HomeMy WebLinkAboutAward of Contract Phase 3 Low Pressure Sewer Collection System Department of Public Works
0 Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Mark McCauley, County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engineer
Agenda Date: February 5, 2024
Subject: Phase 3 Low Pressure Sewer Collection System for Port Hadlock
UGA - Award of Contract
Statement of Issue: Award of Contract to Seton Construction Inc. of Port Townsend,
Washington for their bid of $4,997,707.00, which includes 9.1% Washington State Sales
Tax (WSST) for the above referenced project.
Analysis/Strategic Goals/Pro's Et Con's: The Public Works Department has completed
checking the bids and has investigated the qualifications of the lowest bidder
including Bidder responsibility criteria of RCW 39.04.350(1) and project supplemental
criteria in Special Provisions 1-02.14 Disqualification of Bidders. Bid tabulations and Bidder
verification documentation is attached.
Fiscal Impact/Cost Benefit Analysis: The Bid amount is $4,997,707.00, which
includes 9.1% WSST. This project is funded with Department of Commerce funds and
Department of Ecology State Revolving Loan fund and Centennial Grant.
Recommendation: Public Works recommends that the Board authorize the Award of
Contract to Seton Construction Inc., and return signed award document to Public
Works for further processing.
Department Contact: Samantha Harper, P.E., Wastewater Project Manager, Ext. 175
Reviewed By:
//,//07r
Mark McCaul County Administrator Date
BID TABULATION SUMMARY
PHASE 3 Low Pressure Sewer Collection System FOR PORT HADLOCK UGA
Commerce Project No. 22-96515-026
ECY Agreement No. WQC-2024-JCoPWE-00034
COUNTY PROJECT 405-2114-0 BID OPENING DATE: January 24, 2024
BID OPENING TIME: 2:00 p.m.
ENGINEER'S ESTIMATE
Seton Construction
4640 S. Discovery Rd.
Port Townsend, WA 98368
Nordland Construction
123 Ponderosa PI.
Nordland, WA 98358
Northwest Cascade Inc. PO
Box 73399 Puyallup,
WA 98373
Interwest Construction Inc.
609 North Hill Blvd.
Burlington, WA 98233
ITEM
NO.
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT
BID
TOTAL
BID
UNIT
BID
TOTAL
BID
UNIT
BID
TOTAL
BID
UNIT
BID
TOTAL
BID
UNIT
BID
TOTAL
BID
1
1
CALC
Minor Change and Force Account
$
75,000.00
$
75,000,00
$
75,000.00
S
75,000.00
5
75,000.00
$
75,000.00
$
75,000.00
$
75,000.00
$
75,000.00
$
75,000.00
2
1
LS
As -built Drawings $5,000 Minimum)
$
5,00000
$
5,000.00
$
5,000.00
$
5,000.00
$
5,000.00
$
5,000.00
$
5,000.00
$
5,000.00
5
5,000.00
$
5,000.00
3
1
LS
Mobilization
$
521,554,40
$
521,554A0
$ 297,390.68
5
297,390.68
S
450,000.00
