HomeMy WebLinkAboutLog119
. .
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360) 379-4450
POSTING INSTRUCTIONS
Please post the attached notice on a 2-foot by 3400t board provided by this department in a conspicuous
location visible to vehicle traffic and pedestrians on or reasonably near the proposed
Z-~
development by August': 2006.
The clear adhesive paper can be put over the notice after you mount it to protect it from the elements.
Additional notice boards'may be required where the site does not abut a public road, for a large site that abuts
more than one (1) public road, or the Administrator determines that additional notice boards are necessary to
provide adequate public notice.
Notice boards shall be maintained in good and legible condition by the applicant during the notice period, be in
place at least fifteen (15) calendar days prior to the date of the hearing, and be removed within fifteen (15)
calendar days after the end of the notice period.
Complete the affidavit, have it notarized, and return it to this offICe within three (3) days of posting. If the
affidavit is not filed as required, any scheduled hearing or date by which the public may comment on the
application will be postponed in order to allow compliance with this notice requirem~nt.
If you have any questions, please contact this office at (360) 379-4450.
MLA number: MLA05-00286
Proponent(s): WE FORE LLC
jl,~,
t
'-z,
.,..1.
1\9
. ,
AFFIDAVIT OF POSTING PUBLIC NOTICE
JEFFERSON COUNTY UNtFlED DEVELOPMENT CODE
ORDINANCE ta-:07OZ..ot
State of Washington)
Counly of Jetfenson)
I. " being duly sworn ofoall say that I have posted one (1) public notice poster on or
near the site identified in the following development description:
PROPOSAL: Oiscovefy Bay Golf Club Planned Rural Residential Oevetopment and Long Plat tosubdMde 200+ acres into 48 lots
where minimum lot size is 0.30 acres, and maximum lot size is 2.1 ~. The aPPlicant seeks to utilize the dustering provisions
and lhemaximum allowable bonus density of 20% per UOC 3.6.13, Planned Rural Residential Oevelopmenta (PRRDa). Golf
Coune$,septic drainfieIds and stormwater detention facilities are to betoc:ated within the reserve trad(s) totaling approximately
154 acres.
A 1ralIic impact analysis, a wetland delineation, a supplemental vegeIlItion and wildlife habitat report, a saniIafy sewer report and a
stonnwater management plan have been submitted with this applicalion.
A Mitigated OeIem1ination of Non-SIgnificance was issued August 2. 2006. This final determination is lsuuedpursuant to WAC
197-11-34O(2)(t). Jefferson County has considered comments on its preIiminaIy determinatiof'l of nonsignificance. There is no '
additional comment period. Any appeal of this detennination on the basis of noncompliance with the provisions of Chapter 43.21c
RCW (State EnVironmental Policy Act) must be submitted in writlngbefore 4:30 PM, Wednesday, August 16, 2006 to the
Jefferson County Development RevieW Oivlsion (Jefferson County Pennit Center, 621 Sheridan Avenue, Port Townsend, WA
98368) for consideration by the Jefferson County Hearing Examiner.
. These two notices ..-e posted in fuH compliance with UNIFIED DEVElOPMENT CODE on:
the
~of
.2006.
(Signature of person posting notice)
Subscribed and sworn to before me on this
day of
,2006.
Acknowledgement:
Notary Public In and for the State of Washington,
residing in , Washington.
My commission expires:
NOTARY STAMP
MlA Number: Ml.A05-OO286
Proponent(s): WEFORE lLC
I:\F _MLT_HearExam_APO_U.rpt
1L1.
~. ,~
Previously Published Notice
*NOTE CHANGE IN HEARING LOCA TION*
JEFFERSON COUNTY
NOTICE OF PUBLIC HEARING
TYPE III LAND USE APPLICATION
MLA05-00286
NOTICE IS HEREBY GIVEN that a public hearing will be held by the Jefferson County
Hearings Examiner to review and receive comments on a Type III Land Use Application.
APPLICANT:
WEFORE LLC
C/O MIKE ASMUNDSON
7377 E DOUBLE TREE RANCH
SCOTTSDALE AZ 85258
Application Received Date: May 9,2005
Application Complete Date: June 6, 2005
Application Notice Date: August 2, 2006
SITE ADDRESS AND PROJECT LOCATION: 7401 CAPE GEORGE RD
Parcel Numbers 001 304 001-002, 004, 006-007 & 001 292 005 & 001 293 004, 009-010
& 001 311 002,005 & 001 322007 & 999 200 401 thru 405, & 901 in Sections 29 thru 32,
Township 30, Range 01 West, WM, Located at 7401 Cape George Rd, Port Townsend,
WA 98368
PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES:
Discovery Bay Golf Club Planned Rural Residential Development and Long Plat to
subdivide 200+ acres into 48 lots where minimum lot size is 0.30 acres, and maximum lot
size is 2.1 acres. The applicant seeks to utilize the clustering provisions and the
maximum allowable bonus density of 20% per UDC 3.6.13, Planned Rural Residential
Developments (PRRDs). Golf Courses, septic drainfields and stormwater detention
facilities are to be located within the reserve tract(s) totaling approximately 154 acres.
A traffic impact analysis, a wetland delineation, a supplemental vegetation and wildlife
habitat report, a sanitary sewer report and a stormwater management plan have been
submitted with this application.
A Mitigated Determination of Non-Significance was issued August 2, 2006. This final
determination is issued pursuant to WAC 197-11-340(2)(f). Jefferson County has
considered comments on its preliminary determination of nonsignificance. There is no
additional comment period. Any appeal of this determination on the basis of
noncompliance with the provisions of Chapter 43.21 c RCW (State Environmental Policy
, ,~
?;4",
Act) must be submitted in writing before 4:30 PM, Wednesday, August 16, 2006 to the
Jefferson County Development Review Division (Jefferson County Permit Center, 621
Sheridan Avenue, Port Townsend, WA 98368) for consideration by the Jefferson County
Hearing Examiner.
PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS:
The public hearing will be conducted on Friday, September 08, 2006 in the Pacific Room
at the Jefferson County Public Health Department, 615 Sheridan St, in Port
Townsend. The hearing will begin at or about 2:15PM.
The application and any studies may be reviewed at the Jefferson County Department of
Community Development. All interested persons are invited to (a) comment on the
application; (b) receive notice of and participate in any hearings; and (c) receive a copy of
the decision by submitting such written comment(s)/request(s) to the Jefferson County
Department of Community Development, Development Review Division, 621 Sheridan
Street, Port Townsend, WA 98368, (360) 379-4450.
SEPA INFORMATION AND DETERMINATION:
If the threshold determination is a Determination of Non-Significance (DNS) or a Mitigated
Determination of Non-Significance (MDNS), parties of record may appeal the decision to
the Hearing Examiner within 14 days of the final Notice of Decision. A Determination of
Significance (DS) may not be appealed to the Hearing Examiner. If a DNS or MDNS is
appealed to the Hearing Examiner, parties of record may appeal the Hearing Examiner's
decision to the Appellate Hearing Examiner within 14 days of the final Hearing Examiner
Notice of Decision.
APPEALS:
Appeals of SEPA decisions are described above in the SEPA Information and Preliminary
Determination section. The final permit decision for this Type III permit application will be
made by the Hearing Examiner. Parties of record may appeal the decision to the
Appellate Hearing Examiner within 14 calendar days of the final Hearing Examiner Notice
of Decision. Decisions of the Appellate Hearing Examiner may not be further appealed
except to Superior Court.
Project Planner: S HOSKINS, 360-379-4450
111
-:t ,'4'", ."