Loading...
HomeMy WebLinkAbout12.04 Adoption of 2024-2029 Six-Year TIPCOUNTY OF JEFFERSON STATE OF WASHINGTON In the Matter of Adoption of the 2024-2029 Six -Year Transportation Improvement Program (TIP) RESOLUTION NO. WHEREAS, State law obligates the legislative authority of each county to adopt on an annual basis a Six -Year Transportation Improvement Program (TIP), holding a public hearing prior to adoption, the purpose of which is to, "assure that each county shall perpetually have available advanced plans looking to the future for not less than six years as a guide in carrying out a coordinated transportation program" (RCW 36.81.121(l )); and, WHEREAS, an analysis of the Road Fund was prepared covering the six -year program period using the County's best estimate of future revenues and expenditures in accordance with WAC 136- 15-030; and, WHEREAS, the Board of County Commissioners, Jefferson County, State of Washington, has reviewed the TIP project array and Bridge Condition Report as prepared by the Department of Public Works, and has conducted a public hearing on the corresponding proposed Six -Year Transportation Improvement Program; IT IS HEREBY RESOLVED that the Board of County Commissioners does approve and adopt the Six -Year Transportation Improvement Program for the years 2024 through 2029 in accordance with WAC 136-15. ADOPTED and signed this day of 2023. ATTEST: Carolyn Gallaway Clerk JEFFERSON COUNTY BOARD OF COMMISSIONERS Kate Dean, District 1 Heidi Eisenhour, District 2 Greg Brotherton, District 3 Agency: Jefferson County SIX -YEAR Hearing Date: XX/XX/2023 County No. 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2023 2024 - 2029 Resolution No. XX-23 cgi d z LL Z v w O a a f- PROJECT IDENTIFICATION A. Road Log Number -Bridge Number B. Beginning and End Milepost C. Project (No.) / Road Name D. Description of Work E. Total Cost (incl. prior/future) a w 0 o. 2 F � z Z � a N w N a w g W Z w vj cn cn 0O ,a _ a W w Z = E O� PROJECT COSTS IN DOLLARS EXPENDITURE SCHEDULE Lu N a � w 00 a enZ > a f- F o 0 M LL FUNDING SOURCE INFORMATION FEDERAL FUNDS STATE FUNDS OTHER REVENUES LOCAL FUNDS TOTAL U. w a o LL y v N = o. o m W o : w u. o W N O cn V = LU o. m N YEAR 1 2024 YEAR 2 2025 YEAR 3 2026 YEAR 4 2027 YEAR 5 2028 YEAR 6 2029 TOTAL 2024-2028 03 1 US 101 & County Roads MP 294.6 to MP 295.0 (18019330) Quilcene Complete Streets - Phase 1 Publicly driven ped/bike improvements involving: US 101, traffic calming, sidewalk, crosswalk & lighting improvements with a focus on connecting Ito the school campus. Total = $997,500 WSDOT + $95,660 from PIF) 28 S E T-3 0.50 PE RIW CN Total 1/13 10,000 10,000 10,000 10,000 3/20 0 0 6/24 PBP 695,350 95,660 791,010 791,010 791,010 1 0 1 695,350 95.660 10,000 801,010 801,0101 0 0 0 0 0 801,010 N/A 2 85020 4 Corners Rd. to Anderson Lake State Park (18019890) Olympic Discovery Trail (ODT) - Connection PS&E, ROW and Construction of