Loading...
HomeMy WebLinkAboutPW WSDOT Detour Agrmt HR3 0192 SR19 to Center Rd Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, Public Works Directori Agenda Date: January 2, 2024 Subject: WSDOT Local Agency Haul Road/Detour Agreement (Detouring SR 19 Traffic over Center Road during SR19/SR104 Roundabout construction) Statement of Issue: Sign the attached WSDOT Local Agency Haul Road/Detour Agreement for use of Center Road as a detour for SR19 (Beaver Valley Road) traffic during construction of the SR19/SR104 Roundabout Project. Analysis/Strategic Goals/Pro's Et Con's: WSDOT proposes to close SR19 at SR104 for periods during construction of a roundabout at the SR19/SR104 intersection. Per the agreement, a portion of SR19 traffic can be detoured over Center Road (between SR 104 and Chimacum) between April 1 and July 30, 2024. Between May 1 and June 15, for a maximum of 21 consecutive days, all SR19 traffic from the SR104 intersection can be detoured to Center Rd. The SR104/Center Road intersection has limited capacity, so WSDOT has agreed to operate temporary traffic signals on Center Road and on SR104 at the intersection while Center Road is being used as a detour. Fiscal Impact/Cost Benefit Analysis: This WSDOT Local Agency Haul Road/Detour Agreement is for a WSDOT funded construction project and includes provisions to repair any damage to Center Road that may result from its use as a detour. County funds will be limited to Public Works' staff time associated with processing and administering the agreement. Recommendation: Please sign the WSDOT Local Agency Haul Road/Detour Agreement to allow Center Road between SR104 and Chimacum to be used as a detour for SR19 traffic during the SR19/SR104 Roundabout Project. Return the agreement to Public Works for further processing. We will send the signed copy to WSDOT for their signature. After WSDOT returns a fully executed copy, we will send an original back to the BOCC. Department Contact: Bruce Patterson, Engineer III (385-9169) Reviewed By:A//44rede.:4_,4_zs Mark McCaule , County Administrator Da e CONTRACT REVIEW FORM Clear Form (INSTRUCTIONS ARE ON THE NEXT PAGE) CONTRACT WITH: WSDOT Contract No`f(%t go //, Contract For: Haul Road/Detour Agreement for SR104/SR19 Roundabout Term: Sept 1, 2023 COUNTY DEPARTMENT: Public Works Contact Person: Bruce Patterson Contact Phone: 360-385-9169 Contact email: bpatterson@co.jefferson.wa.us & cspall@co.jefferson.wa.us AMOUNT: o PROCESS: — Exempt from Bid Process Revenue: 0 Cooperative Purchase Expenditure: o Competitive Sealed Bid Matching Funds Required: o Small Works Roster Sources(s) of Matching Funds Vendor List Bid Fund# none RFP or RFQ Munis Org/Obj ✓ Other:Agreement with WSDOT APPROVAL STEPS: STEP l: DEPARTMENT CERTIFIES C LI CE WITH JCC 3.55.080 AND CHAPTER 42.23 RCW. CERTIFIED: fl N/A:[_ �v i z.j�J!z Signature Date STEP 2: DEPARTMENT CERTIFIES THE PERSON PROPOSED FOR CONTRACTING WITH THE COUNTY (CONTRACTOR) HAS NOT BEEN DEBARRED BY ANY FEDERAL, STATE, OR LOCAL AGENCY. `'� CERTIFIED: El N/A: Q 7-1.) .'(a� _ J Z)ZC+ri_5 Signature Date STEP 3: RISK MANAGEMENT REVIEW(will be added electronically through Laserfiche): Electronically approved by Risk Management on 12/26/2023. STEP 4: PROSECUTING ATTORNEY REVIEW(will be added electronically through Laserfiche): ectronically approved as to form by PAO on 12/22/2023. Approved as to Form 12.22.2023 STEP 5: DEPARTMENT MAKES REVISIONS & RESUBMITS TO RISK MANAGEMENT AND PROSECUTING ATTORNEY(IF REQUIRED). STEP 6: CONTRACTOR SIGNS STEP 7: SUBMIT TO BOCC FOR APPROVAL 1 Adak GWashington State AP Department of Transportation Local Agency Haul Road/Detour Agreement SR19/104 Detour Agreement Agreement Number HR3 0192 State Route Number Control Section Number SR 19 1 160700 Region Olympic Intended Use (Haul Road or Detour Road) Detour Road Vehicle Restrictions N/A Local Agency and Address Jefferson County Public Works 623 Sheridan Street Port Townsend, WA 98368 Section/Location See Exhibit A Description of Roads or Streets See Exhibit A This Agreement is made and entered into between the Washington State Department of Transportation (WSDOT) and the above named governmental entity (Local Agency), hereinafter individually referred to individually as the 'Party' and collectively as the 'Parties'. Recitals 1. WSDOT is planning the construction or improvement of a section of state highway as shown above, and 2. In the construction of the project it is planned to use, for the purpose noted above, those Local Agency roads or streets described above and as further detailed in red on the attached Exhibit "A", and 3. It is anticipated that as a result of the use of these roads or streets, additional maintenance expense may be incurred by the Local Agency. Now Therefore, It Is Mutually Agreed As Follows: The Local Agency hereby agrees to WSDOT's use of the roads or streets covered by this Agreement subject to the conditions contained herein. Immediately prior to the beginning of WSDOT's use of the above described roads or streets, the parties to this Agreement shall make a joint condition inspection and WSDOT shall prepare a memorandum record of the condition of said roads or streets. The memorandum record shall include a statement of the extent and frequency of routine maintenance operations normally carried out by the Local Agency on said roads or streets and may include photographs showing condition of the existing roadway. WSDOT agrees to reimburse the Local Agency for the cost of additional routine maintenance and repairs, operations in excess of those enumerated in the record made under the provisions of Section II, made necessary by WSDOT's project. The reimbursement for such additional routine maintenance and repairs shall be limited to the actual cost of such operations supported by proper records. Such costs are to be exclusive of all administrative and overhead costs and all charges for small tools. 4. Upon completion of use of the roads or streets covered by this Agreement, a joint inspection shall be made by the parties to determine the condition of said roads or streets. All maintenance and/or repairs shall be based upon the conditions of these roads or streets at the time of this completion inspection, taking into account the memorandum record made under Section 2. It is expressly understood that WSDOT shall be responsible only for that extra maintenance and repairs of the Local Agency's roads or streets occasioned by the project use. In the event of a dispute over the terms of this Agreement and/or the extent of maintenance or repair work required to be performed, the dispute shall be submitted to the Secretary of Transportation for determination. In determining this responsibility the Secretary shall give consideration to the memorandum record provided for in Section 2. The conclusions of the Secretary as to the extent and amount of such maintenance shall be final and conclusive as to all parties to this Agreement. DOT Form 224-014 Page 1 of 2 Revised 07/2018 6. The Local Agency agrees not to restrict below legal limits the size, weight, or speed of vehicles using the roads or streets covered by this Agreement except as stated above under Vehicle Restrictions. 7. No liability shall attach to WSDOT or the Local Agency by reason of entering into this Agreement except as expressly provided herein. In Witness Whereof, the parties hereto have executed this Agreement as of the party's date signed last below WASHINGTON STATE LOCAL AGENCY DEPARTMENT OF TRANSPORTATION By. _ I By: Printed: I Printed:._ .. Title: Jefferson Co_ unty BOCC Chair I Title: Date: Approved as to form only: 12/22/2023 Barbara Dykes Ehrlichman Date Cavil Deputy Prosecuting Attorney Date: DOT Form 224-014 Page 2 of 2 Revised 07/2018 M8-101 MOD 24" X 48" BLACK ON ORANGE anou a`4 0 500 1000 �4 SCALE IN FEET. MO-101 MOD 24" X 48" BLACK ON ORANGE ■ R11-1501 (BIW) ► 48" X 60" ■ BLACK ON WHITE ■ INSTALL 8 DAYS G20.2A ■ PRIOR TO CLOSURE 48" X 24" t g04p BLACK ON ORANGE ■ ILL BE END CLOSED DETOUR ■ wa n1a P 19 1 rani J► �Jyr J RD H R3 0192 Exhibit A �OV o•� Ip4 ��� n 0 z M8-101 MOD 24" X I" BLACK ON ORANGE flET011R 0 �Mrwrrrrrrrriiiii...RD rrrrr DETOUR MS-101 MOD 24" X 48" BLACK ON ORANGE 1J MB-101 MOD RD 24" X 48" BEAVER VALLEY END BLACK ON ORANGE G��GE CppE (175COVE1IY TO PORT TOVMSEND 20 M� PCMS 1 2 SR 19 CLOSED FOLLOW AT SR 104 DETOUR 2.0 SEC 2.0 SEC DETOUR G20-2A 48" X 24" NO BLACK ON ORANGE . 116 FIELD LOCATE 1 MILE 3 BAY RD PRIOR TO CLOSURE. v uuu CLOSED 94� LOCATE PCMS PER WSOOT 104 ,.