TO: Board of County Commissioners
Mark McCauley, County Administrator
FROM: Pinky Feria Mingo, Director, Environmental Health and Water
Quality
Tami Pokorny, Natural Resources Program Coordinator
DATE: ° 1 Ltun, I? ZGZ 7
SUBJECT: Agenda Item — Approval of Professional Services Agreement with
Natural Systems Design + Coastal Geologic Services for the Brinnon
Reach Assessment & Conceptual Design Project; to conduct
assessments and develop an initial design for the reach; January 1,
2024 — December 31, 2025; $139,984.25
STATEMENT OF ISSUE:
Jefferson County Public Health requests approval of a professional services agreement with
Natural Systems Design + Coastal Geologic Services for the Brinnon Reach Assessment &
Conceptual Design Project; to conduct assessments and develop an initial design for the reach;
January 1, 2024 — December 31, 2025; $139,984.25
ANALYSIS:
Public Health requests approval of a professional services agreement with Natural Systems
Design + Coastal Geologic Services (NSD + CGS) for the Brinnon Reach Assessment &
Conceptual Design Project. NSD + CGS will assess current floodplain conditions involving the
community of Brinnon and the lower one mile of the Dosewallips River and estuary. Reach
geomorphology, hydrology (flood modeling), the Brinnon levee, existing habitat, and other
floodplain functions and features will be assessed on foot with landowner permission, or
utilizing remote imagery. A conceptual design will be developed and refined through a series of
meetings of the Dosewallips River Collaborative to address diverse needs and concerns related
to flood risk, land use, climate change, and habitat for listed salmon species. NSD + CSG is
currently engaged in planning and design efforts in two additional reaches of the Dosewallips
River. JCPH requests the opportunity also work with NSD + CSG in the Brinnon Reach on a sole
source basis in order to maintain consistent approaches and communications.
Community Health Environmental Public Health
Developmental Disabilities Water Quality
360-385-9400 360-385-9444
360-385-9401 (f) Always working for a safer and healthier community (f) 360-379-4487
W Q-24-003
FISCAL IMPACT:
Costs for the project will be provided by the RCO #23-1062 with an in-kind match of at least
15% provided by the following: the value of aerial images provided by the Jamestown S'Klallam
Tribe, an in-kind portion of a FEMA Cooperating Technical Partners Program grant from
American Rivers, the in-kind value of related Community Health Assessment activities from
JCPH, and the in-kind value of a portion of the County's Sea Level Rise Study from DCD.
RECOMMENDATION:
JCPH Management recommends approval of the professional services agreement with Natural
Systems Design + Coastal Geologic Services for the Brinnon Reach Assessment & Conceptual
Design Project; to conduct assessments and develop an initial design for the reach; January 1,
2024 — December 31, 2025; $139,984.25
REVIEWED BY:
Mark McCauley, CVjnty Administrator Date
Community Health Environmental Public Health
Developmental Disabilities Water Quality
360-385-9400 360-385-9444
360-385-9401 (f) Always working for a safer and healthier community (f) 360-379-4487
CONTRACT REVIEW FORM Clear Form
(INSTRUCTIONS ARE ON THE NEXT PAGE)
CONTRACT WITH: Natural Systems Design Contract No: WQ-24-003
Contract For: Brinnon Reach Assessment Term: 1/1/2024 - 12/31/2025
COUNTY DEPARTMENT: Environmental Health
Contact Person: Tami Pokorny
Contact Phone: #498
Contact email: tpokorny@co.jefferson.wa.us
AMOUNT: $139,984.25 PROCESS: Exempt from Bid Process
Revenue: Cooperative Purchase
Expenditure: $139,984.25 Competitive Sealed Bid
Matching Funds Required: Small Works Roster
Sources(s) of Matching Funds Vendor List Bid
Fund 4 128 RFP or RFQ
Munis Org/Obj 12855310 ✓ Other: Sole Source
APPROVAL STEPS:
STEP 1: DEPARTMENT CERTIFIES CO IJ CE W C .5.080 AND CHAPTER 42.23 RCW.
CERTIFIED: ■� N/A: I Jan. 22, 2024
Signature Date
STEP 2: DEPARTMENT CERTIFIES THE PERSON PROPOSED FOR CONTRACTING WITH THE
COUNTY (CONTRACTOR) HAS NOT B N DEBARREP BY ANY FEDERAL, STATE, OR LOCAL
AGENCY.
CERTIFIED: F—ml N/A: �W Jan. 22,2024
Signature % Date
STEP 3: RISK MANAGEMENT REVIEW(will be added electronically through Laserfiche):
Electronically approved by Risk Management on 1/24/2024.
STEP 4: PROSECUTING ATTORNEY REVIEW (will be added electronically through Laserfiche):
Electronically approved as to form by PAO on 1/24/2024.
Mostly standard county langauge. Risk Management decison to accept
non-standard indemnity language. Thanks for pointing out the non-
standard langauge in the contract review form.
STEP 5: DEPARTMENT MAKES REVISIONS & RESUBMITS TO RISK MANAGEMENT AND
PROSECUTING ATTORNEY(IF REQUIRED).
STEP 6: CONTRACTOR SIGNS
STEP 7: SUBMIT TO BOCC FOR APPROVAL
1
PROFESSIONAL SERVICES AGREEMENT
Between
Natural Systems Design + Coastal Geologic Services
And
Jefferson County
Brinnon Reach Assessment& Conceptual Design
THIS PROFESSIONAL SERVICES AGREEMENT("this Agreement") is entered into between the
County of Jefferson, a municipal corporation("the County"), and Natural Systems Design+
Coastal Geologic Services ("the Contractor"), in consideration of the mutual benefits,terms, and
conditions specified below.
l. Project Desi nation. The Contractor is retained by the County to perform the following
Project: For the lower Dosewallips River, assist in the development of assessments,
planning and conceptual designs for the Brinnon reach through a collaborative process
and in partnership with Tribes' and agency project partners and members of the Brinnon
community. The project reach is located between river mile (RM) 0.0 and 1.0 on the
Dosewallips River between Hood Canal and a volcanic outcrop that naturally constricts
the river downstream of the Bonneville Power Administration's transmission corridor.