the ODT segment connecting the Larry Scott Trail, via Jefferson Transit P&R, to Anderson Lake State Park. Total = $1.430,709 (FHWA) + $3,810,720 (RCO) + $273,900 (JC Cap.) 28 S I N/A 3.50 I PE R/W CN Total 1/17 WWRP 35,000 35,000 35,000 35,000 1/20 WWRP 0 0 6/24 STP/STBG 1,430,709 WWRP 3,043,591 5,547 4,479,847 4.479,847 4,479,847 1,430,7091 3,043.591 40,547 0 4.514,847 4,514,847 0 0 0 0 01 4,514,847 09 3 51410-MP 2.59 & 51750-MP 1.82 (18020590/1) Naylors Creek Culvert Replacements Replace culverts at both West Valley and Gibbs Lake Roads with fish- passable crossing. Design funds via FBRB, Construction via FHWA. Total CN = $1.913.000 (FHWA) 44 S I T-0 N/A PE RIW CN Total 10/19 FBRB 0 0 0 0 6/24 PROTECT 1,883,000 0 1,883,000 1,883,000 1.883.000 1,883,000 0 0 0 1,883,000 1,883,000 0 0 0 0 0 1,883,000 07 4 93150 MP 10.34 to MP 14.58 (18020960) Center Road 2R Resurface 4.24 miles of Center Road north from the the Little Quilcene River to Taison Lane. Total = $1,889,872 N 00% w/ match reduction CRAB 05 S E T-3 4.24 PE R/W CN Total 1/23 RAP 0 0 0 0 6/24 RAP 1,665,368 1,665,368 1,665,368 1,665,368 0 1,665,368 0 0 1,665.368 1,665,368 0 0 0 01 0 1.665,368 N/A 5 Countywide (18020980) Jefferson County Road Departure Reduction Project Countywide traffic sign additions & upgrades and guardrail reflectors & delineators. Project is carried over from 2023. Total = $852.905 (FHWA) 10% Local match for PE only) 21 S E N/A N/A PE RIW CN Total 1/22 HSIP 1 0 0 0 0 0 0 8/23 HSIP 40,150 0 40,150 40,150 40,150 40,150 0 0 0 40,150 40,150 01 0 0 0 01 40,150 07 6 93150 Center Road MP 14.55 to MP 14.70 (18020970) Little Quilcene River Bridge Replacement Replacement of a 1955, 64-ft. concrete bridge with structural deficiencies, through a FHWA local bridge program grant. Total = $5,680,128 FHWA 11 S I T-3 0.5 PE RIW CN Total 1/22 BRR 197,170 0 197,1701 189,955 7,215 197,170 1/22 BRR 50,000 0 50,000 50,000 50,000 12/24 BRR 4,899,120 0 4,899,120 4,648.414 250,706 4,899,120 5,146,290 0 0 0 5,146,290 239,955 4,655,629 250,7061 0 0 0 5,146 290 09 7 13430 MP 8.50 to MP 10.98 (18020840) Oil City Road Engineering Assessment - FLAP Project Local funds for infrastructure protection, planning project performed by FHWA Western Federal Lands division, thru FLAP program. Total FLAP = $250,000 (uses toll credits) 18 S E T-5 2.48 PE RM CN Total 1/21 FLAP 2,500 2,500 2,500 1 2,500 0 0 0 0 0 0 0 2,500 2,500 2,500 0 0 0 0 0 2,500 04 8 SR19 MP 9.56 to MP 10.1 (18020760) Rhody Drive Ped-Bike Improvements - North Segment Pedestrain & bicycle facilities along SR19 connecting HJ Carroll Park/ Rick Tollefson Trail to existing facilities at Chimacum Schools Campus. Total PE grant = $109,907 (FHWA) (Projected CN - SRTS funds) 28 S/P E T-3 0.45 PE RNV CN Total 8/21 TA 32.987 5,148 38,135 15,500 15,500 7,135 - 38,135 0 0 6/25 SRTS 447,914 "7,9141 447,914 447,914 32,987 447,914 0 5,148 486,049 15,500 15,500 455,049 0 0 0 486,049 04 