� 9� �y>~ STANDARD SPEC.1-10.3(3)C. 9 R11-1501 (EUW) � 48" X 60" a M8-101 MOD S NOTES: BLACK I STALL 8 DAYS 24" X O qmv _i PRIOR TO CLOSURE BLACK ON ORANGE 1. SEE STANDARD PLAN K-80.10 FOR CLASS "A" + q. p ,�O CONSTRUCTION SIGNING INSTALLATION. ARC7 M8-101 MOD i LEGEND: 24" X 48" c QOq- BLACK ON ORANGE ph1' 0 SIGN LOCATION - POST MOUNT (CLASS "A') r TEAL TEMPORARY TRAFFIC SIGNAL 4 ----- DETOUR ROUTE RO dn. 0 2500 5000 Cacai1 PORTABLE CHANGEABLE MESSAGE SIGN o' SCALE IN FEET FILE NAME c"QlM%lddnat MdUntl049f 495VO.G127 PS TGd TIME 126107 PM .. ""f FED.AID PROJ.NO. Amok DATE Srm22 SR 104 PLODEO BY Lo a$ 10 WASHHSIP-0104(062) TC1 DEI10NED sY &LEiw �. SR 19 INTERSECTION ENTERED BY S.LEZA 210523 Washington State SAFETY IMPROVEMENTS CHECKED BY E. CHRISTOFFERSON eamn.c. xo. "^ Department of Transportation e, PROJ. ENGR. D. 1ICKERNAN. P.E. XL6127 - -- DETOUR PLAN •=f REDIDNAL AWL S. ROARK, P.E. REVISION DATE BY � HR3 0160 ExhiDli A P899 1 DT 17 PE LEGEND 77777777777 RIGHT OF WAY •• EXISTING EDGE OF GRAVEL -------- EXISTING EDGE OF PAVEMENT •I� —r— — EXISTING GUARDRAIL NEW EDGE OF PAVEMENT NEW EDGE OF FILL .�-- NEW GUARDRAIL NEW CURB FACE �— DIRECTION OF TRAFFIC AND NUMBER OF LANES ® TRAFFIC SAFETY DRUM C, TUBULAR MARKER "I" TYPE 3 BARRICADE acres PORTABLE CHANGEABLE MESSAGE SIGN n PPP SEQUENTIAL ARROW SIGN -TYPE C --­N TEMPORARY IMPACT ATTENUATOR TEMPORARY BARRIER WORK ZONE DETAIL A DETAIL A ij ELEMENTS OF WORK i BEGIN CLOSURE OF LEFT TURNS AND EASTBOUND SR 104 SHOULDER MAINTAINING ACCESS TO SR 104 AND WESTBOUND j ACCESS TO SR 19 AS DEFINED BY THE CONSTRUCTION UNDER {I TRAFFIC SECTION OF THE CONTRACT PROVISIONS. WORK TO I BE COMPLETED DURING THIS STAGE INCLUDES BUT IS NOT LIMITED TO: -CONSTRUCT THROUGH LANE (EASTBOUND ROUNDABOUT DETAIL B BYPASS /TEMPORARY CONSTRUCTION BYPASS(. r i -INSTALL NEARBY DRAINAGE AND ILLUMINATION PADS. -ROADSIDE CLEANUP. f 11 ®II I DETAIL C DETAIL B tf�� —10 STAGE 1 DETAIL C ' C____4 0 0 70 140 SCALE IN FEET FILE NAME TIME c:;vsc ,jArund,iow mdM%d0467764rXL6127 8:08:47 AM PS SU1A n rEx FED.AID PROJ.NO. SR 104 . DATE 11/2&7023 Latonas _ — io ASH PARADISE BAY -SHINE ROAD & SR 19 SU1-W tt . PLOTTED BY DESIGNED BY s. L;=rn — PC HSIP-0104(062) 1 1 Washington State SAFETY IMPROVEMENTS ENTERED BY S. LEZA V Department of Transportation :-E CHECKED BY PA03. ENOiR. E. CHRIS_P.E, 50N B. FDRD, PJ:. --- XL6127 oA� Q� - a;i — STAGED CONSTRUCTION PLAN REGIONAL ADM. S. ROARK P.E.DA7E BY IA4.n+r rw •+.+r,r w. LEGEND -17777777777 RIGHT OF WAY EXISTING EDGE OF GRAVEL -------- EXISTING EDGE OF PAVEMENT -i-• -• EXISTING GUARDRAIL NEW EDGE OF PAVEMENT NEW EDGE OF FILL —� NEW GUARDRAIL NEW CURB FACE DIRECTION OF TRAFFIC AND NUMBER OF LANES ® TRAFFIC SAFETY DRUM O TUBULAR MARKER • . TYPE 3 BARRICADE n PORTABLE CHANGEABLE MESSAGE SIGN hi Ili SEQUENTIAL ARROW SIGN -TYPE C �I TEMPORARY IMPACT ATTENUATOR TEMPORARY BARRIER WORK ZONE a `—a--�...-- DETAIL A DETAIL A STAGE 2 DETAIL B ELEMENTS OF WORK BEGIN CLOSURE OF SR 19, NO LONGER THAN 12 CONSECUTIVE DAYS, MAINTAINING ACCESS TO SR 104 VIA THROUGH LANE AS DEFINED BY THE CONSTRUCTION UNDER TRAFFIC SECTION OF THE CONTRACT PROVISIONS. WORK TO BE COMPLETED DURING THIS STAGE INCLUDES BUT IS NOT LIMITED TO: -CONSTRUCT SR 19 AND WESTBOUND SR 104; PARTIALLY CONSTRUCT EASTBOUND SR 104: ROUNDABOUT, SPLITTER AND UNPAVED ISLANDS. -FINISH INSTALLING DRAINAGE AND ILLUMINATION PADS. -ROADSIDE CLEANUP. -INSTALL PERMANANT SIGNS. QUALL—C 0 70 140 SCALE IN FEET TIME 8.08:50 AM DATE 11liSrlp7y maoa F•fa FED.AID PROJ.NO. HSIP-0104(062) 0.� �0 � �[i IATE MirPARADISE Washington State Department of Transportation SIR 104 BAY -SHINE ROAD $ SR 19 SAFETY IMPROVEMENTS nu SU2-W p s PLOTTED BY LalanaS 70 A$ �+ DESIGNED BY S. LEZA 21M3 �..� e ENTERED BY S.LEZA CHECKED BV E. CHRISTOF'FERSON cmmur „ we..q, „o. XL6127 STAGED CONSTRUCTION PROJ. ENOR, B. FORD, P.E. REGIONAL ADM. S. ROARK P.E. REVISION DATE BY LEGEND -17777777777 RIGHT OF WAY •- EXISTING EDGE OF GRAVEL -------- EXISTING EDGE OF PAVEMENT • 1— —1— — EXISTING GUARDRAIL NEW EDGE OF PAVEMENT NEW EDGE OF FILL �— NEW GUARDRAIL — NEW CURB FACE �L— DIRECTION OF TRAFFIC AND NUMBER OF LANES ® TRAFFIC SAFETY DRUM O TUBULAR MARKER 'c'c4 TYPE 3 BARRICADE Fp—cm—sl PORTABLE CHANGEABLE MESSAGE SIGN SEQUENTIAL ARROW SIGN -TYPE C �I TEMPORARY IMPACT ATTENUATOR TEMPORARY BARRIER WORK ZONE DETAIL_Q DETAIL B STAGE 3 ELEMENTS OF WORK BEGIN CLOSURE OF SOUTH SIDE OF ROUNDABOUT MAINTAINING ACCESS TO SR 19, WESTBOUND SR 104 VIA NORTH SIDE OF ROUNDABOUT, AND EASTBOUND SR 104 VIA THROUGH LANE AS DEFINED BY THE CONSTRUCTION UNDER TRAFFIC SECTION OF THE CONTRACT PROVISIONS. AT NIGHT FLAG TRAFFIC THROUGH ROUNDABOUT TO EXTEND WORK ZONE TO INCLUDE THROUGH LANE.WORK TO BE COMPLETED DURING THIS STAGE INCLUDES BUT IS NOT LIMITED TO: DETAIL B -FINISH CONSTRUCTING EASTBOUND SR 104: ROUNDABOUT, SPUTTER AND UNPAVED ISLANDS. - --E FINAL LIFT ON THROUGH LANE. DETAIL C E LjPJ�'1jjjj1I --- - -------- ---------- - -------- n i DETAIL C DETAIL A ' MISCUE 4_-ADDITIONAL ELEMENTS OF WORK BEGIN WORK PERIOD WITH TRAFFIC SHIFTED TO THE FINAL CONFIGURATION AND ALL LEGS OPERATIONAL. LANE CLOSURES ARE PERMITTED AS ALLOWED BY THE CONSTRUCTION UNDER TRAFFIC SECTION OF THE CONTRACT PROVISIONS. WORK TO STAGE 3 BE COMPLETED DURING THIS STAGE INCLUDES BUT IS NOT LIMITED TO: -INSTALL PERMANENT PAVEMENT MARKINGS. —4 -LANDSCAPING. 0 70 140 -REMOVE TESC AND OTHER MISC SITE CLEAN UP. 'a SCALE IN FEET -INSTALL LUMINAIRE POLES. FILE NAME 7641XL6127 PS SU3.tl A �l +� zp` Lam, G�1 �AP Washington State SR 104 PARADISE BAY -SHINE ROAD & SR19 SAFETY IMPROVEMENTS SU3-W j TIME 8:08:53AM 70 AS FED.AID PROJ.NO. HSIP-0104(062) u DATE 1112812023 PLOTTED BY Lalonde �u ,.,,.,. 210523 DESIGNED BY S. LEZA g ENTERED By S.LEZA V Q Department of Transportation _ a CHECKED By E. CHRISTOFFERSON w.raau .0 +neama w PROJ, ENGR- B. FORD, P.E. XL6127 .T� d� STAGE CONSTRUCTION PLAN 1.n1n REGIONAL ADM, S, ROARK P.E. REVISION DATE BY a R a fi w 4S" 48G20-2A 46" a NOTICE 48' rtufflS m MUM rx DOtIBI.£ sB•• �AO� A}fC+4448-' u 710RK WOMB ay W20.1 120.301 [OAVJ �P�-~••`F` W20-901 „ SR 104 -MP 7.98 (RT) SR 104 -MP 814 (RT) 48'• (SEE NOTE 3) SR 104 -MP 963 (LT) SR 104 -MP 947 (LT) G24-501 3 SR 19 - MP 0 56 (LT) SR 19 - MP 0 46 (LT) s SR 104 -MP 8 (LT) 90B SR 104 -MP 90(Rn SR 19 -MP 02 (RT) 104 1 2 1 d 4 � y/f 3 104 NOTES: 4 1, SEE STANDARD PLAN K-8010 FOR CLASS A CONSTRUCTION a SIGNING INSTALLATION. LEGEND 2. ALL SIGNS SHALL BE 413" X 48" BLACK ON ORANGE UNLESS F SIGN LOCATION -POST MOUNT OTHERIMSE SHOWN, CLASS A SIGN LOCATION PLAN 3, INSTALL O"TRAFFIC REVISION AHEAD" SIGN (W20-901) AFTER FINAL 7 SIGN NOTE FLAG STAGE OF CONSTRUCTION IS COMPLETE, 5001N ADVANCE OF NOT TO SCALE THE W2-6 ROUNDABOUT SIGN. r1LB NAAE[ r7ahp4a47yr7fu{1,E17r TCA1 T111E' 0:71M AM FED.. A3O PRO].NO. `•� - h�1 ���J� SR 104 to yaw r+® rr svolaR 1B A,��`• 'r T// PARADISE BAY -SHINE ROAD f4 SR 19Ev TC1-W o° �o'� -93 ,.' �Lt Washington State SAFETY IMPROVEMENTS EN110R0 21r A. MUSANU J Q _ EffE 'av w, - _ V..� _ IRO a �+ Department of Transportation _ _ - PrIMLENM 1LFORD _ XL6127 ADVANCE SIGN PLAN > X REAL AM A ROARK T[Em" Dili[ 9Y .e ` L STA 200+00.00 P.O.T. = BEGIN WHITE EDGE LINE SHIFT TAPER t+r(.QRT M STA 300+00.00 P.O.B. (11.57' LT.) BEGIN YELLOW DEL CENTERLINE SHIFT TAPER (0-0f M....................................-----=1--1---1_--}--_1--_r--l---r----r—Yr�_ r.. •-I I --------- — — — — — — — — — — — — — — — -- _— arWT .., LINE w RV .......... ..... ..... .. _h��F�a-nl-`._'-_{_-��.1...-. 1.-•-....N++�II-J..'-w.l.�.....}..r. �L.•...,.F---��. ' �t BEGIN FA HSIP-0104(062) ASEE am BEGIN PROJECT SEQUENCE PWSH7 T TAPER BEGIN CONSTRUCTION BEGIN CONSTRUCTION SR 104, MP 8.61 SR 104 483+65.45 P_O. . (11.88' T.) = SR 104 480+12.56 P.O.T. (14.32' LT.) = P STA 94+86.16 P.O.B. I QTA 4ac.an 00 P O B END YE LOW DdL. CENTERLI ESHI I T T�[1.0 RT MATCH 18TIN i -• —I— �-I--•---1-----r-•---+--- —+--- —1u—1--�1--ru =r— r-1._ �1r.•+---w-•-�—r---`i� — ------ —----------••-------------------- ------ TL-3 APPROVED TEMPORARY IMPACT ATTENUATOR LIST ASBORB 350 (9 ELEMENTS) ASBORB-M (3 ELEMENTS SLED 14 MODULES) ACZ-350 (4 SECTIONS) TRITON CET (6 SECTIONS) NOTE: TL-3 ATTENUATORS APPROVED FOR ALL SPEEDS LEGEND TEMPORARY PAVEMENT MMiKING - _ SHORT DURATION. TEMPORARY TAPE TEMPORARY SIGN LOCATION (SMiN. HEIGHT) SIGN LOCATION -TEMPORARY MOUNT "M (CLASS / SIGN LOCATION - POST MOUNT • iCLASS 'Al p MN LOCATION -EXISTING SIGN PJ TRAFFIC SAFETY DRUM F) TUSUHAR MAFMR -PAVEMENT MOUNTED %}i TYPE 3 BARRICADE T TRAVEL DIRECTION OF OPEN DINE JP� PORTABLE CHANGEABLE MESSAGE SIGN I— TEMPORARY IMPACT ATTENUATOR TEMPORARY BARRIER -ANCHORED ® WORK AREA AN PCMS 1 2 NO LANE ACCESS SHIFTS TO HWY1S AHEAD 2.0 SEC 2.0 SEC LOCATE AS SHOWN PCMS 1 2 HWY19 ;2. /DA ACCESS OUGH TO CLOSE/DA 2.0 SEC SEC DISPLAY AT LEAST 3 DAYS IN ADVANCE OF THE WORK MO /DA = ENTER MONTH /DAY TAPER (200-RT.) 6.0' 4 0' STAGE 1 Shoulder Shoulder WZ -Varies I 1 Exis in',I TemO. I I2 I7 Lane Lane SECTION A -A n (NOT TO SCALE)Ir--TI---pO TEMPORARY BARRIER -ANCHORED I EXISTING GUARD RAIL TEMPORARY LANE LINE EXISTING LANE LINE STAGE 1 0 30 60 SCALE IN FEET .1D PROJ.NO. ' XL6127 SIGN SEQUENCE �1 Lt E N• n^ n, W20 1 (SEE NOTE 4 A 8D'TYFMCAL a3 NOTES: 1- SEE SPECIAL PROVISIONS :"PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS 2. ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN, ALL SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN 3. EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER 4. SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 'ROAD WORK AHEAD' SIGN. 5. ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE 6. REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) AND TRAFFIC ARROWS, 7. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE WITH STANDARD PLAN M-20.30. a, PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): (A) ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, VAN, OR BUS MAY BE USED)_ (C)MAINTAIN MINIMUM NCLEAR SHOULDER SR 104 PARADISE BAY -SHINE ROAD & SR 19 TC2-W Washington State SAFETY IMPROVEMENTS W Department of Transportation TRAFFIC CONTROL PLANS SEE NOTE 5 30" + j � 36' ONLY fir! L R15R 113 .SAO N 32.02 78 4 0' SINK* 12.4' 12.0, Existing I Temp Lane Lane �7 (NOT TO SCALE) I�L1J1 TEMPORARY BARRIER -ANCHORED Q EXISTING LANE LINE TEMPORARY LANE LINE ' LEGEND�� ®36� BEl31N YELLpWY DBL. CENTERLINE (20.5' RT-) 1- SEE SPECIAL PROVISIONS : "PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS i, 5 TEMPORARY PAVEMENT MARKING - R3-2 tRON/I SHORT DURATION, TEMPORARY TAPE 2. ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN ALL TEMPORARY SIGN LOCATION (5' MIN, HEIGHT) SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN, ( b SIGN LOCATION • TEMPORARY MOUNT STAGE 1 3, EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER (CLASS "B") Shoulder Shoulder WZ - Varies S SIGN LOCATION -POST MOUNT f05' 10.7' 4, SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD WORK AHEAD" SIGN. q (CLASS "A") I Existing Temp I7 h I-� SIGN LOCATION -EXISTING SIGN Lane Lane 5. PLACE SIGN R3-5R BELOW EXISTING STOP SIGNS, & TRAFFIC SAFETY DRUM 6 ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE S O TUBULAR MARKER - PAVEMENT MOUNTED SECTION A 7. REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) (NOT TO SCALE) AND TRAFFIC ARROWS. '?c'c s TYPE 3 BARRICADE TRAVEL DIRECTION OF OPEN LANE n \ TEMPORARY BARRIER -ANCHORED T EXISTING GUARD RAIL B. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE iP.CMS PORTABLE CHANGEABLE MESSAGE SIGN '—' WITH STANDARD PLAN M-20.30. TEMPORARY LANE LINE A EXISTING LANE LINE s' I� TEMPORARY IMPACT ATTENUATOR 9 PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY f ALTERNATIVE STRATIGES): TEMPORARY BARRIER -ANCHORED (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR STAGE 1 ADJACENT PATH OPPOSITE THE WORK AREA. WORK AREA (B) PROVIDE FREE FED SHUTTLE (PILOT CAR, WORK VEHICLE, I 0 30 50 VAN, OR BUS MAY BE USED). [ SCALE IN FEET (C)MAINTAIN MINIMUM 4'CLEAR SHOULDER P FILE f Tom 1"1:46 PN •w �m FEA AIO PROJ.NO. '5 {^` • ,�0.1 (� 1" ,�,�AQt� ��( � � Washington State Department of Transportation SR 104 PARADISE BAY -SHINE ROAD & SR 19 SAFETY IMPROVEMENTS DATE ' PLOTTED BY Wd..l °" • TC3-W 10 271452�3 DESIGN C.HINDS A:NIA� ser I 0 fiY f A.1_IES — — 7� rna..n .rc.� .,. XL6127 PNaI, venR�. u, ronn PRCL), , REOUML ACM. s RQFAK sEvam GATE of . ' TRAFFIC CONTROL PLAN SIGN SEQUENCE (SEE NOTE 4) U �n 1i 30" 4 AL 4a" z 3-RI 111» 1!" OOO WY-4R W20-1 " soot soot ;k ,I LEGEND PCMS 1 2 HWY104 E USE ACCESS ALT CLOSED ROUTE 20 SEC 2,0 SEC LOCATE AT SR 19 MP 2.71t (RT.) PCMS 1 2 HWY104 E MO IDA ACCESS THROUGH TO CLOSE MO IDA 2.0 SEC 20 SEC DISPLAY AT LEAST 3 DAYS IN ADVANCE OF THE WORK, MO IDA = ENTER MONTH /DAY END CONSTRUCTION s> a sloN SR 19 MP 0.17 SR 19 81+40.41 P.O.T. {011 .... ................. ... -..--- ---- _... L STA 219+30.00 P.O.T. ---.......- ......-......--_..... — — F__— -->> — T TEMPORARY PAVEMENT MARKING - SHORT DURATION, TEMPORARY TAPE TEMPORARY SION LOCATION (S'Mlk HEIGHT) SOON WCA7I01N - TEMPORARY MOUNT •Ry 1CLASS SIGN LOCATION -POST MOUNT 'A-) (CLASS i7 SIGN LOCATION -EXISTING SIGN �1 TRAFFIC SAFETY DRUM 0 TUBULAR MARKER-PAVEDIBNT 44OUNIED Nh4 TYPE 3 9ARRICADE TRAVEL DIRECTION OF OPEN LAND �I PORTABLE CHANGEABLE ME50% SIGN N_ TEMPORARY IMPACT ATTENUATOR TEMPORARY BARRIER -ANCHORED ® WORK AREA -- NOTES: 1. SEE SPECIAL PROVISIONS : "PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS. 2. ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN. ALL SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN. 3. EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER. ,L SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20A 'ROAD WORK AHEAD' SIGN. 5 PLACE SIGN R3-5R BELOW EXISTING STOP SIGNS, 6 ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE. 7. REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) AND TRAFFIC ARROWS- B. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE WITH STANDARD PLAN M-20,30, 9. PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR STAGE 1 ADJACENT PATH OPPOSITE THE WORK AREA (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, 0 30 SO VAN, OR BUS MAY BE USED), SCALE IN FEET (C) MAINTAIN MINIMUM 4-CLEAR SHOULDER p1pX H' 10 A^ FED.AID PROJ.NO. '��� �n�L' �• , ■n�L,� ■� ,'111111111111h,J� �/. Washington State Department of Transportation SR 104 PARADISE BAY -SHINE ROAD & SR 19 SAFETY IMPROVEMENTS TC4-W �.. +�°{j XL6127 TRAFFIC CONTROL PLAN• =A aY PCMS 1 2 ROAD 1.85 WORK MILES AHEAD AHEAD ZO SEC 2.0 SEC LOCATE AT: SR 104 MP 10901 (RT.) BEGIN 'YELL rk A _ -- -40 TL-3 APPROVED TEMPORARY IMPACT ATTENUATOR LIST ASBORB 350 (9 ELEMENTS) ASBORB-M 13 ELEMENTS) SLED (4 MODULES) ACZ-350 (4 SECTIONS) TRITON CET (6 SECTIONS) NOTE: TL.3 ATTENUATORS APPROVED FOR ALL SPEEDS CENTERLINE TAPER (1.0'LT.) EDGE LINE (25.B'LT.) 1.3 STAGE 1 6,7' GORE 4.0• yyZ -Varies jShoulder (Vades) Shoulder ,24 I I 1,5' 1,0' + I2,� Existing Existing Temp R-Turn Lane Lane Lane SECTIG A -A (NOT TO SCALE) TEMPORARY BARRIER -ANCHORED V TEMPORARY LANE LINE A EXISTING LANE LINE 5 4• 4 0' STAGE 1 Shoulder Shoulder WZ - Varies IT Te P Temp ! f Lane Lane SECTION B-B �I (NOT TO SCALE) II TEMPORARY BARRIER -ANCHORED r EXISTING GUARD RAIL TEMPORARY LANE LINE Q EXISTING LANE LINE 6TCdtiY D9C CENYEt1CIRE --••................... --,. .. -. J �WWNE EDGE GNE SHIFT T-APERS I�S1..17CLT. �7f15 IiT 320 ••�PIVFX........ ... ..........a--, Sift S 104 --1_--T--__ ......� ....,. OER TAR END CONSTRUCTION SR 104 500+52.59 P.O.T. P STA 111+74.36 P.O.E. BEGIN WHITE EDGE LINE (11.0'RT.) LEGEND }� 5 TEMPORARY PAVEMENT MARKING PPP& SHORT nURATiON. TEMPORARY TAPE TEMPORARY SION LOCATION WHIN. HEIGHT} {e y� i IGGNNS LOCCAATION -TEMPORARY MOUNT SIGN LOCATION - POST MOUNT ICLASS -A•) SIGN LOCATION -EXISTING SIGN a TRAFFIC SAFETY DRUM C�1 TUBULAR MARINER -PAVEMENT MOUNTED S $r-A TYPE 3 BARRICADE �- TRAV@L O4RECTIAN OF OPEN LANE IPCIAy6] PORTABLE CHANGEABLE MESSAGE SIGN PO.- TEMPORARY IMPACT ATTENUATOR 3 TEMPORARY BARRIER -ANCHORED i WORK AREA 3 L.I.) END CONSTRUCTION lU4 APN ]U3+415.L7 M STA 321+25.48 P.O.E. (11.57' LT.) END FA HSIP-0104(062) END PROJECT _ END CONSTRUCTION SR 104, MP 9.11 SR 104 507+22.57 (0.00' RT.) = SIGN SEQUENCE N STA 48+00 P.O.E. (SEE NOTE 4) A0A0 OU113 HOULDE ROi14 � CLOEEA YDA]( A1 AHiAO ae" �S- •9" o w W20.301 W21.5 W20.1 F � � eaD': ? !@011 STAGE 1 4 0 30 60 SCALE IN FEET NOTES: 1 SEE SPECIAL PROVISIONS : "PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS 2. ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN ALL SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN 3, EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER 4, SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD WORK AHEAD" SIGN. 5, PLACE SIGN R3-5R BELOW EXISTING STOP SIGNS. 6, ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE 7, REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) AND TRAFFIC ARROWS. 8. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE WITH STANDARD PLAN M-20.30- 9, PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): (A) ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA. (B) PROVIDE FREE FED SHUTTLE (PILOT CAR, WORK VEHICLE, VAN, OR BUS MAY BE USED), (C) MAINTAIN MINIMUM 4-CLEAR SHOULDER 322W37 FV 1_ " FED.AID PROJAO. ��A ��'\` A 0" 1�,� ���� � A Washington State Department of Transportation $R 104 PARADISE BAY -SHINE ROAD & SR 19 SAFETY IMPROVEMENTS* TCS-W �'LOTTen 10 A iTM eY ndsdTI ocslaNLD eY C. . CH1•CRAD sY A. . cNLcld� sY M.saaL IX • «o XL6127 PA0.I.CNOR. fL FGat3• TRAFFIC CONTROL PLAN RROW0t, MW a.aoARrc k1mlow oAn sY L STA 200+00.00 P.O,T, = M STA 300+00.00 P.O.B. (11.57' LT.) MATCH LXN311 BEGIN WHITE EDGE LINE SHIFT TAPERS 124.5'LT. 11.5'1 BEGIN YELLOW OBL. CENTERLINE SHIFT TAPERS {0.5' RT - 12,5' ........................................ I -_- I — - 1 — 1 — .-1— _—)— -- (--- ------------------ -- — — -- Y BEGIN FA HSIP-0104(062) El1EH4E R0C'SHVT TAPER — BEGIN PROJECT BEGIN CONSTRUCTION BEGIN CONSTRUCTION I{ 104, MO 8.61 Sk 1 4 48 +65.45 P. . { 1. 