Goals of this multi-benefit project are to increase spawning and rearing habitat for Hood
Canal Summer-run salmon while improving community resilience by developing a
resiliency plan to also address flood and erosion risks and existing flood protections.
Funding for this agreement is provided by a grant from the Recreation and Conservation
Office for projects identified and recommended by the North Pacific Coast Lead Entity,
RCO 423-1062.
2. Scope of Services. Contractor agrees to perform the services identified on Exhibit"A"
attached hereto including the provision of all labor.
3. Time for Performance. This Agreement shall commence on January 1, 2024 and
continue through December 31, 2025. Work performed consistent with this Agreement
during its term, put prior to the adoption of this Agreement, is hereby ratified. The
Contractor shall perform all services pursuant to this Agreement as outlined on Exhibit
"A". Time is of the essence in the performance of this Agreement.
4. Payment. The Contractor shall be paid by the County for completed work and for
services rendered under this Agreement as follows:
a. Payment for the work provided by Contractor shall be made as provided on Exhibit
"B"attached hereto,provided that the total amount of payment to Contractor shall
not exceed$139,984.25 without express written modification of the Agreement
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page i of21
WQ-24-003
signed by the County. The anticipated timeline for completing the project is also
detailed in Exhibit`B".
b. Invoices must be submitted by the 101h of the month for the previous month's
expenses. Such invoices will be checked by the County, and upon approval thereof,
payment will be made to the Contractor in the amount approved. Failure to submit
timely invoices and reports pursuant to Exhibit B of the Agreement may result in a
denial of reimbursement. Invoices not submitted within 60 days may be denied.
c. Final payment of any balance due the Contractor of the total contract price earned
will be made promptly upon its ascertainment and verification by the County after
the completion of the work and submittal of reports under this Agreement and its
acceptance by the County.
d. Consultant shall provide invoices and necessary backup documentation for all
services including timesheets and statements(specifying the services provided).
Any indirect charges require the submittal of an indirect cost methodology and rate
using 2 C.F.R. Part 255 and 2 C.F.R. Part 230.
e. The Contractor's records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the County and state for a period of six
(6)years after final payments. Copies shall be made available upon request.
5. Ownership and Use of Documents. All non-confidential or de-identified documents,
drawings, specifications, and other materials produced by the Contractor in connection
with the services rendered under this Agreement shall be the property of the County
whether the project for which they are made is executed or not. The Contractor shall be
permitted to retain copies, including reproducible copies, of drawings and specifications
for information, reference and use in connection with Contractor's endeavors.
Contractor shall not be held liable for reuse of documents or modifications thereof,
including electronic data, by County or its representatives for any purpose other than the
intent of this Agreement.
6. Compliance with Laws. Contractor shall, in performing the services contemplated by
this Agreement, faithfully observe and comply with all federal, state, and local laws,
ordinances and regulations, applicable to the services to be rendered under this
Agreement.
7. Audit. An audit will be submitted to the County upon request. Upon request,
Contractor will submit the most recent financial audit within 30 days.
a. Upon request the County shall have the option of performing an onsite review of all
records, statements, and documentation.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3, PAO Approved 7/12/2021 Page 2 of 21
b. If the County finds indications of potential non-compliance during the monitoring
process,the County shall notify Contractor within ten(10)days. County and
Contractor shall meet to discuss areas of contention in an attempt to resolve issues.
c. Audit will provide statements consistent with the guidelines of Reporting for Other
Non-Profit Organizations AICPA SOP 78-10, and is performed in accordance with
generally accepted auditing standards and with Federal Standards for Audit of
Governmental Organizations, Programs, Activities and Functions, and meeting all
requirements of 2 C.F.R. Part 200, as applicable.
8. Indemnification.
a. To the extent of its comparative liability, each party agrees to indemnify, defend
and hold the other party, its officers, officials, employees, agents and volunteers
(and their marital communities), harmless from and against any and all claims,
damages, losses and expenses, including but not limited to court costs, attorney's
fees and alternative dispute resolution costs, for any personal injury, for any
bodily injury, sickness, disease or death and for any damage to or destruction of
any property (including the loss of use resulting therefrom)which are alleged or
proven to be caused by an act or omission,negligent or otherwise, of its officers,
officials, employees, agents and volunteers (and their marital communities).
b. A party shall not be required to indemnify, defend, or hold the other party or
its officers, officials, employees, agents and volunteers (and their marital
communities) harmless if the claim, damage, loss or expense for personal
injury, for any bodily injury, sickness, disease or death or for any damage to
or destruction of any property (including the loss of use resulting therefrom)
is caused by the sole act or omission of the other party or its officers,
officials, employees, agents and volunteers.
c. In the event of any concurrent act or omission of the parties and their officers,
officials, employees, agents and volunteers, negligent or otherwise, these
indemnity provisions shall be valid and enforceable only to the extent of the
comparative liability of each party and its officers, officials, employees,
agents or volunteers.
d. The parties agree to maintain a consolidated defense to claims made against
them and to reserve all indemnity claims against each other until after liability
to the claimant and damages, if any, are adjudicated. If any claim is resolved
by voluntary settlement and the parties cannot agree upon apportionment of
damages and defense costs, they shall submit apportionment to binding
arbitration.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 3 of21
e. The indemnification obligations of the parties shall not be limited in any way by
the Washington State Industrial Insurance Act, Title 51 RCW, or by application
of any other workmen's compensation act, disability benefit act or other
employee benefit act. Each party hereby expressly waives any immunity
afforded by such acts to the extent required by a parry's obligations to indemnify,
defend and hold harmless the other party, its officers, officials, employees,
agents and volunteers (and their marital communities). A parry's waiver of
immunity does not extend to claims made by its own employees directly against
that party as employer. The indemnity provisions of this section are a material
inducement to enter into this Agreement and have been mutually negotiated.
f. The provisions of this section shall survive the expiration or termination of
this Agreement.