$
450,000.00
$
574,000.00
$
574,000.00
$
400,000.00
$
400,000.00
4
1
LS
Project Temporary Traffic Control
$
600.000,00
$
600.000.00
$ 385,000.00
$
385,000.00
$
285,000.00
$
285,000.00
S
688,000.00
5
688,000.00
$
315,000.00
$
315,000.00
5
170
DAY
Portable Changeable Message Sign
$
48.00
$
8,160.00
$
138.00
$
23,460.00
$
250.00
$
42,500.00
$
100.00
17,000.00
$
150.00
$
25,500.00
6
1
LS
Clearing and Grubbing
$
50,000.00
$
50,000.00
$
25,000.00
$
25,000.00
$
85,000.00
$
85,000.00
S
380,000.00
$
380,000.00
$
95,000.00
$
95,000.00
7
1
LS
Removal of Structures and Obstructions
$
10,000.00
$
10,000.00
$
21,500.00
$
21,500.00
$
85,000.00
$
85,000.00
$
282,000.00
S
282,000.00
$
10,000.00
$
10,000.00
8
26,433
LF
Sawcutting for Pavement Removal
$
6.00
$
158,598.00
$
4.00
5
105,732.00
S
5.00
$
132,165.00
$
4.00
$
105,732.00
$
5.00
$
132,165.00
9
8,125
SY
Remove Existing Pavement
$
14,86
$
120,737 50
$
15.20
$
123,500.00
$
18.00
$
146,250.00
S
12.50
5
101,562.50
S
9.00
$
73,125.00
10
100
SY
Remove Cement Cone. Sidewalk
$
23,65
$
2,365.00
S
30.00
S
3,000.00
5
35.00
$
3,500.00
$
24.50
$
2,450.00
°,>
38.00
$
3,800.00
11
22
SY
Remove Cement Conc. Pavement
$
16.14
$
355,08
$
30.50
$
671.00
$
35.00
5
770.00
$
34.25
$
753.50
$
28.00
$
616.00
12
138
LF
Remove Cement Conc. Curb and Gutter
$
17A 5
$
2,366.70
$
15.00
$
2,070.00
$
25.00
$
3,450.00
$
11.00
$
1,518.00
5
40.00
$
5,520.00
13
25
EA
Pothole Exisiting Utilties
$
2.000.00
$
50,000.00
$
650.00
$
16,250.00
S
1,500.00
$
37,500.00
$
575.00
$
14,375.00
$
1,400.00
$
35,000.00
14
3,792
TON
Import Trench Backfill
$
58,00
$
219,936.00
$
20.00
$
75,840.00
$
45.00
$
170,640.00
$
35.25
5
133,668.00
S
17.50
5
66,360.00
15
276
CY
Slope Backfill Material
$
6000
$
16,560.00
$
43.00
$
11,868.00
5
75.00
$
20,700.00
$
125.00
$
34,500.00
$
40.00
$
11,040.00
16
3.511
TON
Crushed Surfacing Top Course
$
60.00
$
210,660.00
$
68.00
$
238,748.00
5
55.00
5
193,105.00
$
56.00
$
196,616.00
$
52.25
$
183,449.75
17
1,896
TON
Crushed Surfacing Base Course
$
50.00
$
94,800.00
$
54.00
$
102,384.00
$
50.00
$
94,800.00
$
56.00
$
106,176.00
$
41.25
5
78,210.00
18
203
TON
Trail Surfacing Top Course
$
60.00
$
12,180.00
$
46.00
S
9.338.00
S
75.00
S
15,225.00
$
78.00
$
15,834.00
$
61.00
$
12,383.00
19
1,729
TON
HMA Class 1/2-inch PG 58H-22
$
200,00
$
345,800.00
$
201.00
$
347,529.00
$
215.00
$
371,735.00
5
240.00
$
414,960.00
5
200.00
$
345,800.00
20
80
LF
Schedule B Storm Sewer Pipe 24 In, Diam,
$
100.00
$
8,000.00
$
122.00
5
9,760.00
$
175.00
$
14,000.00
$
175.00
$
14,000.00
$
93.00
$
7,440.00
21
20
LF
Schedule A Storm Sewer Pipe 18 In. Diam.
