GEOTECHNICAL REPORT
Prepared For Dean Rosenthal
July 8, 2003
For the Property Located described as
Lot 8 in Tala Point Estates, Tax # 821103012
Section 10, Township 28 North, Range 1 East, W.M.
Jefferson County, Washington
Prepared by
NORTHWESTERN TERRITORIES, INC.
717 S. Peabody Street
Port Angeles, Washington 98362
Phone 360-452-8491 Fax 360-452-8498
Web Site www.nti4u.com
E-mail info@nti4u.com
--.
NORTHWESTERN TERRITORIES, INC.
A JLS GROUP COMPANY
- 717 SOUTH PEABODY STREET, PORT ANGELES, WA 98382
^ Engineers ^ Land Surveyors ^ Geologists
N~, ^ Construction Inspection ^ Materials Testing
(3G0) 452-8491 FAX 452-8498 www.nti4u.com E-Mail: in(oQnli4u.com
JLS GROUP,
INC.
Geotechnical Report
Lot 8 in Tala Point Estates, Tax # 821103012
July 8, 2003
Dean Rosenthal
45 McCoord Woods Dr.
Fairport, NY 14450
Subject: Geotechnical report for Lot 8 in Tala Point Estates, Tax # 821103012
located in Section 10, Township 28 North, Range 1 East, W.M., Jefferson
County, WA
Dear Mr. Rosenthal:
Background
At your request, Bill Payton, Engineering Geologist with Northwestern Territories Inc.
conducted a bluff stability inspection at the above mentioned property on July 2, 2003.
The purpose of this inspection was to ,examine the marine bluff at the subject site by
visual means in order to determine the relative stability of the bluff and make
recommendations in regards to the proposed construction of a single family residence.
All measurements were made with hand held instruments and should be considered
approximations. The site is heavily vegetated especially towards the north end of the
property and thus the topography of the property and the location of the top of the bluff
is not well defined. For increased accuracy and assistance in development planning, it.
is recommended that a topographic survey be completed for the property including
mapping the top of the bluff.
Site Description
The subject waterfront property is located on East Ludlow Ridge Road overlooking Port
Ludlow Bay to the west and Admiralty'Inlet to the north (Figure 1). The property is
currently undeveloped. There are residential homes on each side of the property.
The upland portion of the property is heavily vegetated in young to mature native trees,
brush, ferns and grass. There is a gully that runs northward through the property and
drains out at the top of the bluff (Figure 2). In the gully, dense brush predominates. No
springs or seeps were noticed and the gully appeared dry. Because of the gully, the
., only potential building site is located at the southeast corner of the property near the
cul-de-sac (Figure 3). The limited buildable area may hamper development of the
property with respect to the size of house and suitable area for a septic drainfield~
From the cul-de-sac, the property is roughly level for about 112 to 126 feet. At this point,
the gully becomes the dominant feature and the property begins to slope northward at
about 18 degrees (33%) then increases to about 25 to 30 degrees (47%-58%). As the
gully develops, the sides of the gully also steepen to around 25-30 degrees. There is a
strip of relatively flat land between the gully and the east property line. The top of the
bluff appears to be roughly 345 feet northward from the cul-de-sac or south property
line.
Beach access was gained via a neighbor's property several lots south of the subject
property. The bluff at the property is roughly 120 to 150 feet high and mostly devoid of
vegetation due to recent slide activity (Photo 1). The upper bluff is near vertical, while
the lower bluff has a slope of about 36 to 38 degrees. The sloping soils. that comprise
the lower bluff are predominantly slide debris derived from the upper bluff. Some young
alders have started to grow on this slide debris. The bluff is composed predominantly of
sand with lenses of gravelly sand and silt. No springs or seeps were noticed on the bluff
face.
Mechanics of Bluff Recession
There are many forms of bluff recession that occur in the coastal regions of northwest
Washington. Two common processes are the erosion of the toe of the bluff by wave
action, and the sloughing of upper bluff soils due to saturation of the soil during the rainy
season. Both of these processes seem to be occurring at the subject property.
When waves attack the toe of an unprotected bluff, the lower bluff soils are eroded
away. Eventually, this erosion will oversteepen the bluff to a point where. the soil can no
longer, support itself at such a steep angle. Then the bluff soils will slough off, depositing
material at the toe of the bluff. This will have the effect of temporarily reducing the angle
of the bluff to a more stable angle, and then the whole process will start over again.
