In the Matter of Award of the
Contract for Courthouse Clock Tower
Rehabilitation Project;
Project No. 3035941547
}
}
}
}
16-06
RESOLUTION NO.
WHEREAS, the County Board of Commissioners, on February 21,2006, called for bids for
the above referenced project, and;
WHEREAS, due notice of the call for bids was given as required by law, and;
WHEREAS, nine (9) sealed bids were received and opened during public session for the
week of March 20,2006, per the attached bid tabulation, and;
WHEREAS, bids and contractors qualifications of the apparent low bidders were reviewed
and evaluated, and;
WHEREAS, interviews were held with the two lowest bidders to further evaluate their
qualifications, including those for historic preservation work, as summarized in the attached memo dated
AprilS, 2006, and;
WHEREAS, it is in the best interest of the people of Jefferson County to accept the lowest
bid from a contractor that is responsible, qualified and responsive, and has had previously demonstrated
experience with historic preservation work;
IT IS HEREBY RESOLVED, that the best, most responsible, and responsive bid was
submitted by Drury Construction Co. Inc., ofPoulsbo, W A; for the total bid including Base Bid and
Alternates #2 and #3, in the amount of$I,467,410.80 including WSST, subject to execution of the Contract
for Construction;
IT IS FURTHER RESOLVED, that the specifications and contract documents in their entirety
as included in the bid package, are part of this bid acceptance.
10th day of April 2006.
ON COUNTY
o MISSIONERS
;- ~
-:
r~~ Cmc
Julie Matthes, CMC
Deputy Clerk of the Board
..
u
~
'=
""
~
=
=
;
~
..
:=
....
.t:J
~
-=
~
""
~
~
=
E--
~
U
Q
U
~
fI:l
=
=
-=
1::
gr--~
u:;o
~~e
= =" '"
=~8::
U= ~ 25 'iii
.!:::!
~ ~ ~ ~
fI:l 'I) 'S
"" .... ::s 'I)
~~"Oc..
l:: .... V> 0
~f:g:g
~~~~
0 0 0 ::~ N <"l -.t 0 0 0 0
Q en 0 0 .... N 0\ <"l 0 0 ~ 0
= r..l I- -0 00 r..: ::;::;: ~ 0 0\ V; 0\ V) N
I- ell V) <"l V) .-..... \0 0 \0 0 N -.t
r..l < ell 0 N 0 ::.,..;, N M V) M r-- M V)
en ~ ~ N -.i' v:i :~ N r--" 0" N r..:- N 0\'
~ Cl) -.t N \0 00 \0 ~" 0\ V) N N
r..l ,5 \0. "'l, -.t. .-"it. -.t. ~ r--. r--. 0\" 0
~ ,', ,.. N
..l -c:l .... .... - <~ - .... .... .... .... ....
< ::l
I- < ]
0 -c:l
I- l:I
..
~ ~ ~ :~ ~ ~ ~ ~ ~ ~ ~
ell 0 8 0 .i::)- N t<'l 0 0 0 0 0
~ 0 ~ .'....oc' N 0\ 0 0 0 0 0
f;j 00 $ ... ':H:~ -c 00 r-.: vi 00 00 vi
< N ~ 0 lI'l lI'l ... t- o t-
~ N 0\ 00 0\ t- o t- 0\ '"
ell r-: 00 00 M .,.;- 0 N 0\ 00 M
~ ~ ~ 00 t- :.:.:-"" 00- ~ 00 N t- 0\ '<t
Cl) ... ... ,~ ... N ... N N
C
< :a
..l ::l
~ ]
~ ~ ~ ~ :::'w ~ ~ ~ ~ ~ ~ ~
0 0 0 ::::::=. N <"l 0 0 0 0 0
.., 0 0 N ,.,~ 00 0\ ~ 0 ~ 0 ~
,., f;j ...; ~ 00 :':-:ri'l- 0\ 0\ - v; V) 0 V)
0\ <"l ..,~ V) i! t<'l 0\ M \0 N
r..l ell .... \0 <"l 00 \0 M r-- 0\ N.
I- ~ r--. vi 00 ::::::~ 0\' N M 0 00 0\' ....
< Cl) N -.t <"l M M -.t r-- -.t N 00
~ ,5 ....
-g
r..l ]
~
<
~ ~ ~ ::::::~ ~ ~ ~ ~ ~ ~ ~
0 0 0 :::::e: 0 0 0 0 0 0 0
0 0 -.t .-.'.-N -.t 0 0 0 0 ~ 0
~ l- V; N ...; :::::t<): -0 0\ -0 0 ...; 00 0
ell M V) r-- ::<~ -.t 0 N N -.t -.t V)
r..l ell 0 M V) 0\ N - \0. o. 0\ -.t
I- ~ <0 ...-i' 0 ...-i' ...-i' r..:- .... .... 00 N
< Cl) 0 ::!; -.t .'.'.'''''' V) M M V) M \0 \0
~ c .... - '.:-:-:..;.: .... .... .... - - ....
:a
r..l ::l
~ <l
< ,5
~ ~ ~ .:.:-:-~ ~ ~ ~ ~ ~ ~ ~
0 0 0 ::::::8: 0 0 -.t 0 0 0 0
0 0 V) 0 0 M 0 ~ 0 0
00 ..; V; ::-:::~ -0 N N 0 .... r..: r..:
N r-- ::!; 0 0 V) lI'l M - \0
00 N :: :::::r -.t -.t. r-- M 0\ -.t 00
::!;. vi r..:- oo .... 0\ <0 r..:- ...-i' vi
M 00 .....,01). 00 0 V) r-- r-- N 00
I- ~ .... N. >::~ :} -.t. -.t~ ~ ~ \0. r--.
en .... .... .... .... .... - .... .... ....
Q en
= ~
r..l Cl)
en .5
< -c:l
::l
= <l
.5
~ ~ ~ ::::::~ ~ ~ ~ ~ ~ ~ ~
S
.; , , d
I:: ':cJ:::::: N
-.e - 0
0 on g :-lll':-:': 0 u
-- .5 ::< :5 .... I::
~ -
... - ,~ "0
0 ~ 0 :~:~ ~u 1::.
--
~ U :g:::S I:: - ~ 0
0 .9 u .~
'I) g
'iii 0 5 .~ I::
.. U :tl::~ .; ... 2 I::
u .9
~ .5 .;= I:: g V> - .9
~ <<i u C.-,.... - I:: ... - V>
V; g 0 g u I:: ...
-= .... :lHi 1 u
00 ~ 5 8 u g 0 g
00 ~ V> 'I) V> V> U
V> I:: :-0::::=
.t:J ... C) u > I:: I:: "0 V>
~ \iIil u 0 :~,:~ 0 0 0 'I) I::
E-- ~ 'I) ] U I 5 ~ u u u 0
... ~ a u
~ :E ~ V> V> ~
~ u :cf:~ i ~ .g ~ > u
u 's..
.... I-l .( V> ~::i <: "0
= = ii:: 0 E-< 0 ~ < ~
.....
M
~
~
"'" It> "'" '" '" '" CIO ...
'" CIO '" CIO '" ,...
I
I
i
I .
W
c ' ,
0 I !
:::l ,
ell
:= ,~
:s
ell
.c
GI
E 0::
...
GI E
0 ~ ,
u.. 0 , e
c 'l- I 1;;
0 ~ E C
:::l U '" 0
ell 0 0: '6 C ~
;:, C 0
j () III , 0 2 ~ ::E
c "E
GI 0 0 'Ui 1l
w III :::l Cl C 1;;
~ ;:, ell 0 lii 3l C ,.<:
0 ~i (,) .<: 0 ICI) ~
GI U , E '2 lZ ,U
~!E ~ .. 1;l 2
.~ .. e! 0 '8 ;.8 ~ 0) ,.,
::s i C; 0)' lei. ~ u: Cl u. CI) 'Ul c. .!
GI 0- '0 :u '" CI)
01;:, .~. u C ~ C 3: .<: I:; 5l'
- i 0 .f! '" 0) , t) Ul 0 '"
.5 YJO M! 0:: c<i u. C .., :.:: ,u ,::E u: .ll. ..J iD :CI)
'" CIO '"
mien co CD IX) co
CIO CIO CIO
N
...
