f). Jefferson County has considered comments on its
preliminary determination of nonsignificance. There is no additional comment period. Any appeal
of this determination on the basis of noncompliance with the provisions of Chapter 43.21c RCW
(State Environmental Policy Act) must be submitted in writing before 4:30 PM, Wednesday, August
16, 2006 to the Jefferson County Development Review Division (Jefferson County Permit Center,
621 Sheridan Avenue, Port Townsend, WA 98368) for consideration by the Jefferson County
Hearing Examiner.
PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS:
# lOG ITEM
Page~ ;Lot-1~
The public hearing will be conducted on Friday, September 08,2006 in the Board of County Commissioner's
Chambers in the basement of the Jefferson County Courthouse. The hearing will begin at or about 2..: ,S- t>W\
The application and any studies may be reviewed at the Jefferson County Department of Community
Development. All interested persons are invited to (a) comment on the application; (b) receive notice of and
participate in any hearings; and (c) receive a copy of the decision by submitting such written
comment(s)/request(s) to the Jefferson County Department of Community Development, Development Review
Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4450.
SEPA INFORMATION AND DETERMINATION:
If the threshold determination is a Determination of Non-Significance (DNS) or a Mitigated Determination of
Non-Significance (MDNS), parties of record may appeal the decision to the Hearing Examiner within 14 days of
the final Notice of Decision. A Determination of Significance (DS) may not be appealed to the Hearing
Examiner. If a DNS or MDNS is appealed to the Hearing Examiner, parties of record may appeal the Hearing
Examiner's decision to the Appellate Hearing Examiner within 14 days of the final Hearing Examiner Notice of
Decision.
APPEALS:
Appeals of SEPA decisions are described above in the SEPA Information and Preliminary Determination
section.
The final permit decision for this Type III permit application will be made by the Hearing Examiner. Parties of
record may appeal the decision to the Appellate Hearing Examiner within 14 calendar days of the final Hearing
Examiner Notice of Decision. Decisions of the Appellate Hearing Examiner may not be further appealed except
to Superior Court.
Project Planner: S HOSKINS, 360-379-4450
For further information, please visit the Jefferson County Department of Community Development web page at
www.co.iefferson.wa.us/commdevelopmentl.
lOG ITEM
#
Page -<1 ot4