Loading...
HomeMy WebLinkAboutExhibit 20 - Olympic Terrace 2 Phase II Plat Alteration Checklist and Final Plat Compilation MatrixOYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson 1 Type II Plat Alteration Fees paid 12/21/2020 2 Application forms completed and received with signatures of all property owners within Plat. Names and addresses of all property owners within Plat shall be provided by the applicant (14.301#1) for noticing purposes. Rec’d 3/11/2021 Reviewed 4/9/2021 3 Application deemed substantially complete April 8, 2021 3.1 Review Covenants. If violation, new agreement signed by all property owners Dave can review 4 Wetland/Biological delineations or evaluation submitted Dave can review 5 Any additional information requested and received – SEPA Determination/Addendum June 14, 2021 1.5 hrs Request SEPA Checklist 4/22/21 DWJ review checklist 6 Notice of application to property owners within Plat. Includes notice that a public hearing may be requested within 14 days by any one receiving notice (14.203#2). Notice per 17.05.070 Public notice roster. June 23, 2021 3.5 hrs Comment period ends July 7, 2021 7 Final action within 90 days of filing unless extension requested by applicant (14.203) 4/15/21 PLA will grant extensions per Cliff 8 Public Works and other agency notice and review 4/15/21 1 hr Cliff will contact Eric Kuzma And contact ESM 9 Public hearing if requested. Requires 10-day prior notice, additional notice per RCW 58.17. N/A 10 Notice of Application and pending SEPA 6/23/2021 2 hrs Code requirement 11 Request for additional information – TIA 8/9/2021 .25 hrs Response to comments on access 12 Received TIA & Review 10/20/2021 Complies with Add Info Request OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson .75 hrs 13 Received Roadway and Stormwater Plans 11/22/2021 .5 hrs Code & HE Decision requirement 13a Revised Roadway & Stormwater Plans for emergency access 12/20/2021 SEPA comments and HE Decision page 15 #7 13 b Public Works and EH review fee invoice 1/13/2022 1.0 hrs Section 14.302 14 SEPA Determination Addendum of MDNS Public Works Stormwater and Roadway Review 10/17/2022 Phase I Stormwater Clearing & Grading Permit 7/7/2022 Draft Plat Alteration submitted 1/3/2023 Public Works draft plat review 2/16/2023 Assessor draft plat review 2/9/2023 Public Health Review N/A 17 Preliminary Plat Conditions (each condition listed below) #1 The applicant shall comply with all mitigation measures of the Final Modified Mitigated Determination of Non- Significance issued by the Jefferson County SEPA Responsible Official on May 6, 2005 for the proposed plat of Olympic Terrace 2 #2 The conditions recommended by the Jefferson County Department of Public Works on pages 7, 8, and 9 of their memo dated February 17, 2005 (Log item 43) are incorporated into the recommended conditions of approval (see attached Log item 43) #3 Based on the requirements of Chapter 17.30.180, all OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson easements of record shall be graphically portrayed on the final plat with the Auditor's File Number (AFN) of the easements also referenced on the face of the plat. Required easements for utility installation and maintenance shall conform to the standards of Subsection 6. 303 of the Subdivision Ordinance. All utility easements shall be made by a separate recorded easement, declaration of easements, or dedication of easements, and by graphic portrayal on the final long plat Mylar. #4 Based on the requirements of Chapter 17.30.180 (Subdivision Ordinance 6.303.2), a seven (7) foot wide utility easement adjacent to any private road easement may be required. #5 Based on the requirements of Chapter 17.30.190 (Subdivision Ordinance 6.309. 2 & 3), design and construction of any vehicle turnarounds shall accommodate school buses. Prior to final plat approval, the applicant shall obtain written certification from the Chimacum School District regarding adequacy of provisions for any school bus turnaround. #6 Based on the requirements of Subdivision Ordinance 6.309.4, 60-foot wide public road rights-of-way shall be dedicated in fee simple for any public roads. The dedication shall specify that Jefferson County is not liable for impacts of stormwater runoff from the roads. OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson #7 In order to provide adequate emergency vehicle access a secondary emergency access road shall be constructed to meet International Fire Code standards in the general configuration shown on Sheet three of three of the preliminary plat application plans revised as of April 27, 2005. #8 Based on the requirements of Chapter 17.30 (Subdivision Ordinance 6.3 and 6.4) no reduction, modification, waiver or exception to standard road widths and design shall be allowed unless approved by the Director of Public Works. #9 The subdivision roads shall be constructed in substantial conformance with the design shown on the revised site plans submitted April 27, 2005. The construction plans for any stream crossing culvert shall include hydraulic analysis and shall specify the size, centerline station and depth, length, grade, skew angle and material for any proposed culvert. An HPA from the Washington Department of Fish and Wildlife may be required. #10 Prior to commencing construction of roads on the site, the applicant shall submit road and drainage plans to the Public Works Department for review and approval. The roads shall be designed and constructed in conformance with Public OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson Works Department standards including the guidelines of the American Association of State Highway and Transportation Officials (AASHTO) and the standards of the Washington State Department of Transportation (WSDOT) Highway Design and Hydraulics Manuals. #11 Prior to final plat approval the applicant shall reconstruct Teal Lake Road from Mile Post 0. 00 to MP 0. 14 to a total paved width of 38 feet and from MP 0. 14 to MP. 0. 31 to a total paved width of 34 feet. The construction shall be subject to an agreement between the applicant and Jefferson County. The work shall be performed in conformance with Jefferson County' s adopted standards for design, construction methods, and materials. The applicant shall be responsible for funding the total cost of construction, including the development of roadway and drainage plans, environmental review, permitting, project management, and construction engineering and inspections. The applicant shall reimburse Jefferson County for its reasonable costs related to project oversight, plan review, and approval, inspections, and administration. #12 Roadway monuments shall be placed in monument cases that comply with WSDOT standard plan H-7 and meet the requirements of WSDOT Standards Specifications Section 8-13 and 9-22. The monuments shall be placed on the roadway centerline at all intersections and points of curvature and tangency and at the radius point of all cul-de-sacs. OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson #13 An agreement for the continued maintenance of Road D shall be established either by recording a separate instrument and referencing said instrument on the plat or by declaring the agreement on the plat. #14 Based on the requirements of the Subdivision Ordinance (Section 6.404) and RCW 58. 17. 280, addresses shall be assigned to all lots. Addresses may be shown on the final plat or may be applied for at the time of building permit application. #15 Based on the requirements of Chapter 17.30.250, Road Approach Permits shall be obtained from the Jefferson County Department of Public Works for access to individual lots. The permit numbers shall be referenced on the final plat or there shall be a notice on the plat that road approach permits shall be obtained when applying for building permits. Not applicable if roads maintained by HOA If not, Prior to Final Plat Approval #16 Based on the requirements of Chapter 17.30.280, the roads serving the subdivision shall be named, and the name of the road shall be shown on the final plat. It is required that the applicant consult the Department of Public Works in reference to signing and when selecting a name to avoid duplication of an existing road name. #17 Address plates for the lots shall be located in accordance with Jefferson County 911 Emergency Locator System Ordinance provisions. At time of building permit issuance #18 Based on the requirements of Chapter 17.30.240 all street OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson signs, traffic signs, and traffic striping shall be installed prior to final plat approval. #19 A Storm Water Site Plan that includes a Large Parcel Erosion Control Plan and a Permanent Stormwater Quality Control Plan shall be submitted to the Jefferson County Department of Public Works for review and approval prior to commencing land disturbing activity. The Stormwater Site Plan shall apply Minimum Requirements # 1 through 11 from the Washington Department of Ecology Stormwater Management Manual for the Puget Sound Basin. #20 The applicant shall provide documentation from the designing engineer that erosion control practices including storm water quality control were fully implemented during the construction phase, in accordance with the Department of Public Works approved plans. The documentation shall be submitted prior to final plat approval and will include copies of reports from all monitoring during construction. #21 The proponent shall enter into a Stormwater Management Facility Maintenance Agreement with the County. After construction has been completed, the Department will send the proponent a copy of the Agreement that has been signed by the Public Works Director. The Department cannot give final approval for the project until the Agreement has been signed and filed with the Jefferson County Auditor. #22 After construction is complete, the proponent shall submit a letter from the project engineer certifying that the stormwater management facilities have been constructed as OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson per the approved plans. The Department cannot give final approval for the project until this certification has been received. #23 Based on the requirements of Chapter 17.30.290, if no development of the lots is proposed at this time, the applicant shall state on the face