C ,-
0 ,C l'J
,0)
'6 0 ::E
2 13 1l
'Ui Ul ~ .<:
c ~ c: c: c: CI) ~
E 0 ~ lil 2 0
(,) 2 u .8 ~ 0)
ei. C 0 :16 c.
~ :-E ~ ~ Ul '" CI)
~ 2 c: .c t) 2 '5 ,~
8 0 'C: '0) 0 'iD
c 0: LlJ ,ll. ::E C ll.
12
"
0)
c: C "[
:B GI J
.~ c: E
~ 8 J!
J ~ '" 11 'ii)
:l
is 'is. ~ Ul '0
& I&! c
8 ~ ,., ..
IS .c
'8 c ''0 ~ ~ Cl
.. C :;: '0
'1: C '8 c .. ~ :is
12 J GI 0 .. ,5: ~ Cl
:x: 8 '0 C I 1 :is gj '5 c:
c ~ 0
5 c LlJ :;: ~ ~ :;:
.. J! :x: GI :~ Ul
'C .. l! ~ 0: '=
~ GI C &! '"
0) a. Cl 'C ~ j ~ 11 e ~
:c a. ,0:: .,
>C .. ~ !f '5
~ c: '. LlJ c ,I!! IE '0 Cl ~ c
I ~~ '" :l tl "
jJl ~ 8 c c ,'5 IS
g ,., ':Ii en '" ~ ,!i1 0
c ~ (,) Ij ~ '6 (,) en
e!l !. ! 11 11 III c t ~ e 1 g
~ 0 ~ 1 ~ ... l
0 c ~ E Il 'e' III 8 c
OJ c: = 'c ~
" " 0 Cl~ 0 o ~ jc3 ~ u 0
~ 0 (,) (,) Co :Ii u: ,en en Ii: (,) ,en Co l-
i ,
I , ,
,
1
MEMO
Jefferson County Public Works
To:
Allen Sartin
Central Services Director!
Deputy County Administrator
Date: 6 April 2006
From: -n .
Gordon Ramstrom <:J1O ,-
Architectural Project Coordinator
Pages:(33) Total
Re:
Frank Gifford
File
Jefferson County Courthouse CC.
Clock Tower Rehabilitation Project .
Project No. 303594157
Subj: Review of Bids
Recommendation: The results of the interviews held 04/03/06 concluded that the low bid
contractor did not meet the minimum qualifications for the performance of this Clock Tower rehab
work. Further, this determination places the second low bidder as the lowest cost responsible,
qualified and responsive bidder. We hereby strongly recommend the award of the Contract for
Construction be made to Drury Construction Co. Inc. of Poulsbo, WA., subject to the execution of
the Contract for Construction.
General Project Description: This project is for the stabilization and conservation of the upper
portion of the Courthouse Clock Tower. Priorities for this work are upgrades to the structure,
weatherproofing, conservation of materials and clockworks. This project is considered phase one of
the rehabilitation of the Courthouse facility. A future phase is proposed to strengthen the lower part
of the Clock Tower in conjunction with the main part of the building.
Summary of the review process:
A. Bid Tabulation: See attached Bid Tabulation dated 04/04/06. Nine bids were received,
distributed above and below the Architects estimate. One bid was received two minutes late, but it
was not one of the low bidders. Washington State Sales Tax (WSST) was increased to 8.4% since
bids were received.
B. Additional Bid Information: The four low bidders were requested to submit additional
information per specifications, INSTRUCTIONS TO BIDDERS, Section 00100 Part Five, and Article
7.08. The three lowest bidders provided these materials, and were all responsive bidders.
c. Subcontractors: After review of qualifications and phone interviews, the contractor for
Center Coring was not approved. This was due to a lack of demonstrated experience for the work
involved. The two lowest bidders agreed to change this subcontractor to another that had
demonstrated experience and qualifications for this work, without a change in price. The third low
bidder proposed to carry out this work themselves, with the assistance of a consultant. This option
required further investigation.
D. Qualification Materials: All materials received were reviewed and evaluated. The
qualifications and experience of the two low bidders for historic preservation work was compared.
These materials are attached herewith.
. Page 1 of2
..01
E. Interviews: See attached Interview evaluation forms dated 04/03/06. These forms compare
the two apparent low bidders on the list of issues noted, pursuant to INSTRUCTIONS TO BIDDERS,
Section 00100 Part Five. The interviews were intended to be an impartial review, and I requested
the participation of Valerie Greene, Architectural Projects Coordinator, Jefferson County Public
Works, as a second opinion. The two reviewers drew the same conclusions. The results from the
evaluation forms are, in general, self explanatory, but the key issues are summarized as follows:
a. Company historic preservation experience:
i. Fischer General Contracting, Inc. noted very limited experience with historic
preservation or rehabilitation. Their referenced projects included the Jefferson
County remodel at Castle Hill Center (2005). Another project was work on the
Sequim Transit Facility, Sequim, WA, (2004), which resulted in the demolition
of the existing structure.
ii. Drury Construction Co. Inc listed renovation of the historical structure for
Seabeck Christian Conference Center - Phase IV, in Seabeck, WA (2002).
Also noted was the Washington Veterans Home, in Retsil, WA (2002),
including seismic upgrade. In addition, the rehabilitation of Winslow Corner,
on Bainbridge Island (2004). .
b. The historic experience of the Project Manager for the General Contractor:
i. Fischer General Contracting noted Jeff Granlee's experience on the Sequim
Transit Facility and the Castle Hill Center, both noted above.
ii. Drury Construction noted Rob Owen experience as the Renovation of the
historic courthouse in Medford, OR. Also, upgrades and repairs to historic
buildings at Bonneville Dam, OR. In addition, masonry rehabilitation at the
Veterans Hospital in Roseburg, OR.
c. The historic experience of the Project Superintendent for the General
Contractor:
i. Fischer General Contracting noted Ken Foss' experience as the Peninsula
Skills Center in Port Angeles, W A. Also the Jefferson County Fire District #e
on Cape George Rd. in Port Townsend
ii. Drury Construction noted Alex Olson's experience at the Retsil Veteran's
home seismic upgrade. Also noted in the interview was a project for Seattle
Steam on Western Ave. near Union St. in Seattle
d. Subcontractors: Both teams used most of the same subcontractors. Both intended
to self perform the finish carpentry, Drury was considered to have stronger
capabilities based on the interview response. Both teams had agreed to change their
Center Core subcontractor as noted above in (C.).
e. Key Skills for success in Historic Preservation: These criteria were based on key
construction phase goals that were questioned in the interviews. This focused on
problem solving abilities as expressed in quality, safety and protection of the existing
facility.
F. Findings: The review process including interviews showed that the low bid general
contractor was deficient in demonstrated historic preservation experience to be approved for a high
profile project such as the Clock Tower rehabilitation. The second low bidder had adequate
demonstrated qualifications to receive a recommendation to award, for the contract for construction.
. Page 2 of2
.., N
co 1'0
co Cll In
1'0
co
1'0 co
E I
.. I
; I
0 ~I
u.. 0
c l- i
0
:;:: .II: ! ~I g II
u
l'll .S! ,t!) 'U je:
= ! Q)I I~
'ij,(.) III l'e:I :J
>iGl C I ~i ~ ~ 1
0
W,lli :;:: g lii $
~I= l'll ,e: , r.
GI 0 U l.: E (,) r. C 'lZ 8 e/) ~
.~ ~ !E 9 ~ .. ~ l!! '0 g 8 .8 ,~ >-
'ij ~~ Q)' ci. 11 iI: t!) u. 'e/) III .!
GI = = ~ ">1 0 u e: ~ Ie: :~ i r. g !(/)
,- 0 c1J' OIl 0 .!! .. i~ III 1::= ..
__+.5_, (.) a _ _0:+ M u. Cl ..., 'u .iI: Cl. lID e/)
I
co co co
CD 1'0 1'0 co co 1'0
CD CD CD
..,
CD
e: i 1-
0 ! Ie: is
'U i~ i~
S i ill
I i .5
III III I 'Ill i~ Ie:
e: ~ e: g I ,e: ~
E 0 ~ '~ 8
(,) ,~ '.8 >- ~
ci. ~ 0 'iii ~ III "
r. .. e/) I~
~ 2 e: .Q " e: ~ 2 g lil'
8 Ii. 'e: 01 iii ~
c w Cl. ? Cl ICl. ~
I ~
1
c:: I i_ '~
,g 'e Q.