8' SR 104 480+12.56 P.O.T. (14.32. LT.) = P STA 94+86.16 P.O.B. L STA 196+90.00 P.O.B. TIE-3 APPROVED TEMPORARY IMPACT ATTENUATOR LIST ASBORB 350 (9 ELEMENTS) ASBORB-M (3 ELEMENTS) SLED (4 MODULES) ACZ-350 (4 SECTIONS) TRITON CET (6 SECTIONS) NOTE: TL-3 ATTENUATORS APPROVED FOR ALL SPEEDS 600' SHIFT .. .. ... TYPI ..................... . .. _- 6WSHIFT TAPER SIGN SEQUENCE a yw U 1 �h a00t BOD't w W wsin rv1�R o � a w 4r 4i 4P W2T 4)m®�^ (SEE NOTE w 2r M&2P w$34 SR LEGEND PCMS 1 2 STAGE 2 P LINE 1. NOTES: SEE SPECIAL PROVISIONS : "PUBLIC CONVENIENCE AND SAFETY - TEMPORARY PAVEMENT MARKING - SHORT SHORT DURATION, TEMPORARY TAPE S NO LANE WZ -Varies 4.0' 4 0' CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS - TEMPORARY SIGN LOCATION (5' MIN- HEIGHT) ACCESS SHIFTS Shoulder Shoulder 2, ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN. ALL TO HWY1 AHEAD 1'2'I 11.01 1 11-0' SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN b SIGN 'LOCATION -TEMPORARY MOUNT ` Temp l Temp, I (CLASS B") ZO SEC 2.0 SEC Lane Lane 3- EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER SIGN LOCATION -POST MOUNT LOCATE AS SHOWN "ROAD (CLASS "A") 4- SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 WORK AHEAD" SIGN, rj SIGN LOCATION -EXISTING SIGN PCMS SECTION A -A (NOT TO SCALE) 5. ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE ® O TRAFFIC SAFETY DRUM TUBULAR MARKER -PAVEMENT MOUNTED 1 2 HWY19 MO /DA 1� TEMPORARY LANE LINE Iu\ TEMPORARY BARRIER -ANCHORED e. REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) ACCESS THROUGH EXISTING LANE LINE AND TRAFFIC ARROWS. 11!'c TYPE 3 BARRICADE TO CLOSE MO I DA 7- ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED TRAVEL DIRECTION OF OPEN LANE WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE 20 SEC 20 SEC WITH STANDARD PLAN M-2030 PCMS] PORTABLE CHANGEABLE MESSAGE SIGN LEAST DAYS IN DISPLAY AT 3 ADVANCE OF THE WORK- 8 PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY I� TEMPORARY IMPACT ATTENUATOR MO IDA = ENTER MONTH IDAY ALTERNATIVE STRATIGES): (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR TEMPORARY BARRIER -ANCHORED STAGE 2 ADJACENT PATH OPPOSITE THE WORK AREA (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, WORK AREA D 30 60 VAN, OR BUS MAY BE USED} SCALE IN FEET (C)MAINTAIN MINIMUM 4'CLEAR SHOULDER £a.! MAEE CyurriJnief1d019l�TnaLR71 QQ� ' Q� i' L Washington State Department of Transportation SR 104 PARADISE BAY -SHINE ROAD d SR 19 SAFETY IMPROVEMENTS TC6 W 10 FED.AID PpOJAQ, _ _,.v °A "n ONTE En BY Mnd J Y S DESIGNED NY aFYNos A e11 A, ✓1FpyVa1 y� , GS[i -Ehm gH9 BY Is. XL6127 TRAFFIC CONTROL PLAN M ILFCM LEGEND P LINE NOTES: 1, SEE SPECIAL PROVISIONS : "PUBLIC CONVENIENCE AND SAFETY - TEMPORARY PAVEMENT MA1TIfING - F}ipRr DURATION. TEMPORARY TAPE STAGE 2 WZ -Varies 40' 40' CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS. 1 TEMPORARY SIGN LOCATION (5'MNJ. HEIGHT) Shoulder Shoulder 2 ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN. ALL b S CATION -TEMPORARY MOUNT t lZ I Temp r Temp 11 SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN, �Cl3N I Lane Lane 3• EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER, SIGN LOCATION - POST MOUNT BB (CLASS 'Al 8 4 SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD I SIGN LOCATION - EXISTING SIGN SECTION A -A WORK AHEAD" SIGN. ® TRAFFIC SAFETY DRUM (NOT TO SCALE) 5 ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE. I �1 V TEMPORARY LANE LINE e {] TOBULAR MARKER -PAVEMENT MOONTED TEMPORARY BARRIER , -ANCHORED 6 REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) AND TRAFFIC ARROWS 44i TYPE 3 BARRICADE -..}I EXISTING LANE LINE E 7, ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED —^ I TRAVEL DIRECTION OF: OPEN LANE WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE I 3pqj'A� PORTABLE CHANGEABLE MESSAGE SK3N WITH STANDARD PLAN M-20,30. Nam+ TEMPORARY IMPACT ATTENUATOR B• PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY I ALTERNATIVE STRATIGES): I TEMPORARY BARRIER -ANCHORED (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR STAGE 2 ADJACENT PATH OPPOSITE THE WORK AREA. (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, Ill 1hI�1t� 0 30 60 VAN, OR BUS MAY BE USED). E iiii����i�i !!!l�JJJJ SCALE IN FEET (C)MAINTAIN MINIMUM 4'CLEAR SHOULDER. FRr NAME e:lwu.uanwcndonxlluufa scar R n� R1[` �r � elf SR 104 PARADISE BAY ROAD & SR 19 �u. TC7-W ! tiNE 11:1L94 PY "E o°" FEtl. RIp YROI.N p. oiie IT11rljexy owrreo er ".d 10 f uT w tV• -SHINE — AL71:3 o. � a oesictieu c.wNas `w,�A G, . ° �r . C�• �`, a E Washington State Department of Transportation SAFETY IMPROVEMENTS �!+tiru F ENcileC�IEo By XI 6127 n11L olw. e;FOR�, TRAFFIC CONTROL PLAN acowsAL w a ROAR i REM" ytTa BY 40" ROA w(LLSUE CLOSED .x DA-Na I+ xx - UI R11.1501 (BIW) UPCOMING CLOSURE DATES A TIME UPDATED WEEKLY PCMS PCMS 1 2 1 2 HWY104 E USE HWY104 E MO IDA ACCESS ALT ACCESS THROUGH CLOSED ROUTE TO CLOSfi MO IDA 2.0 SEC ZO SEC 2.0 SEC 20 SEC LOCATE AT: DISPLAY AT LEAST 3 DAYS IN SR 19 MP 2,713 (RT) ADVANCE OF THE WORK. MO IDA = ENTER MONTH IDAY SIGN SEOUENCE RB" d8" 46" ROAD ROAD . CLOSED CLOSED VOD FT A}fEAD w R6" 4k" 4e- wW20•1I Y1'20.3 W210•] Ct _ 500's SA6`k SDQ'i I f —� air T T �z d d d U w a® END CONSTRUCTION ............_-•• •_........... -_ *K 7`! 51+4V.4T r.u.l. [i L SA 219+30.00 P.O.T. ex - - - - — — — — — --•-- '----- -- ROAD CLOSED 30 R11-2 (BIYV) NOTES: t, SEE SPECIAL PROVISIONS :"PUBLIC CONVENIENCE AND SAFETY - LEGEND TEWORARY PAVEMENT MAPANR CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS _ SHORT GIIRATION. TEMPORARY TAPE AND PUBLIC NOTIFICATION REQUIREMENTS FOR R11-1501, iTEMPORARY SIGN LOCATION [7MEN. 3{EILiFlT) 2. ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN. ALL I SIGN LOCATION -TEMPORARY MOUNT SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN. [CLASS B� 3. EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER. I .SIGN LOCATION .POST MOUNT (CLASS 91"} 4. SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD SIGN LOCATION - EXISTING SIGN WORK AHEAD" SIGN, TRAFFIC SAFETY DRUM 5. ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE i C�! TUBULAR MARKER -PAVEMENT MOUNTED 6. REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE UNE(S) AND TRAFFIC ARROWS • 1 TYPE 3 BARRICADE 7, ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED TRAVEL p1RECTN]N OF OPEN LANE WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE F [ PORTABLE CHWGEA9LE MESSAGE SIGN WITH STANDARD PLAN M-2030 I � TEMPORARY IMPACT ATTENUATOR B. PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): TEMPORARY BARRIER .ANCHORF.A APEDESTRIANS TO USE THE PAVED SHOULDER OR ` STAGE 2 ADJACENTCENT PATH OPPOSITE THE WORK AREA AD I PROVIDE FREE FED SHUTTLE (PILOT CAR, WORK VEHICLE, t ® WORK AREA 0 O 360 VA VAN, OR BUS MAY BE USED), [ SCALE IN FEET (C)MAINTAIN MINIMUM 4-CLEAR SHOULDER, sae NAlll c:4rr ak yA fxvR41A nA n[` �'��` A�t�1 [ 4 ...�..-.. �� \Y~'�� C5~ Q•`f[y' .• .. ..._.o. •.. f► �� -'/ Washington State Department of Transportation i SR 104 PARADISE BAY -SHINE ROAD & SR 19 SAFETY IMPROVEMENTS* . •• �. -c TCB-W xIME 13F.10 RN Hxl�Alr3 a eATE1ea rra u�rt 10 FED.AID PROJ.NO. By cYol Tic E° eY M My NuC3 xx e rJrlpQO or M. MIEa XL6127 TRAFFIC CONTROL PLAN AIs"ImOA•_ 9.AN" NEUMMI. AM b. ROAM _ _ ReAll" DATX. BY PCMS 1 2 ACCESS FOLLOW TO HWY1 CNTR RD CLOSED DETOUR 20 SEC 20 SEC LOCATE AS SHOWN LEGEND TEMPORARY PAVEMENT MARKING - SHORY OLIRATICNI, TEMPORARY TAPE TEMPORARY SIGN LOCATION JFMIN HEIGHT) SIGN LOCATION -TEMPORARY MOUNT -97 (CLASS SIGN LOCATIOk -POST MOUNT (CLASS 'A'] �7 SIGN LOCATION - EXISTING SIGN TRAFFIC SAFETY DRUM fa TUBULAR MARKER -PAVEMENT MOUNTED 44i TYPE 3 BARRICADE TRAVEL DIRECTION OF OPEN IME iP£htii� PORTABLE CHANGEA6tE MESSAGE SIGN N TEMPORARY IMPACT ATTENUATOR TEMPORARY BARRIER-ANCHOREO ® WORN AREA TL-3 APPROVED TEMPORARY IMPACT ATTENUATOR LIST ASBORB 350 (9 ELEMENTS) ASBORB-M (3 ELEMENTS) SLED (4 MODULES) ACZ-350 (4 SECTIONS) TRITON CET (6 SECTIONS) TL-3 ATTENUATORS APPROVED FOR ALL SPEEDS STA 111+74.36 P.O.E. SIGN SEQUENCE ROAq woalt :. ANEAtI W14L z ® 24- w W14L W20-1 ® 24„ (SEE NOTE 5) 24" 30" O W13.1 W1 a-2P 1 �- z Q R1trs 8Do'a yr P LINE STAGE 2 40• 4.0 WZ -Varies Shoulder ShNAd6r r 110. 110. Temp Temp ry Lane Lane SECTION A -A (NOT TO SCALE) FF��FF��pp TEMPORARY BARRIER -ANCHORED I EXISTING GUARD RAIL ♦ TEMPORARY LANE LINE Q EXISTING LANE LINE STAGE 2 D 70 6U SCALE IN FEET END FA HSIP-0104(062) END PROJECT END CONSTRUCTION SR 104, MP 9.11 SR 104 507+22.57 (0'00' RT.) = NOTES: 1. SEE SPECIAL PROVISIONS : "PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS. 2, ALL SIGNS SHALL BE 48 " X 40", UNLESS OTHERWISE SHOWN. ALL SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN 3, EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER 41 SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD WORK AHEAD" SIGN, 5. ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE 6. REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) AND TRAFFIC ARROWS 7. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE WITH STANDARD PLAN M-20.30. B, PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, VAN, OR BUS MAY BE USED), (C)MAINTAIN MINIMUM 4' CLEAR SHOULDER. -— I n FEMAID PROJ.NO. {�1� QQ� '40k� SR 104 UATi a hh"W] tD g �,�P[• �'�P[` �/- PARADISE BAY -SHINE ROAD ✓g SR 19 TC9-W rLeT1Ee eYaine; G. 1'Lr 3 Q�G�1 �nt�1 Washington State SAFETY IMPROVEMENTS iaT •o13eAee b+/ F. MOd}AMl `` 44 1 cnECll[n sY IIL •"_- .., .�.�� .