$
100.00
$
2,000,00
$
118.00
$
2,360.00
$
150.00
5
3,000.00
S
226.00
$
4,520.00
$
120.00
$
2,400.00
22
1
EA
Precast Concrete D ell
$
9,000.00
$
9,000.00
$
8,100.00
$
8,100.00
$
13,000.00
$
13,000.00
$
4,300.00
$
4,300.00
$
22,000.00
$
22,000.00
23
1
EA
Connection to Drainage Structure
$
2,600,00
$
2,600.00
$
925.00
$
925.00
S
1,000.00
5
1,000.00
$
3,200.00
$
3,200.00
$
2,600.00
$
2,600.00
24
1
LS
Shoring and Extra Excavation (Sewer)
$
100.000.00
$
100,000.00
$
50,000.00
$
50,000.00
$
50,000.00
S
50,000.00
5
6,000.00
5
6,000.00
5
12,000.00
$
12,000.00
25
2.540
LF
HDPE Low Pressure Sewer 2-inch Diam. DR 11
$
45.00
$
114,300.00
$
24.00
$
60,960.00
$
35.00
$
88,900.00
$
21.50
$
54,610.00
$
34.25
S
86,995.00
26
8,879
LF
HDPE Low Pressure Sewer 3-inch Diam. DR 11
$
55.00
$
488,345.00
$
31.00
$
275,249.00
$
35.00
$
310,765.00
S
29.50
$
261,930.50
$
38.00
$
337,402.00
27
9,492
LF
HDPE Low Pressure Sewer 4-inch Diam, DR 11
$
65.00
$
616,980,00
$
32.00
$
303,744.00
$
45.00
$
427,140.00
$
35.50
S
336,966.00
$
40.00
$
379,680.00
28
7,456
LF
HDPE Low Pressure Sewer 6-inch Diam, DR 11
$
75.00
$
559,200.00
S
40.00
5
298,240.00
S
55.00
$
410,080.00
$
40.00
$
298,240.00
$
49.00
$
365,344.00
29
1,180
LF
PVC Sewer Casing Pipe 12-inch Diam. SDR 35
$
135.00
$
159,300.00
$
78.00
$
92,040.00
$
185.00
S
218,300.00
S
122.00
$
143,960.00
$
88.00
$
103,840.00
30
6
EA
Concrete Pipe Anchors
$
3.000.00
$
18,000.00
$
750.00
$
4,500.00
$
1,000.00
$
6,000.00
$
1,900.00
$
11,400.00
5
2,000.00
5
12,000.00
31
3
EA
Connection to Existing Sewer Main
$
4,500.00
$
13,500,00
$
1,100.00
S
3,300.00
$
2,000.00
$
6,000.00
$
16,000.00
$
48,000.00
$
2,000.00
S
6.000.00
32
10
EA
Cleanout Assembly Type In -Line
$
10,000.00
$
100.000.00
$
8,800.00
$
88,000.00
$
14,000.00
$
140,000.00
5
7,775.00
$
77,750.00
S
8,500.00
$
85,000.00
33
27
EA
Cleanout Assembly Type End
$
7,500.00
$
202,500,00
$
6,250.00
5
168,750.00
$
9,000.00
$
243,000.00
$
5,675.00
$
153,225.00
$
6,100.00
$
164.,700.00
34
5
EA
Cleanout Assembly Type at Bend
$
10.000.00
$
50,000.00
$
8,990.00
$
44,950.00
S
14,000.00
5
70,000.00
S
7,850.00
5
39,250.00
$
8,600.00
$
43,000.00
35
5
EA
Cleanout Assembly Type Wye
$
10,000.00
$
50,000.00
$
8,175.00
$
40,875.00
$
14,000.00
$
70,000.00
$
7,200.00
$
36,000.00
$
7,800.00
$
39,000.00
36
8
EA
Cleanout Assembly Type Unidirectional
$
11,000.00
$
68.000.00
$
11,500.00
$
92,000.00
$
19,000.00
$
152,000.00
$
9,550.00
$
76,400.00
$
10,500.00
5
84,000.00
37
13
EA
Comb Air Release/Vacuum Valve Assembly 2 In. (Sewer)
$
12,000.00
$
156,000.00
$
15,000.00
$
195,000.00
$
28,000.00
$
364,000.00
S
14..600.00
5
189,800.00
$
15,400.00
$
200,200.00
38
9
EA
Gate Valve 2-inch
$
3,000.00
$
27,000,00
$
1,825.00
S
16,425.00
$
2,000.00
$
18,000.00
$
1,840.00
$
16,560.00
$
2,100.00
S
18,900.00
39
18
EA
Gate Valve 3-inch
$
6,500.00
$
117,000.00
S
1,880.00
S
33,840.00
5
2,500.00
$
45,000.00
S
1,875.00
$
33,750.00
$
2,200.00
$
39,600.00
40
9
EA
Gate Valve 4-inch
$
7.000.00
$
63,000.00
$
2,045.00
$
18,405.00
$
3,000.00
$
27,000.00
$
1,900.00
5
17,100.00
$
2,300.00
$
20.,700.00
41
9
EA
Gate Valve 6-inch
$
7,500.00
$
67,500.00
$
2,250.00
$
20,250.00
5
3,500.00
$
31,500.00
$
2,250.00
$
20,250.00
$
2,700.00
$
24,300.00
42
139
EA
Service Connection 2-inch Diam.