9. Insurance. Prior to commencing work,the Contractor shall obtain at its own cost and
expense the following insurance coverage specified below and shall keep such coverage
in force during the terms of the Agreement.
a. Commercial Automobile Liability Insurance providing bodily injury and property
damage liability coverage for all owned and non-owned vehicles assigned to or used
in the performance of the work for a combined single limit of not less than$500,000
each occurrence with the County named as an additional insured in connection with
the Contractor's performance of this Agreement. This insurance shall indicate on the
certificate of insurance the following coverage: (a) Owned automobiles; (b) Hired
automobiles; and, (c)Non-owned automobiles.
b. Commercial General Liability Insurance in an amount not less than a single limit of
one million dollars ($1,000,000)per occurrence and an aggregate of not less than
two (2)times the occurrence amount($2,000,000.00 minimum) for bodily injury,
including death and property damage, unless a greater amount is specified in the
contract specifications. The insurance coverage shall contain no limitations on the
scope of the protection provided and include the following minimum coverage:
i. Broad Form Property Damage, with no employee exclusion;
ii. Personal Injury Liability, including extended bodily injury;
iii. Broad Form Contractual/Commercial Liability—including coverage for
products and completed operations;
iv. Premises—Operations Liability (M&C);
v. Independent Contractors and Subcontractors;
vi. Blanket Contractual Liability.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 4 of21
c. Professional Liability Insurance. The Contractor shall maintain professional liability
insurance against legal liability arising out of activity related to the performance of
this Agreement, on a form acceptable to Jefferson County Risk Management in the
amounts of not less than $1,000,000 Each Claim and$2,000,000 Aggregate. The
professional liability insurance policy should be on an"occurrence" form. If the
professional liability policy is "claims made,"then an extended reporting periods
coverage (tail coverage) shall be purchased for three (3)years after the end of this
Agreement, at the Contractor's sole expense. The Contractor agrees the Contractor's
insurance obligation to provide professional liability insurance shall survive the
completion or termination of this Agreement for a minimum period of three(3)
years.
d. The County shall be named as an"additional named insured"under all insurance
policies required by this Agreement, except Professional Liability Insurance when
not allowed by the insurer.
e. Such insurance coverage shall be evidenced by one of the following methods:
(a) Certificate of Insurance; or, (b) Self-insurance through an irrevocable Letter of
Credit from a qualified financial institution.
f. The Contractor shall furnish the County with properly executed certificates of
insurance that, at a minimum, shall include: (a) The limits of overage; (b) The
project name to which it applies; (c)The certificate holder as Jefferson County,
Washington and its elected officials, officers, and employees with the address of
Jefferson County Public Health 615 Sheridan Street, Port Townsend, WA 98368,
and, (d)A statement that the insurance policy shall not be canceled or allowed to
expire except on thirty (30)days prior written notice to the County. If the proof of
insurance or certificate indicating the County is an"additional insured"to a policy
obtained by the Contractor refers to an endorsement(by number or name) but does
not provide the full text of that endorsement,then it shall be the obligation of the
Contractor to obtain the full text of that endorsement and forward that full text to the
County. Certificates of coverage as required by this section shall be delivered to the
County within fifteen(15)days of execution of this Agreement.
g. Failure of the Contractor to take out or maintain any required insurance shall not
relieve the Contractor from any liability under this Agreement, nor shall the
insurance requirements be construed to conflict with or otherwise limit the
obligations concerning indemnification of the County.
h. The Contractor's insurers shall have no right of recovery or subrogation against the
County(including its employees and other agents and agencies), it being the
intention of the parties that the insurance policies, with the exception of Professional
Liability Insurance, so affected shall protect both parties and be primary coverage for
all losses covered by the above described insurance.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 5 of21
i. Insurance companies issuing the policy or policies shall have no recourse against the
County (including its employees and other agents and agencies) for payment of any
premiums or for assessments under any form of policy.
j. All deductibles in the above described insurance policies shall be assumed by and be
at the sole risk of the Contractor.
k. Any deductibles or self-insured retention shall be declared to and approved by the
County prior to the approval of this Agreement by the County. At the option of the
County,the insurer shall reduce or eliminate deductibles or self-insured retention, or
the Contractor shall procure a bond guaranteeing payment of losses and related
investigations, claim administration and defense expenses.