-. Department of Transportation �, lti a•r XL6127 TRAFFIC CONTROL PLAN w REaNNML ADM a_aaAwt wlnslop PATE BY ' L STA 200+00.00 P.O.T. = UNE M STA 300+00.00 P.O.B. (11.57' LT.) BEGIN WHITE EDGE LINE (23.5'LT„ 11.0'RT.) BEGIN YELLOW DBECENTEERLINE (12.0'1-T.,00'CL.) ' __=1— —I —r— =r—--r---r� —r— --I—--•r---•�r— o — -------------------- -- LINE rBEGIN —------------------------A HSIP-0104(062) PROJECT BEGIN CONSTRUCTION CONSTRUCTION SR 104 483+65.45 11. T.) = SR 104, MP 8.61 P STA 94+86.16 P.O.B. SR 104 480+12.55 P.O.T. (14.36' LT.) = L STA 196+90.00 P.O.B. MIT& EDGE LINT: SIGN SEQUENCE a➢ U a w aO4i OWL OW p W14R W1-4R W20-1 NO (SEE NOTE 4) 30" 30" W16-2P MOD W16-2P MOD 30" X 24" 30" X 24" j w M LINE LINE sR 104 _ A P 1 ME ....................__...-.... ................ tE8R1lD M LINE P LINE NOTES: TEMPORARY PppVElIENT MARWN6 1. SEE SPECIAL PROVISIONS :"PUBLIC CONVENIENCE AND SAFETY - SHDRT OLIRATIOPf. TEMPORARY TAPE PCMS 5,0' STAGE 3 50, CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS. iTEMPORARY WN LOCATION (5 MIN. HEIGHT) 1 2 Shoulder WZ -Varies Shoulder 2. ALL SIGNS SHALL BE 48" X 4e", UNLESS OTHERWISE SHOWN ALL SIG j N LOCAIION -TEMPORARY MOUNI T IIIIIIIIII 11,0 120 SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN K (CVLSS 'B.) ROAD LANE I Temp Lane Temp. Lane { WORK SHIFTS I 3, EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER { SIGN LOCATION -POST MOUNT h iCLASS -11•) AHEAD AHEAD 4, SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD JL ' 0 5iGN LOCATION • EXISTING SIGN 2.0 SEC 2.0 SEC SECTION A -A WORK AHEAD" SIGN, E ® TRAFFIC SAFETY DRUM LOCATE AS SHOWN (NOT TO SCALE) 5. ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE i EXISTING GUARD RAIL ♦ TEMPORARY LANE LINE G tLIBULAR MARKER -PAVEMENT MOUNTED 6 REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) 41L TYPE 3 BARRICADE ♦ PERMANENT LANE LINE Q EXISTING LANE LINE AND TRAFFIC ARROWS E 7. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED E TRAVEL DIRECTION OF OPEN LANE WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM) IN ACCORDANCE ® PORTABLE CHANGEABLE MESSAGE SIGN WITH STANDARD PLAN M-20.30. r ( H iEMP.ORIIRY IMPACT gTTENLIATOR B, PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): ( TEMPORARY BARRIER . ANCi1t1RED STAGE 3 (A) ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA, (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, WORK AREA D 3D 60 VAN, OR BUS MAY BE USED). i SCALE IN FEET (C)MAINTAIN MINIMUM A' CLEAR SHOULDER, rlL RALtr aew+.w�e..nea.sanuu[.+I+ rcl �► 1LME rk44.13 FM FEMAID PROJ.NO. SR 104 4 +M ••• + i ftootiva ar �1r 3 to A ' \• PARADISE BAY -SHINE ROAD 8 SR 19 YCifl-W rsr A•�. '{ � L�t A ek Washington State SAFELY IMPROVEMENTS _.. t am pMo ay AL M s ,.�.,., - 4 ,L 44 Department of Transportation ox (:innti-ei±cn:_=_a Farm_ XL 1127 TRAFFIC CONTROL PLAN . REGIGMAL AUK &ROARK L z eg oD sHCe (SEE NOTE 9) q N 4 ROAD 60" CLOSED 30" R11-2 30" W1-6R (SEE NOTE 9) t�6 w SR 104 -- p LINE A LEGEND TEMPORARY PAVEMENT MARKING - SHORT DURATION. TEMPORARY TAPE TEMPORARY SIGN LOCATION WMIN. HOGST) SIGH. LOCATION -TEMPORARY MOUNT _ (CLASS " SIGN LOCATION .POST MOUNT (CLASS -A') k3 SIGN LOCATION -EXISTING SIGN TRAFFIC SAFETY DRUM q TUBULAR MARKER -PAVEMENT MOUNTCO Ys'ti TYPE 3 9MRICADE -- TRAVEL DIRECTION OF OPEN LANE PORTARLE CHANGEABLE MESSAGE SIGN }� TEMPORARY IMPACT ATTENUATOR TEMPORARY BARRIER -ANCHORED WORK AREA sY (SEE NOTE 9) r I we M LINE P LINE 5 V STAGE 3 50, Shoulder WZ - Varies Shoulder 16 0' 12 0' 1 Permanent Permanent Lane Lane SECTION A.A (NOT TO SCALE) - EXISTING GUARD RAIL v TEMPORARY LANE LINE ♦ PERMANENT LANE LINE A EXISTING LANE LINE STAGE 3 0 ]D 60 SCALE IN FEET FED.AID PROJ.NO. 10 n 1 n 1 M LINE P LINE BP STAGE 3 7.3' Shoulder WZ -Varies Shoulder 16.01 P,rmarenf PeIRi Len. aMn�MIN� SECTION B-B (NOT TO SCALE) ♦ PERMANENT LMC LINE ♦ TEMPORARY LANE LINE A EXISTING LANE LINE $ B zSF f 1 ..�. L _ timx SR 104� w BM NOTES: I. SEE SPECIAL PROVISIONS :"PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS. 2. ALL SIGNS SHALL BE 48" X 40", UNLESS OTHERWISE SHOWN. ALL SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN 3. EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER. 4, SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD WORK AHEAD" SIGN, 5• ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE 6• REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) AND TRAFFIC ARROWS 7, ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE WITH STANDARD PLAN M-20.30 B. PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): (A) ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA- (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, VAN,OR BUS MAY BE USED} (C) MAINTAIN MINIMUM 4-CLEAR SHOULDER. 9 PERMANENT SIGNS SHALL BE INSTALLED PRIOR TO THIS STAGE SEE SIGN PLAN AND SIGN SPECIFICATION SHEET. SR 104 TC11. w// PARADISE BAY -SHINE ROAD & SR 19 Washington State SAFETY IMPROVEMENTS Department of Transportation TRAFFIC CONTROL PLAN X. PCMS 1 2 HWY19 E USE ACCESS ALT. CLOSED ROUTE (SEE NOTE 9) 2.0 SEC ;2O SEC tC4ATE.AT: ------------ SR 19 MP 2.71 (RT.) SIGN SEQUENCE (SEE NOTE 4) (SEE NOTE 4) 4f♦" 48' W20-901 W21-1 U a -� • ' ' - (SEE NOTE N LINE Hid SR 19 1 END CONSTRUCTION SR 19 NIP 0A7 (SEE NOTE 9) SR 19 81+40.41 P.O.T. (4 L STA 219+30.00 P.O.T. IS NOTES: 1. SEE SPECIAL PROVISIONS :"PUBLIC CONVENIENCE AND SAFETY - team CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS 2. ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN ALL FEIYIPORARY PAVEMENT MISRiUNG _ SHORT OURATIO4 TEMPORARY TAPE SIGNS SHALL BE BLACK ON ORANGE,UNLESS OTHERWISE SHOWN TEMPORARY SIGH LOCATTON 15'MIH. HEOIT) j 3 EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER. k3 SK3N LOCATION -TEMPORARY MOUNt (CLASS -151 4. SEE CLASS A SIGN PLAN, TC1-W, FOR LOCATION OF W20-1 "ROAD WORK AHEAD" AND MO-901 "TRAFFIC REVISION AHEAD SIGNS. 51oH LOCATION -POST MOUNT "A') (CLASS 5. ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE. }0 51G0 LOCATION - E)(18T)N6 SIGH 6. REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) 0 TRAFFIC SAFETY DRUM i AND TRAFFIC ARROWS- 0 TU9UI,AR MARKER-PAVE7,IERi MOUNTRD 7. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE I l44 TYPE ) MARICADE WITH STANDARD PLAN M-20.30- -�^ TRAVEL DIRECTION OF OPEN LANE B PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY I PCMS PORTABLE CHANGEABLE MESSAGE SIGN ALTERNATIVE STRATIGES): r TEMPORARY IMPACT ATTENUATOR (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA. (B) PROVIDE FREE PIED SHUTTLE (PILOT CAR, WORK VEHICLE, TEMPORARY BARRIER-ANCRORED VAN, OR BUS MAY BE USED) STAGE 3 (C)MAINTAIN MINIMUM 4-CLEAR SHOULDER WORK AREA �~ 0 30 60 9. PERMANENT SIGNS SHALL BE INSTALLED PRIOR TO THIS STAGE SCALE IN FEET SEE SIGN PLAN AND SIGN SPECIFICATION SHEET i FILE IIAt4E c:luwnl-d— ­Md. )67111u,27 7CI7 y SR 104mil nMR I VYr All '^„°a°n ""� FED.AID PROJ.NO. st"Me ' ' d� ��� MAP ;C72-W PILOT ' PLOTTEQ eY 1u As ,w'�� '1 4 �,��•` [� Washington Slate Department of Transportation PARADISE BAY -SHINE ROAD & SR 19 SAFETY IMPROVEMENTS 0[>V1G11EU 6T G . F1/TEfIEC pY A.M7>tANt1 ,)X c1iECKeo sr aL .�.w" TRAFFIC CONTROL PLAN peW _EHOH JL FORD -RMIG XL6127 — E xy rA6" ADNL a. FIDARK A[V{f10N OAYL eY PCMS 1 2 ROAD 1,85 WORK MILES AHEAD AHEAD 2.0 SEC 2.0 SEC LOCATE AT: SR 104 MP 10,90z (RT.) SIGN SEQUENCE (SEE NOTE 4) (SEE NOTE 4) ie- . RA1T1 ee ROAD E10011 wan AlIEAA AN110 45' 4g• W20-901 W20-1 is P STA 111+74.36 P.O.E. LEGEND TEMPORARY PAVEr§NT MARKIN43 SHORT DURATION• MPORARY TAPE TEMPORARY SIGN LOCATION [5'MIN. HEIGHT] LOCATION -TEMPORARY MOUNT SIGN{CLASS "B'1 SIGN LOCATION •POST MOUNT' ICLASS 'Al j7 SIGN LOCATION -EXISTING SIGN TRAFFIC SAFETY DRUM 0 TUBULAR MARKER -PAVEMENT MOUNTED 4i-. TYPE 3 BARRICADE T TRAVEL DIRECTION OF OPEN LANE f PORTABLE CHANGEABLE MESSAGE SIGN M TEMPORARY IMPACT ATTENVATOR TEMPORARY BARRIER -ANCHORED ® WORK AREA END FA HSIP-0104(062) END PROJECT SR 104 503+88.25 M STA 321+25.48 P.D.E. (11.57' LT.) M LINE 60' STAGE 3 8,01 $frnvMpi WZ -Varies Shoulder p Temp 4' Lane Lane MIN SECTION A -A [� (NOT TO SCALE) hull—V EXISTING GUARD RAIL V TEMPORARY LANE LINE ♦ PERMANENT LANE LINE A EXISTING LANE LINE STAGE 3 0 30 60 SCALE IN FEET END CONSTRUCTION SR 104, MP 9.11 SR 104 507+22.57 (0.00' RT.) = NOTES: S. SEE SPECIAL PROVISIONS :"PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS 2. ALL SIGNS SHALL BE 48" X 48", UNLESS OTHERWISE SHOWN, ALL SIGNS SHALL BE BLACK ON ORANGE, UNLESS OTHERWISE SHOWN 3. EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER- 4, SEE CLASS A SIGN PLAN, TCi-W, FOR LOCATION OF W20-1 "ROAD WORK AHEAD" SIGN. 5, ALL PAVEMENT MARKINGS SHALL BE PREFORMED REMOVAL TAPE 6, REMOVE OR BLACK MASK TAPE ALL CONFLICTING LANE LINE(S) AND TRAFFIC ARROWS T. ALL CENTERLINE PAVEMENT MARKINGS SHALL BE SUPPLEMENTED WITH TYPE 2 RAISED PAVEMENT MARKERS (RPM)IN ACCORDANCE WITH STANDARD PLAN M-20 30 B. PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): (A) ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, VAN, OR BUS MAY BE USED). (C)MAINTAIN MINIMUM 4- CLEAR SHOULDER. 