9 SR19 MP 8.94 to MP 9.56 (18020950) Rhody Drive Ped-Bike Improvements - South Segment Pedestrian & bicycle facilities along SR19 connecting the Chimacum School Campus to the Chimacum Crossroads commercial corridor. Partial PE grant = $175,041 (FHWA) (Projected PE-PIF & CN-SRTS fund 28 S/P E T-3 0.62 PE RIW CN Total 7/22 TA 22,812 160,000 67,144 249,956 208,535 16,570 225,105 6/24 SRTS 16,340 16,340 24,851 16,340 41,191 6/26 SRTS 1,459,987 1,459,987 1,459,987 1,459,987 J 1 1 22,812 1.476.3271 160,0001 67,1441 1,726,2831 233,3861 32,9101 1,459,987 0 0 0 1,726,283 2024-2029 TIP copy.xlsx Page 1 of 4 Agency: Jefferson County SIX -YEAR Hearing Date: XX/XX/2023 County No. 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2023 2024 - 2029 Resolution No. XX-23 NLL g v �j z w Z c~i w O a a i= PROJECT IDENTIFICATION A. Road Log Number -Bridge Number B. Beginning and End Milepost C. Project (No.) / Road Name D. Description of Work E. Total Cost (incl. prior/future) Lu IL w g w O ow m CO) O Z o z w y y a � w oC Z w vi en v c O O ,� _ C7 a Z w ^ - £ O0 PROJECT COSTS IN DOLLARS EXPENDITURE SCHEDULE w m a ~ w W n w a F _ N G Z Z 2 U_ FUNDING SOURCE INFORMATION FEDERALFUNDS STATE FUNDS OTHER REVENUES LOCAL FUNDS TOTAL °z LL w d a p LL U) _ u w o_ p m W U. o Z w U. uJ w N N y v = w a H m YEAR 1 2024 YEAR 2 2025 YEAR 3 2026 YEAR 4 2027 YEAR 5 2028 YEAR 6 2029 TOTAL 2024-2028 09 10 34230 MP 1.6 (18020850) Lords Lake Loop Road - Slide Repair An approx. 300 ft. long, 11-12 ft. wide road realignment to repair an embankment slide that occurred during a 2021 storm event. Total CN = $395,900 (FEMA) 04 S I T-5 0.1 PE R!W CN Total 6/22 FEMA FEMAm 0 0 8/23 FEMA FEMAm 0 0 4124 FEMA 356,310 FEMAm 19,795 19,795 395,900 395,900 395,900 356,310 19,795 0 19,795 395,900 395,900 0 0 0 0 0 395,900 09 11 50540 MP 0.84 (18020890) Shine Road - Slide Repair Shift 800ft.± of road away from bluff as a corrective measure following 2021 storm damage. Project also includes potential work to repair riprap. Total = $367,152 incl. $100k (FEMA + $100k ARPA) 04 S I I T-0 0.75 PE R/W CN Total 6/22 FEMA FEMAm 0 0 10/22 FEMA FEMAm 0 0 6124 FEMA 218,250 FEMAm 12,125 100,000 12,125 342,500 342,500 342,500 218,250 12,125 100,000 12,125 342,500 342,5001 0 0 0 0 0 342,500 N/A 12 East Jefferson County (18021160) Culvert Lining Project Ongoing project to cast -in -place structural liners as a cost-effective alternative to correct the County's many, aging non -fish bearing culverts. Total = $275,000 44 S E N/A N/A PE RM CN Total 4/23 9,000 9,000 4,506 4,500 91000 0 0 5124 266,000 266,000 133,000 133,000 266,000 0 0 0 275,000 275,000 0 137,500 137,500 0 0 0 275,000 09 13 50200 MP 0.650 to 0.695 (TBD) Gardiner Beach Road Boat Ramp Repair Joint project with the Port of Port Townsend to to elevate roadway to accommodate the Port's reconstruction of the existing boat ramp. Total = $800.000 04 S I T-0 0.05 PE R/W CN Total 0 1 0 0 1 0 