Many of the landslides that occur in our region happen in the winter or spring when the
ground is saturated with water, and especially after heavy rainfall events. When the soil
becomes saturated, there is a decrease in the cohesion between the soil grains and an
increase in the pore-water pressure. This condition can trigger landslides and debris
flows on slopes. Often, there will be an impermeable soil layer part way down the bluff,
which prevents the downward migration of groundwater and causes the water to
migrate laterally, exiting the bluff above the impermeable layer. Surface runoff flowing
down the face of the bluff can also cause erosion and damage vegetation on the bluff.
2
;,
For this reason, it is important to control on-site drainage and runoff in order to minimize
__ negative impacts to the bluff. It is also important to maintain vegetation on the bluff face
in order to reduce erosion of the bluff soils.
Site Geology
The Washington State Department of Ecology's Coastal Zone Atlas maps the bluff area
of the subject property as Undifferentiated stratified sediments older. than Vashon
lodgement till (Qpf). This soil consist mainly of sand and gravel, but in some areas
contain silt, clay, peat and possibly till. The Atlas maps the upland area of the property
as the Vashon lodgement till (Qvt1), a compact mixture of boulders, cobbles, pebbles,
sand, silt and clay, generally overlain by 1-5 feet of ablation till. The Atlas also describes
this soil as being excellent for foundation stability and good for.seismic stability. The
Atlas maps the slope stability of the bluff in the area of the property as Unstable recent
slide (Urs) (Figure 4).
Soil descriptions from the. Department of Ecology's "Geology and Ground-Water
Resources of Eastern Jefferson County, Washington" were consistent with the Coastal
Zone Atlas soil descriptions.
According to the Soil Survey of Jefferson County Area, Washington (United States
Department of Agriculture, 1975), the subject site is in an area mapped as the Kitsap silt
loam and as the Cassolary sandy loam. The Kitsap soil consists of moderately well
drained soils that formed in glacial lacustrine or marine sediments. The Survey states
that the runoff of this soil is -rapid and the hazard of erosion and slippage are severe.
The Cassolary soil consists of somewhat poorly drained soils that formed in glacial
lacustrine or marine sediments. Runoff of this soil is classified as slow to rapid
depending on slope, and the hazard of erosion is classified as slight to severe again
depending on slope.
Visual observations made in the area were generally more consistent with the Coastal
Zone Atlas soil descriptions.
Conclusions and Recommendations
The bluff at the subject property is actively being eroded as evidenced by the recent
slide on the bluff face, and future sliding should be expected. Typically, bluff erosion and
sliding are more common in -the winter and spring due to increased rainfall, higher tides
and winter storms. It is impossible to predict when a slide will occur or how much the
bluff will recede. Average rates of bluff recession for this area have been suggested to
be on the order of 6" to 12" or more per year. However, several. feet of bluff could be lost
during one event.
Based upon our investigation, and the possible average rate of recession of 12" per
year, we recommend that a 150 foot minimum setback be established from the top edge
of the bluff to the foundation of the proposed house. Also, because of the presence of
3
i "•
the gully and the steep sides of the gully, we recommend that the proposed house be
___ located in the relatively flat area at the southeastern end of the property mentioned
above. In order to minimize the footprint of the house, it may be beneficial to build a two
story house, with a basement daylighting at the head of the gully. If this area does not.
provide enough room for a house and septic drainfield, it may be possible to locate the
} ~ drainfield in the relatively flat area between the gully and the east property line. The 150
foot bluff setback should be maintained for the .drainfield as well.
The following recommendations should also be considered with regards to the proposal:
It will be necessary to maintain ground cover to reduce erosion from surface
runoff. Any bare areas that develop should be revegetated. Native deep-rooted
vegetation that requires little or no irrigation would be the most beneficial. If
vegetation cannot be established, say in the gully, then erosion control mats or
rock may be useful in order to reduce erosion. Please consult the online
publications mentioned below for further information.
2. Vegetation on the bluff face provides stabilization to the bluff face soils and
helps remove water from the soil. Vegetation growth on the bluff face should be
enhanced where possible. Any existing vegetation should be left in as natural
state as possible. If a better view is desired, trees should be pruned such that
they are not damaged. It may be worthwhile to consult a tree expert in this
matter.
3. Depending on the location of the house with respect to the gully, deepened
footings may be needed in order to comply with the requirements of Section
1806.5 of the Uniform Building Code (See Appendix).
4. Heavy irrigation or other activities that would contribute large quantities of water
to the soil should be avoided.
5. Surface runoff should not be allowed to flow over the face of the bluff and
cause erosion of the bluff face soils. One way to mitigate this if necessary
would be to construct a swale or interceptor drain on the upland and direct the
water to a catchment area and ten to the beach via tightline. Please see the
online publications recommended below for more information on this subject.
