HomeMy WebLinkAboutBruch & Bruch Construction, Inc. - Snow Creek Change Order - 102323 JEFFERSON COUNTY Sheet 1 of 1 DEPARTMENT OF PUBLIC WORKS Change 1 Date: 9/14/2023 CHANGE ORDER Order No. Ordered by County Engineer under terms of QX Section 1 -04.4 of the Standard Specifications 18020310 Contract No. Change proposed by Contractor To: Bruch & Bruch Construction End orse y: '1 Bruch & Bruch Construction, Inc 1706 W. Hwy 101 o tractor Firm Name Port Angeles, WA 98362 z' �``'� l`�'' 10.17.2023 Signature Date Sean Coleman, Project Manager Title Consent given by Surety: (when required) Project Title Snow Creek Road MP 0.84 Culvert Replacement By: Attorney-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: This change order will make the following changes to the contract: 1. In accordance with the WSDOT Standard Specifications Section 1-10 Temporary Traffic Control, add the bid item "Flaggers", per hour to the contract. The unit price shall be$74.00 per hour, and the estimated quantity is 30 hours. Therefore, the total cost for this change is ($74.00/hr) X (30 hr) = $2,220.00 2. Revise the guardrail plans as shown on the attached "Roadway Plan and Profile" sheet, and as follows: Delete 131.25 LF of"Beam Guardrail Type 31" and replace with 131.25 LF of"Beam Guardrail Type 31 -8 Ft. Long Post". There is no cost associated with this change. Delete the"Beam Guardrail Type 31 Non-Flared Terminal" located at Station 13+59.00, 15.60 Lt. and replace with a "Beam Guardrail Type 31 Buried Terminal Type 2". The total cost for this change is a lump sum amount of $1,080.00 for additional freight charges. The total change in cost for this change order is $2,220.00 + $1,080.00 = $3,300.00 All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $1,092,394.00 $1,092,394.00 $3,300.00 $1,095,694.00 ORIGINAL CONTRACT CURRENT CONTRACT CONTRACT TIME NEW CONTRACT TIME(days) TIME(days) CHANGE(Add/Del) TIME(days) 80 80 0 80 APPROVAL RECOMMENDED AP,PRO\c/ RECOMM N 7/z4 ..4,4 a. -- /0- [2 -L Project Mana er Date County Engineer'l Date A PRO1(A RE MMENDED 6PKROV D ilo�lL l�L3 - 4131/43 Engineering ervi s Manager Date Chair, efferson County Commissioners Date \ Department of Public Works O Consent Agenda Page 1 of Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineery� , Agenda Date: October 23, 2023 Subject: Change Order No. 1 with Bruch and Bruch Construction, Inc., Snow Creek Road MP 0.84 Culvert Replacement, County Project No. 18020310, County Road No. 352909, FEMA Hazard Mitigation Grant No. D21-031 Statement of Issue: ChangeOrder 1 with ue. 0 de No. w t Bruch and Bruch Construction, Inc. of Port Angeles, Washington. Analysis/Strategic Goals/Pro's Et Cons: Change Order No. 1 adds the bid item Flagger, and a lump sum amount for re-ordering of guardrail items requested by the County. Fiscal Impact/Cost Benefit Analysis: Change Order No. 1 will increase the contract amount by $3,300.00, from $1,092,394.00 to $1,095,694.00. However, due to underruns on various bid items, the contract will be completed for approximately $29,000 less than the original contract amount. Project construction is funded at 87.5% by a FEMA Hazard Mitigation grant and 12.5% by a Public Works Board Construction Loan. Recommendation: Public Works recommends that the Board authorize Change Order No. 1 with Bruch and Bruch Construction, Inc., and return two originals to Public Works. Department Contact: Mark Thurston, P.E., Project Manager, 385-9160. Reviewed By: "4/4d117("1 1� Mark McCau , County Administrator k Date( A PORTION OF SECTION 23 AND 26) T. 28 N., R. 2 W.) W.M. STA 13+77.60, 17.40' RT STA 1 3+ 15.50, 17.70' RT STA 12+81.50, 23.70' RT END BEAM GUARDRAIL TYPE 31 END BURIED TERMINAL TYPE 2 BEGIN BEAM GUARDRAIL TYPE 31- BEGIN BEAM GUARDRAIL TYPE 31- BEGIN BEAM GUARDRAIL TYPE 3 BURIED TERMINAL TYPE 2 BURIED TERMINAL TYPE 2 1 C PER WSDOT STD PLAN C22.16-07 STA 11+94.00, 0.00' PER WSDOT STD PLAN C22.16- 7 �' I BEGIN PAVEMENT- STA �N1A`FCW EXISTING STA 14+56.00, 0.00' STA 14+12.00, 26.80' RT - BEGIN YELLOW CENTERLINE END PAVEMENT- END BURIFD TERMINAL TYPE 2 �` MATCH EXISTING END YELLOW CENTERLINE - GUA ..R . - --CASTS �- Ln -� Ln ROW CIL ry o v -� ~- - OAD C to RL .' _ � r ___&ET -MINIMUM LENGTH GUARDRA -PG�TS STA-rf+87.60, 25.00' LT T7--12+22.20, 16.70' LT /-E BEGIN BEAM GUARDRAIL TYPE 31 - �. ' BURIED TERMINAL TYPE 2 BURIED TERMINAL TYPE 2 • �� �EGIN BEAM GUARD TYPE 31 PER WSDOT STD PLAN C22.16-07 BEGIN BEAN! GUARBRA16 TYPE ;31 EN9"-I4GH Ei n REP TERM+N nL J 0 40 SQ STA 14+30, 25' LT �1 Feet END BURIED TERMINAL TYPE 2 STA 13+90, 15.60 LT PLAN END BEAM GUARDRAIL TYPE 31 31.25 LF ADDITIONAL BEGIN BEAM GUARDRAIL TYPE 31 BEAM GUARDRAIL TYPE 31 BURIED TERMINAL TYPE 2 NEEDED PGP %A/Cnr)T QTn PI ANI r 00 iF_n7 PROFILE CALL 811 BEFORE YOU DIG DESIGNED BY: MARK THURSTON 10 2022 if�S°?q00�i SNOW CREEK ROAD MP 0.84 CULVERT REPLACEMENT DRAFTED BY: MARK THURSTON 10 2022 777 y� is �� COUNTY ROAD PROJECT 18020310 CHECKED BY: ERIC KUZMA 11 2622 w v 1 q- i--� 1t f' JEFFERSON COUNTY COUNTY ROAD NO. 352909 PROJ. ENGR-: MARK THURSTON F aNNAA L�d L DEPARTMENT OF PUBLIC WORKS JEFFERSON COUNTY, WASH. SHE 3� DATE REVISION DATE BY JEFFERSON COUNTY ENGINEER APPROVAL DATE �si!![�G�fl ROADWAY PLAN AND PROFILE 11 SHEETS