HomeMy WebLinkAboutPowerlines_DRC_meeting_8-23-2023Jefferson County | August 23, 2023 Dosewallips River, Virtual DRC Meeting Rocky Brook and Powerlines Reaches Welcome and Introductions Agenda Additions (and Eddy Items) Dosewallips River Project Floodplain Processes Overview NSD Team and Background Natural Systems Design Eleanor Bartolomeo, Senior Engineer Tim Abbe, Principal Geomorphologist Scott Katz, Geomorphologist Ryan DeKnikker, Habitat Biologist Torrey Luiting, Ecologist & Project Manager Resiliency Project Development Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Summary of Last DRC meeting (Feb 2022) Presented the Dosewallips River Lazy C and Powerlines Reach Resiliency Plan Recommendations were for aquatic habitat restoration actions to be focused in the Powerlines Reach Focus on maintaining and supporting freshwater habitat Room to use restoration tools Parks and County lands Private landowners - outreach Lazy C floodplain development and FEMA no-rise regulations are important considerations 1 Last Meeting Summary Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Purpose and Focus Project Focus Channel stability to support chinook freshwater egg survival Channel complexity to support rearing habitat Both aspects benefit HC summer chum and chinook salmon habitat Preliminary design and permit application materials Project Focus: Focus on freshwater habitat importance for HC summer chum and chinook salmon Habitat complexity considerations Build on past studies about channel and floodplain conditions Updated geomorphic and habitat assessment Conceptual design ideas, if/where appropriate 2 Powerlines Rocky Brook Reach Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Powerlines Preliminary Design Project Area 3 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Rocky Brook Study Area for Assessment 4 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Salmon Recovery Goals and Limiting Factors Hood Canal Summer Chum Salmon Designated an ESA threatened species in 1999 Causes of Decline (WDFW and PNPTT 2000) 1. Climate related changes in stream patterns 2. Fishery exploitation 3. Habitat loss Key Habitat Limiting Factors Loss of channel complexity Altered sediment dynamics Riparian degradation (alteration of large wood cycle) 5 Photo Credit: WDFW Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Salmon Use and Limiting Factors Puget Sound Fall Chinook Salmon Designated an ESA threatened species in 1999 Causes of Decline (WDFW and PNPTT 2000) 1. Climate change 2. Habitat degradation 3. Fishery exploitation Key Habitat Limiting Factors (in addition to estuarine habitat loss and degradation) Floodplain modifications Channel complexity Stream flow Channelization 6 Photo Credit: WDFW Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Example NSD Habitat Restoration Projects 7 Chinook and Pink salmon beneath Elwha River ELJ Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Click to edit Master title styleCispus River Site B: 1999 Lewis, County, WA N Engineered Logjam flow deflectors for bank protection Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 B-1 B-2 B-3 B-4 Black-top road is where FR 23 washed out in 1996 Cispus River Site B, RM 19 October 1999 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 B-1 B-2 B-3 B-4Cispus River Site B, RM 19 December 2007 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Structure slows down flow along bank to stop erosion while creating lots of cover for fish South Nooksack River, WA South Fork Nooksack River 2010 Engineered Logjam complex revetments for bank protection Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 2021-2022 ASRP Satsop & Wynoochee Rivers SatsopWynoochee Aberdeen Montesano Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Project Overview 13 Project Goals: 1.Increase channel length and sinuosity. 2.Create multi-thread channels. 3.Increase inundation of side channels and floodplains. 4.Increase wood loading 5.Increase pools count and quality. 6.Decrease channel migration rates. 7.Increase riparian cover. Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Project Layout – East Fork Satsop River 14 Statistics: 1.52 engineered log jams. 2.2,200 logs 3.1.2 miles of river 4.3 private landowners & 1 land trust 5.4 work sites 6.2 construction seasons Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Immediate Geomorphic Effects 15 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Immediate Geomorphic Effects 16 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Overview of Powerlines Scope of Work Stakeholder Outreach Field Reconnaissance & Survey Possible lidar flight Wetlands & Waters Delineation Cultural Resources Assessment Hydraulic & Geomorphic Assessment Preliminary Design & BOD Permit Applications 2025 and/or 2026 construction goal 17 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Important Consideration - FEMA Floodplain Zones/Mapping 18 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Overview of Schedule – Powerlines June – October 2023 Kick off, survey/lidar, recon Wetlands and cultural field assessments October-December 2023 Survey processing and basemaps EC model & hydrology updates Wetlands and cultural reports January – May 2024 Hydraulic modeling and preliminary design Basis of design report June – October 2024 QC and finalization of design and BOD Permit application package 19 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Input and Questions (Powerlines) Input Questions 20 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Rocky Brook Project Summary Project Timeline June 2023 - October 2024 Understand the river in this reach Human habitats and use Salmon habitats and use Characterize existing conditions of the floodplain and in the river Consider broad range of restoration tools and actions compatible with the reach Community vulnerabilities Salmon recovery – freshwater habitat focus Climate change resiliency Create concepts and Resiliency Plan to support salmon recovery Create information to support future grants for community resiliency priorities 21 Project Goals Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Rocky Brook Project Summary 22 2021 aerial Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Outreach Efforts – Rocky Brook to Jupiter Bridge November 17, 2022 Brinnon Community Center July 20, 2023 Brinnon Community Center Tim Abbe meeting with landowners August 30 Room for more meetings that day – let’s connect! Planning for field reconnaissance on September 13-14 with willing landowners Capacity to visit reach again late September if/as needed if more landowner interest in meeting 23 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Overview of Rocky Brook Scope of Work Stakeholder Outreach & Engagement Field Reconnaissance & Existing Conditions Assessment Lidar flight upcoming Hydraulic modeling Geomorphic & Aquatic Habitat assessment More Stakeholder Outreach & Engagement Reach-scale Collaborative Goals Development Conceptual Designs – if/where appropriate Resiliency Plan 24 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Overview of Schedule – Rocky Brook July – December 2023 Kick off & landowner outreach and engagement Lidar & reconnaissance site visit(s) Habitat assessment Geomorphic assessment Hydrology & hydraulic modeling January – May 2024 Outreach and engagement Reach-scale goals development Hydraulic modeling and conceptual design Resiliency plan development June – October 2024 Outreach and engagement QC and finalization of concept design and resiliency plan 25 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Input and Questions (Rocky Brook) Input Questions 26 Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Next Steps – Outreach and Assessments Landowner outreach and engagement Field work: geomorphic, wetlands, cultural resources – mid to late September Landowner outreach and engagement Field work to support assessment – mid to late September 27 Powerlines Rocky Brook Eddy Items Next Agenda (September 27th, 4th Wednesdays) NSD Returns on with updates Nov/Dec meeting Jefferson County | Dosewallips River, Rocky Brook & Powerlines Reaches August 23, 2023 Contacts Jefferson County Public Health Tami Pokorny TPokorny@co.jefferson.wa.us Natural Systems Design Eleanor Bartolomeo, Engineer eleanor@naturaldes.com Tim Abbe, Geomorphologist tim@naturaldes.com Torrey Luiting, Project Manager torrey@naturaldes.com 28