4/24 50,000 50,000 50,000 50,000 0 0 0 50,000 50,000 50,000 0 0 0 0 0 50,000 07 14 91420 MP 1.24 (TBD) Hell Roaring Creek Trib. Culvert Replacement, Upper Hoh Road A Trout Unlimited project to replace existing double CMP fish barrier culverts with a 4-sided concrete box culvert. Total = $1.190.214 (NOAA) 44 S I T-4 NIA PE R/W CN Total 1/24 NOAA 2,000 2,000 2,000 2,000 1/24 7,500 7.500 7,500 7,500 6/24 NOAA 5.750 5,750 5.750 1 5,750 7,750 0 0 7,500 15,250 15,250 0 0 0 01 0 15,250 N/A 15 85020 Olympic Discovery Trail - PS2P Project (TBD) Planning & Design project for 5 segments of the ODT: (1) Old Hwy. 9 (100%PS&E); Disco. Bay-Seg. B (30% PS&E); Fairmount to Eaglemount (10% PS&E); Eaglemount to ALSP (10% PS&E); STO to ODT (10% PS& Jeff. Co. Total: $2.030.000 of $16,130,000 total FHWA RAISE Grant) 28 S I I I N/A I NIA PIE R/W CN Total 1124 RAISE 2,030,000 2,030,000 500,000 500,000 280,000 200,000 450,000 100,000 2,030,000 0 0 0 0 2,030,000 0 0 0 2,030,000 500,000 500,000 280,000 200,000 450,000 100,000 2,030,000 09 16 30130 MP 0.42 (TBD) Big Quilcene River Bridge Replacement Project Project will restore a 1.1 mile segment of the Big Quilcene River and associated floodplain, including replacement of the Linger Longer Bridge. Total = $25,000,000 CN - FHWA RAISE Grant 10 S S T-4 0.2 PE R/W CN Total 1124 RAISE 10,000 10,000 10,0001 10,000 0 0 1124 RAISE 30,000 30,000 60,000 10,000 20,000 30,000 40,000 0 0 30,000 70,000 20,000 20,000 0 0 0 0 40,000 09 17 52000 MP 0.08 to MP 1.30 (TBD) Van Trojen Road - Bituminous Surface Treatment Project will convert existing gravel road surface to BST (bituminous surface treatment). Work will be completed by county road crew. Total = $147.600 05 S E T-0 1.22 PE R/W CN Total i 0 0 0 0 6125 147,600 147,600 147,600 147,600 0 0 0 147,600 147,600 0 147,600 0 0 0 0 147,600 07 18 91420 MP 9.7 to MP 9.8 (18019880) Upper Hoh Road Spruce Creek Mitigation Environmental mitigation / Permanent repairs project in response to 2015 emergency repairs. Total= $293.160 (FHWA) 20 S/P S T-4 0.1 PE R/W CN Total 11/18 ER 25,950 4,050 30,0001 12,500 12,500 5.000 1 30,000 0 1 0 6/25 ER 190.300 1 29,700 220,000 1 1 220,0001 1 220,000 I 216,250L 01 01 33,750 250,0001 12,5001 12,5001 225,0001 0 0 0 250.000 2024-2029 TIP copy.xlsx Page 2 of 4 Agency: Jefferson County SIX -YEAR Hearing Date: XX/XX/2023 County No. 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2023 2024 - 2029 Resolution No. XX-23 U) tgi tj M LL z F- p a o- II-- PROJECT IDENTIFICATION A. Road Log Number - Bridge Number B. Beginning and End Milepost C. Project (No.) I Road Name D. Description of Work E. Total Cost (incl. prior/future) W Z g 0 a rn < N z o � 1 5- Cn w y Q � Z 2 W Z w uj en J v o O 06 _ 5 M LL Z = _ E H PROJECT COSTS IN DOLLARS EXPENDITURE SCHEDULE w w = w d FUNDING SOURCE INFORMATION Q W w W } o ZO Z LL FEDERALFUNDS STATE FUNDS OTHER REVENUES LOCAL FUNDS TOTAL Z n a Z p LL N v N = Z a p m