$
5.000.00
$
695,000.00
$
3,595.00
$
499,705.00
$
2,750.00
$
382,250.00
$
2,500.00
5
347,500.00
$
2,525.00
$
350,975. 00
43
28,367
LF
Testing Low Pressure Sewer Pipe
$
5.00
$
141,835.00
$
1.00
$
28,367.00
$
2.00
$
56,734.00
$
2.00
$
56,734.00
S
1.25
$
35,458.75
44
1.000
LF
Chain Link Fence Type 3
$
29.26
$
29,260.00
S
53.00
S
53,000.00
S
67.00
$
67,000.00
S
53.00
$
53,000.00
$
54.00
$
54,000.00
45
10
EA
Flexible Guide Post
$
1,000.00
$
10,000.00
$
80.00
$
800.00
$
300.00
$
3,000.00
$
280.00
$
2,800.00
$
90.00
$
900.00
46
138
LF
Cement Conc Traffic Curb and Gutter
$
71.79
$
9,907.02
$
145.00
$
20,010.00
S
50.00
$
6,900.00
$
61.00
$
8,418.00
$
82.00
S
11,316.00
47
100
SY
Cement Conc Sidewalk
$
105,59
$
10,559.00
$
160.00
$
16,000.00
$
500.00
$
10,000.00
$
310.00
S
31,000.00
$
137.00
$
13,700.00
48
1
LS
CSWPPP and TESC Plan
$
20,000.00
$
20,000.00
$
1,200.00
$
1,200.00
$
3,000.00
$
3,000.00
$
1,000.00
$
1,000.00
5
7,000.00
$
7,000.00
49
20
EA
Inlet Protection
$
15.00
$
300.00
5
95.00
$
1,900.00
5
100.00
$
2,000.00
5
90.00
$
1,800.00
$
100.00
$
2,000.00
50
1
LS
Temporary Erosion and Sediment Control
$
50,000.00
$
50,000.00
$
20,000.00
$
20,000.00
$
50,000.00
$
50,000.00
$
64,000.00
5
64,000.00
5
65,000.00
$
65,000.00
51
4
ACRE
Seeding Fertilizin and Mulching
$
6,50000
$
26.000.00
S
4,275.00
$
17,100.00
$
7,000.00
$
28,000.00
$
6,600.00
$
26,400.00
$
4,400.00
5
17,600.00
52
3.023
CY
Topsoil Type A
$
3000
$
90,690.00
$
64.00
$
193,472.00
$
75.00
$
226,725.00
$
67.00
$
202,541.00
$
52.00
$
157,196.00
53
6.171
LF
Paint Line
$
1.00
$
6,171.00
$
2.00
$
12,342.00
$
2.00
$
12,342.00
$
1.50
$
9,256.50
5
1.00
$
6,171.00
54
1
CALC.
Permanent Signage
$
20,000.00
$
20,000.00
5
20,000.00
$
20,000.00
5
20,000.00
S
20,000.00
S
20,000.00
$
20,000.00
$
20,000.00
$
20,000.00
Subtotal of Bid Items
9.1% Sales Tax
Total Lump Sum Bid Amount
$6,626,019.70
$602,967.79
$7,228,987.49
$4,580,849.68
$416,857.32
$4,997,707.00
$5,793,976.00
$527,251.82
$6,321,227.82
$5,820,806.00
$529,693.35
$6,350,499,35
S4,671,386.50
$425,096.17
$5,096,482.67
Prepared by Project Manager: Samantha Harper, P.E. Date: 1/25/2024
Reviewed by Eng. Serv. Manager:
Reviewed by County Engineer: Monte Reinders, P.E. Date:1
BID & CONTRACTOR VERIFICATION SUMMARY
Jefferson County Public Works
Project Name PHASE 3 Low Pressure Sewer Collection System for PORT HADLOCK UGA
County Proiect No. 405-2114-0
Form Version Date: 1/25/2024
Bid Opening Date: 24-Jan-24
Bid Opening Time: 2:00pm
J
t
A
O
c
c
to
U)F
rc
w
u
I-
m —
V)
0
LL
Z
W
m
N'u
J y
W
0
o
Oavi
� 3
0.o
w�
'
X O
le
z
�tif
O
a
F
O
rr.�
O
N
W
m
U) 25
LL ti
W
0 C
3 p
¢
V F
O .�
OI
z m J
O
m
S
ro
Ix
y
f
O
;�
h
A
rn
n z 0 :3y
rn
U
O Q
K
O
x
F
c
W
f
K
O
LL
d
Z,
O
r j o
W
m
W
F
3
z Q
O W
LL q
00
W
z o
O.E
o.