QI .c
~ c:: ~ J i QI
~ ,g .a I::
.l!! '"
Jg ~ i :J
~ '8 III 'e
tl Jg 0: >- '"
e ...
'8 e ~ '0 0 ~ ... III
QI e e = ~ !i '0
1 c '8 '" ~ :s
~ 0 .. ,5; ~
tl QI ~ III
~ '0 e .ftj :s 'I/l 0 e
a e all e ~ ,2 c. I ~ i
QI ~ ~ i .9 QI '" ~
r.
tl 'e ~ ~ II II:: QI '= 0
~ 8- III '1: S C ~ 0: 'iii e :::!
)( '" 8- ,~ 10: ~ :J 0
c:: " W e E ~ l!! I! '0 III '~ cr C
~ ~ g '" :J III: e
>- ~ e/) 8 i '" e 0 e 0 0
c ~ ~ ~ '6 ,11/ (,) 0 e/)
]: ~l '" 11 11 II .. e ,(,) t ~ e ~ ~
III C. .!l = !i 1i 8 g ?;o
-l: ~ 'e' - .e e
e: 'e- e '2 ~ 'e
.. <3 ~~ Jl~ QI J::. 0 '" 0
::!! (,) Cl. 11. (,) ,~ ii: e/) .~ G e/) ~ (,) e/) Ill. l-
i
Qualification back up
materials for:
Fischer General
Contracting, Inc.
FISCHER GENERAL CONTRACTING, INC.
Attachment to the Clock Tower Rehabilitation Project Qualification Form
Item 2, Parts a, b & c) - Project Superintendent Information
Candidate # I -
Name - Jeff Granlee
Project & Owner - Sequim Transit Facility, Sandie Barnhart 360-452-1315
Clallam Transit System, 830 West Lauridsen Blvd., Port Angeles, W A 98363
Project & Owner - Castle Hill Remodel, Loring Bemis 360-385-9160
Jefferson County Department of Public Works, PO Box 2070, Port
Townsend, W A 98368
Candidate #2 -
Name - Ken Foss
Project & Owner - Gig Harbor High School HV AC, Kelly Mollison, 360-308-2082,
Sub Contract to Stirrett-Johnsen, 5555 Westgate Rd. NW, Silverdale W A 98383
Project & Owner - Bldg. 1101, Naval Base Kitsap, US Navy, Don Haworth 360-315-
4521, EJB World Services, Bldg 1026, Naval Base Bangor, Silverdale WA 98315
Candidate #3 -
Name - Dan Fischer
Project & Owner - Peninsula Skill Center, Roger Easling 360-565-1834. Port
Angeles School District, 216 East 4th Street, Port Angeles W A 98362
Project & Owner - Henry Miller Fire Station, Justin Clouse 360-379-1104. Jefferson
County Fire District #6, 3850 Cape George Road, Port Townsend W A 98368
Item 4, Part c) - Example of Audit, or Other Applicable Materials
Fischer General Contracting Inc. has routinely been audited by the Department of Revenue
and the Employment Security Department as part of the standard close out procedures
associated with State, County and City owned projects. Attached are copies of three
examples of the results of these audits.
17951 Viking WayNW' P.O. Box 661. Poulsbo, WA 98370-0661
(360) 697-5402 . (360) 779-4373 Fax . fgci@comcast.net
F1SCHGC988BB
FISCHER GENERAL CONTRACTING, INC.
Jeffrey M. Granlee - Project Superintendent
Jeff has been in the construction field for over 20 years, working his
way up from carpenter duties to project superintendent. Past projects
prior to joining Fischer General Contracting Inc include the new Central
Kitsap High School project and the Puget Sound Naval Shipyard job
order contracts. He was safety officer for Wick Construction from
1996 - 1997 and has been foreman/superintendent for Fischer General
Contracting Inc since August 1997.
Completed projects that Jeff has supervised include the Fire Station
#64 project in Chico, WA and a major interior remodel of Silverdale
State Bank, Silverdale, WA.
More recently Jeff has successfully supervised the Sequim Transit
Facility for Clallam Transit. This project was valued at over one million
dollars and was completed within the scheduled time period. He is
also just completing three projects in the Port Angeles - Port
Townsend area for a total value of $2,028,858.00.
Jeff is a graduate of the Context Associated Excellence series and
numerous AGC, STP and CTS courses.
17951 Viking Way NW' P.O. Box 661' Poulsbo, WA 98370-0661
(360) 697-5402 . (360) 779-4373 Fax . fgci@comcast.net
FrSCHGC988BB
e3/2e/2eeG 2e:31
3Gl!l385'3172
I-'UJ:SL!L;WU~K::i
t-'Alj~ l::l::l/l::l4
,~~
Jefferson County Courthouse. Clock Tower Rehabilitation Project
GENERAL CONTRACTOR ~
mSTORlC REHABILITATION - QUALIFICATION FORM
General Contractor Name: f' \s e-\--.-{' (' C\:... e.~e5' ~ \ C o~-\-\("'-c+ ~ f\.j r ...\..",,- ~ .
Address: . r . 0 . 00 ><- Co ~ \) Q \J \.."-. \ S \0 0 , l~ A 9 ~ ~ 1 () - 0 Co Co I
,
Project Name: S ~:J..'~'(Y\ ,,\c"Y'\c; \ T ~ ~c ~ \ ~ \-y
~t f
Project Address: \ "" () W" s -\ ell c\ (''-!r '3 h ~ ~-\ , "3<>'b u \ "" I W ~ "111:3 ,;> ')......
.. . '. ~~s \'Y-~'J~<:"\- s~O--x-~~ ~'-"..\ O-S ~ '('~c:>-\-\)'\~\--:()n oQ-
BnefProJect ~cnption:,-\~~ e."-I'--\s\-\ Y\) .~ '('Y'I'0'\'-. '-V\ ~ \, y G. ",~-t^-.. ~~ \...0 ~_ \J QX / (}..~'\~I\.
(Include trades Involved) ScJ~ \ \. ~~ ~~ c;,R- \ ~c-\~ v ~ 6... -.Q.~~ \\ \.-\ 0"'- I ~J" \. ~ L......S
"'::>--\~\"''-~-\-\j$'\> t ~ \:> \.~ ~~, \A.J ~~ I;L 6...\s CI0 ~6.... ~ Ol..^--) '(\.Q.~ 6.QC\c\ ~~
~ ~.Q-"""",,-~ \. "'-> ~ ~ \.J.-' \ ~ \ 't\ J ~ (J0'("'\.~ ..'\-\....'--"-(\- 0'--. '1\ 0 w \t-o..(', \ ~"\-y .
Contract Amount: ~ 'J \ \) \.J L\:? \" s ~ . .
Construction Start Date: '\"'\.'X y G, I ':) aO L\
Construction Completion Date: 1) e. C' ~ \>.\LJ\ \ \ I dO t L\ .
S~~\ ~ (~QA"'Y\. "<-10...'\ A- oloo - L\ c::s ~ - \ ':> \ S .
Owner and/or Contact Person: C. \ 0..\\ Do.. vY'. \ ,0\. "'C; \ + s '/'-" -T-Q:~ o...g '3 Co '3
, ..g~O W~~\- Lo...,--~~6-~Xl "6\'06.., J \>C)'\\- \\""o\~\QS, W~
(Include current contact informati~n) c::: ' . \.D "').. I \ c:: ~ ':l r _ \ \ \...0
. <:.. \c---.o...." \ \ ~) Y'<'-.. \ ","Y" J Co () - '\ ;:) '-.!) "-
Architect of Record: L " '0\6 \0 '~_S' ~ ~ S Y"f"'\ ~ ~ 'f\ ~ ~ ~ ~ ~ c. ~ ,~~ ' q g 3 (0 '.l...
0\~ Sav..~ -f(~o...'of;S-&.'I a.,-\-. "5~, -6 -"QQ0- ~<\J~\~SI lJ f\
(Include current contact information) T <
Structural Engineer: \'
" ~ ~"cO\)..~ '" L, l\ ~ \p -Q. f'
(Include current contract informs' n)
'- c:;~~ \4,t.~\-\e.ch., ~.
