HomeMy WebLinkAboutCAR1998-00180 fig FS o/Vt
JEFFERSON COUNTY BUILDING APPLICATION
Jefferson County Permit Center Stornv zwr Plan
Castle Hill Mall Require 7- —TT
621 Sheridan St.
Port Townsend, WA 98368
360-379-4450
PERMIT # •BLD98-0393 DATE RECEIVED. : 06/23/98
SITE ADDRESS: NANTUCKET PL
:PORT TOWNSEND, WA 98368
APPLICANT. . . :KARL KOSTENBADER PHONE: (703) 425-1288
MAILING ADDR: 6216 WINDWARD DR
:BURKE VA 22015
CONTRACTOR. . :KELLEY SHIELDS INC PHONE: 385-7156
MAILING ADDR: 260 KALA POINT DR
:PORT TOWNSEND WA 98368
CONTR. LIC #:KELLESI150LF EXPIRATION DATE: 05/28/98
ARCHITECT/ . . : PHONE:
DESIGNER •
MAILING ADDR:
PARCEL NO. : 965000019 landslide — plat cond ; wetland _ flooding —
LEGAL DESC:STR 27-30-01 W WM seismic _ streams _ erosion f & w _
LOT 161, BLOCK , TAX # aquifer recharge
KALA POINT #3
DESCRIPTION OF IMPROVEMENT: single family residence
BUILDING TYPE •RES BEDROOMS--- BATHROOMS-- MAIN FL. . . : 2187 sf
TYPE OF IMPROVEMENT:NEW EXIST. : 0 EXIST. : 0 ADD'L FL. . : 0 sf
GARAGE/CARPORT • PROP. . : 3 PROP. . : 3 HTED BSMT. : 0 sf
WOODSTOVE • TOTAL. : 3 TOTAL. : 3 UNHT BSMT. : 1838 sf
UBC OCCUPANCY GROUP: SEWAGE DISP. . :CON OTHER • 0 sf
TYPE OF CONST • WATER SUPPLY. :KALA PT CRPT/GAR. . : 528 sf
UNITS. : 0 STORIES: 0 HEAT TYPES. :HTP/ / DECKS • 322 sf
DIMENSIONS: COMMERCIAL: 0 sf
FRAME TYPE:WOOD INDUSTRIAL: 0 sf
EST COST. $: 147453 BANK HT. . . : 0 ft
PROJ GRP. . : 10506 SH SETBACK: 0 ft
Owner/agent FEES
Signature: type amount by date recpt
PRMT $ 1127. 25 EMH 06/23/98 2873
Date: PLCK $ 338. 18 EMH 06/23/98 2873
B.C. $ 4 . 50 EMH 06/23/98 2873
Issued By:
Date:
(bld_appl.txt 4/98)
1,90 Cr+flcaI Area $ 1469. 93 TOTAL
ti
JEFFERSON COUNTY
STORMWATER MANAGEMENT ORDINANCE
SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL WORKSHEET
Property Owner: 144,-/L( 1Z-0 S R U i3 A-P E.Yz Telephone: C.7 a 3J z - 0-2 e
Address: (p 2) to W wfl IL . 1 J v 12►c. e up, 2 c7 1 s
Assessor's Parcel Number: 9 to j- ()O 0 - 01
Building Permit or Septic Permit Application Number(if applicable):
Brief Project Description: KLJ 2 D
Site Location: (--0T 1 61 - \Cprt.p. V o I Cc" �� c)-F IJ AN., C.!C-712)
Person Responsible for BMP Installation and Maintenance: D L\--N k S
Address: 0 i 7 i^ri `- — VT
Telephone: 3�5� _ � ) J�'
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads.
Please check the measures you plan to implement and show their approximate location on the site
plan. You may also propose measures other than those listed. Attach additional sheets, if more
space is required.
[,_J" Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas, landslide or erosion hazard arca, etc.).
March 10, 1997
9
•
EROSION AND SEDIMENT CONTROL WORKSHEET
[t] .- Phase clearing so that only areas that are actively being worked are uncovered.
[d----- Start and complete land disturbing activities and stabilize the site between April 1 and
September 30. Stabilization means that disturbed areas will have well-established plant
cover or be landscaped to minimize erosion.
•
Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[ ] Place gravel base on roads, driveways, and parking areas after clearing and subgradc
preparation.
Protect adjacent properties and water bodies from sediment deposition:
[ ] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies. (See attached illustrations from Stormwater Management Manual.)
[ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
Stormwater Management Manual.)
Regularly inspect and maintain all BMPs especially after storms events.
[ij/ Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
March 10, 1997
10
EROSION AND SEDIMENT CONTROL WORKSHEET
ft 2. Describe how disturbed areas will be permanently stabilized (seeded, landscaped, apply gravel base
to roadways, etc.)
— DR, ! VLwA ` t — G �� �._�-�"
D S Pc' w tT-t i
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate, dry well, infiltration trench, route runoff to existing drainage facilities, etc.).
•
March 10, 1997
11
.-- EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
; Management Practices. Describe proposed maintenance of BMPs.
k....) \ ^ yam/
v - l L I i L-N TDL,�t ��'" ;:r .)Com.
.�P\--,--) — 1-4--?--it , c_A--e(3
_1 n--pJ -- �O -)Q_ C�t-)c--. „.)
The Best Management Practices proposed above will be implemented to control erosion, sediment, and
stormwater runoff. I will notify the Permit Center for inspections as required.
,0,44./A-0. 7(.2-t-t!--4- V P )2 Cr-Signature of Owner/Agent Da c
APPROVED BY
JEFFERSON COUNTY
JUL 141998
AUTH 1
v
March 10, 1997
12
f
A tai-
NTUt: ET- /-)
\ . ___
0
\2 - 00:111/ I
o� 1 i � /. 1 _ _. ZOO
0l
1 1
n
d t
V 7 1
qI , �
uN�gf100 / t
a3ANOOtiddd d3��3C
\ v 1
1-1' . 1 \ ''''
/ \ 1
_Jo
�
•
g
'
.. 1�,E:,�r'`-a0v--ti p`^ v. d-
U
.Q, r
y
_,_
aQi
r)j. -4?‘ t
I
�/
, / : 4__ __vrilw____ ,cz, \. __, --,72, 1___ ___--5 r ___/-, )-/. 12.S . , / 41
1 o
3x _ _
.s":3_2_-__1-7dPi __--- ‘2_,„..... ....._
. .....
__________
,., ,f--,,---,-
i 1 . eu
tri
•
1> GC:,L.`r --,)v,...) N/ \
t3 •
Karl. Kostenbader
f Le cK'I
(OP-10-4e S-,�r)4�
Lot ��,
l ) „,,„.,,,,„,i ,cC,.-Y�.c�o PE. krEI-L-v,.� ^'��
Kala Point
Division 3
�P2C1� q�oSDl�001� �'' [�S �1ia►)rtt,t ,)�
fi
` ^ -tom C�.�-�^�t �J �1 ��� F 4t �”! "`t �i
Y ,-,:,,,,,,,,,,-,k,-"k
/ -