HomeMy WebLinkAboutCHANGE ORDER No. 1 Phase 2 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer/AC Agenda Date: May 6, 2024 Subject: Change Order No. 1, Phase 2 - Water Reclamation Plant for the Port Hadlock UGA, Project No. 405-2114-0, Commerce Project No. 22-96515-026 Statement of Issue: Change Order No. 1 with Interwest Construction of Burlington, Washington. Analysis/Strategic Goals/Pro's Et Con's: This change order includes the difference in cost to change pipe material for both the potable and process water lines; the difference in cost for a larger access hatch for the equalization tank vault; and additional stormwater features. The changes from the original plan were done 1) to unify the type of material used for the potable and process water for the treatment plant; 2) provide a more efficient operational access to the equalization tank pump vault through one larger hatch rather than a double hatch with a center bar, which would make removal of equipment and access more difficult; and 3) to route stormwater to existing stormwater features in order to provide a lower access road which will provide access to the north side of the treatment plant site. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 1 is $42,288.15 (includes 9.1% Washington State Sales Tax). The contract amount will increase from $10,020,835.00 to $10,063,123.15. The project is funded at 100% by the Department of Commerce. Recommendation: Public Works recommends that the Board authorize Change Order No. 1 with Interwest Construction, and return two originals to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Revie d By('�`` Mark McCauley, County Administrator Dat JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: 4/30/2024 CHANGE ORDER Order No. 1 Ordered by County Engineer under terms of fX Article 9 and 11 of the General and Supplemental Conditions ntt;; F•I:i rt.11 Contract No. ` IChange proposed by Contractor To: • Interwest Construction Endorsed by: ? 4575 Fey Rd '`N` `""`'� 4 '"` �`"�' Port Angeles,WA 98363 Contractor Firm Name \--D-de/ q/10/2,4 1 Signature Date Title I Consent given by Surety:(when required) Project Title Phase 2-Water Reclamation Facility for sy: the PH Sewer Attorney-in fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: This change order includes changes modifications to original contract items and additional items. The changes include pipe material change for the potable(C1)and porcess water(C3)line; Increase in the size of access hatch into equalization tank vault;and stormwater modifications. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. IS . -� ORIGINAL CURRENT ESTIMATED ESTIMATED � ,,s � z�`� �,,�� - _ CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL �t. �" -.t.: N .' AMOUNT(Incl.9.1%sales tax) AMOUNT(Intl.9.1%sales tax) THIS ORDER(Incl.9.1%sales tax) AFTER CHANGE(incl.9.1%sales tax) h0. $ 10,020,835.00 $ 10,020,835.00 $42,288.15 $ 10,063,123.1S _'� "" �Y .,',.11 F ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT W- � CONTRACT TIME CONTRACT TIME CHANGE(Add/Del) TIME - SO2 D N/A N/A �� = . APPROV R'�EffCOMMEN APPROVAL R MENDED hon,;.Y-7 G �� 3a r Z Projec Manager Date County Engineer Date APPROVAL RECOMMENDED APPROVED H N/ Engineering Services Manager Date Chair,Jefferson County Commissioners Date JEFFERSON COUNTY Contract No 405-2114-0 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: 4/29/2024 CHANGE ORDER ESTIMATE Order No. 1 ESTIMATED ESTIMATED UNIT UNIT QUANTITY AMOUNT MEASURE PRICE CHANGE CHANGE COP No. DESCRIPTION 001 Change in C1 and C3 pipe material LS $27,892.69 1 $27,892.69 002 Increase in EQ tank access hatch and type LS $6,629.75 1 $6,629.75 003 Stormwater Pipe additions (FA-01) LS $4,238.47 1 $4,238.47 CO 001 Subtotal $38,760.91 ESTIMATED NET CHANGE SUBTOTAL: $38,760.91 9.1%Sales Tax $3,527.24 ESTIMATED NET CHANGE TOTAL: $42,288.15