9. PERMANENT SIGNS SHALL BE INSTALLED PRIOR TO THIS STAGE SEE SIGN PLAN AND SIGN SPECIFICATION SHEET ( Tw 1?:sx" F9i ,T FED.AID PROJAO. Q SR 104 PARADISE BAY -SHINE ROAD & SR 19 ++... .. iC13-W OATS 'n:etim ev laa hkl'eyri ' eesxir�Q w `aT c Hwos �a.,A,,,, 4 'A 4 Washington State Department of Transportation SAFETY IMPROVEMENTS w�* W i i�Ep gy y_yx'- FRW, EHau, ��e�,� ��G41t\�' ( & FDRQ REQN AL MW a.✓!TG7 Re IS M WITE Br XL6127 .,, TRAFFIC CONTROL PLAN ;. MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER Posted Speed (mph) WIDTH (feel) 25 30 35 40 45 50 55 60 65 70 8 40 40 fi0 90 120 130 150 160 170 190 SO 40 60 90 90 150 170 190 200 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN B: PCMS 1 2 SHOULDER 1 CLOSED MILE AHEAD AHEAD 20 SEC 2.0 SEC LOCATE AS SHOWN SIGN SPACING = X (1) FREEWAYS & E%PPES6WAY6 55170 MPH 1500- RURAL HIGHWAYS 60 / 65 MPH BOO' RURAL ROADS 45 / 55 MPH 500, (U ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS. AT -GRADE INTERSECTIONS AND DRIVEWAYS BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 1 570 1 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9.900 TO 22,000 Ibs. HOST VEHICLE WEIGHT > 22.000 Ibs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100' 123' 172' 74' 100, 159 Z CHAWI-TZATION DE=E SPACING 11.11 MPH TAPpR I TA1Y. . 50RO 40 80 %+44 30 i O s' 1 MILE �I_ X " X X L/3 B R IDD I - 48" 48" 's ROAD WORKSHOULDER AHEAD CLOSED NOTES: 48" AB.. 48,. 1, SEE SPECIAL PROVISIONS: "PUBLIC CONVENIENCE AND SAFETY - F w2o-, W20-101 CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS q sHauln�a IND'IRA 2 SIGNS SHALL BE 48" X 413", UNLESS SE SHOWN 3 ALL SIGNS SHALL BE BLACK ON ORANGE, UNLEALL SS OTHERWISE • 48" SHOWN. t LEOEND f e W21-5 3. EXTEND CHANNELIZING DEVICE TAPER ACROSS SHOULDER. :1 SII��OCCA N -TEMPORARY MOUNT 4, DURING HIGH SPEED CLOSURE NO ENCROACHMENT ON TRAVELED LANE IF ENCROACHMENT IS NECESSARY, LANE SHALL BE CLOSED USING AN APPROVED PLAN. E N7 TRAFFIC SAFETY DRUM 5. CLOSURES NEAR INTERSECTIONS SHALL NOT BLOCK SIGHT TRAVEL DIRECTION OF OPEN LANE DISTANCE FOR VEHICLES ENTERING FROM THE SIDE ROAD PORTABLE CHANGEABLE MESSAGE SIGN 6. PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY gJ S ALTERNATIVE STRATIGES): a TRANSPORTABLE A77ENUATOR (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR S SHOULDER CLOSURE: ADJACENT PATH OPPOSITE THE WORK AREA. C WCM AREA HIGH SPEED (> 40 MPH) (B) PROVIDE FREE FED SHUTTLE (PILOT CAR, WORK VEHICLE, VAN, OR BUS MAY BE USED). NOT TO SCALE (C)MAINTAIN MINIMUM 4'CLEAR SHOULDER, Fa; NAME I 3Sr'fCl hQ� \y' '�� 4 �,�� n�{11 4 Allow w Washington State Department of Transportation SR 104 PARADISE BAY -SHINE ROAD & SR 19 SAFETY IMPROVEMENTS fC14 W IRE I%3N3 AM •"" FED -AID PROJ.NO. , p DATE 3TnrpWl e Txmreo an' euWem 10 A$ oaslanO c ' y MMAM C c l4 6Y R.1NO8ArK1 TRAFFIC CONTROL PLAN PRGJ.N 1. 0.F011 Roe. eN61i. -e, FpRp XL6127 L612 ` "Yom AA% aY f1E1#GNAi ADW 6 RDARK MAXIMUM CHANNELOATION DEVICE SPACING (feet] MPH TAPER TANGENT 50 - 65 0 SO 45 1 1➢ 1 60 RECOMMENDED MN SPACING z X (1) STOP CONDn" I WML_Q0D>VM MIh UOR TO STOP GATE ARM SHALL BE FULLY RETROREFLECTIVE ON RURAL HIGHWAYS 60fi5 MPH BOO' ± BOTH SIDES WTH ALTERNATING REDMMITE SHEETING RED RURAL ROADS 45-55 MPH 500'i 1�2• L[ENSS 16 ItLUMMAl Ea LA�(1170 SOLID YELLOW (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE F 7 NI.. T INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS YELLOW 12'LERS 1Y LENS ILLUMINATED FOR 1ti ;XAL {gACti Ii147MIIRA7 ED S-6 SECONDS wo.ru nkaa A,: 78"MIN (SEE NOTE 9) AFAD REDNELLOW LENS DETAIL AFAD GATE ARM DETAIL ®D130130 ® 11• a a a a x I x BD' 4C P4" f7eP 4E ;<� 30„ W2&.1 W20-4 W20-713 W20­7C LEGEND a (MINIMIZE DISTANCE BETWEEN MAINLINE AFADS TO MINIMIZE DELAYS 6 TRAFFIC QUEUES) W w j r FOR DRIVEWAY, BUSINESS ACCESS, aw IAND INTERSECTING ROADWAY DETAILS: SEE TC1&W. 2W'±MAX •ihiORlf ARFJL SEE NOTE 4 — aoaDaD a PCMS 7 4 ROBO- WATCH 4 FLAGGER STOPPED (MAY AT TO AFAD) AHEAD TRAFFIC 24" 4 C Z FIELD LOCATE 1 S MILE 570E i70F PRIOR TO AFAD OR PRIOR • 30" acp 36" TO EXPECTED TRAFFIC ,e[9 Ji QUEUE PER STD SPEC 10.6A [B7VQ 0r R70-6L (BINS 4a� s>t" 4e• 4e• y W O:U a> F p 4T" ia" 4{• 4C wzo-7c wzo-7B wzar W2D1 N N N N 4'MIN .� aF0 NOTES: R10.6A (BIW)dp pr X ,,F �( 1 THIS ENHANCED PLAN APPLICABLE HIGH VOLUME HIGHWAYS WITH 500+ VEMICLESMOUR 24" _ X IN ALL DIRECTIONS. WORR N AREA LENGTH ADJUSTS ACCORDINGLY. 1f 0e 31" aR' .Aa 4A" NL�4lll it BEP q- . / 2 FLAGGERS' GOAL IS TO MAXIMIZE TRAFFIC CAPACITY BY MINIMIZING TRAFFIC GAPS A LOST TIME STRATEGIES: (A) DON'T WAIT FOR APPROACHING TRAFFIC AFTER QUEUE RELEASED LET THEM WAIT FOR THE NEXT TURN. CA0 [30 (I,iIOP {` 3 MAY SHIFT LATERALLY. 36" TRAFFIC CONES, 42" TALL CHANNELIZATION DEVICES, OR TRAFFIC SAFETY DRUMS OR R10-6L B CH « •1 sI (MAY ATT 4 PEDESTRIAN S BICYCLIST ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATEGIES): TO AFAD wzo•1 W2 w20.79 MoPTA (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OR ADJACENT PATH OPPOSITE THE WORK AREA; ¢ FLAGGER SUBSTITUTION (6) COMBINE BIKES & VEHICULAR TRAFFIC, BIKES TO CLEAR PRIOR TO RELEASING ONCOMING TRAFFIC; 3 SIGN LOCATION -TEMPORARY MOUNT UPDATE SIGNAGE S USE STOP/SLOW PADDLE W21-1301 Wr BIOS (C) PROVIDE FREE SHUTTLE (WORK TRUCK, VAN, OR BUS MAY BE USED). b (CLASS "B'� 5 SEE STANDARD SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS: I ExISIING ExlsnlnG EX18'TifQG E7GSi1NG 1-07,8(1) HIGHAA IBILITY APPAREL ® TRAFFIC CONE (SEE NOTE 3) SHOULDER LANE LANE 8HDIILOER 1-10. 3(1)A AFAOS AND NIGHTTIME ILLUMINATION I WORK AREA 1p MIN LANE 1-103(2)ATRAFFIC CONTROL PROCEDURES AUTOMATED FLAGGER ASSISTANCE DEVICE TO ALT,TRAF 9-35124-INCH STOP/SLOW PADDLE SIZE (SEE NOTES B & 9) 6 SEE NOTE 3. SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE INDICATED, FLAGGING STATION (SEE NOTE B) 7 EACH AFAD OPERATED BY AFg0.TRAINEO FLAGGER WHO VISUALLY SEES BOTH AFAD AND APPROACHING TRAFFIC (DIGITAL ALTERNATIVES OK), LEAVING AFAD UNATTENDED WHEN IN OPERATION IS PROHIBITED. _.' TRAVEL DIRECTION OF OPEN LANE — 1, F� �� B. AFAD GATE ARM DESCENDS AFTER RED LENS DISPLAYED S SHALL REACH HALFWAY ACROSS THE PCMS PORTABLE CHANGEABLE MESSAGE SIGN SECTION A -A CONTROLLED LANE AND ASCENDS TO UPRIGHT POSITION ON FLASHING YELLOW LENS DISPLAY 9, EXISTING PAVEMENT MARKINGS MAY VARY, 7D}LI liii TRANSPORTABLE ATTENUATOR (fL-3) ALTERNATING 1 WAY TRAFFIC: ® WORK AREA AFAD-CONTROLLED (HIGH VOLUME 45+ MPH HIGHWAYS) VOL NOT TO SCALE RAMS cllwe wdetlW04TNa1t101f27 TCis. .~- •~ ,�� ' `• �,�� Amok r�y� �/- I_ Washington State Department of Transportation $R 104 PARADISE BAY -SHINE ROAD & SR 19 SAFETY IMPROVEMENTS ^•• ••, V TC15-W ■� rx llyy AM :r n,n FED,AID PROJ.NO. DATE 111INMI 10 AS PLO,. BY alo111111 °Pa c 2115523 x x xx 1. Z6127 ' PNRLRNOR a-sQaa. TRAFFIC CONTROL PLAN RFOKIN4L 40M. S.ROARK DATE la q i4 x X �K Y �F y x 3G" MIN 36"MIN 36" MIN ^_ 336" MIN 24" aMIX AL 1 uwu �� D RW \�!1 J AM1A0 3,-MIN 36'-MIN 36"MIN 35"M4N W20-1 W20-4 W20-7A OPTIONAL20-7B IF SLa 40 MPH OR LESS W21-1201 �I SIGN SEQUENCE A 4WX48` dgns rcq and on 45t mph roadways LEGEND �. SIGN LOCATION -TEMPORARY MOUNT -97 (CLASS O TRAFFIC CONE (SEE NOTE X i--r- FLAGGING STATION (SEE NOTE M TRAVEL O RECTtON OF OPEN LANE ® WORK AREA AN UNSIGNALIZED INTERSECTING ROADWAY DETAIL SAME SIDE AS LANE CLOSURE (TWO OPEN LANES) ALTERNATING 1-LANE, 2-WAY TRAFFIC: AFAD-CONTROLLED (HIGH VOLUME 45+ MPH HIGHWAYS) NOT TO SCALE CIO PROJ.NO. XL6127 UNSIGNALIZED INTERSECTING ROADWAY DETAIL OPPOSITE OF LANE CLOSURE NOTES: to FOR LEGEND, TABLES, AND ADDITIONAL NOTES: SEE TC1SW. 11. WORK MAY BRIEFLY OCCUR WITHIN LANE CLOSURE ACROSS INTERSECTING BUSINESS ACCESSES AND DRIVEWAYS ONLY. MAY HOLD ACCESS TRAFFIC FOR LESS THAN 1 MINUTE WHILE RESTRICTING TURNS FROM MAINLINE. CHANNELIZATION DEVICES DELINEATING APPROACH OR ACCESS MAY BE REMOVED OR RELOCATED AS NEEDED 12 SINGLE AFAD (WITH RED FLAG/RED GLOW CONE FLASHLIGHTS MAY BE ADDED TO THE INTERSECTING ROADWAY APPROACH TO HELP GUIDE ALTERNATING S TURNING TRAFFIC 13 FLAGGERS MAY COLLABORATE TO RELEASE APPROACH/ACCESS AND MAINLINE TRAFFIC TRAVELING IN THE SAME DIRECTION CONCURRENTLY �J9wh► SR 104 ^M"' PARADISE BAY -SHINE ROAD & SR 19 TC16 Washington State SAFETY IMPROVEMENTS Department of Transportation x TRAFFIC CONTROL PLAN xx• CHANNPAZAT71ON 1XVICE SCING feel NeM TAPER rANGM 50/70 40 1 80 15H5 10 1 60 SIGN LOCATION -TEMPORARY MOUNT 'B7 (CLASS O TRAFFIC CONE FLAGGING STATION TRAVEL DIRECTION OF OPEN LANE P I& PORTASLE CHMOLABLE MESSAGE SIGH = PROTECTIVE VEHICLE -I DATE SEE SIGN SEOUENCE r� BELOW J0^1well TYPICAL ROUNDABOUT FLAGGER CONTROLLED NOT TO SCALE FED,AID PROJ.NO. 10 R573 n...r. w�.27 1 NOTES: 1, SEE SPECIAL PROVISIONS :"PUBLIC CONVENIENCE AND SAFETY - CONSTRUCTION UNDER TRAFFIC" FOR WORK HOUR RESTRICTIONS Z ADDITIONAL ROADWAY LIGHTING IS REQUIRED AT FLAGGING STATIONS, SEE STD SPEC. 1-10.3(1)A 3 EXTEND TRAFFIC CONES TAPER ACROSS SHOULDER. 