LL c Z a a N (n y V = a m YEAR 1 2024 YEAR 2 2025 YEAR 3 2026 YEAR 4 2027 YEAR 5 2028 YEAR 6 2029 TOTAL 2024-2028 07 19 91420 MP 2.74 (TBD) Snell Creek Culvert Replacement, Upper Hoh Road A Trout Unlimited project to replace an existing PCC fish barrier culvert with a pipe arch or 3-sided concrete box culvert. Total = $1.946,124 NOAA 44 S I T-4 N/A PE RIW CN Total 1/24 NOAA 2,000 2,000 2,000 2,000 1/24 10,000 10.000 10,0001 10,000 6/25 NOAA 5,750 5,750 5,750 5.750 7,750 0 0 10,000 17,750 12,000 5,750 0 0 0 0 17,750 07 20 91420 MP 4.93 (TBD) Lindner Creek Culvert Replacement, Upper Hoh Road A Trout Unlimited project to replace ban existing CMP fish barrier culvert with a voided slab bridge. Total = $2,199.613 (NOAA) 08 S I T-4 N/A PE RIW CN Total 1/24 NOAA 2,000 2,000 2,000 2,000 1/24 10,000 10.000 10,000 10,000 6125 NOAA 5,750 5,750 1 5,750 5.750 7,750 0 0 10,000 17,750 12,000 5,750 0 0 0 0 17,750 08 21 10750 MP 1.35 (TBD) Donkey Creek Tributary Culvert Replacement, Clearwater Road A Trout Unlimited project to replace an existing PCC fish barrier culvert with an aluminum pipe arch culvert. Total = $569,722 84% RCO SRFB) 44 SIP I T-5 N/A PE RIW CN Total 1/24 4,000 4,000 1,000 2,000 1,000 4,000 1/24 10.000 10,000 5,000 5,000 10,000 6125 5,750 5,750 5,750 1 5,750 0 1 0 0 19,750 19,750 6,0001 7,000 6,750 0 01 0 19,750 07 09 22 85010 & 52710/93250 (18019560) Rick Tollefson Trail - Ballfield Connection Old Hadlock Road and Chimacum Road intersection realignment with multi -use trail connecting the Rick Tollefson Trail to Bob Bates Fields. Total = $306,104 (WSDOT) 04 28 P E T-0 T-3 0.30 PE RIW CN Total 1/19 PBP 601188 60,188 60,188 60,188 PBP 5,251 5,251 5,251 5,251 6/26 PBP 240,665 240,665 240,665 240,665 0 306,104 0 0 306,104 0 65439 240.665 0 0 0 306,104 03 23 US 101 MP 309.88-310.50 Duckabush Estuary Restoration -Realignment Project Project will replace US101 causeway with a bridge. Will also realign a Duckabush Rd. segment & replace a culvert with a bridge on Shore Rd. Total = $126 million (WDFW/USACE/WSDOT) 10 SIP S T-3 0.62 PE RIW CN Total 1/24 1 6,000 6,000 1,000 1,500 1,500 1,500 1,000 6,500 0 0 4/26 0 0 0 0 0 6,000 6,000 1,000 1,500 1,500 1,500 1,000 0 6,500 09 24 13430 MP 0.5 (TBD) Oil City Rd. Culvert Replacement (Bridge) MP 0.5 - FLAP Project Local funds for permanent repair of Two Trout Creek washout by FHWA Western Federal Lands division, thru FLAP program. Total FLAP = $1,828,560 (uses toll credits) 11 S I T-5 2.48 PE RIW CN Total 1/24 FLAP 7.200 7.2001 2,400 2,400 2,400 7,200 1125 44,000 44,0001 30,000 14,000 44,000 6/26 FLAP 3,000 3,000 3,000 3.000 0 0 0 54,200 54,200 32,400 16,400 5.400 0 0 0 54,200 07 25 91420 MP 7.9 to MP 8.2 (18020560) Upper Hoh Road Bank Stabilization - FLAP Project Approximate location of next critical area of scour along Upper Hoh Rd. To Hoh Rain Forest/ONP boundary, performed by FHWA, WFL division. Total FLAP = $4.993.378 uses toll credits) 