1. . Any judgments for which the County may be liable, in excess of insured amounts
required by this Agreement, or any portion thereof, may be withheld from payment
due, or to become due,to the Contractor until the Contractor shall furnish additional
security covering such judgment as may be determined by the County.
m. Any coverage for third party liability claims provided to the County by a"Risk
Pool" created pursuant to Ch. 48.62 RCW shall be non-contributory with respect to
any policy of insurance the Contractor must provide in order to comply with this
Agreement.
n. The County may, upon the Contractor's failure to comply with all provisions of this
Agreement relating to insurance, withhold payment or compensation that would
otherwise be due to the Contractor.
o. The Contractor's liability insurance provisions shall be primary and noncontributory
with respect to any insurance or self-insurance programs covering the County, its
elected and appointed officers, officials, employees, and agents.
p. Any failure to comply with reporting provisions of the insurance policies shall not
affect coverage provided to the County, its officers, officials, employees, or agents.
q. The Contractor's insurance shall apply separately to each insured against whom
claim is made or suit is brought, except with respect to the limits of the insurer's
liability.
r. The Contractor shall include all subcontractors as insured under its insurance
policies or shall furnish separate certificates and endorsements for each
subcontractor. All insurance provisions for subcontractors shall be subject to all the
requirements stated herein.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 6 of21
s. The insurance limits mandated for any insurance coverage required by this
Agreement are not intended to be an indication of exposure nor are they limitations
on indemnification.
t. The Contractor shall maintain all required insurance policies in force from the time
services commence until services are completed. Certificates, insurance policies,
and endorsements expiring before completion of services shall be promptly replaced.
All the insurance policies required by this Agreement shall provide that thirty (30)
days prior to cancellation, suspension, reduction or material change in the policy,
notice of same shall be given to the Jefferson County Public Health Contracts
Manager by registered mail, return receipt requested.
u. The Contractor shall place insurance with insurers licensed to do business in the
State of Washington and having A.M. Best Company ratings of no less than A-,with
the exception that excess and umbrella coverage used to meet the requirements for
limits of liability or gaps in coverage need not be placed with insurers or re-insurers
licensed in the State of Washington.
v. The County reserves the right to request additional insurance on an individual basis
for extra hazardous contracts and specific service agreements.
10. Worker's Compensation(Industrial Insurance);
a. If and only if the Contractor employs any person(s) in the status of employee or
employees separate from or in addition to any equity owners, sole proprietor,
partners, owners or shareholders of the Contractor,the Contractor shall maintain
workers' compensation insurance at its own expense, as required by Title 51 RCW,
for the term of this Agreement and shall provide evidence of coverage to Jefferson
County Public Health, upon request.
b. Worker's compensation insurance covering all employees with limits meeting all
applicable state and federal laws. This coverage shall include Employer's Liability
with limits meeting all applicable state and federal laws.
c. This coverage shall extend to any subcontractor that does not have their own
worker's compensation and employer's liability insurance.
d. The Contractor expressly waives by mutual negotiation all immunity and limitations
on liability,with respect to the County, under any industrial insurance act, disability
benefit act, or other employee benefit act of any jurisdiction which would otherwise
be applicable in the case of such claim.
e. If the County incurs any costs to enforce the provisions of this subsection, all cost
and fees shall be recoverable from the Contractor.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 7 of 21
11. Independent Contractor. The Contractor and the County agree that the Contractor is an
independent Contractor with respect to the services provided pursuant to this
Agreement. The Contractor specifically has the right to direct and control Contractor's
own activities, and the activities of its subcontractors, employees, agents, and
representatives, in providing the agreed services in accordance with the specifications
set out in this Agreement. Nothing in this Agreement shall be considered to create the
relationship of employer and employee between the parties.Neither Contractor nor any
employee of Contractor shall be entitled to any benefits accorded County employees by
virtue of the services provided under this Agreement, including,but not limited to:
retirement, vacation pay; holiday pay; sick leave pay; medical, dental, or other insurance
benefits; fringe benefits; or any other rights or privileges afforded to Jefferson County
employees. The County shall not be responsible for withholding or otherwise deducting
federal income tax or social security or for contributing to the state industrial insurance
program, otherwise assuming the duties of an employer with respect to Contractor, or
any employee of Contractor.
12. SubcontractingRReguirements.
a. The Contractor is responsible for meeting all terms and conditions of this Agreement
including standards of service, quality of materials and workmanship, costs, and
schedules. Failure of a subcontractor to perform is no defense to a breach of this
Agreement. The Contractor assumes responsibility for and all liability for the
actions and quality of services performed by any subcontractor.
b. Every subcontractor must agree in writing to follow every term of this Agreement.
The Contractor must provide every subcontractor's written agreement to follow
every term of this Agreement before the subcontractor can perform any services
under this Agreement. The Public Health Director or their designee must approve
any proposed subcontractors in writing.
c. Any dispute arising between the Contractor and any subcontractors or between
subcontractors must be resolved without involvement of any kind on the part of the
County and without detrimental impact on the Contractor's performance required by
this Agreement.
13. Covenant Against Contingent Fees. The Contractor warrants that he has not employed
or retained any company or person, other than a bona fide employee working solely for
the Contractor,to solicit or secure this Agreement, and that he has not paid or agreed to
pay any company or person, other than a bona fide employee working solely for the
Contractor, any fee, commission,percentage, brokerage fee, gifts, or any other
consideration contingent upon or resulting from the award or making of this Agreement.
For breach or violation of this warranty, the County shall have the right to annul this
Agreement without liability or, in its discretion to deduct from the contract price or
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 8 of21
consideration, or otherwise recover, the full amount of such fee, commission,
percentage, brokerage fee, gift, or contingent fee.
14. Discrimination Prohibited. The Contractor, with regard to the work performed by it
under this Agreement, will not discriminate on the grounds of race, color, national
origin, religion, creed, age, gender, sexual orientation, material status, sex, or the
presence of any physical or sensory handicap in the selection and retention of employees
or procurement of materials or supplies.
15. No Assignment. The Contractor shall not sublet or assign any of the services covered by
this Agreement without the express written consent of the County. Assignment does not
include printing or other customary reimbursable expenses that may be provided in an
agreement.
16. Non-Waiver. Waiver by the County of any provision of this Agreement or any time
limitation provided for in this Agreement shall not constitute a waiver of any other
provision.