of the plat under " Notice to Potential Purchasers": Prior to the commencement of any land disturbing activities and prior to issuance of a building permit, a Small Parcel Erosion and Sediment Control Plan shall be developed to the standards of the Jefferson County Stormwater Management Ordinance and be submitted to the Department of Community Development for review and approval. Temporary erosion control Best Management Practices shall be approved by the Department of Community Development and implemented at all times during land disturbing activities." #24 Based on the requirements of Chapter 17.30.350, construction of roads and storm water facilities and/ or site disturbing activities requires that the applicant submit plans in accordance with the Department of Public Work's plan review schedule, and, the applicant shall notify the Department of Public Works during various phases of construction in accordance with the department's inspection schedule. Typically, the following inspections are required: Installation of temporary erosion and sediment control measures; Clearing and road subgrade preparation; Application of gravel base; Application of compacted crushed OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson surfacing top course; Construction of storm water management facilities; Final plat review. Additional inspections may be necessary based on site-specific conditions or the nature of the project. #25 Temporary erosion control methods for construction purposes roads, facilities shall be approved by the Department of Public Works and employed during construction. A set of approved plans shall be on site at all times during construction. #26 Based on the requirements of Chapter 17.30.300, water main extensions and water system improvements that may be required to service the development shall be installed prior to final plat approval. Extensions and improvements shall be in conformance with the Ludlow Water System Plan, The Jefferson County Coordinated Water System Plan and shall include acknowledgment from Olympic Water and Sewer that water main extension have been certified in accordance with the provisions of Chapter 246-290-110 (2) WAC. #27 Based on the requirements of Chapter 17.30.300, prior to final plat approval, documentation shall be submitted from Olympic Water and Sewer confirming and sewer systems have been constructed in accordance with applicable state and local standards. #28 Based on the requirements of Chapter 17.30.350, performance surety may be posted in lieu of completion of construction as provided by 6. 60, Jefferson County Subdivision Ordinance. The applicant may enter into a surety OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson agreement with the Department of Public Works as an alternative to complete installation of required improvements prior to final plat approval. The surety may not exceed one (1) year, and must be in a form acceptable to the County Prosecutor. Acceptable examples of sureties are available from the Department of Public Works. All sureties must be accompanied by an estimate of the cost of all improvements, and the estimate must be approved by the Department of Public Works prior to acceptance of surety. #29 Based on the requirements of Chapter 17.30.320 and prior to final plat approval, the applicant shall provide written evidence from Fire Protection District # 3 that the final design and construction of the long plat will comply with the applicable provisions of the International Fire Code, and the recommendations of the Fire District which are consistent with State law. #30 Based on the requirements of Chapter 17.30.350, the applicant shall arrange for the inspection of all required improvements with the Department of Public Works, the Planning Department, or Health Department, whichever is responsible. Inspections shall be requested by the applicant at such stages as indicated by the appropriate department. #31 In accordance with the applicable fee ordinance, the applicant shall pay all costs of work incidental to approval of the 10 subdivision before final approval is granted. #32 Prior to final approval by the Department of Public Works, the applicant shall submit lot closures of the survey at least one OYLMPIC TERRACE 2 PHASE II PLAT ALTERATION CHECKLIST AND FINAL PLAT COMPILANCE MATRIX MLA05-00013 – SUB18-00015 # ACTION ITEM/CONDITION COMPLETION - DATE EXPLAIN HOW ACTION ITEM OR CONDITION WAS MET Prepared by Project Planner, David Wayne Johnson week in advance of approval. If lot closures are incomplete or inaccurate, the Applicant shall make any corrections or additions prior to final approval. After lot closures are approved by the Department final fees will be calculated and submitted to the applicant for payment. #33 Upon certification that all conditions have been met, the applicant shall submit a final Mylar of the plat to the Department of Public Works at least three days in advance of approval by the Director of Public Works. #34 Prior to final plat approval, the applicant shall document that the proposal meets the requirements of Appendix D, Final Long Plat Checklist. SEPA Mitigation Mearsures See MDNS dated April 13, 2005