6. Surface runoff from hard surfaces such as roofs, driveways, walkways and
patios should be controlled and routed to the beach via tightline such that
surface water discharge to adjacent properties does not significantly exceed
predevelopment conditions.
7. Silt fences or other sediment control devices may be needed during
construction such that sedimentation to adjacent properties does not
significantly exceed predevelopment conditions.
4
8. Drainage control devices should be maintained in good working order and
inspected at least once a year.
9. An engineered drainage and erosion control plan should be developed for this
property to address items 6, 7, 8, and 9 above.
Based on the findings, recommendations and limitations of this report:
There has been a landslide at the subject property in the past, however, the
recommended setback distance should provide for minimal landslide hazard to
the proposed house.
2. Observations of slope stability indicate that the proposal should not be subject to
risk of landslide under the current conditions that exist at the site.
3. The proposal should not increase surface water discharge or sedimentation to
adjacent properties beyond predevelopment conditions.
4. The proposal should not decrease slope stability on adjacent properties.
5. The proposal should be stable under normal geologic conditions.
For further information please review the three online publications published by the
Washington State Department of Ecology (DOE) entitled: "Slope Stabilization and
Erosion Control Using Vegetation", "Vegetation Management: A Guide for Puget Sound
Bluff Property Owners" and "Surface Water and Groundwater on Coastal Bluffs". These
publications are now out of print but can be obtained from the DOE vvebsite at:
http://www.ecy.wa.gov/biblio/sea html under the 1993 and 1994- year heading. The DOE
website also contains much more useful information regarding slope stability and site
development; this reference is highly recommended.
Limitations
This report has been prepared for your exclusive use in conjunction with the above
referenced project. The report has not been prepared for use by others or for other
locations. It may be used by others only with the expressed written permission of the
Engineer.
Within the limits of scope, schedule and budget, this report was prepared in general
accordance with accepted professional engineering and geological principles and
practices in this or similar localities at the time the report was prepared. No other
warranty, expressed or implied, is made as to the conclusions and professional advice
included in this report.
5
r.- - -_-
.__ ... _,, ..._~._ , v.
The observations, conclusions and recommendations presented in -this report were
_ _ based on our visual observations of the subject property at the time of our site visit; no
laboratory tests were performed. Soil and geologic conditions can vary significantly
between test holes and/or surface outcrops. If there is a substantial lapse of time,
conditions at the site have changed or appear different than those described in this.
report, we should be contacted and retained to evaluate the changed conditions and
make modifications to our report if necessary.
Sincerely,
NORTHWESTERN TERRITORIES, INC.
i (}~~
Robert A. Leach, P.E., MBA
Principal Engineer
~ ~ ~ ~" ~C~
~'~
Bill Payton, L.E.G.
Engineering Geologist
G:\Gen\Bill\Reports\REDA0301.b1uff stability.l0(2&1 E).Tala Point.doc
-'~p`b~Ro ~SHy'9~y
,~~'` °,,
~„ oy
~ -PE. 13772 O ~,~
~~,c ~/S7E~~ ~~
"+~SS~oNa~ ~a°~
,EXPIRES 12!30/2004
6
Expires 11-0fr03
_.. } 1
_ ~ ~
_ ~ ~ Z .
~
_ ~ -
_ ~ ~
S Subject Property
.
~ ~ ~
"' ~ rr
?:
w
-~ ~„ -
° .-~
~ ` •
py
±
Y y
`~- V C~ ~
f^ .
'~
~
X
'S
. Y
q FV- rQ u
F
(~
~• ~a~~-~~~~ a tea-
4I~+ If ~
S~~r~~
Y4
~ ~ ~
*
~ ~~=•
7 .. V
..
.. ~ .~.
~~
C`
[[]]
'
' •
~ ~
..: .! ~ ~
L Y
! f
z•
~-
~
~
/
' 1
~
~
r..
~
~ CC
~
/ ~ ~
~ =,~+{
~
[~ P
_
_
'
Y~ -
~~ - ~, D :
~
is - .
~~~4R . __ ~
_ • _
z
~
_
~~
~ .... ~ r•
.... .... p~U~~ EIkY ~a•,...
~..... ..~ ................
........
! ~ r~
......~ ..~..
~ _ ~~
~
~ ~ ~ ~
klapaprovidad by.kFGeaanCaoniyGlS,Y ~ ~
!
Figure 1
~.~ .~
r *`~~` .
-;~ ,r
~ ~~. _~
r ~~ tee- .
~, x
r~
- ~ • ~
~f;,
.F ~ i
~ ~ f.'.
f. ~ ~ ~ s ~:
ti
~ ~.
.. ~~ 5
~' ~ •v
T :~~::. ~
f ;~' ~ .