\
....--+----\ C2.._ ,~ .. \ r- .. \. \ \"':> ~
Addition Comments: \ \---Q... - ..ll<...~ \j...' ~ \ '\'~ ,<,-'S \ \' '" C"C \ ,'t--y
(Relevant to ~ence) ~'<-'" """- ~ -\L ~X,,\- Q,.- " (A5",' ,~'-'-"', ,""'/ C_" ""'\o~
~~-rc-.. \" "'-'< ~. '\ \--- \, I.A.\ \ (,', ,,) ~ ..., w ODe\. -9-.. "'-~ ~, c:, \ "'t
o'c, ~ ,o..~ ~ w ~~ ~ v-- ~ \'~~ 'y, \ "") J ~~ \ v:- ':-\-\"'\. ,\D ~l...0
~~~s O--~~ 'D,---~c;, 'S~~-\-\ ~-s.. ~ ~~O\~C~ \~c\u,p\:~
,~c:S)-, ""~ .~ 6..o0X-'S ~~ ~C\..~~ w(\..J, \;L / '\~\" \~'l\) I ~- \C)l,,)\ \ Y\J"
~ c'r... Q.~' \ co-.... \ o..I{.......~ ~.. \ -Q. c. ~\--y ~ c.. 0-.. \ \.10 ~ k..
03/20/2006 20:31 3603859172
I-'UJ:SL!L;WU~K::i
I-'Al:il::. l:l;j/l:l4
i-'.
Jefferson County Courthouse - Clock Tower Rehabilitation Project
GENERAL CONTRACfOR -
mSTORIC REHABILITATION - QUALIFICATION FO~
General Contractor Name: r-\~~~ (" C,-e f).QS'CX \ C.<0~ \D-:\.{"\-; I\~ ~T1\('_
Address: ~"CJ. 6 ox:. en Co \ ~ ~ \) \J..\ s \0 0 , tA.\ -A Cf'2,3 10 - O~(o I
r
Project Name: CQ~~-\~ \\\\\ C~~\-~~O~~\
Project Address: Co \ cs S "'--'L" \ ~ o,~ S'" I 'r \:) r-\ -\ \:J~ Y\SSlX\~ W A ~<g' 3 VJ R
~ ,
.. . '. ~ \ ~ ~ 'rO \ Q t.-\- Wo-..'3 0-.. ~- '" \) VI>-.. ,~\ 0 Y\. c) ~
BnefProJectDescnption:~ -SQ... Q-Q--Q.X:;-Or-. ~. ~ 'W>",\.'\t" ~\
(Include trades involved) '6,^~ \& ~ Y\~ ,~~-\- ~'0--'~ ~0-C~ \ ~ -"'I ~ \
~ ~ \ ~~\- ''f\C\'-~~ ~~. ~\~c:\"\ ~ ~~~ \ \ ~ OY\./
t c... e a",-~ '0\~c\ ~ \ ()to J
Contract Amount: ~ \ '3./ Co ~ d , - ,
Construction Start Date: C a~ -\- '" o...~ --\-- s ~ ~ n -.Q.. ~ j ~ \ '-\, J-.OO 5
Construction Completion Date: '('0~ V'Q~ '-0 Q..J("' \ ~ / '?--O'Dt:;; .
l \ 6 ~ ''3 '3 \00 - ? 8 :5 ,- C\. \. ~ 0 ' \. .
OwnerandlorContactPersop: --Y~~'('son ~--6 ~+t ~'\. J1 ~uJo\ \',- w~ 'f--<J
, (J - a . g ox. ;).. 0"\ 0 ~ \f I;:) '\--""\- \0 \.0 y\ ~Q.--V\ c.\. tJ ~ <1. ~ ~ \.0 g
(Include current contact information) , I '--\-,\ Q
. 0~\\ S\OCA."'--~ ?J~()-9.l..\3 -~\{\ ,e.'>C '
Architect of Record: '0' S C<.... '> 'A. \' c..~" \ -\- ~c .\-zs \
'0: \.'C' ~c~ \ ~ \. l'~D..Y SO'-^.. ~, ~ \Y4 l ~ lt0t1 9 ~50 t
(Include current contact infonnation) , [ ,
Structural Engineer:~ \ \L\ \' L_m
'\ " ~ C\ '''' ~ \).... V"'\ 'f'r\ S L'-. '5 ~. \' c 'r\ \ -\- ~ c.~ \'5
(Include current contract infonnatio
Addition Comments: C ~~-\'\. '(', ,-~6 ~ '<\:',........., C\. \0 D v-tl ') ~ \ C) D ,- ~ y---Q ~ '/
(Relevant to experience). \. \.' I-..f"...\ \ o..~uJ C'"'-" ~
~Q~ ~..QX\ ~ y./ 0--(:)O'\~ c:t..~ ,,0-. ~ / \ \
~ =e', f'..'), ~"'., ~ ,,\.,' "') I Q~ \C,D'< \ ") ,~( \--."-'" \~'"
~'0..6 ~ \QC:.~~ '\ C~ \.. \AJ~1~-
Fischer General Contracting, Inc. - Construction and Key Personnel
Daniel A. Fischer - PresidenVProject Manager
Dan has over 20 years experience in the construction industry and over 10 years working
as a superintendent/project manager for companies in Western Washington and managing
his own company. Fischer General Contracting, Inc. is in the AGC Retro Plan and a
member of the AGC Safety Team as of 1999. Some of Fischer General Contracting,
Inc.'s major accomplishments include the renovation of housing at Fort Worden State
Park, additions and modifications to the Family Service Center in Bremerton,
construction ofthe new Jefferson County Animal Shelter in Port Townsend and the
Observation Lookout at Kloshe Nanitch, Snyder Ridge for the US Forest Service; as well
as several successful projects for Johnson Controls World Services, Inc., Submarine Base
Bangor, W A. He has extensive training in construction management and safety, has
completed the Association of General Contractors superintendent training program and
served as a program instructor for 10 years. He is a graduate of the Context Associated
Excellence Series.
Susan SKA Johnson - Vice President
Susan is responsible for the financial systems of the company. She has over 20 years
experience in all areas of general accounting, including extensive budgeting, fixed asset
and construction - in - progress skills. Prior to joining Fischer General Contracting, Inc.
she worked for a major wholesale chemical distributor and for an international
conglomerate of 10 companies, both based in Seattle. She has a Bachelor of Science
degree in Business Administration and is a graduate of the Context Associated
Excellence Series.
Kenneth S. Foss - Project Foreman
After his honorable discharge from the U.S. Navy, Ken completed his carpenter
apprenticeship and joined Fischer General Contracting, Inc. Ken has worked his way up
to Project Foreman, currently supervising the remodel of the main gate at the Naval
Undersea Warfare Center, Keyport; Remodel of the Windsong Apartments for Kitsap
County Consolidated Housing Authority and a sound barrier fence at Spectrum High
School for the North Kitsap School District. Ken is also a graduate of the Context
Associated Excellence Series as well as numerous AGC, STP and CTS courses.
03/21/2006 15:54
6048853613
MCLEOD MASONRV LTD
PAGE 02
'FinD Nlnae:
JeftWion Couacy Courthouse. Clock Tower Reb.lbiJitltion IWjoc;:t
StTJlCONTIlACToJl
B1STOIUc IlBBUB.rrATJON - QVALmCA TION FORM
PJojectNJme: _ p.ort Townsend Ci ty Hall
~~t~~;250 Madison Street. Port Townsend
Brid Project Deec:ripdon:
Restoration 9f brick and stonework
Yaw TnIde InvolWll'QllC:
Masonry
SulXvnCracl. ViJuc: Phase -1.:. - .$186. 80Q, 00 Phase 2 ~ $8 I), ldH '1(l
Construction Olntian and Completion Deco: ~ Ma~~h -Ang ?OOC:; .And 0,.. t _ Dee 2005
~ lDdIor ConIBd P~IOft:
City of Port Townsenq - LennArrt VA~hA~~y 360 379 J20i
(iicJude <1UtI'CI1t contac:l tafOiiiiilon) - . .
AIclUteet;
Architectural ResourC@s ~roltp - l(At~. .Jnnn'rQn 2-f'l6 669.02J2
(Inc:ludo c:urrcnt COIUICI blftmonation)
General Contnecor:
Daw~on ConJl:t:l"1Jl":tjnn_ fanuy Al19aY~h 3'O.76~..8-i.30
(Include cwrent ccmnct infomwian)
McLeod Masonrv USA Inc.
. -
AdditiOll comrnentl:
(Relevant to ox1*i,*,,)
We have been in the masonry business since 1974, and been rest:oring
historical buildings since 1988. Please visit our web site at
~.mcleodmasonrY.com for further information on our company.
../l LL L~U IIC.J - i...JLMIYI
,
I ~UIYI .\,.JUL.-WOU wn~~ I IVI~ I ~L.- ~C~O.:;::J I ='.::J::::::J-=:J
1""". I
.' POULS'BO 'SIlEET,"METAL,',INc.
P.O. ~ox '10 · 3203 Totten Rd.. Unit G-I · Poulsbo, WA, 98370
Telepbottc ("6~)': 697-9944 · . fax (360)' 697.9959
22 March 2006
. _FFERSON COUNTY,<;OUR1JIOUSE
CLOCK 'TOWER REBAB~ITATION,PROJECT
PORT TOWNSEND,W A$mNGT9N'. .
SUBCONTRACTOR: EVlDENCE'()F 'Q.UALIFICA TION
S.ubcontractor: Poulsbo Sheet Metal, Inc.
. ,
Previous Projects:',
.. : 1., ProjeCt: Fort Worden Officer Residence
Port T9wns~d, W A.
Historic :remodel inclu4ed rep~acing'existing zinc roof
with new coPPer roof. "~ject,iricluded copper gutters
. and various, decorative. fla$hings.: .
Owner: Washi~gton State' Parks .and Recreation Cortunission
PO Box 42650 .
Olympia, WA.98~04.
,. Contact at Fort Worden: Steve Shively (360) 344-4406
2. 179j~Ct: Fort Worden
Port Townsend, W A .
Replaced the large, round ventilators with teme-coated steel
. ventilators; manufactured'1rt pur shop to matchthe:,original
,units.
LICENSE # 'POULSSM()32CQ
.=.-~~-~~~o ~: :::)~,,",IVI
,- "
rKUM ~UUL~U ~n~~1 M~I~L ~o~o~/~~b~
J->_~
'Poulsbo Sheet Metal, Inc.
page 2
Owner: . Washington State Parks arid' Recreation Commission
. PO, Box 42650 '.' .
: Olympia, VIA 98504
. ContaCt at Fort'Worden: Steve'Shively (360) 344-4406 .
rt~iect Superintendent','
1. 'Don ,Swanlun~~ President
" Poulsbo,SheetMetal, Inc.
ProJect HistorY sarile as ab9ve. .
,',:,.
," . . "
". . .,
','. .
"31.' /,,//
.,~
. .. .
. : '
WWWWUwJ.l.r4.
"-UCl",,L ....WUfV'\.:l
Jefferson County Courthouse - Clock Tower Rehabilitation Project
SUBCONTRAcrOR
HISTORIC REHABILITATION - QUALIFICATION FORM
'Firm Name: ~:f5 bVa.tiC)(\. ?(C:~tucts a ~1I1 C'e.J
Project Name: ~ SQo 'qfbC~d M ttJt/ 1e
Project Address:
Brief Project Description:
Your Trade Involvement:
Subcontract V 8lue:
Construction Duration and Completion Date:
Owner and/or Contact Person:
(Include current contact information) .
Architect:
(Include current contact information)
General Contractor:
(Include current contract information)
Addition Comments:
(Relevant to experience)
-
I"A~1:. t:/'J/t:/'J
MAR-21-2006 04:58P FROM:
(253)474-5542
TO: 13607794373
P.2/3
March 21, 2006
Fischer General Contracting Inc.
Attn: Daniel Fischer
P.O. Box 661
Poulsbo. VVA 98370
Dear Daniel,
The intent of this letter is to address my "Contractor Qualifications" for establishing that I am an
appropriate sub-contractor for your exciting project. I understand fully the concerns you have given
the speciall~jon of historic window JeStoration and replication. I will address the main concerns
that I see separately.
As for my background, 1 began working at 10bnsonlPostmaIl; a wood window manufacturer. in 1992
on the production line. I became General Manager and a partner in 1999 and separated the window
division into a stand-alone company. I left that company accompanied by several employees in May
of 2002. My intent was to create a company to compliment contractors such as you. Legacy
Renovation Products " Services bas a sole focus ofbistoric application specialty con1raeting and
manufacturing. We bave already been on numerous high impact, quality critical, historic application
projects as you will see listed later and remain steadfast in our goal to become the premier specialty
contractor or sub-contractor for historic projects m the state.
My experience and qualifications are noted above. Here are the summery resumes of my field and
manufacturing crew:
. Chris Redman and I began working together as co-workers in 1993. He has been an integral
part of my business plan for 11 years and often perfonns as superintendent in my stead.
. Earl Brydson has been my employee for 6 years and bas performed predomil'ately in the
field on many of the complicated historic projects I have undertaken. He has also
manufactured in the shop extensively.
. Lars Jensen bas been with my company for nearly a year and has extensive background in
project management and carpentry.
. I have several other employees with a combined shop and job-site experience of over 80
years.
Here are three contractor and/or owner references and phone numbers for projects that Legacy
Renovation has worked on:
. Mike Dooley with Lease Crutcher Lewis. The project we worked together on is the Cobb
Building Renovation. 206-622-0500.
3001 soutfiSteeCe Street. T~ WA 98409 · 253.474.5175 F~ 25.3.474.5542
MRR-21-2006 04:58P FROM:
(253)474-5542
TO: 13607794373
P.3/3
. Doug Maxfield with Lease Crutcher Lewis. The project we worked together on is the
Northwest School. 206-622-0500.
. Scott Jones with Rafn Company. The projects we've worked together on are the OK Hotel
and the Cadillac Hotel. 425-702-6600.
· Quinn Dolan with Centennial Contractors. Building 1010 on Fort Lewis. 253-912-1910.
Here are three architects whose projects I have provided for:
. Stickney Murphy Romine9 PLLC. 2()6..623-1104. Project: The Cadillac Hotel.
. Bola Architecture. 206-447-4749. Projects: The South Cle Elum Train Depot and the UW
Phase 2b.
. Clark Design Group. 206-782-8208. Project: The O.K. Hotel.
I can provide a more extensive list if required. Please feel free to let me know what I can do to help.
Troy Axe
Legacy Renovation Products " Services, Inc.
300 1 South Steele St
Tacoma, W A 98409
LeeacyRenovation@msn.com
Ph: 253.474.5175
Fax: 253.474.5542
3001 soutIiSteeCe Street. Tacoma... WA 98409 · 253.474.5175 F~ 253.474.5542
lar 22 06 11: 32a
Dean Courser
253-437-8001
p.2
,I'
FR[J'J.' : F J SH:R-GEt-ERl=L -aJ.ITRACT I I'Ii
l1~ntu ~"'t2b ~t:I;.U ;jb.,;;ftt~.:U l;t
FAX NO. : 360-779-4373
KJijLJ.lr'WUf<<!:;
Mar. 21 2ee6 02: 59PM P2
PA6E 84/84
JeffinoA CovaIy Courthouac . CIoct Tower ltahabiJit8lion )>>n)ject
. SUItCONTIlACfOR ,
HISTORIC IlItIIABILrrATlON - QtJALIP1CATION Ii'ORM
'Film Name: SA-F'W....., ~,..v'(.e.s J LJ<.-.
Project Name: 01 r:: [ ['I':;' C /', . 1+ (:,.+~ I
I
Project Address: ,) C ~ ~ ;" cl :4-t.~ ~{... '7 ),~'I c 1
Brie:fProject .DeIcription: D~'(.~'..i 1"?::.....;" t~I'\...? ;"~"'>\ <:.1 ~/~}T'" f...( ,:~. b. 6/,
YowTndcInvolvaJHlllt: . __'>c:c<C;:-~.lcJ r- iZv~j\.t;r,,- ~id<r
SubcoMrict. VilJue:
.>>} ,"
/ c; COG
:
'1 'I .
Conatruction Dundioa and Completion Dato: _... .- ~ ' ).... V,f'~
0wDcr lIIdfor Contact Penon:
a', ~ "
'-.;.'1\ ,'(,: t ,.~~/
(JIldude CIImIIt CO.DIICt ~),
AIdBteat:
n.:T
.4'1(( - ~'l.I.--} rJt\ d ,. p ')
.3(.'6 c.J:5'- /I c 't
GalcnI Comnctor.
.;) ,-.
II " ,_ .....
T\~~',
/l~
Lc. ,
C{"?T' (edr--
'f }..~ - )C.:,) - c~t: C C
(Jaclude'eurrent coatmct iaJiJnMIion)
Addition Comments:
(Relevant to Q)JCrienc:e)
ar 22 06 11:32a
Dean Courser
253-437-9001
p.3
,
FRCI'1 >:FI~ -o:J.ITRACT11-li
~~/~/~~Gb ~U;J~ ~b~~~l/~
FR)( I'll. : 360-779-4373
H.III...L1,~
Mar. 21 2SB; 02:59PM P2
PAGE 04/84
Jetfenon eo.ty Coanhoae - CIodt Tower IlcIhabiJitBtion Project
. SUBCON'l'RAcroR .
HISTORIC IlEllAlllLrl"ATlON - QVALlftCATION JrORM
'Finn N8Dle: 5 A-rW~ ~&I,ce.s I 'LIt:... .
.
Proj<<:t Name: C ~ cf / If ~ ii- or f' (
Project AdcIreIs: "3>i c( dfl ci~ i4-v-.t - 5<1;, 5 ('~(
BriefProjectDclcripticm: ~ ~((/):5i-.. (-I-i~'"h:(l'c.. .6,v.; Idiillt T~'::llb~(.C~)'"\ /,\'j(.)
)''11 LA).<' <A..",
Your Tnde Invol~t.
....c
, S C',,-t ,.c.1 d t--
Ec.c
K:. s il(;f t"
'IT'
t4",. I P t'lt:":;, fe, ( .:
f;icj't D Fr PI'
S~V8lue:
<.! ,
-' 8 5 r O.t;c
Cona1rv.ction DuratioD and Completion Oa: _...' '1 ,1'\" 11 -; )\ '5- Fe. h 0 €
0MIer lIIdIor Contact Penon: '
HI' ~)t'(.'( .....~
(IIlchIde ClI1I'ftDl CODt8Ct iDbmetion) . ..
$.:>e, .
"'\""~ K. ;") " -rl-;
!..:. ~, ...> .<-,11-<(
;M./i" cj,~-S4'-t1
Architect:
~ C ;')1<:( ,'It/!.
.A r~I' -
Anch-.":-.) PJ\;!iiP5 .)C-c'{J;3-jJc<
<-. -I ',c I, li'\,; r Q. L
j 11../"')\('1 I'd,;'l. fly'
(taclude ~ coatact iDfbnDadon) I
GaloraI Co.mnctor; n r ,:
., (,., :- ~"\ l C 1'11\ {2::'" f\ Y
(Juc1ude'current CODhCt iraJDllHlion) I
s (01/ J () i:lk.s
1..f.) 5"- '?<)) - 6 [ CC:
Addiuon Comments:
(Relevant to aperience)
Qualification back up
materials for:
Drury Construction Co.
Inc.
Phone
(360)394-6000
Fax
(360) 394-6005
E-Mail.
dccOdruryoonslNction.com
License No.
DRURYC*233LO
DRURY CONSTRUCTION CO., INC.
19302 Powder Hill Place, Suite 100
Poulsbo, Washington 98370
Jefferson County Courthouse - Clock Tower Rehabilitation Project
RESPONSE TO REQUEST FOR QUALIFICATIONS
March 23,2006
1) General Contractor
a) Please see attached "HIstoric Rehabilitation. - Qualification Form"
b) Please see attached "Historic Rehabilitation - Qualification Form"
2) Project SuperintendenVProject Manager:
a) The proposed Project Manager is Rob Owens.
b) Examples of previous project experience are:
GSA Historical Renovation of Courthouse - Medford. Oreaon
Work included major interior renovation of plaster including fluted columns, decorative
medallions, dental molding, rework of existi/')Q travertine tile, wood stair treads and metal
handrails, wood wainscoting, wood window repair and painting. All work was done after
hours due tooccupancyduring the day. Contract Amount: 1.2million
CorDS of Enaineers - Bonneville Dam - Orecon
Architectural and structural repairs to existing historical buildings at Bonneville Dam.
Work included interior window repair, floor repairs, wall repair, wood trim, restroom repair,
roof repair and exterior siding. Contract Amount: 6.5 million including complete new site
utilities and landscape.
Veterans Administration - Rosebura. Orecon
Major exterior brick repair (full building scaffolding) of 5-story building including mortar,
grout, cleaning and sealing along with repair of soffits, decorative moldings and entries.
Work included remodel of existing rooms and corridors while patients and doctors are still
present. Extensive sound and dust control monitoring was required. Contract Amount
1.8 million.
a) Proposed Superintendent - Ron Jensen
b) Project Experience include the following:
. Seabeck.Chrlstlan Conference Center - Seabeck, Washington
Renovations of historic Seabeck Conference Center Inn
a) Proposed Superintendent -' Chuck Fryer
b) Project Experience include the following:
· Wlnsl,ow CC;)rI')er -Bainbridge Island, Washington
Renovations of historic commercial building on Bainbridge Island that houses the
Chamber of Commerce and The Winslow Inn.
a) Proposed Superintendent - Alex Olson
b) PrOject Experience include the following:
. Retsil Veteran's Home Seismic Upgrade -Retsil . Washington
Seismic upgrade to existing Veteran's home.
c) OWNER REFERENCES - Please see attached "Historic Rehabilitation -
Qualification Form"
Jefferson County Courthouse - Clock Tower Rehabilitation Project
GENERAL CONTRACTOR
HISTORIC REHABILITATION. QUALIFICATION FORM
General Contractor Name: DRURY CONSTRUCTION CO.. INC.
Address: 19302 Powder Hill Place. Suite 100. Poulsbo. W A 98370
Project Name: Seabeck Christian Conference Center - Phase IV Administrative Wing:
Project Address: 15395 Seabeck Hwy. Seabeck. W A 98380
Brief Project Description:
Complete renovation of the entire historical structure. The building was shored up and the entire
foundation was removed and new foundation was then placed. A complete renovation of the interior
was performed that included typical trades such as drywall, paint, flooring, electrical, HV AC,
plumbing, other misc. finishes and a new fire sprinkler system was installed.
Contract Amount: $ 433,470.00
Construction Start Date: Julv 13. 2002
Construction Completion Date: June 21. 2003
Owner and/or Contact Person: Seabeck Christian Conference Center- Larry Hill- Ph: (360) 831-5010
(Include current contact information)
Architect of Record: Rice Ferflus Miller Architects -Steve Rice - Ph: (360) 377-8773
(Include current contact information)
Structural Engineer: Putnam Collins Scott Associates - Jim Harris - Ph: (206) 292-5076
(Include current contract information)
Addition Comments:
(Relevant to experience)
GENERAL CONTRACTOR
HISTORIC REHABILITATION - QUALIFICATION FORM
General Contractor Name: DRURY CONSTRUCTION CO., INC.
Address: 19302 Powder Hill Place, Suite 100, Poulsbo, W A 98370
Project Name: Washington Veteran's Home (Retsil's) - Seismic, Generator & Fire Hvdrant Upgrade
Project Address: 1141 Beach Dr., Retsil, W A 98378
Brief Project Description:
This project consisted of an upgrade to the existing Boiler Plant to meet current seismic design
codes. The upgrade consisted of demolition of existing structure, reinforced footings, column, beam
and roof. In addition, the existing boiler stack was removed and a new metal stack was installed.
Drury Construction completed the fire hydrant upgrade as well as the installation of a new
emergency generator in the building.