17. Termination.
a. The County reserves the right to terminate this Agreement at any time by giving ten
(10) days written notice to the Contractor.
b. In the event of the death of a member,partner, or officer of the Contractor, or any of
its supervisory personnel assigned to the project,the surviving members of the
Contractor hereby agree to complete the work under the terms of this Agreement, if
requested to do so by the County. This section shall not be a bar to renegotiations of
this Agreement between surviving members of the Contractor and the County, if the
County so chooses.
c. The County reserves the right to terminate this contract in whole or in part,with 10
days' notice, in the event that expected or actual funding from any funding source is
withdrawn, reduced, or limited in any way after the effective date of this agreement.
In the event of termination under this clause,the County shall be liable for only
payment for services rendered prior to the effective date of termination.
18.Notices. All notices or other communications which any party desires or is required to
give shall be given in writing and shall be deemed to have been given if hand-delivered,
sent by facsimile, email, or mailed by depositing in the United States mail, prepaid to the
party at the address listed below or such other address as a parry may designate in
writing from time to time. Notices to the County shall be sent to the following address:
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 9 of21
Tami Pokorny,Natural Resources Program Coordinator
Jefferson County Public Health Department
615 Sheridan Street
Port Townsend, WA 98368
Office: 360-379-4498
Email: tpokorny@cojefferson.wa.us
Notices to Contractor shall be sent to the following address:
Dawn Duncan, Office Manager
Natural Systems Design, Inc.
1900 Northlake Way, Suite 211
Seattle, WA 98103
Ph: 206 480-1 1 14
Email: dawn@naturaldes.com
19. Integrated Agreement. This Agreement together with attachments or addenda represents
the entire and integrated Agreement between the County and the Contractor and
supersedes all prior negotiations, representations, or agreements written or oral. No
representation or promise not expressly contained in this Agreement has been made.
This Agreement supersedes all prior or simultaneous representations, discussions,
negotiations, and agreements, whether written or oral,by the County within the scope of
this Agreement. The Contractor ratifies and adopts all statements, representations,
warranties, covenants, and agreements contained in its proposal, and the supporting
material submitted by the Contractor, accepts this Agreement and agrees to all of the
terms and conditions of this Agreement.
20. Modification of this Agreement. This Agreement may be amended only by written
instrument signed by both County and Contractor.
21. Disputes. The parties agree to use their best efforts to prevent and resolve disputes
before they escalate into claims or legal actions. Any disputed issue not resolved
pursuant to the terms of this Agreement shall be submitted in writing within 10 days to
the County Risk Manager, whose decision in the matter shall be final, but shall be
subject to judicial review. If either party deem it necessary to institute legal action or
proceeding to enforce any right or obligation under this Agreement, each party in such
action shall bear the cost of its own attorney's fees and court costs. Any legal action
shall be initiated in the Superior Court of the State of Washington for Jefferson County.
The parties agree that all questions shall be resolved by application of Washington law
and that the parties have the right of appeal from such decisions of the Superior Court in
accordance with the laws of the State of Washington. The Contractor hereby consents to
the personal jurisdiction of the Superior Court of the State of Washington for Jefferson
County.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3, PAO Approved 7/12/2021 Page 10 of21
22. Section Headings. The headings of the sections of this Agreement are for convenience
of reference only and are not intended to restrict, affect, or be of any weight in the
interpretation or construction of the provisions of the sections or this Agreement.
23. Limits of Any Waiver of Default. No consent by either party to, or waiver of, a breach
by either party, whether express or implied, shall constitute a consent to, waiver of, or
excuse of any other, different, or subsequent breach by either party.
24.No Oral Waiver. No term or provision of this Agreement will be considered waived by
either party, and no breach excused by either party, unless such waiver or consent is in
writing signed on behalf of the party against whom the waiver is asserted. Failure of a
party to declare any breach or default immediately upon the occurrence thereof, or delay
in taking any action in connection with, shall not waive such breach or default.
25. Severability. Provided it does not result in a material change in the terms of this
Agreement, if any provision of this Agreement or the application of this Agreement to
any person or circumstance shall be invalid, illegal, or unenforceable to any extent,the
remainder of this Agreement and the application this Agreement shall not be affected
and shall be enforceable to the fullest extent permitted by law.
26. Binding on Successors, Heirs and Assigns. This Agreement shall be binding upon and
inure to the benefit of the parties' successors in interest,heirs, and assigns.
27.No Assignment. The Contractor shall not sell, assign, or transfer any of rights obtained
by this Agreement without the express written consent of the County.
28.No Third-party Beneficiaries. The parties do not intend, and nothing in this Agreement
shall be construed to mean, that any provision in this Agreement is for the benefit of any
person or entity who is not a party.
29. Signature in Counterparts. The parties agree that separate copies of this Agreement may
be signed by each of the parties and this Agreement shall have the same force and effect
as if all the parties had signed the original.
30. Facsimile and Electronic Signatures. The parties agree that facsimile and electronic
signatures shall have the same force and effect as original signatures.
31. Arms-Length Negotiations. The parties agree that this Agreement has been negotiated
at arms-length, with the assistance and advice of competent, independent legal counsel.
32. Public Records Act. Notwithstanding the provisions of this Agreement to the contrary,
to the extent any record, including any electronic, audio,paper or other media, is
required to be kept or indexed as a public record in accordance with the Washington
Public Records Act, Chapter 42.56 RCW, as may hereafter be amended,the Contractor
agrees to maintain all records constituting public records and to produce or assist the
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page I of21
County in producing such records, within the time frames and parameters set forth in
state law. The Contractor further agrees that upon receipt of any written public record
request, Contractor shall,within two business days, notify the County by providing a
copy of the request per the notice provisions of this Agreement.
33. Confidentiality. With respect to all information relating to County that is confidential
and clearly so designated, as required by the Health Insurance Portability and
Accountability Act(HIPAA)and any other applicable privacy laws, the Contractor
agrees to keep such information confidential. The Contractor shall not disclose,transfer,
or sell any such information to any party, except as provided by law or, in the case of
personal information, with the prior written consent of the person to whom the personal
information pertains. The Contractor shall maintain the confidentiality of all personal
information and other information gained by reason of this Agreement, and shall return
or certify the destruction of such information if requested in writing by Jefferson
County. This Agreement, once executed, will be a"public record"subject to production
to a third party if same is requested pursuant to• the Washington Public Records Act,
Chapter 42.56 RCW, as may hereafter be amended.
DATED this day of , 20
(SIGNATURES FOLLOW ON THE NEXT PAGE)
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 12 of21
SIGNATURE PAGE
JEFFERSON COUNTY WASHINGTON NATURAL SYSTEMS DESIGN+
COASTAL GEOLOGIC SERVICES
Board of County Commissioners
Jefferson County, Washington
By: By:
Kate Dean, Chair Date Signature
By: Name: Leif Embertson
Greg Brotherton, Commissioner Date
Title: President
By: Date: 64,/b L/
Heidi Eisenhour, Commissioner Date
SEAL:
ATTEST:
Carolyn Gallaway CMC, Date
Clerk of the Board
Approved as to form only:
r
` January 24, 2024
Philip C. Hunsucker, Date
Chief Civil Deputy Prosecuting Attorney
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 13 of21
EXHIBIT A
SCOPE OF WORK
Contractor will characterize the geomorphic,habitat, and hydraulic conditions of the reach,assess the flood
risk to the local community, and develop a conceptual design to restore habitat for Hood Canal summer
chum and Chinook salmon and engage with the County, Tribes, land and business owners and additional
stakeholders. To accomplish this overarching project goal,the scope of work is broken down into the
following tasks:
Task 1: Existing Conditions Assessment
Task 2: Conceptual Design
Task 3: Stakeholder Outreach
Task 4: Project Management
Task 1: Existing Conditions Assessment
The existing conditions assessment will focus on gaining an understanding of the current geomorphic,
habitat,and hydraulic conditions of the reach and nearshore habitats to understand how the site setting and
land use history inform current site conditions, habitat limiting factors for Hood Canal Summer Chum and
Mid Hood Canal Chinook,and influence flooding and erosion risk for the surrounding community.
Background Data Collection and Field Reconnaissance
1.1 Background Data Collection and Field Reconnaissance Plan
Contractor will review the available background data including:
• Recent and past topography of the site(e.g.,2005,2019, and 2023 LiDAR Digital Elevation Models)
• Recent and past aerial imagery of the site(e.g.,USGS Earth Explorer,NAIP,Google Earth)
• FEMA flood maps
• Geologic maps of the project area(e.g., Washington Department of Natural Resources; Jefferson
County Landslide Risk maps)
• Existing publicly available infrastructure and land-use information(e.g., Property ownership, roads,
utilities)
• Existing recreational river usage within the reach based upon available information from fishing and
boating websites or other previous studies.
• Results for past habitat assessments and limiting factors analyses(e.g.,Labbe, 2005; WDFW fish
distributions; Hood Canal Summer Chum and Chinook recovery plans;Correa,2003)
• Final Jefferson County Sea-Level Rise Study(ESA 2023).
1.2 Field Reconnaissance
• Contactor will schedule one(1)field day to perform a data-collection reconnaissance of the project
area.A raft or on-foot methods will be used to collect geomorphic, substrate,coarse-scale aquatic
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 14 of21
habitat data,riparian vegetation,wetland and floodplain habitats,and characterize existing
conditions.
• Contractor will not access properties where access permission is not granted or contact with
landowners is not able to be made. In the circumstance that portions of the reach are unable to be
accessed in the field,Contractor will utilize the understanding gained during the desktop assessment,
combined with field observations,to inform understanding of the entire project reach.
• The Contractor's field team will include a lead engineer,geomorphologist, biologist,and project
manager.
Data Analysis,Habitat Assessment and Hydraulic Model
Following background and field data collection,Contractor will compile the data to complete the following
analyses:
1.3 Topographic Surface Development
• Compile LiDAR, in particular the 2023 LiDAR collected for the project area, into an updated
composite topographic surface and generate a Relative Elevation Model(REM)of the project
reach.
1.4 2D Hydraulic Modeling
• Contractor will complete an assessment of basin hydrology within the project area to assess both
peak flows and smaller,more frequent flows that influence salmonid habitat conditions in the
reach.An assessment of anticipated mid-century(2050)flows under current climate change
predictions will also be included.
• A 2-dimensional hydraulic model will be developed to represent existing conditions using the
channel and floodplain topography to evaluate channel-floodplain connectivity, inundation
extents, instream velocities and shear stresses,and to inform the local risk of flooding.
• Contractor will model selected flows under both the current and mid-century(2050)flow
regimes. Four(4)flow events will be selected with two flows focusing on more frequent
discharges that are tied to key salmonid life history states,and two flows focusing on larger
flood event to inform geomorphic trends and flooding risks in the project reach.These flood
events will include the existing 100-year flood,and the adjusted 100-year flood based on a 2050
flow regime.
1.5 Levee and Flood Assessment
• Contractor will use the hydraulic model to evaluate the level of protection provided by the
existing levee system to the town of Brinnon.
o This will include modeling the existing 100-year flood event,and one additional
scenario that incorporates sea-level rise data and the mid-century flow regime.
• Contractor will prepare two(2)maps showing the modeled extent of flood conditions within the
study area under the existing(100-year)and climate change scenarios.