Mapspiwridadby.kffermnCvunty~l€~ ....,~~ ~`,''
_, -. -- --
Figure 2
Map Output
Page 1 of 1
ArcIM~ HTML Viewer Ma
Legend
3e~~ied Feaiurea
i O dk1'B
~~++~~
- Approximate
~~ ~ - - top of bluff.
~ I~aad System
..- Parests-k
~ ..
~ ~ Possible-
i drainfield area.
`f
Flat area-
. ,
:
~
r
,~
- , ~,
,~
.~
;~ ;
us
!~
.
.
Ma~apwided ry.MleanGe~iyGi;~:.
_...._- . ~~ ~0 @
OR INFORMATIONAL PURPOSES ONLY-
fferson County does not attest to the accuracy of the data contained herein and makes no warranty with
espect to its correctness or validity. Data contained in this map is firrrted by the method and accuracy of its
Ilection. Mon Jul 07 15:41:18 2003
Figure 3
_ ', ,~
~I~rS
~:. ,
;u ~) ~*
}~ .;i~M,j~ Uri
~i ~ ~~~ o
~) k ~ 1
Iff ~ (1
~ s ' ~i}0 `~ tJra
it r 1
__ ~ t r
~ {"
~~ r } ~ 1 ~~Tl}r~L
-- t,~Y --~.-
_ .;~+
_. _ _ ~~
U ~~.~ ~
,~7 ...
L ,,,. , ~
-~~ ~ ~~
s ~ ~~.,..__.
~ 't } y
v t l4tilm
_~,;,~.
G .:u ~LYSt 15:9 hi~~r~r
pproximate location ~ ry,.
f property. ,. ~_ _
-J of
``,.
,:Urt
4~ ~~$ ::~.:~~,~~_ ~S1as
_ ~ .:. ..
. . 'f _. ;. .7 , _."' ~~ ~._ ~-~''~ -~`-'~h.r+'~,i ~ f ~. ,'. _ _.. ~..~_.a~. _ ~~.~~1 ire
Figure 4
'CHAP. 18, DIV. 1
tFIGURE 18-1-1 1997 UNIFORM BUILDING CODE
1 /FACE OF
I.~ FOOTING
TOP OF
SLOPE
//~ ~Y
~;
FACE OF - - ' '
STRUCTURE -
TOE OF H/3 BUT NEED NOT H
SLOPE EXCEED 40 FT.
(12 192 mm) MAX
11
H/2 BUT NEED NOT EXCEED 15 FT. (4572 mm) MAX.
FIGURE 18-1-1-SETBACK DIMENSIONS
-..,..
NTi ENGINEERING ~ SUR~/EYING, INC.
717 SOUTH PEA80DY STREET, PbRT ANGELES, WA 9831±2
Eng/neers ~ Lend Surveyo-s i Geologists
j ~ Consfruction Inspection ~ Materials Testinq
~~ (360) 452-8491 1-800-6545545 FAX 452-8498 E-Mail: info(iid_ntl4u.com
r~u uanli4ucom ~ ~ - ~ ~ ~ -
Jufy 27, 2006 '
Dean Rosenthal •
341 South Keel 1111~1y
Pt. Ludlow, WA ' ~~: ;365
Re: Addendum to GeotechniGal. Report dated July $, 2003 for Parcel # 821103012
Dear Mr. Rosenthal:. ~I
At your request, NTI Engineering 8 Surveying,-Inc. (NTI) performed an updated geotechnical
review of your property described as Lot 8 in Tala Point Estates, Parcel # 821103012. The
purpose of this review was to determine if the geologic conditions at the site were the'same as
was reported in the July 2003 report completed by NTI for the property, and to address the
proposed location of the septic/drainfield location. This review was requested by the Jefferson
r;ounty Department of Community Development in a letter dated June 27, 2006.
The review consisted of a review of the July 2003 geotechnical report and the septic system site
plan completed by Creative Desigri Solutions, and a site visit made on July 13, 2006 for visual
observations of the property and bluff.
Tlie current conditions at the site are essentially the same as was reported in the July 2003
report, and tine proposed septic/drainfield location behind the recommended 150' bluff setback
is acceptable from a geotechnical perspective. If you have any questions regarding this matter,
OI~ need further assistance, please feel free to contact us.
Sincerely,
NTI Engineering and Surveying, Inc
~l
dill Payton, f LE.G ~ I v,
engineering Geolu,,, ~ ~
c:Torln Mitchell ; l ~ ,
Rick Lander ~ ,k ~+.+
' Ez~ires 11 /06/06
G:\GenlBill\Reports\ROSD0601.10(28-1E)septic location letter Tale Pt.doc -
,. ~. ..
~: