Loading...
HomeMy WebLinkAboutOvivo Change Order AR Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: Ocotber 16, 2023 Subject: Change Order #2, Ovivo USA, LLC Port Hadlock Wastewater Project Statement of Issue: Execution of Change Order #2 to the contract with Ovivo USA, LLC for supply of the Membrane Bioreactor (MBR) wastewater treatment plant equipment for Port Hadlock. Analysis/Strategic Goals/Pro's tt Con's: Change Order #2 adds $438,000.00(plus WSST) to the contract for a master control panel (materials and on-site support). The master control panel will be used to coordinate communications between Ovivo and non-Ovivo provided equipment. Since the bid was submitted, design has been modifided to enhance overall operations of the treatment plant; reduce odors; enhance operation in the future by buffering the effects of low and high flow events; provide emergency power and sludge thickening. Fiscal Impact/Cost Benefit Analysis: Change Order #2 is for $438,000.00. 100- percent of the funding for this work comes from State Dept. of Commerce revenue that has been dedicated to this project. Recommendation: Public Works recommends that the Board sign Change Order #2 where indicated and return signed change order to Public Works for further processing. Department Contact: Samantha Harper, P.E., (360) 385-9175. Reviewed By: /P l r1 IA3 Mark McC y, County Administr to Date CONTRACT RMEW FORM I dear rorm I (INSTRUCTIONS ARE ON THE NEXT PAGE) CONTRACT WITH: Change Order#2 w/Ovivo USA LLC, Contract No: PW 2023-099 Contract For: Master Control Panel btwn MBR Sys and non-MBR Sys Term: COUNTY DEPARTMENT: Public Works Contact Person: Samantha Harper Contact Phone: 360-385-9160 ext 175 Contact email: sharper@co.jefferson.wa.us AND ckilmer@co.jefferson.wa.us AMOUNT: $438,000.00 plus WSST PROCESS: Exempt from Bid Process Revenue: $438.000.00 plus WSST Cooperative Purchase Expenditure: $438,000.00 plus WSST Competitive Sealed Bid Matching Funds Required: $o Small Works Roster Sources(s) of Matching Funds N/A Vendor List Bid Fund# 405 RFP or RFQ Munis Org/Obj ✓ Other: Change Order APPROVAL STEPS: STEP 1: DEPARTMENT CERTIFIES COMPLIANCE WITH JCC 3.55.080 AND CHAPTER 42.23 RCW. lliallr elyM aI Sevwu MV°P.P E. CERTIFIED: �■ N/A: Samantha Harper, P.E. eN.-s.m.,..wv...�• Ope lad/OOe ra Sl}a crap Signature Date STEP 2: DEPARTMENT CERTIFIES THE PERSON PROPOSED FOR CONTRACTING WITH THE COUNTY (CONTRACTOR) HAS NOT BEEN DEBARRED BY ANY FEDERAL, STATE, OR LOCAL AGENCY. Digitally signed by Samantha Harper,P.E DN:C-US,E=sharper@co.la8arson wa.us,0--Jefferson a Samantha Harper, P.E. County Public Works,CN-'Samantha Harper,P.E." CERTIFIED: N/A: Date:2023.tO.0415:56:3207'00' Signature Date STEP 3: RISK MANAGEMENT REVIEW(will he added electronically through Laserfiche): Electronically approved by Risk Management on 10/5/2023. STEP 4: PROSECUTING ATTORNEY REVIEW (will be added electronically through Laserfiche): Electronically approved as to form by PAO on 10/5/2023. Change order. STEP 5: DEPARTMENT MAKES REVISIONS & RESUBMITS TO RISK MANAGEMENT AND PROSECUTING ATTORNEY(IF REQUIRED). STEP 6: CONTRACTOR SIGNS STEP 7: SUBMIT TO BOCC FOR APPROVAL 1 CHANGE ORDER NO.: 2 Owner: Jefferson County Owner's Project No.: 405-21140 Engineer: Tetra Tech Engineer's Project No.: N/A Contractor: Ovivo USA, LLC Contractor's Project No.: Project: Port Hadlock Wastewater Contract Name: Port Hadlock Wastewater Effective Date of Change Order: Upon Execution Date Issued: 10/02/2023 by all parties The Contract is modified as follows upon execution of this Change Order: Description: New master control panel to incorporate the Ovivo system and the non-Ovivo system controls. Programming and integrating controls for non-Ovivo equipment which were not included in the original design. Attachments: See attached proposal dated 9/28/2023 Change in Contract Price Change in Contract Times Original Contract Price: Original Contract Times: Substantial Completion: Per Article 2.02 (Original Contract) $ 1,395,158.00(plus WSST) Ready for final payment: Per Article 2.02 (Original Contract) Increase from previously approved Change Orders No. Increase from previously approved Change Orders 1 to No. 1: No.1 to No. 1: Substantial Completion: N/A $ 6,098.00(plus WSST) Ready for final payment: N/A Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: N/A $ 1,401,256.00(plus WSST) Ready for final payment: Per Payment Schedule in Change Order 2 Proposal, pp.5-6. Increase this Change Order: [Increase] [Decrease]this Change Order: Substantial Completion: N/A $ 438,000.00(plus WSST) Ready for final payment: Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: Per Article 2.02 (Original Contract) $ 1,839,256.00(plus WSST) Ready for final payment: Per Payment Schedule in Change Order 2 Proposal,pp.5-6. Re m ended by Engineer(if required) Accepted by Contractor By: it �2GG �1� Title: "Vt Ovivo Project Manager Date: �I�',�j 10/4/2023 Firnre[-q41.[hanop nrdPr Firnro C-q41.[hanvp Order.RPv.1. Authorized by Approved as to form only: October 5, 2023 Greg Brotherton Date Philip C. Hunsucker, Date Chair,Jefferson County Board of Commissioners Chief Civil Deputy Prosecuting Attorney EJCDC-C-941,Change Order EJCDC•C-941,Change Order,Rev.l. Copyrightm 2018 National Society of Professional Engineers,American Council of Engineering Companies and American Society of Civil Engineers.All rights reserved. Page 2 of 2 Ovivo SiC Systems -.4A 2300 Greenhill Dr.#100 Worldwide Experts in Water Treatment Round Rock,TX 78664 O _ 0. Q ECN 10 for Plant Control Panel and Programming to Port Hadlock L Date Prepared By Services Performed For: L 8/18/2023—RevO Ovivo Port Hadlock 9/6/2023—Rev1 2300 Greenhill Dr. 4100 623 Sheridan St 9/28/2023—Rev2 Round Rock,TX 78664 Port Townsend, WA 98368 L O This External Change Notice(ECN) is issued pursuant to the current contract between Port Hadlock("Client") and Ovivo("Vendor"), effective September 6', 2023. This ECN is subject to the terms and conditions contained in the contract between the parties and is made a part thereof.Any term not otherwise defined Czherein shall have the meaning specified in the contract. In the event of any conflict or inconsistency between the terms of this ECN and the terms.of the contract,the terms of this ECN shall govern and prevail. Proposal Overview Tetra Tech has requested Ovivo, as per"RFP—Ovivo SCADA Integration 02162023" (attachment#1),to provide a proposal for the Port Hadlock WWTP project to cover additional scope related to the three items listed below. 1) provision of a new Master Control Panel for non-Ovivo provided plant equipment, 2) services related to the programming and integration of all plant equipment into new panel, 3) provision of a plant SCADA system*. r�4 J J --T• _ L- 3tl t + • c r _ �,r 1 icy -ems .. v� r Project Change Notice(ECN 10)for Port Hadlock 1 'At this time Ovivo cannot commit to scope 3) of providing a plant SCADA system, and we regretfully need to decline offering a proposal for this scope. As Ovivo does not generally provide services related to SCADA programming it would be a scope that we would have to subcontract out; and therefore,we feel we would not provide enough reasonable value for the client in taking on this scope and only end up providing additional overhead and management costs. In this proposal Ovivo gives an overview of the scope being offered, including both material and labor, related to items 1) &2)above. Ovivo Scope of Supply Ovivo has taken the requirements laid out in Tetra Tech's RFP and have applied them to the August 2022 version of the P&IDs(attachment#2) and the 90%design Electrical Enlarged Site Plan (attachment#3). As this is the basis of Ovivo's proposal, any future changes of the equipment depicted in these drawings, due to the maturing of the design, is open for future changes. • Supply/program—new Master Control Panel, located in Electrical room/chemical storage. Control Panel to be NEMA 4X,Stainless Steel Control Logix Redundant PLC(2x CPU racks) Compact Logix 1/0 rack • 1/0 to include EQ system 1/0,Yard Pump 1/0, Fuel Storage 1/0, Dewatering 1/0, and odor control 1/0. • Provision of 20-25%spare 1/0 Local Panelview. • Modify/Upgrade-existing MBR Skid Panel, located on MBR skid (existing panel, modified as follows) Upgrade current Red Lion HMI to Allen Bradley Compact Logix 1/0 rack ■ 1/0 to include MBR system, and some minor adjacent 1/0 as space permits ■ Provision of 20-25%spare 1/0 Local Panelview. • Junction Boxes Locations ■ EQ Tank ■ Yard Pump PON- Project Change Notice(ECN 10) for Port Hadlock 2 ■ Dewatering ■ Fuel Storage NEMA 4x SS junction boxes with wiring diagrams, conduit schedules, etc. • Electrical cD Provide drawings for 2x MCP panels Provide drawings for 4x Junction Box Panels (Marshalling) • Programming Programming to be added for all wired 1/0, and network VFD/starters as show in the P&ID drawings provided. Update all control documents as required, all systems will be represented by Ovivo standard documents. • Shipping of new Master Control Panel to site Planned to be shipped with all other Ovivo project equipment _ If panel is required at an earlier/later time than all other Ovivo provided equipment, additional shipping costs may result in a change. • Provision of labor for interfacing with SCADA integrator • 15x business days of On-Site controls/electrical support. Days assumed to be applied over 3x trips; and includes all labor and travel expenses. All on-site days in support of new Master Control Panel will count against 15 business day balance. • Training of staff during installation and commissioning on the HMI and program use Out of Scope Items Future addition of equipment not currently called out on Aug 2022 P&IDs or in scope of supply above • Starter and/or VFDs for plant equipment. Note: Ovivo assumes all starters/VFDs to be either Allen Bradley or Schneider, any other brand may result in a change • Field wiring to connect equipment and instrumentation to new Master Control Panel, or communication wiring. • On-Site support in excess of 15x days provided,to be reimbursable based on Ovivo's current Technical Services Rate sheet at time of scope execution. • Design of physical location of new Master Control Panel within the plant. , '1 POW Project Change Notice (ECN 10) for Port Hadlock 3 Tetra Tech to design final location of new Master Control panel and all conduit runs from plant equipment. Ovivo to provide design input as needed. • Integration and Installation of new Master Control Panel into new wastewater treatment plant General Contractor to unload panel from delivery truck and install into final location within plant. Electrical Contractor to make all wiring field runs and land all wires within panel. Ovivo to provide site support to electrical contractor during integration of new Master Control panel. • Non-Ovivo provided equipment-start-up,testing and commissioning. Ovivo to provide site support to electrical contractor as needed.Ovivo will confirm signals from termination point to PLC. Supporting Documentation & Attachments Scope of Supply updatc • P&ID update • PFD update • Control Narrative update • SCC update Including incorporation of plant programming Provision of filtered list for SCADA integrator • New Panel Design Package Control Block Diagram, Loop diagrams for instruments Panel layout drawings o Component cutsheets • MBR skid panel design package update • Shelf Spare Parts List • IOM update 'v �__-- Project Change Notice(ECN 10) for Port Hadlock 4 Delivery Details • Deliverables to be provided in an updated submittal package. • New Plant Panel to be delivered along with all Ovivo provided equipment. Delivery Terms Delivery terms will remain consistent with project contract,wherein Ovivo will cover shipping costs to site, site's general contractor responsible to offload and store equipment. Purchase Price DescriptionDollars) 1 Plant Control Panel and Programming $396,245.00 2 15x business days' (3x trips) of on-site Support $41,755.002,3 Total: $438,000.00 Notes. 1. On 16`on-site day,controls engineer's time to be reimbursable based on Ovivo's current Field Services Rate sheet at time of scope execution. 2. Current prices based on 2023 Field Service Rate Sheet(see attachment#4) 3. For price breakdown see attachment#5 Payment Schedule * Propose the following milestone payments for Item 1: 50%($198,222.50)at signing of Change Order 40%($158,498.00)at delivery of panel 10%($39,624.50) at performance test : )L 4 4 ,' - 1 z Project Change Notice(ECN 10) for Port Hadlock 5 • Propose the following milestone payments for Item 2: 33.33%($13,918.33) after week 1 of service is completed 33.33%($13,918.33) after week 2 of service is completed 33.33%($13,918.33) after week 3 of service is completed Pricing and Commercial Terms • Item 2 to oe billed in full week increments. If third week is not utilized,then the third week will not be billed. • Standard Terms are 30 days NET, interest charged at 1 %%per month (18%) per annum on outstanding balances. Please refer to contract terms for a reference point. • Pricing are net,taxes are not included. • Prices are valid for 30 days from proposal issuance date. If a formal purchase order is not received and accepted within this validity period Ovivo reserves the right to review and adjust pricing and lead times as necessary. • Prices are quotes in US Dollars unless otherwise noted. • No allowances have been included for bonds of any kind. Warranty Warranty terms will remain consistent with Ovivo's project warranty statement, with the scope contained within this proposal being covered by Part 2 of the Ovivo M.BR System Warranty. General Notes Pricing is based on the use of Ovivo standard design,equipment engineering submittals(IFI), materials of construction, QA/QC procedures and documentation. Project Change Notice(ECN 10) for Port Hadlock 6 Proprietary and Confidential Information The attached document contains proprietary and confidential information and is submitted under a confidential relationship. By accepting this document,the recipient agrees: • It will not disclose to third parties or use any drawings, specifications, designs, processes or information supplied by Ovivo in any manner detrimental to the interests of Ovivo; • Any special features particular to this design and information gained as a result of this document shall be treated as confidential and shall be the property of Ovivo and will not be incorporated in whole or in part in other projects unless recipient obtains written permission from Ovivo to do so,- Not to copy in whole or in part nor reveal its contents in any manner or for any purpose except for the purpose stated herein; • The foregoing applies without limitation to all documents prepared by Ovivo in connection with this submission and the recipient acknowledges that this document involves confidential rights of Ovivo and all design, manufacturing, reproduction, use and sale rights regarding same are expressly reserved. Project Change Notice(ECN 10) for Port Hadlock 7 Approval and Acceptance In order to move forward with this change request Ovivo requires that the below be signed off and returned to the Ovivo Project Manager. Upon acceptance,a revised PO will need to be issued to include additional scope. Port Hadlock Ovivo Project Manager By: By: Samantha Harpef Eric Schaefer Project Manager Project Manager 9/28/2023 Date: Date: _-, + Project Change Notice(ECN 10) for Port Hadlock 8 Attachments: Attachment #1 - RFP — Ovivo SCADA Integration 02162023 (2 pages) Attachment #2 - August 2022 version of the P&IDs (7 pages) Attachment #3 - 90% design Electrical Enlarged Site Plan (2 pages) Attachment #4 — 2023 SiCBLOX Field Service Rate Sheet (1 page) Attachment #5 — Field Service Cost Breakdown (1 page) \A ' r Project Change Notice(ECN 10) for Port Hadlock 9 Attachment 1 Text from original document 2/16/23. Text added 3/15/23. RFP Description: Ovivo to provide full integration services during construction for all MBR and non-MBR equipment.A list of anticipated services includes, but is not limited to the following: Services: • Create Process Flow Diagram showing the high-level connectivity between the control systems o OV: Controls specific or expand standard PFD? ■ Tt: OV to create control block diagram for controls portion o P&ID: ■ Tt: OV to take over MID ownership for extended scope,to own control and make update to control line as needed • Detailed control sequence of operation o OV: expanded SCC • Integration of field instruments to local/remote controllers o OV: tie in additional instruments into local 10 o Tt: currently have an OV panel and plant panel o OV: evaluate distance between 10 to determine remote 10 or panels, prefer less wiring and more ethernet • Wiring of all control panels and field instruments (conduit and wire pulls by others) o Tt: internal wiring of control panels o Tt: develop loop diagrams for instruments o OV to provide control panels needed at site • Detailed design of SCADA network architecture, with needed redundancy • Detailed design of process control panels o OV to provide full design package o Tt has a 95%design package for control package • Interface design between MBR and non-MBR equipment(interlocks and permissives) o A lot of information in process control narrative o Evaluate critical and non-critical interfaces o OV: interfaces shown in electrical drawings and SCC • Data access/acquisition for SCADA platform o OV would switch from RedLion to Allen Bradley with FactoryTalk o OV/Tt: use of Allen Bradley throughout facility • PLC redundancy design and implementation o ControlLogix to be used potential with dual power supply o OV to recommend shelf spares list o Need hot switch over setup • SCADA servers and thin-client remote desktop services o OV would propose middle of road industrial PC o OV to spec PCs,then to be decided who to furnish • Remote VPN SCADA access, or secure web services o OV uses inhouse products; an EWON and program WaterExpert • SCADA software and application development o OV to provide full programming suite and supporting software Attachment 1 • Alarming/notification platform implementation o OV's WaterExpert application provides • Development of automated reporting software required for DOQ compliance o Tt: been using DreamReports in WA o OV can propose alternative • System start-up,testing and commissioning o Mechanical out of scope; EC&I in OV scope • Staff training o OV will quote a specific amount of training, with additional time being invoiced • Record document preparation (O&M manuals, as-builts, programming documentation, etc.) o OV to include proposed document delivery register o TBD: documentation to be stand alone or combined with previous documentation • Some SCADA items outside of process scope (i.e. monitoring generators/power monitoring), currently hardwired interfaced o OV has experience with MODBust o Hardwired interfaces can be open for discussion • Tetra Tech maintains ownership over construction contractors o OV to take on installation confirmation The scope would include setting up a SCADA server and remote workstation within the Administration Trailer using remote desktop services, or equal.The goal is to provide a single unified SCADA platform, fully integrated without need for novel interfaces between MBR/Non-MBR SCADA platforms, or which would otherwise require separate operator consoles for MBR versus non-MBR processes. The quote is to be based upon the phase 2 100%drawings and specifications. Please refer to the following specification sections, which shall be utilized as minimum requirements for the quote: • Section 409002 Testing and Commissioning • Section 409600 SCADA System Software • Section 409635 Programming Quote to include a construction phase submittal to be submitted from Ovivo through the Contractor. The quote should also include costs for site visits,testing, training, and record documentation of the new SCADA system.