• Contractor will identify any flood protection deficiencies in the current levee system near
Brinnon located on river left upstream of the Highway 101 Bridge via annotated mapping.
o This includes examination of the existing conditions modeling results for areas of
inadequate flood protection,and field examination of existing levee erosion.
• Contractor will incorporate the findings into the Conceptual Restoration Design(Task 2).
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 15 of 21
1.6 Aquatic Habitat Assessment
An assessment of Chinook and Summer Chum salmon habitat will be completed based on the field
reconnaissance and available data. The coarse-scale assessment will focus on:
• Mapping and quantification of channel types(i.e.mainstem,braid,or side channel), and
coarse scale aquatic habitat units(i.e.pools,riffles,or glides;width and depth of each unit
where feasible with single day field effort).
• Streambank condition, locations of riprap, levees,and road banks(i.e. hydro-modified),
stable large wood jam identification,and dominant substrate class.
These elements will be geo-referenced,measured if/as applicable and feasible,and roughly
quantified if possible.
1.7 Floodplain and Riparian Assessment
• Contractor will map and characterize the riparian habitats that are located within the
riverine/floodplain environment.This will include mapping by dominant vegetation strata using
notes from the field reconnaissance and extrapolated through aerial photo interpretation.
• Contractor will map and characterize wetland and tributary habitats within the active floodplain.
These habitats will be evaluated to determine if they currently provide aquatic habitats for
salmonids. Contractor will rely on existing wetland mapping(i.e.NWI Mapping),notes from the
field reconnaissance,the relative elevation mapping based on 2023 LiDAR,and existing stream
mapping. Data will be synthesized in GIS.
1.8 Climate Change Analysis
• Historic flow records clearly show a trend of increasing peak flows in the Olympic Peninsula
region.The warming climate has resulted in glacial recession and hydrologic changes that
include a trend of increasing peak flows and diminishing low flows coupled with increased
sediment supply. In addition,the predictions for sea-level rise in low-lying marine shoreline
indicate the potential for increased flood risk within the Brinnon project area.
• Contractor will determine how river migration and morphology is likely to respond to greater
peak flows,and how recently mapped sea-level rise(ESA 2023)will have consequences to
habitat, infrastructure and property. Cumulative climate change effects will be described.
Contractor will then evaluate potential restoration actions and their ability mitigate the impacts
of climate change related to changes in river hydrology and sea-level rise related to
infrastructure.
1.9 Existing Conditions Summary
• Contractor will summarize the analysis completed in Task 1 related to reach geology,channel
and floodplain morphology,hydrology and hydraulics, sediment,channel migration history,
large wood,riparian and wetland communities, aquatic habitat conditions and salmonid use,and
primary impairments to fluvial processes. Documentation of nearshore and estuarine
environments will be provided in a singular report provided by Jefferson County.Contractor will
summarize the findings of that study within existing conditions report. This will not include new
analysis or graphic preparation.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 16 of21
• Contractor will prepare a brief technical memorandum to compile the analysis completed as part
of Task 1.This memorandum will be presented to Jefferson County and will provide the
foundation for the development of the Conceptual Plan in Task 2.
The results of data collection and analysis Tasks 1.3 through 1.9 will form the framework for the
development of the Conceptual Design(Task 2). Draft results existing conditions assessment and the 2D
hydraulic analysis and will be presented to the Dosewallips River Collaborative(Task 3)where the main
trends and conclusions of the work will be discussed.
Task 1 Assumptions
• Analysis and results will be summarized and presented to the Dosewallips River Collaborative in
Task 4.
• Jefferson County will arrange for access to private property as needed. Contractor will not
access properties where permission has not been obtained from landowners.
• Field conditions are such that field work can be accomplished within one 10-hr field days and
stream flow is such that stream is navigable by inflatable raft.
• Field data may be supplemented with geospatial data if access to private property is not granted
for the field reconnaissance effort. If geospatial data is not sufficient to evaluate a particular data
type(i.e. substrate)it will be noted as a data gap for future collection.
• Jefferson County will reach out to the Dosewallips River Collaborative group and other local
stakeholders who may have habitat data and local community knowledge and points of concern
information and will provide that information to Contractor to supplement Contractor's field
data collection plan(Task 1.1).
• Hydraulic modeling will consist of a maximum of eight(8)discrete flow events to characterize
the current and anticipated mid-century(2050)hydraulic conditions.
Task 1 Deliverables:
• Field reconnaissance plan identifying parcels in which access is secured and parcels in which
access is prohibited.
• Updated LiDAR topographic surface.
• 2D hydraulic model output and flood risk maps.
• Coarse-scale aquatic,floodplain, and riparian habitat map of the project reach.
• Draft Existing Conditions Memorandum.
Task 2: Conceptual Design
Conceptual design will be developed for a single restoration approach,to include multiple actions and
elements, in collaboration with Jefferson County. Proposed actions will focus on addressing the causal
mechanisms of increased channel migration rates, loss of floodplain forest, loss of key aquatic habitats,and
the sustainability of existing levee system adjacent to Brinnon. The concept will include a description of
project constraints(e.g., construction,geomorphic, social), implementation feasibility,and the pros/and cons
related to community risk.Conceptual actions will be classified by their potential to be implemented in the
short-term(2-3-year process),or long-term(4-20-year process). Examples of project elements that can be
implemented in the short-term include the construction of in channel engineered logjams,side channel
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 17 of21
connection,and riparian planting. Examples of projects that can be implemented in the longer term include
floodplain restoration and changes in land use practices or primary infrastructure elements.