Contract Amount: $ 1,882353.00
Construction Start Date: March 2, 2002
Construction Completion Date: April 26, 2003
Owner and/or Contact Person: Washinf!ton Veterans Home - Bob Dixon - Ph: (360) 902-7265
(Include current contact information)
Architect of Record: Tres West Enf!ineers. Inc. Charlie Lee - Ph: (253) 472-3300
(Include current contact information)
Structural Engineer: Reid Middleton - Brian Moon - Ph: (425) 741-3800
(Include current contract information)
Addition Comments:
(Relevant to experience)
Jefferson County Courthouse - Clock Tower Rehabilitation Project
GENERAL CONTRACTOR
HISTORIC REHABILITATION. QUALIFICATION FORM
General Contractor Name: DRURY CONSTRUCTION CO., INC.
Address: 19302 Powder Hill Place, Suite 100, Poulsbo, W A 98370
Project Name: Winslow Corner
Project Address: 540 - 590 Winslow Wav, Bainbridge Island, W A 98110
Brief Project Description:
Complete rehabilitation of historical, turn-of-the-Century, wood frame building. All typical trades
were used including carpentry, electrical, plumbing, drywall, plaster and roofing. Drury
Construction completed this modernization while maintaining the character of the building. The
upper floor was converted into what is now "The Inn at Winslow Corner" which consists of short-
term rental units. All work was performed while building was occupied.
Contract Amount: $ 552,295.00
Construction Start Date: July 10, 2004
Construction Completion Date: May 21,2005
Owner and/or Contact Person: Winslow Corner, LLC - Lynn Scullion Reisfeld - Ph: (858) 459-4009
(Include current contact information)
Architect of Record: O'Connor Architects - Peter O'Connor - Ph: (206) 842-5490
(Include current contact information)
Structural Engineer: DavIe Houk Ph: (206) 842-5769
(Include current contract information)
Addition Comments:
(Relevant to experience)
Jefferson County Courthouse - Clock Tower Rehabilitation Project
22 Mar 06 01 :02p
Gord
16048853613
p.2
Jefferson County Coorthousc - Clock Tower Rehabilitation Project
SUBCONTRACTOR
BlSTOItIC REHABD..J.T ATION - QUALmCATION FORM
Firm Name: -Ll.GLerJJ''') 1"'1 A-SC'l...)1Q. y L>:sA- -t:j...J c...
Project Name: f6f?..1 -rc;\I'--If-....4. SGI'-J f) G ,y-f..-U\{ _L-
PrOjectAddress:~T 10A./i-...)5E.h\.O I dSO M'AolSC;,vS~'~.
Brief Project Description:,..)
.!3AlCi< Ai'-.JO S~ ~S~Ac11Or-..::J,
Your Trade Involvement:
MASo~Y. At-. 00 n~
Subcontract Value: C<~. ~ ~ 8~,cx:.x::> ' ynC<S€ I ~.;;< .
Construction Duration and Completion Date: Fhas'e.. j.. fYlare.A-. io,,:> - J U:-',' / o~
Ftose d. ~~/oS" - rtt:e()'l~r-) cr::;-
Owner and/or Contact Person: '
CI,y'n~ tof!....i ~~c;~/.....C::,- ~~() YAR~'f
(Include current contact information)
Arcbi~t; 0_ ..
AR.CHllE.C~ rtSCX)P..CCS- ~ Jo-tN~.
(Include cuaent conUct information)
G~ Contractor: /':_ , I ., ^ .
. \.l<.lSO"--\ UA'-lSi1"Z0 c.. nO-) - l-JA.I0UY' ,~L Me-\G H.
(Include current 'contract information)
Addition Comments:
(Relevant to experience)
WE HA~ BEt=.N 1)-"",) 1He. (Y"'v4:Sc~y I~OUS:TRy SiNCE
PR4, Af..,./v..J ReStDRII'(~ M \SIc.:R \C.AL- BUH_Dil'-lG.S ~;/h.J.CE.
]<(89. fL~.kSe. VlSll OuL WE.8 $1'TE- A=1 ~'" vrci-eoc;t
m 0 Sot, 0Y, corn,
Z 'd tl61 'ON
^NVdWO~ NOI1)n~lSNO~
V'/dSI:ll 900Z'lZ'~\lVi
3-22-2006 3:06AM
FROM POULSBO SHEET METAL 3606979959
Milr. 21 200G 02:4,?PM P2
P.4.
F:-R1" .'- , ..
_ l:I~/,~tJn"tlb "::I::I:.:$,L
::Jbl:J;;Stl~~l('t.
/"1J1:fU UiIUI<<:i
PAGE e4/04
JeffmoD County Courthoase - Cloclc Tower RahebiHCatioll Project
SUBCONTRAcroR
HISTORIC REB'ABlLrrAnoN - Ql1ALTJrlC4TION PORM
Firm'NlJne:_.~~bo Sttee-t )At-tal, I"". ' _,__
Projeot NMftC: -.Je{'f'ex~C.h Ce~J:1 ~tb,f,<" .
Project AddrcH: l02.o J'efl'eK;rn-'I ~. _,"PoYtTtpJn~ / WA
'BridProjectDceaiption; Cloc 1<- T owt-Y' ~,~b;\ j1~~'o--.
YourTradelnvolvement= Kep-laa 1k< pa-",,-tcJ Md.a,l t/)..n-et rooFs WI~ (Oppe~
\'OO+:I'~ . 'ft'o".-J< 0:.......... ,.,sicill Sc.~p-rc'V o..~ d.O'41r"!1...~,-,-t a..~
~CN'I~-("' a..-.l 1'""o;,.-fA U va. .. '~OIA.!!:o t:tI"~ f'llt~t-u,...~ c; . . .
S~.Velue: $ 3tt, 110.00 ___ "'_
COJJ&tn1ction Duratkm 8!ld Completion Date:
.,~.. .,,......
Owner lIDdIor Contact PcrBOD:
(Iildudo CUIrcm cxmtact iDformation)
.Arcbitect:
(lIlcludc c:urr.ent <:oatact iDformation)
00ncra1 Contractor:
(laeha<le C",u~t CODtrId iDfonnllion)
Addition Commeata:
, (~eJC'VIDt (0 experienec)
3-22-2006 3:05AM
FROM POULSBO SHEET METAL 3606979959
P.2
" . ,," . '.. ..
" -, , '
..
.. . ' .'
, POULSBO S'HEET, METAL,',INc,.
' ,. ,
P.O. Box .310 . 3203 Totten Rd. Unic G-l . . Poulsbo) WA 98370
Tcleph~ne (360) 697~9944 .. FQ:'(360) 697':9959
22 March 2006
,JEFFER~ON COUNTY COURTHOUSE
, ,CLOCK ~P~~'UHABlLitATION:,P~OJECT
,PORT TOWNS:ENl); ~ ASHIN~TON,
SUBCONTRACTOR EVlI)E,~CE'QF QUALIFICATION
, Subcontractor: , Poulsbo Sheet Metal, Inc.
PrevIous 'Projects::'
1. Project: Fort, Worden Officer Residence.
, Port Townsend; 'W A
. .Historic remodel ~cluded r:q>lacing 'existing 'zinc roof
withnew .copper ro~f. Pr~ject.lnciuded' copper gutters, '
and various decorative nashings,.': .
Owner: Washington State, Parks and Recreation Commission
PO 'Box 42650' '
Olympia" W A 98504
Contact at Fort Worden: Steve Shively (360) 344-4406
, 2.', Project: Fort Worden " ,..-'
Port TQWllsenq" WA'
,Replaced- the large, r01.lnd ventilators with teme-coated steel .
ventilator.s" manufactured ~'~lir 'shop to match the .original
units'. .
UCENSE (/ i>>OUl;SSM03ZCQ.
3-22-2006 3:05AM
FROM POULSBO SHEET METAL 3606979959
P.3
""', .
. .',.
... "
, PouIsbo Sheet Metal,' Inc.
'page 2
.' Owner: Waslrington State Parks and Recreation CQtnmission
. pO Box- 4265.0' .,
" Olympia,' W A 985'.04 ,
Contact at Fort Wo~den: Steve'Shively (36.0) 344-4406.
. .
Project Superinte.ndent:
1. . Don Swari1und, President
. Poulsbo Sheet.Metal, Inc.,
. . '
Project H~story same as :above~
" .. '&t' {l' ,
. '. '
. ',' .:. / . .