11 S S T-0 0.3 PE RIW CN Total 1/24 FLAP 7,200 7,200 2,400 2,4001 2,400 7,200 1124 44,000 44,000 30,000 14.000 44,000 6126 FLAP 3,000 3,000 3,000 3,000 0 0 0 54,200 54,200 32,400 16,400 5.400 0 0 0 54,200 08 26 50360 MP 3.74 to MP 6.00 (TBD) Paradise Bay Road Overlay 2R overlay of Paradise Bay Road from Andy Cooper Road to SR104 at the Hood Canal Bridge. Total = $1.362.000 (CRAB) 05 P E T-0 2.26 PE RIW CN Total 1/25 RAP 1 74,700 8,300 83,000 83,000 83,000 I 0 0 6/26 RAP 1 1,151.100 127.900 1,279,000 1,279,000 1 1,279,000 0 1 1.225,800 0 136,200 1,362,000 0 83,000 1,279,000 0 0 0 1,362,000 07 27 91420 MP 0.00 to MP 12.04 (18020560) Upper Hoh Road Pavement Preservation - FLAP Project Pavement preservation & safety improvements along Upper Hoh Rd. to Hoh Rain Forest/ONP boundary performed by FHWA, WFL division. Total = $1.567,272 (FLAP) + $409,000 RAP 21 S E T-4 12.04 PE R/W CN Total 1/17 FLAP RAP 62,000 62,006 500 5.000 55,000 1,500 62,000 1 01 1 1a 6126 7 FLAP RAP 347,000 1 347,0001 1 1347,000 347,000 I 0 409,0001 01 01 409,0001 5001 5,000 55,000 3482500 01 0 409,000 2024-2029 TIP copy.xlsx Page 3 of 4 Agency: Jefferson County SIX -YEAR Hearing Date: XX/XX/2023 County No. 16 TRANSPORTATION IMPROVEMENT PROGRAM Adoption Date: XX/XX/2023 2024 - 2029 Resolution No. XX-23 w vi PROJECT COSTS IN DOLLARS EXPENDITURE SCHEDULE w J FUNDING SOURCE INFORMATION Lu y C) FEDERAL FUNDS STATE FUNDS O Z PROJECT IDENTIFICATION IL y Q c W u A. Road Log Number - Bridge Number z Q Q Z O 0 Q x Q~ W Q.' Z 7 CO) O W o Z ~ N W w B. Beginning and End Milepost W w w c7 w 2 O oe w r., �- o r Q LL w � a v Q = w LL a O y v= x OTHER LOCAL YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 TOTAL V O � C. Project (No.) / Road Name > ? Z O x Q c) W x � G a W H W F- REVENUES FUNDS TOTAL 2024 2025 2026 2027 2028 2029 2024-2028 z D. Description of Work Z � 0 O O o m F m a E. Total Cost (incl. prior/future) LL LL LL N to LL LL W LL a 13430 MP 8.8 to MP 8.9 (TBD) Oil City Road MP 8.8-8.9 Permanent Repair PE 1/25 FEMA 307,838 FEMAm 51,307 51,307 410,452 205,226 205,226 410,452 09 28 Environmental mitigation / Permanent repairs project in response 20 P S T-5 0.10 R/W 1126 FEMA 7,500 FEMAm 1,250 1,250 10,000 10,000 to 2015-2016 emergency repairs. CN 6/27 FEMA 2,498,931 FEMAm 416.488 416,488 3,331p907 3,331,907 1 10,000 3,331,907 Total= 3,491,425 (FEMA) Total 1 2,814,269 469,045 0 469.045 3752359 0 205,226 215,226 3,331,907 0 0 3,752,359 93150 MP 3.39 to 3.49 (TBD) 930,274 Yarr Bridge Replacement PE 10/24 BRR 930,274 930,274 10,000 400,000 400,000 120,274 07 29 Replacement of a 1955, 25-ft. concrete bridge with structural 11 P S T-3 0.10 R/W 1/25 BRR 70,000 70.000 25,000 deficiencies, through a FHWA local bridge program grant. CN 6/28 BRR 4,485,431 4,485,431 45,000 70,000 Total = $5,558,333 (FHWA) Total 5,485,705 0 0 0 5,485,705 10,000 425,000 445,000 120,274 4,485,431 4,485,431 0 4,485,431 5,485,705 US 101 & multiple