2.1 Project Goals and Objectives
Contractor will work with the County and the Dosewallips River Collaborative to establish goals for the
restoration plan. This scope assumes that the primary goals are to establish a better understanding of the
historic changes,the geomorphic and ecological processes that form and sustain salmon habitat,and the
extents of flood inundation and erosion associated with the existing levee system.
2.2 Conceptual Design
Contractor will prepare a single conceptual design and present it to Jefferson County,the Dosewallips River
Collaborative Group and other project stakeholders as part of Task 4. Based upon feedback on the
conceptual design,a revised final conceptual design will be prepared such that it may be advanced toward
preliminary design in a future phase of work.Contractor will document the conceptual plan based on the
RCO Manual 18 guidance. The concept will consist of single plan-view graphics with a brief written
description and are assumed to include instream and floodplain restoration elements and recommendations
for levee repair or setback as feasible.
2.2 Proposed Conditions Hydraulic Modeling
The 2D hydraulic model developed during Task 1 will be updated to represent the proposed conditions of a
single design concept to aid in characterizing the hydraulic,geomorphic and habitat response of the proposed
plan.Proposed restoration elements will be represented in the hydraulic model as changes in the model
terrain and/or changes in hydraulic roughness. Hydraulic output from the proposed conditions model(depths,
velocity,water surface elevation)will be compared to the existing conditions to assess changes in hydraulic
conditions as a result of the proposed restoration action and inform the anticipated geomorphic and habitat
response of the conceptual plan.
2.3 Basis of Design
Contractor will develop the conceptual basis of design per RCO Manual 18 guidelines including the goals
and objectives of the restoration approach,the development of the conceptual design,the evaluation and
selection of the final conceptual design. Consultation with project stakeholders,and discussion of the
conceptual design will be incorporated into a final basis of design report.
2.4 Construction Cost Estimate
A conceptual level cost estimate will also be developed for the final conceptual plan and incorporated into
the Basis of Design report.
Task 2 Assumptions
• One round of consolidated review and comment in track changes on conceptual design plan from the
Jefferson County
• No additional field work or substantive redesign is required to finalize Conceptual Plan
Task 2 Deliverables:
• One Conceptual Design plan in PDF format will provide plan-view representation of proposed
actions.
• Final Conceptual Design figure in PDF format based on input from Jefferson County and
Collaborative group,and other project stakeholders as determined by the County.
• Conceptual basis of design report per RCO Manual 18 guidelines.
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 18 of21
• Conceptual construction cost estimate.
Task 3: Stakeholder Outreach
The Dosewallips River Collaborative(DRC)meetings will be the primary method for Contractor to organize
outreach events,deliver draft analysis results,and obtain critical review of technical work. Contractor will
attend and present at two(2), in-person DRC meetings,and three(3)online meetings over the course of the
development of the Conceptual Design to share findings,discuss restoration goals and conceptual designs,
and select a preferred restoration concept. Contractor will prepare brief PowerPoint presentations if/as
appropriate for each meeting.
Each of the meetings would be held at critical milestones in the project,with topic and timing negotiated
with the County in advance, for example:
l. Kickoff meeting to discuss project goals,available data, and key concerns—Spring 2024
2. Present findings from existing conditions assessment including the LiDAR and hydraulic modeling—
Fall/Winter 2024
3. Present the draft conceptual design plan—Winter/Spring 2025
4. Select a.preferred design alternative—Summer/Fall 2025
Task 3 Assumptions:
► Three(3)DRC meetings will be held on an online platform and will be attended by one Contractor
staff member as appropriate to the main content of the meeting and will be 2 hours in length. This
task also includes up to 8 hours of preparation time for each meeting.
► Two in-person DRC meetings will be held in Brinnon, WA and facilitated by the County.These
meetings will be attended by one Contractor staff member as appropriate to the main content of the
meeting and will be 4 hours in length. An additional 4 hours of travel time will also be required for
Contractor staff.
o This task also includes up to 8 hours for preparation of materials to be presented at each
meeting.
Task 3 Deliverables:
• Attendance and presentation at five(5)Dosewallips River Collaborative meetings;3 remote and
2 in-person.
Task 4: Project Management
Contractor will lead project scheduling,maintain adherence to the scope of work,timelines,and due dates;
lead Contractor team interaction with the existing watershed projects; and ensure adherence to data quality
assurance and controls. Contractor will provide updates to Jefferson County to facilitate the tracking of
progress and to communicate major findings as information becomes available.Contractor will produce
monthly summary reports to accompany our invoicing for services completed.
Task 4 Assumptions:
• Contractor's tasks will include project scheduling,maintaining adherence to the scope of work,
timelines,and due dates; coordination of landowner permissions to access property; leading the team
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 19 of 21
interaction with the Dosewallips River Collaborative;and ensuring adherence to data quality
assurance and controls.
• Contractor will meet with County staff on a bi-weekly basis for one hour to discuss key tasks for the
months,provide updates on completed work, and landowner outreach progress. Contractor will
produce summaries of work completed to accompany our monthly invoices for services completed.
Task 4 Deliverables:
• Monthly status reports, updates, and invoices—January 2024 through December 2025
• Attendance at bi-monthly project coordination meetings
Brinnon Reach Assessment&Conceptual Design
Professional Services Agreement Template,JCPH,Version 3,PAO Approved 7/12/2021 Page 20 of21
EXHIBIT B
Estimated Budget and Schedule
DESCRIPTION BEGINNING ENDING DATE SUB
DATE TOTAL
Task 1. Existing Conditions February 2024 December 2025 $69,257.75
Assessment
Task 2. Conceptual Design January 2025 December 2025 $38,029.00
Task 3. Stakeholder Outreach May 2024 December 2025 $16,497.50
Task 4. Project Management February 2024 December 2025 $16,200.00
PROJECT TOTAL $139,984.25