K
mzw
7 Q
F
Z
m
o
O
'�
O
`
m€
Jm
W
ro
N
w
f%1
O d
f
oV
c0
a •�
yw0
W
QU
R'
W
W
c
O
N
i
O
O
O
0
m
z
G
r2
�j
~
3
r
Q
G `°
3
F
.. ,fOs F
S
J v
Q O
N?
W
F
Z
Z
K
K
ry
R'
O
0
W
W_ w
C
O
w 3
LL'
W
Q
O
_
a4
F`
W
Y�
y w
Z d W
C
F 11
O'C
O¢m
x
O
7
y
n
I:
O
W
U
.1°.
C
m
c
LL N
Y 2
c>I O
LL
r
i °�
z
J
1' p-
J a
F Oi
z t Y
7 y
.0
F�
¢
x
� Y D
LL WW
it
Q
o
z
z
¢
d
E
w
it
rcE
w
t=
m
O
2
O
m m
9t
wop
a
B
uZ
O
w L)
0
m
K
w
z
M
o
F
O
O
f%lm
3
w y
U
x O
U
W
zc m
O o.
H
¢
o
N
w
0W V
w
a
w a
`o
ILJ
0
¢YR
W
F
g
o
w
C
c
z
o
z
C9
rn
LL.
0
o
0
4
¢
L
%`O,
O
inr
m
0
w
~ c `o
¢
W
m
Y
a
w
LL
a,
c
°r u
c
WIii
K f
¢ >W
W
Uw
K
w o
K
x
KZ
W—
Q z
K
t7
F.
QQ
O
z
3
J
rc
w
� O
m
2Z
fa
rn.�
O y
K��
f
x
�Z
Wi
J
z�
LL F
z_
a o z
w rn 7
F Q
ZZ
> v Z
0
13
Y
00
XQ
y'
m
F
m
Q
0
W
J
U
K
U
Oa.
U
F
W
LL
W a
K O
O
m>
O
W
Z °�
H
m m 0
D
W `m
w>
C
W m
O m
N
O m
y
O
O m
W
•r
Z 7 y
z
J
_
U
Q
W
p
N
N
W
F
J
z
Q
a
F
¢
LL'
K
m C
0 t
W `
OI
W q
N>
>
> •C
O d
W
N�
W>
>
O` a
W H
O
W
Y >
f v W
O
IL q
Z O
C>
9
19 Z
O
M
0
o_
m
O
Z
O
Z
U
w
J
Qa
V
N
J
O
E_
O
o
0
m
LL
m '�
p�
m 3
O«
7 0
m rn
W q>
K
N
Z
z 0
W of
y 0
Z 0
O
Im
YC«
U Rt
>_
�[
U
= a Q
K m0
LL of
¢ a
q O
¢m en
O_
ogf
0 K
p
r
•�
m
z
y
W
z
O
O
m
z
N
W
LL
K
O
V
Q
UQ
Ik
0
O
F>
U p�
LL. O
o'
Ge O
9
0 A
W_ 3
xx 3 z
Q J
W
U
U A
J 3
W A
U 3
H w
%
W 0 7
2 w
W
x¢
W LL
x a7
O
F` m
LL' N 3
m
W
U W
m F
m
O
G
W
U
Q
Z
J
O
0
W
W
Y
U
F
K
F
Y
q
O
F N
U 3
0
F 3
U
LL C
~ C O
W
J
N C
J E
J
Q-
U 9
3
0
m p 0
rr�
g vi
C
a.