, .
, , .
,..,'~" ,',,":',' '
, ,. If..
',' :'"
,,; ~\ .'.
:" ':. ~ , "
I .
MAR-22-200~ 05:13P FROM:
(253)474-5542
TO: 13603946005
P.2/3
March 22, 2006
Drury Construction Co., Inc.
Attn: Rob Owens
19302 Powder Hill Lace, Suite 100
Poulsbo, W A 98370
Dear Rob,
The intent oftbis letter is to address my "Contractor Qualifications" for establishing that I am an
appropriate sub-contractor for your exciting project. I understand fully the concerns you have given
the specialization of historic window restoration and replication. I will address the main concerns
that I see separately.
As for my background, I began working at JohnsonIPO-cdm8ft~ a wood window manufacturer, in 1992
on the production line. I became General Manager and a partner in 1999 and separated the window
division into a stand-alone company. I left that company accompanied by several employees in May
of 2002. My intent was to create a company to compliment contractors such as you. Legacy
Renovation Products & Services has a sole focus ofbistoric application specialty contracting and
manufacturing. We have already been on numerous high impact, quality critical, historic application
projects as you will see listed later and remain steadfast in our goal to become the premier specialty
contractor or sub-contractor for historic projects in the state.
My experience and qualifications are noted above. Here are the summary resumes of my field and
manufacturing crew:
. Chris Redman and I began working together as co-workers in t 993. He bas been an integral
part of my business plan for II years and often performs as superintendent in my stead.
. Earl Brydson has been my employee for 6 years and has performed predominately in the
field on many of the complicated historic projects I have undertaken. He has also
manufactured in the shop extensively.
. Lars Jensen has been with my company for nearly a year and has extensive background in
project management and carpentry.
. I have several other employees with a combined shop and job-site experience of over 80
years.
Here are three contractor and/or owner references and phone numbers for projects that Legacy
Renovation has worked on:
. Mike Dooley with Lease Crutcher Lewis. The project we worked together on is the Cobb
Building Renovation. 206-622-0500.
3001 southSteeCe Street · Tacoma, WA 98409 · 253.474.5175 Fax 253.474.5542
MAR-22-2006 05:13P FROM:
(253)474-5542
TO: 13603946005
P.3/3
. Doug Maxfield with Lease Cmtcher Lewis. The project we worked together on is the
Northwest School. 206-622-0500.
. Scott Jones with Rafh Company. The projects we've worked together on are the OK Hotel
and the Cadillac Hotel. 425-702.6600.
. Quinn Dolan with Centennial Contractors. Building tol0 on Fort Lewis. 253-912-1910.
Here are three architects whose projects I have provided for:
. Stickney Murphy Romine, PLLC. 206-623-1104. Project: The CadiUac Hotel.
. Bola Architecture. 206-447-4749. Projects: The South Cle Elum Train Depot and the UW
Phase 2b.
. Clark Design Group. 206-782-8208. Project: The 0.1(. Hotel.
I can provide a more extensive list if required. Please feel free to let me know what I can do to help.
Troy Axe
Legacy Renovation Products & Services, Inc.
3001 South Steele St
Tacoma, W A 98409
Lee:acvRenovation@msn.com
Ph: 253.474.5175
Fax: 253.474.5542
3001 soutIiSteeCe Street · Tacoma., WA 98409 · 253.474.5175 F~ 253.474.5542
03/22/2006 13:16
2538562712
PATENT SEATTLE
PAGE 02/02
Jefferson County Courthouse - Clock Tower Rehabilitation Project
SUBCONTRACI'OR
HISTORIC REHABILITATION - QUALIFICATION FORM
FirmName: PATEN" COr\~-tWc..tiDt"\ SV~;:f~yY)~
Project Name: ~t+~~~ ~D. Cg"",e..~ \...clA.1.oE /C/o~owez....
Project Address:'~ :rr::-~~^ S{.. "Fbt2-+ 101oA1"sevJ. ) lAI A-
BriefProjeotDescr.iption: ~5-b~0I' D~ clod::. +..."""ea.
Your Trade Involvement: "SC.~o\~~~ ~j ~~ewa.? ~ C"'\
Subcontract Value:
Constnlction Duration and COlllplction Date;
Owner an~COntact Pemmr)
-rc~ "X'fA("L. 2..t5~~~7-;- 0"2.10
(Include current contact infoml!tion)
,( ~A'/.,> Z,".37-;-o~'~
Architect:
--
(Include cmrent contact information)
General Contractor:
~2..'I C~t'\.~~~,-.hU""1 C.,
(Include current contract infoxmation)
--
:L '^'c:-
) t2.ob OlN~~
-
~D.~l/"'~
Addition Comments: ?N~~ l)"S ra~ i ~ ~6 c:.c.~\J ~~i I'\ess
(Relevant to experience)
'5iJ'\c.~ \~O l_ ~E- ~A-"e. j" l-..o",""Oj,E. ~:~E-Sltj.....:> ~ ",-",,,e
~~~\'1 Co-r (~r~ ~AI\'i \) i ~\(."""\ --\' 0 e. ~;4-, vE:
?~.)e.c...{!. ~(I~ -;-,.....; y~l2.<;. ~... i",.".-+i"E, p2-0bUds
~US~ e,..LS 4- co-r\flf~ rlLc:>j~ ~~f:\'1 ~~ ot"\o +;r\'\,6..
~/~'d Sl61 'ON
ANVdWOJ NOI1JOH1SNOJ
~d91:0 900l'll'MV~
E e~1!l'" fSNilJ.SAS No:rJ.on~.l.SNCIO ..LNaJ.V'" or;-
fNd~S:~ 90/~~/g ;~~^..Q.~
.
Jefferson County Courthouse - Clock Tower Rehabilitation Project
SUBCONTRACTOR
HISTORIC REHABILITATION - QUALIFICATION FORM
Firm Name: W I l..-'-l ~tV\ <;;: PiCtLlIL-J
Project Name: ?OtrT /t>w I-J~~ LL-=c::..I<-"7b l.-U~
Project Address: ~6FRsL~o u t:c- t\...--''\'l Go4..tL( .J-.Js.cL.tJ;;,E,
Brief Project Description:
Your Trade Involvement:
Subcontract Value:
Construction Duration and Completion Date:
Owner and/or Contact Person:
(Include current contact information)
Architect:
(Include current contact information)
General Contractor:
(Include current contract information)
Addition Comments:
(Relevant to experience)
Se:e- I:::.T\~~~
el3/17/2elel6
~
ell:el2
36el3744329
WILLAM SPERRY
PAGE
el2/el3
~ .. '
~
.
William E. Sperry
Clock Worker
PO Box 2097
'''orks, W A 98331
Phone: 360-374-4090
Fax: 360-374-4329
Emai1: hucklodg@olyoen.com
Re: Bid for repair of Jefferson County Tower Clock
Dear: Rob Owens,
Per your request I am submitting a bid for the repair of the Jefferson County Clock Tower
located in Pon Townsend. This clock was made by E Howard Clock Co. and is a single train,
4 dialed clock, circa t 892.
Scope of work: This proposal includes the following:
1. Removal of all gears and bushing from the frame of the clock. This will be accomplished prior to
suspending Ihe: cltx;k hou~illl:&.
2. Rebush all bushings within .004 of an inch tolerance true and polish all pivots.
3. Polish escape wheel and the entrance and exit side of the verge. Check pendulum
sl,lspen.o;il)n ~rrine for wear and replace ifnecell.ury.
4. Clean entire clock, remove excess grease and oil, lubricate after reassembly.
.5. Adjust clock timing, set in beat, adjust the warning lever so clock will count the
hours properly.
6. Adjust counter weight on dial anns after the restored dials and hands have been
replaced OT repaired.
7. Inspect weight lift cables and drive gears.
This bid does not include:
1. Suspension of clock housing.
2. Restomtion of dial and hands.
3. Rotation of bell or any work on clapper.
Quali fications:
1. Restored this clock in J,982 and instructed maintenance staff on proper maintenance procedures.
:2. R.estored the Howard, 2 train tower clock for the city of Tacoma and maintained it for over 10 years.
3. Have rebuilt and restored clocks for 25 years.