4, PROTECTIVE VEHICLE -MAY BE A WORK VEHICLE 5. ALL SIGNS SHALL BE BLACK ON ORANGE UNLESS OTHERWISE SHOWN- 6- PEDESTRIAN ACCOMEDIATIONS (ENGINEER TO ACCEPT ANY ALTERNATIVE STRATIGES): (A)ALLOW PEDESTRIANS TO USE THE PAVED SHOULDER OF ADJACENT PATH OPPOSITE THE WORK AREA (B) PROVIDE FREE PED SHUTTLE (PILOT CAR, WORK VEHICLE, VAN, OR BUS MAY BE USED), (C)MAINTAIN MINIMUM 4'CLEAR SHOULDER � SR 104 —., b WAR PARADISE BAY -SHINE ROAD & SR 19 TC17-W Washington State SAFETY IMPROVEMENTS Department w� tment of Transportation a• TRAFFIC CONTROL PLAN. STAGE 1 STAGE 2 STAGE 3 PCMS PCMS PCMS 1 2 1 2 1 2 HWY104 E FOLLOW HWY19 FOLLOW HWY104 E FOLLOV ACCESS CNTR RD CLOSED CNTR RD ACCESS CNTR R CLOSED DETOUR @ HVfYlN DETOUR CLOSED DETOUI 2.0 SEC 2.0 SEC 20 SEC 2.0 SEC 2.0 SEC 2.0 SE( SR 19 -MP 10.17 (RT.) SR 19 -MP 10.17 (RT,) SR 19 -MP 10.17 IF LEGEtVO V SIGN NOTE FLAG SIGN LOCATION -TEMPORARY MOUNT (CLASS 'B7 SIGN LOCATION -POST NQUW i r4 TYPE 3 BARRICADE �+— TRAVEL DIRECTION OF OPEN LANE PORTABLE CHANGEABLE MESSAGE SIGN ® WORK AREA -CLOSURE BY O O O 0 48" 48" 4B" 41•' 48" aL +04 FJIST DETQUR 48" +w I i7E pa 4B•• .. ., Iw EA 40" w 1114-9 MOD M4-9R MOD 11114-9 MOD M4-9L MOD 12" Shield (BAA4 12" Shield (B/W) 12" Shield (B/W) 12" Shield (B/W) 8C/6C Directlon 8C/6C Dlrecdon BC16C Dlreclion BC16C Direction BD DETOUR BD DETOUR BD DETOUR BD DETOUR 17.25"x3.7" Arrow 22 5"x3 7" Arm176 5" Arrow 22.5" x3 7" Arrow SR 19 SB - SR 19 SB - CHIMACUM RD SB SR 19 NB- MP 9,3% (RT.) MP 9145 (RT.) 1004 NORTH OF 100'S SOUTH OF SR 19 (RT) CHIMACUM RD (RT.) CHIMACUM RD SB - 1500'1 NORTH OF SR 19 (RT) CENTER RD SB - 100'f NORTH OF LARSON LAKE RD (RT,) CENTER RD SB - 1o0Y NORTH OF EGG AND I RD (RT.) O 46" 46" t^• EAST 19 60" RETQUR 48" DETOUR 461' NENO48" R0A0CLOSED+ pk MILES AMEAO 3W' LOCAL rx1rFIC OxIY II114-9 MOD 111114-9 MOD M4-9 MOD R11-3(BMW) 12" Shield (BAA) 12" Shield (BIW) 12" Shield (BIVV) 8C/6C Direction BD DETOUR BD END DETOUR BD DETOUR 12"x5.5" Anow 17.25"0,7" Arrow SR 19 NB - SR 104 V4B - CENTER RD NB - SR 19 SB - MP B79t (RT) MP 889t (LT) 1003 SOUTH OF MP 967t (RT) SR 19 (RT) XX = 9 MILES CENTER RD NB - 100'1 SOUTH OF SR 19 SB - LARSON LAKE RD (RT,) MP 470i (RT,) XX = 5 MILE CENTER RD NB - 100'i SOUTH OF SR 19 SB - EGG AND I RD (RT.) MP 2672 (RT.) XX = 3 MILES CLOSURE OF SR 19 & ACCESS TO SR 104 RESTRICTIONS NOT TO SCALE EDAM PrROi.ND. XIL 6127 NOTES: 1. SEE STANDARD PLAN K-80,10 FOR CLASS A CONSTRUCTION SIGNING INSTALLATION. 4 ALL SIGNS SHALL BE 48" X 48"SLACK ON ORANGE UNLESS OTHERWISE SHOWN, 3. DETOUR ROUTES MAY BE USED SEPARATELY OR AT THE SAME TIME. SR 104 PARADISE BAY -SHINE ROAD & SR 19 DUI-W Washington State SAFETY IMPROVEMENTS ..a, Department of Transportation DETOUR PLAN w•. TEMPORARY ADHESIVE TRANSVERSE RUMBLE STRIPS SEE NOTE 5 B STRIPS 0 4-SPACING US 101 JCT 4 MILES PCMS -I PCMS - 2 2 1 2 SIGNAL SLOW 0 HWY 19 N FOLLOW 1 MILE STOPPED ACCESS CNTR RO AHEAD TRAFFIC CLOSED DETOUR 2.0 SEC 20 SEC 2.0 SEC 2.0 SEC ral�fr >L G24�501 n 49" 36" 24" SPEED LIMIT 301, 24' 60 ' 112-1 (EllIW) G20-2A SR 104 0 300't TEMPORARY 0 200.z STOP LINE i llln � ��. 12 MILEt 09M 1600't F BOD't M 700'1 M 500't M 200't ® 350't Vie„, SEE NOTE 6 4e" t E. 48" LIIpT 48" M4-9 MOD 35 W20.901 W3.5 W23-7 12"6n1iE BM4 5.9" TEXT !I 9fE (SEE NOTE 5) BD oc rn EiR 1B" MIN 1725'k37'A— LED DISPLAY (Amber/Black) B M4-9R MOD 12" ShIdd (BM4 BD DETOUR 22 5" x3 7' Arrow 49" 24" Bxn ]6" r 0ETD11 4a'. 48.. BE 9REPAREO o star CENTER & SR 104 R10-6R (B/W) 48" INTERSECTION 4 W20.7B INTERSECT I 100t 350',1 4 35 ILf/�C�/ TEMPORARY STOP LINE 200't M FG 24" SPEED 60 30" LEGEND 112-1 (BNV) (RESTORE EXISTING a IWRC SAFETY DRUM SPEED LIMIT) 0 SIGN LOCATK]N -POST MOUNT *•F PORTABLE SIGNAL (OVERHEAM - TEMPORARY STOP LINE BOtl TEMPORARY TRANSVERSE RUMBLE STRIPS RA134.R SPEED DISPLAY SIGN CAMS) PORTABLE CHANGEABLE µESSWE SKIN SEE NOTE 6 36" SPEED 'r&•• R2.1 LIMIT 48" 5-9" TEXT (Bnn 35 s8" 18" MIH LED DISPLAY W3.3 (Amber/Black) ^ 350'2 200't 300't I• SR 104 PNONE NOMBEATO BE SUPPLIED P LN PEG G24-501 4a" ran13DEEcr wMM.En. i-Enu 3fi" ag AOAO. YORI[ 24 40" G20 2A M4-9 MOD 12' Shieltl (BM4 )r 3WA 16 ]60: IB 10Bt 48" ■ x4- ..!! p� +g• � 36•' R10.6R 1BMI M4.9L MOD WI-3 VY20.76 ' Bald [Rw OP OLIOVN 22.SY]'rArow BD DETOUR (SEE NOTE 5) 1 7.25 x37" Arrow 197 48" 41!" 48" *-V 411" 4e:lvr' t W23_7 W3-5 .0-101 i 500'1 700't 8 00',E 1600't CLASS A SIGN LOCATION PLAN SR 104 CONSTRUCTION NOT TO SCALE FED.AID PROJ.NO. IQ, J41 � 12 MILES SR 31R 11 MILES NOTES: 1, SEE STANDARD PLAN K-80.10 FOR CLASS A CONSTRUCTION SIGNING INSTALLATION. 2. IF SIGNS ARE INSTALLED PRIOR TO THE DETOUR BEING IN EFFECT. THE SIGNS SHALL BE COVERED OR TURNED AWAY FROM VIEW OF TRAFFIC. AFTER THE DETOUR IS NO LONGER NEEDED THE SIGNS SHALL BE COVERED OR TURNED AWAY FROM VIEW OF TRAFFIC. 36 WHEN SIGNS W3-5 AND 112-1 ARE IN USE CONFLICTING SIGNS SHALL BE COVERED PER STANDARD SPECIFICATION 1-10.3(3)A. 4. ALL SIGNS SHALL BE BLACK ON ORANGE UNLESS OTHERWISE SHOWN. 5. TEMPORARY ADHESIVE TRANSVERSE RUMBLE STRIPS, SEE DETAIL THIS SHEET AND SPECIAL PROVISIONS: "TEMPOPRARY ADHESIVE TRANSVERSE RUMBLE STRIPS". 6, RELOCATE RSDS AS WORK AREA MOVES DOWNSTREAM. ENGINEER MAY ORDER ADDITIONAL RSDS (WITH W23-6) AND W23-5 PRIOR TO EACH WORK CREW WITHIN WORK AREA A11111111011, ��SR 104 b l// PARADISE BAY -SHINE ROAD & SR 19 DU2-W Washington State SAFETY IMPROVEMENTS Department of Transportation DETOUR PLAN �. TEMPORARY ADHESIVE TRANSVERSE RUMBLE STRIPS _L0 6", SEE NOTE 5 B STRIPS Q 4-SPACING PORT H S LOCkIRONDALE 9 MILES CENTER RD TEMPORARY STOP LINE NW I soo't h zso' 3000'1 h soo't h soD'x h 200': h 300'm h t 100't h ® a �. 48, 48" h . ". i8' AMC8E 1J1 AST 24" lop AEV1510m PREPARiO UETOU ie" � +`Lo W. AHEAD TO STOP r 49 45' itl M4-9 MOD iM� M4-9R MOD R10.6L la" 1�. 5•.e1e (R^ah 1z" SnialB is+N W20•A0, ri>-3 YW20.78 4G6G G, yyZ3•T YYS-3 ecffic oYacaw. SD'DETOUR (SEE NOTE 5J SD DETOUR 17.25'k3.7" Artaw 22 5'r3 ]" Artaw M4-9 MOD M4-9 MOD 12• Snlele (OW 12" Shl.W IBAM 5E ACCESS BD DETOUR 7E CLOSED 1T•'a55"Arrow iE At 1p, a2 14 4r 48" 49 4tl RE 48' RINBLEi9 45•• iRAFFlC+B'. R£FARET) RLYI519N I3ETOU STRIPS access 41- TO STOP I,LD 36" ae" AHEAD C 70�TP 48 104 RIO 6R (81W) W3-3 W23.7 W20.713 W3.3 W20.901 Jrr�� 0 (SEE NOTE 5) [f..4 I 100'3 y 250't 500'1 0 300'x 4 200'x 4 5003 0 500't TEMPORARY CENTER RD STOP LINE LE49MNO W TRAFFIC SAFETY DRUM PCMS 11 SIGN WCA;KNJ - POST MOUNT 1 2 FF PORTABLE SIGNAL (OVERHEA) SIGNAL SLOW O 1 MILE STOPPED � TEMPORARY STOP LINE AHEAD TRAFFIC TEMPORARY TRANSVERSE RUMBLE 1081 STRIPS PORTABLE CHANGEABLE MESSAGE SIGN 20 SEC 2.0 5EC CLASS A SIGN CENTER ROAD LOCATION PLAN CONSTRUCTION NOT TO SCALE . RAW wdplNelp�illYLifit f L p�► ,� PEb,AIb PROJ.NO. ,1t3�aJp=J 10 4.1W J,7 c�olam RINED C 414135 eao.0 A. _A a M ax r, l5A �41 iJ.EN4% R.FORD — - XL6127 IKWAL AM &ROARK 1K. 0Y 3000'i 1Lo OUILCENE 6 MILES NOTES: 1, SEE STANDARD PLAN K-80.10 FOR CLASS A CONSTRUCTION SIGNING INSTALLATION- 2- IF SIGNS ARE INSTALLED PRIOR TO THE DETOUR BEING IN EFFECT. THESIGNS SHALL BE COVERED OR TURNED AWAY FROM VIEW OF TRAFFIC. AFTER THE DETOUR IS NO LONGER NEEDED THE SIGNS SHALL BE COVERED OR TURNED AWAY FROM VIEW OF TRAFFIC. 3. WHEN SIGNS W3-5 AND R2-1 ARE IN USE CONFLICTING SIGNS SHALL BE COVERED PER STANDARD SPECIFICATION 1-10.3(3)A. 4. ALL SIGNS SHALL BE BLACK ON ORANGE UNLESS OTHERWISE SHOWN S TEMPORARY ADHESIVE TRANSVERSE RUMBLE STRIPS, SEE DETAIL THIS SHEET AND SPECIAL PROVISIONS; "TEMPOPRARY ADHESIVE TRANSVERSE RUMBLE STRIPS". AWOL �SR 104 -,/ PARADISE BAY -SHINE ROAD & SR 19 DU finaton State I SAFETY IMPROVEMENTS � l SR 104 EASTBOUND TEMP SIGNAL CENTER RD NORTHBOUND TEMP SIGNAL DOE LINE _EXISTING I :TY DRUM PAVEMENT) MARKING TRAFFIC SAFETY DRUM CONSTRUCTION NOTES: LJ INSTALL TEMPORARY STOP LINE WHITE PREFORMED TAPE. ,)INSTALL TEMPORARY DOUBLE CENTERLINE YELLOW PREFORMED TAPE FROM TEMPORARY STOP LINE 300't BACK ALONG EXISTING CENTER LINE. WAIT -TIME DISPLAY VMS GREEN YELLOW RED 25 MPH (Blank) WAIT ZONE Nq:## pp:i1N a MINUTES:SECONDS UNTIL GREEN LOCATE VMS ON TEMP SIGNAL MAST ARM, LEGEND M SIGN LOCATION CLASS A -POST MOUNT F� PORTABLE SIGNAL (OWRHEADT ■a- PORTABLE SIGNAL (GROUND MOUNTED) 17771 TEMPORARY SIGNAL LANDING TEMPORARY STOP LINE V4 CONSTRUCTION NOTE FLAG 6 TRAFFIC SAFETY DRUM —,� TRAVEL DIRECTION OF OPEN LANE ,.-.. EXISTING TIMBER POLE WITH LUMINAIRE NCIIJ I— IUPpRIASLETEMPORARYTRAFFI(:Sr� IAPPRRXWATE OUANrRIE ' RPtil.^ OIFN711I1--I im TFtINM FAR I PD LT Afa[�cltf c T _ c.v. ❑uwl IIOHRrjmwL h4A. %� T •. / !.• ?,1" TEMPORARY SIGNAL .