LL
J F W
t9
H
J
K
iL
O
2
rn
-1
c
f/1
j
LL
U
z
Z
li
F 3
Z
rA E
LL.
O
LL, _
O
LL• _
O d
K `
K
O C
K 2
O
Z 3 0
U_
W V
U T`
Q—
Y
H J f
x
7
�'
W
z
—
O
J
rc
3
V
U
9
z O
~
it
W
U 7 j;
I-
F- 7
F
F 7
F- o
F W
�
W I-
U
R' 7
K
m K
W _—
U
O
O
W
z
z
>
O
C4
-�
ay
O
O
OLL
g
Z
m
>
m
>
°o
Ua
z E
O
z L
Z
O
F d
¢ 0
m
wNa°
V
QQ
U d
Q
QU d
h
4,
�n
U u
m
U W
f.0a
y O U
O.
,•+
Q
3
u
E- an d
z N
O
F
Z
~
3
Q
Q
N
x
W
1
W
a
U
H
W
t7
U
U)
to
0
W;
��
O
U
U y
F
m ui
W o o
1-
K
F
C'
H is
R'
F %ri
0
Z�
F- C
O
FQ
O —
J
J
IL
O!
Q
O
J 0 2
LLLL-
CONTRACTOR
O
LL
LL
o
o
c
O
a
o
^E
Z
0
z
w
¢
m
M
w
m
w
m
w
m
o
��
m
>
m2
>K
n
¢J3
¢ oY
c
z
O
z a
01r
z a
O�
w
o-
z a 0
zz
a ��
W
fm
Uti�
u
j
z
0
�w0
tp
uW.
0.�
F>;
V
Ni+
Oxa
O¢
02
2 E
W
OLL
ad9
J d
Q
mKto
I
Provide date
Submitted,
Account is
No records found
YES or
of meeting
Sent or Not
$1,234.567.00
X
YES
YES
YES
YES
91-1234567
YES
YES
YES
YES
YES
YES 1
YES
N/A
Not a DBE
YES
Not on list
123456789
123456789
ABCDEF`123YZ
1/1/2018
YES
current
I Not on list
by SAM
654321-00
N/A
Exempt
attended
Required
Seton Construction
4640 S. Discovery Rd.
1
Port Townsend, WA 98368
$4,997,707.00
x
Yes
Yes
Yes
Yes
91-090295
Yes
Yes
N/A
Yes
Yes
Yes
Yes
N/A
Not DBE
N/A
N/A
600120697
600120687
SETONC11550A
10/30/2025
Yes
Account is
current
Not on list
Yes
375947006
Exempt
1/5/2024
Yes
Nordland Construction NW
123 Ponderosa Place
Account is
2
Nordland, WA 98358
$6.321.22782
Yes
Yes
Yes
Yes
41-2182880
Yes
Yes
N/A
Yes
Yes
Yes
Yes
N/A
Not DBE
N/A
N/A
602529765
602529765
NORDLCN953NT
11/18/2025
Yes
current
Not on list
Yes
41737006
Exempt
1/5/2024
Yes
Northwest Cascade Inc.
P.O. Box 73399
Account is
3
Puyallup, WA 98373
$6,350,499.35
Yes
Yes
Yes
Yes
91-0826936
Yes
Yes
N/A
Yes
Yes
Yes
Yes
Yes
Not a DBE
N/A
278049149 1
278049149
NORTHC1148BG
10/4/2025 1
Yes
current
Not on list
Yes
307161000
Exempt
1/5/2024
Yes
Interwest Construction Inc.
4575 Fey Rd. Port
Account is
4
Angeles, WA 98363
$5,096,492 67
Yes
Yes
Yes
Yes
91-1413003
Yes
Yes I
N/A
Yes
Yes
Yes
Yes
N/A
Not a DBE
N/A
N/A
601029425
601029425
INTERC1121OF
11/8/2025
Yes
current
Not on list
Yes
650775004
Exempt
1/5/2024
Yes
ENGINEER'S ESTIMATE (with 9.1%sales tax)
$7,226,987.49