Hello,
WSDOT’s quarterly performance report, the Gray Notebook for the quarter ending September 30, 2023 <https://wsdot.wa.gov/about/data/gray-notebook/default.htm> , is now available in its
interactive format. While numerous performance measures are reported throughout the GNB, highlights from this issue include:
* Over the past decade, combined serious injury and fatal crashes on Washington public roads have increased 63.3% from 2,352 in 2013 to 3,840 in 2022
* The amount of WSDOT-owned bridge deck area in need of structural rehabilitation increased 380% from 412,034 square feet on 24 bridges in June 2022 to 1,976,233 square feet on 36 bridges
as of June 2023
* WSDOT built 25 stormwater treatment and flow control facilities in FY2023
* In the third quarter of 2023, WSDOT Incident Response teams provided an estimated $25.5 million in economic benefit by reducing the effects of incidents on drivers
* Washington State Ferries completed 36,005 (97.2%) of its 37,025 regularly scheduled trips in the first quarter of fiscal year 2024 compared to completing 34,221 (97.6%) of its 35,050
scheduled trips during the same quarter in FY2023
* As of September 2023, 70% of WSDOT-owned primary buildings were in critical condition
Feel free to share this message with staff and colleagues and, if you have comments and suggestions, please contact Sreenath Gangula, Assistant Director, Performance Management, at (360)