county roads MP 294.54 to MP 295.03 (TBD) 276,970 Quilcene Complete Streets - Phase 2 PE 1/27 PBP 276,970 276,970 76.970 200,0001 03 30 Phase 2 project implementing plan to provide sidewalks, crosswalks, & 28 P E T-3 0.05 R/W bicycle lanes to connect school, community center & local businesses. CN 6129 PBP 1.566.048 0 1,566,048 10 Total = $1,843,018 (WSDOT) Total 0 1 1,843,018 0 0 1,843,018 0 0 1,566,048 1,566,048 93150 MP 3.26 (18020990) 0 76,970 200,000 1,566,048 1,843,018 1 055,434 Center Road Culvert Correction - Chimacum Creek PE 7125 PROTECT 1 055 434 1,055 434 200,000 325 000 325,000 205,434 07 31 Replace non -conforming Chimacum Creek 11 P I T-3 NIA R/W 1/26 PROTECT 70,000 70,000 25,000 culvert with fish passable structure. CN 6/29 PROTECT 5.053,685 5,053.685 45,000 70,000 Total grants= $6,258,129 (FHWA) Total 6,179,119 0 0 0 6,179,119 01 200,000 350,000 370,000 205,4341 5,053,685 5,053,685 5,053,685 6,17%119 Countywide Safety Improvements PE 1/25 HSIP 180,000 20,000 200,000 50,000 50,000 50,000 50,000 0 200,000 N/A 32 Systemic safety countermeasures applied to county network identified 21 P E N/A N/A R/W in a local plan and funded thru a bienniel WSDOT federal grant program. CN 6/27 HSIP 1.200.000 0 0 0 1,200,000 0 Total HSIP = $1,380,000 (FHWA) (10% Local match for PE only) Total 11380.000 0 0 20,000 1.400,000 0 50,000 50,000 1,200,000 1,200,000 50,000 50,0001 1,200,000 1,400,000 Countywide Bridge Heavy Maintenance Program PE 1/26 BRR 40,000 10,000 50,000 25,000 25,000 0 50,000 N/A 33 Protection of primary bridge components, seismic retrofits, etc. through 48 P E NIA N/A R/W a bienniel WSDOT administered federal grant program. CN 6/27 BRR 240,000 60,000 0 300,000 150,000 150,000 0 300,000 Total = $350,000 Total 280,000 0 0 70,000 350,000 0 0 25,000 150,000 25,000 150,000 350,000 Countywide Various Road Improvements 10,000 0 60,000 Various projects countywide involving lighting, signage, intersection PE 1/24 60,000 60,000 10,000 10,000 10,000 10,000 10,000 N/A 34 control, culvert replacement/rehabilitation, drainage, surfacing upgrades, N/A P E N/A N/A R/W pedestrian and bicycle facilities, or other improvements. CN 1/24 1 0 150,000 0 150 25,000 25,000 25,000 25,000 25 000 25,000 0 150 000 Total = $210,000 Total 0 0 0 210,000E41.308J,702 35,000 35,000 35,000 35,000 35,000 35,000 210,000 27-579,101 11,613,437 396.207 1,719,95710,873,166 6,643,104 5,522,183 5,834,151 5,451,865 6,954,733 41,279,202 PE 4,838,465 525,165 196,000 271,849 5,830,479 1,017,290 1,577,999 1,374,161 735,244 941,434f 160,0001 5,806.1 R/W 197,500 22,841 0 126,750 347,091 167,351 79,591 80,000 45,000 01 0 371,9 CN 22,543,136 11,065,431 201,207 1,321,358 35,131,132 9,688,525 4,985,514 4,068,022 5,053,907 4,510,431 6,794,733 35,101,1 otal 27,579,101 11,613,437 396,207 1,719,957 41,308,702 10,873,166 6,643,104 5,522,183 5,834,151 5,451,8651 6,954,733 41,279,2 2024-2029 TIP copy.xlsx Page 4 of 4