HomeMy WebLinkAboutChange order seton Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: October 2, 2023 Subject: Change Order No. 3, Phase 1 - Site Prep., Earthwork and Service Utilities for the Port Hadlock Sewer, Project No. 405-2114-0, Commerce Project No. 22-96515-026 Statement of Issue: Change Order No. 3 with Seton Construction of Port Townsend, Washington. Analysis/Strategic Goals/Pro's ft Con's: This change order includes the increased cost to change the clay core material, installation method and design detail. The originally designed clay core in the wastewater pond embankment will be replaced with an improved design consisting of a 60 mil HDPE liner and lean concrete backfill. The intent of this impermeable cut off wall is to ensure reclaimed water will be directed downwards through the bottom of the infiltration facility. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 3 is $99,559.01. The contract amount will increase from $1,450,527.51 to $1,550,086.52. NOTE, the cost included 9.1% sales tax. The project is funded at 100% by the Department of Commerce. Recommendation: Public Works recommends that the Board authorize Change Order No. 3 with Seton Construction, and return two originals to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Revie By: ` Mark McCa , County Administrator Date JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: 9/21/2023 CHANGE ORDER Order No. Ordered by County Engineer under terms of I A Section 1-04.4 of the Standard Specifications Contract No. Change proposed by Contractor To: Seton Construction Endorsed by: SETON CONSTRUCTION, INC. 4640 S. Discovery Rd. tractor m name Port Townsend, WA 98368 Signature Date PRESIDENT 9/22/23 Title Consent given by Surety:(when required) Project Title Phase 1-Site Prep., Earthwork,and Service By. Utilities for the PH Sewer Attorney-in fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: The change was to a install 60 mil HDPE liner with concrete backfilled trench in lieu of original clay core. Estimated quantities and cost shown on attached sheet. With the decision to construction this option, Bid Item No. S Clay Core will be deleted from the contract and new bid items for the installation of the core material will be added to the contract. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT(incl.9.1%sales tax) AMOUNT(incl.9.1%sales tax) THIS ORDER(incl.9.1%sales tax) AFTER CHANGE(incl.9.1%sales tax $ 1,243,245.78 $ 1,450,527.51 $99,559.01 $ 1,550,086.52 ORIGINAL CURRENT CONTRACTTIME NEW CONTRACT CONTRACTTIME CONTRACTTIME CHANGE(Add/Del) TIME 100 112 0 0 APP VAL RECOMM DED APPR MMEND Project Mano er Q Date County Engineer Date 00 A ROVAL ECOM ENDED APPROVED a Z EngineerinVerviLl4s Manager �.�► Date Choir Jefferson County Commissioners Dote JEFFERSON COUNTY __ _Contract N 405_-2114-0 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS _ Change Date: 9 21 2023 CHANGE ORDER ESTIMATE Order No. 3 ESTIMATED ESTIMATED ITEM DESCRIPTION UNIT UNIT QUANTITY AMOUNT NO. MEASURE PRICE CHANGE CHANGE NEW ITEMS _ 70 Purchase Liner SY _ $10.41 2,654 $27,626.98 71 Install Liner SY $4.96 875 $4,340.00 72 Purchased Concrete CY $153.67 528 $81,137.76 73 Placed Concrete _ CY $13.11 528 $6,922.08 74 Trench Excavation CY $19.75 528 $10,428.00 New Item Total $130,454.82 EXISTING ITEMS DELETED QUANTITIES 5 Clay Core CY $49 800 ($39,200.00) Existing Items Deleted Quantities Total ($39,200.00) EXISTING ITEMS ADDED QUANTITIES $0.00 Existing Items Added Quantities $0.00 ESTIMATED NET CHANGE SUBTOTAL: $91,254.82 9.1%Sales Tax $8,304.19 ESTIMATED NET CHANGE TOTAL: $99,559.01 Port Hadlock Concrete Core Pricing COP No. 3 - Revised 9/8/2023 Revised 9/15/2023 SAH 9/15/2023 Option 2-60 Mil HDPE Liner&18 Inch Conc Filled Trench Item Unit I Quantity $/Unit Total$ Purchase Liner SY 2654 $10.41 $27,626.98 Install Liner SY 875 $4.96 $4,340.00 Purchase Conc CY 528 $153.67 $81,137.76 Place Conc CY 528 $13.11 $6,922.08 Trench Excavation CY 528 $19.75 $10,428.00 Total $130,454.82