% J/ _ 7 LANDING MATH 12" DIAM 48' DRAIN PIPE �•/ � 48" 48�� I �• Rt DAL. JEIPM +r ;•/ III• 48 � W3_3 �rr•• M4-9L MOD IT Shlda MW BC16C SD DETOUR DbJlan �'' 22.5N3 T'Arrow upP uG 76" $ 11 SEE SIGN R10.6L (BIW) f' �. =row_ _, -t- _ r-r--=-_�_ _�- =r .i-T� �T_ �r_•AT=-•;� B'MIN JJ 107SHOULOER 11S'SNIFT , TAPER ,•'��J� f f 100' fl,/f SHOULDER , S 0 EN CIEwk TAPER SHEET DU2-W MATCH EXISTINGIN T5NIPORARY BLACK TAPE OVER EXISTING EDGE LINE N /f BEGIN TEMPORARY WHITE EDGE LINE .L} END TEMPORARY t3LACK TAPE LINE OWR EXIISTIN09r` END TEMPORARY WHITE EDGE LINE MATCH EXISTING DETOUR CLASS A SIGNS & TEMPORARY SIGNALS SR 104 & CENTER RD NOT TO SCALE 48" M4-9L MOD y �/ 12'. Shl I4 (BMq BD DETOUR v /� %• 22.5N1T' Ar 1., r BEGIN TEMPORARY BLACK TAPE JrBEGIN TEMPORARY DBLYELLOW I? S -' CENTERLINE TAPER EN ❑ TEMPORARY SLACK TAPE L r I QER EKISTING EDGE LINE END TEMPORARY DBL YELLOW ENTERLINE TAPER ------------- SR�104 f NOTES: 1: SEE STANDARD PLAN K-01110 FOR CLASS A CONSTRUCTION SIGNING INSTALLATION 2, FOR ADDITIONAL SIGNING ON SR 104 SEE DU2-W. 3. FOR ADDITIONAL SIGNING ON CENTER RD SEE DU3-W. 4. AT LEAST 3 TRAFFIC SAFETY DRUMS SHALL BE INSTALLED IN A TAPER AHEAD OF THE TEMPORARY TRAFFIC SIGNAL 5. ALL SIGNS SHALL BE 48" X 48" UNLESS OTHERWISE SHOWN. ALL SIGNS SHALL BE BLACK ON ORANGE UNLESS OTHERWISE SHOWN 6. SEE SPECIAL PROVISIONS: "PORTABLE TEMPORARY TRAFFIC CONTROL SIGNAL" FOR TEMPORARY SIGNAL LANDING 7 WHEN THE TEMPORARY SIGNALS ARE IN OPERATION THE TWO "STOP" AND "STOP AHEAD" SIGNS ON THE LOOP RAMP SHALL BE COVERED. SEE STANDARD SPECIFICATIONS 1-10.3(3)A AND B-21.3(3). TIMa w-Akw Ml tln nA Tn md 1 "� ^'� FEMAID PROJ.NO. ,� y � �� SR 104 n.x ner r�o D0Y naa PARADISE BAY -SHINE ROAD & SR 19 OU4-W II EwvrKIF Washington State Department Transportation SAFETY IMPROVEMENTS RY &OCIIIANY c1+g0n1o_8Mum &FOD of WPGU.[NM RtUMAL.AOIL S.RgAsm FIF41"ON GATE er Xe427 ,.E,,,,,,�. ,.,,,r„. `." DETOUR PLAN 2 Lane, ramp, shoulder, and roadway closures are subject to the following restrictions: 3 4 Hours are shown in 24-hour format. 5 6 State Route 104 between MP 8.61 to MP 9.05 7 Alternating One -Lane, Two -Way Traffic or Intersection — Flagger Controlled 8 Operation 9 Mon 21:00 to Tues 06:00 10 Tues 21:00 to Wed 06:00 11 Wed 21:00 to Thurs 06:00 12 Thurs 21:00 to Fri 06:00 13 Fri 21:00 to Sat 06:00 14 15 State Route 104 between MP 13.61 to MP 13.87 16 Alternating One -Lane, Two -Way Traffic or Intersection — Flagger Controlled 17 Operation 18 Mon 21:00 to Tues 06:00 19 Tues 21:00 to Wed 06:00 20 Wed 21:00 to Thurs 06:00 21 Thurs 21:00 to Fri 06:00 22 Fri 21:00 to Sat 06:00 23 24 State Route 19 25 Full Closure of SR 19 with Detour onto Center Rd 26 27 The Contractor will be permitted one full closure of SR 19 at SR 104 for 21 28 consecutive calendar days during Stage 2 construction. Work for the full 29 roadway closure shall be considered complete and the road ready to open to 30 traffic when all segments shaded in Stage 2 of the staging plans are complete, 31 all paving and temporary pavement markings are complete, all Contractor 32 equipment and personnel are cleared from the roadway clear zone, and all 33 signs, barricades, and PCMS's pertaining to the roadway closure and detour 34 have been covered, removed, or turned off, or as determined by the Engineer. 35 The roadway shall not be opened to traffic before the final lift of HMA is placed 36 and traffic flow will not be allowed until all highway safety elements are in place. 37 38 The full roadway closure shall begin on or after May 1st, 2024, and be complete 39 on or before June 15th, 2024, unless otherwise approved by the Engineer. 40 41 The Contractor shall select the specific closure dates within this period and notify 42 the Engineer in writing of the schedule dates a minimum of 10 calendar days 43 prior to the planned start of the closure. Only extreme weather events or 44 extenuating circumstances, as determined by the Engineer, will be considered 45 allowable reasons to change the planned start date after notification has been 46 given. The Engineer may deny approval of the Contractor's selected start date 47 if the required and advanced notification is not received. The dates of the one- 48 time full roadway closure shall be displayed on PCMS boards and Class A signs 49 at the project site for 7 days in advance of the closure, as shown in the Plans. 50 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 The total duration of the closure shall not exceed 21 days. The measurement of the total closure period will begin at 00:00 on the planned closure start date, or as approved by the Engineer. Partial Closure of SR19 with Detour onto Center Rd The contractor will be permitted partial closure of SR 19 at SR 104 for the duration of Stage 1 and Stage 3 construction to allow northbound turning movements from SR 104 to SR 19 and eastbound turning movements from SR 19toSR104. The Stage 1 and Stage 3 partial detours shall occur between the dates of April 1 and July 30, 2024. Traffic will be detoured onto Center Rd as shown on the Plans. State Route 104 Short Term Traffic Holds Short Term Traffic Holds for construction vehicle ingress and egress may be performed at any time through normal legal movements diverging and merging with public traffic. Traffic holds for truck ingress and egress shall be limited to 1 minute or less. Short term traffic hold for activities beyond construction vehicle ingress and egress shall be limited to 23:00 to 5:00, maximum 5 minute duration. Traffic holds shall be coordinated with the Hood Canal Bridge closures to minimize traffic impacts. Release traffic in all directions until queues dissipate before commencing another traffic hold. Where bicyclists and motorists need to share a lane following the end of traffic holds, release motorists first allowing queues to clear and then allow bicyclists to proceed. If the Engineer determines the permitted closure hours adversely affect traffic, the Engineer may adjust the hours accordingly. The Engineer will notify the Contractor in writing of any change in the closure hours. Exceptions to these restrictions are listed below and when applicable take precedence over closures listed above. The Engineer may also consider on a case -by -case basis additional exceptions following a written request by the Contractor. Lane, ramp, shoulder, and roadway closures are not allowed on any of the following. A holiday, 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or Monday are considered a holiday weekend. A holiday weekend includes Saturday, Sunday, and the holiday. 3. After 12:00 on the day prior to a holiday or holiday weekend, and 4. Before 12:00 on the day after the holiday or holiday weekend. 1 5. The two-hour period prior to and the two-hour period after the following 2 special events: 3 4 Discovery Marathon June 1 — 2, 2024 5 Lavendar Festival July 19 — July 21, 2024 6 Wooden Boat Festival September 6 — September 8, 2024 7 8 9 It shall be the Contractor's responsibility to obtain the dates and times of all 10 events. The 21 consecutive calendar day closures for SR 19 are not subject 11 to the holiday closure requirements. 12 13 Traffic Delays 14 When Automated Flagger Assistance Devices (AFADs) or flaggers are used to 15 control traffic, traffic shall not be stopped for more than 15 minutes at any time. All 16 traffic congestion shall be allowed to clear before traffic is delayed again. 17 18 If the delay becomes greater than 15 minutes, the Contractor shall immediately begin 19 to take action to cease the operations that are causing the delays. If the 15 minute 20 delay limit has been exceeded, as determined by the Engineer, the Contractor shall 21 provide to the Engineer, a written proposal to revise his work operations to meet the 22 15 minute limit. This proposal shall be accepted by the Engineer prior to resuming 23 any work requiring traffic control. 24 25 There shall be no delay to medical, fire, or other emergency vehicles. The Contractor 26 shall alert all flaggers and personnel of this requirement. 27 28 General Restrictions 29 Construction vehicles using a closed traffic lane shall travel only in the normal 30 direction of traffic flow unless expressly allowed in an accepted traffic control plan. 31 Construction vehicles shall be equipped with flashing or rotating amber lights. 32 33 No two consecutive on -ramps, off -ramps, or intersections shall be closed at the same 34 time and only one ramp at an interchange shall be closed, unless specifically shown 35 in the Plans. 36 37 Roads or ramps that are designated as part of a detour shall not be closed or 38 restricted during the implementation of that detour, unless specifically shown in the 39 Plans. 40 41 Note: "controlled access" paragraph is deleted. 42 43 Advance Notification 44 The Contractor shall notify the Engineer in writing of any traffic impacts related to 45 lane closure, shoulder closure, sidewalk closure, or any combination for the week by 46 12:00 p.m. (noon) Wednesday the week prior to the stated impacts. 47 48 The Contractor shall notify the Engineer in writing ten working days in advance of 49 any traffic impacts related to full roadway closure, ramp closure, or both. 50 The Contractor shall notify the Engineer in writing of any changes to the stated traffic 51 impacts a minimum of 48 hours prior to the traffic impacts. Video log by: Date of video log: Inspected by: Date of inspection: General Comments: Specific Comments: HR3 0192 Exhibit B Record of Condition Prior to Detour Usage of WSDOT of WSDOT of Jefferson County Road/Street Milepost/Location Comments Page 1 of 2 HR3 0192 Road/Street Milepost/Location Comments Page 2 of 2 HR3 0192