HomeMy WebLinkAboutNEPA CE reevaluation approval 022924From: John Fleming Sent: Thursday, February 29, 2024 3:42 PM To: Donna Frostholm <DFrostholm@co.jefferson.wa.us> Subject: CASP2023-00003 NEPA-CE re-evaluation documentation Hi Donna: While going through WSDOT Local Programs for obligating federal funding for the ODT-Anderson Lake Connection project, we found that there are 2 numbers that need to be corrected on the NEPA-CE document. The trail length and end mile post need to change from 3.40 miles long to 3.15 miles long, and 10.75 ending mile post to 10.50 ending mile post. Please see email string below as the official documentation of the re-evaluation. I will upload this into EnerGov. Thank you, John From: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Sent: Thursday, February 29, 2024 3:29 PM To: John Fleming <JFleming@co.jefferson.wa.us> Subject: RE: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you are not expecting them. Hi John, The email is all the documentation needed. Just add it to your file. Thanks! Marlisa Adams (she/her) Olympic Region Local Programs Office (564) 669-3617 Mailing Address: PO Box 47440 Olympia, WA 98504-47440 Physical Address: 7407 31st Ave NE Lacey, WA 98516 From: John Fleming <JFleming@co.jefferson.wa.us> Sent: Thursday, February 29, 2024 2:48 PM To: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Subject: RE: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail Hi Marlisa: Received and retained for the record. Will you want the change to be documented on the NEPA/CE, and updated signatures from all 4 parties? Thank you, John From: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Sent: Thursday, February 29, 2024 2:40 PM To: John Fleming <JFleming@co.jefferson.wa.us> Cc: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov>; Ho, John <HoJohn@wsdot.wa.gov>; Eric Kuzma <EKuzma@co.jefferson.wa.us>; Jeff.Gray@otak.com; nico.vanderhorst@otak.com Subject: FW: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you are not expecting them. Hi John, Please save this email as a copy of the re-evaluation. See comments below… Thanks! Marlisa Adams (she/her) Olympic Region Local Programs Office (564) 669-3617 Mailing Address: PO Box 47440 Olympia, WA 98504-47440 Physical Address: 7407 31st Ave NE Lacey, WA 98516 From: Beall, Jodie <BeallJ@wsdot.wa.gov> Sent: Thursday, February 29, 2024 1:14 PM To: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Cc: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov> Subject: RE: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail Thanks Marlisa. NEPA was originally approved on 1/17/24. I am re-evaluating the NEPA due to the changes in the total project length as described in the email chain below. The NEPA date is being updated to 2/29/24. Please pass this email along to the County and keep a copy for your record of re-evaluation. This project still meets a programmatic CE. Jodie Beall NEPA Specialist/Wetland Biologist WSDOT Local Programs 360-705-6975 From: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Sent: Wednesday, February 28, 2024 4:57 PM To: Beall, Jodie <BeallJ@wsdot.wa.gov> Cc: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov> Subject: FW: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail Hi Jodie, See email explanation below… Thanks! Marlisa Adams (she/her) Olympic Region Local Programs Office (564) 669-3617 Mailing Address: PO Box 47440 Olympia, WA 98504-47440 Physical Address: 7407 31st Ave NE Lacey, WA 98516 From: John Fleming <JFleming@co.jefferson.wa.us> Sent: Wednesday, February 28, 2024 4:33 PM To: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Cc: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov>; Ho, John <HoJohn@wsdot.wa.gov>; Eric Kuzma <EKuzma@co.jefferson.wa.us>; Jeff Gray <Jeff.Gray@otak.com>; Nico Vanderhorst <nico.vanderhorst@otak.com> Subject: RE: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail Hi Marlisa: Thank you for the review of the NEPA/CE and instructions to submit a re-evaluation. 1) The reason for the re-evaluation is to a) change the “Ending terminus” from 10.75 to 10.5, and b) change the “Miles” from 3.4 to 3.15 On the approved NEPA/CE the trail length is not correct at 3.4 miles. The 3.4 miles initially came from simply only looking at the 60% plans end station length, and converting feet to miles. Trail end station on 60% plans = STA 179+41.28 17,941.28’ / 5,280 feet/mile = 3.40 miles This simple derivation of trail length from the plans was the source of the error used on the NEPA/CE form. It resulted in an apparently longer trail length than actually designed within the plans. The actual trail length is a little more complicated to figure out from the plans. The actual trail length is calculated from the trail end station minus trail begin station, minus mid-station correction gap. From the 90% plans: Trail end station = STA 182+11.5 Trail begin station = STA 10+13.98 Mid station correction gap = STA 100+00 minus STA 94+48.08 Actual trail length = 18,211.5’ – 1,013.98’ – (10,000’ – 9,448.08’) = 16,645.6’ 16,645.6’ / 5,280 feet/mile = 3.15 miles This will also change the ending terminus mile post from 10.75 . Beginning terminus mile post = 7.35 Corrected ending terminus mile post = 7.35 + 3.15 = 10.50 3.15 total project trail miles are used on the STIP, WSDOT Project Prospectus, and the WSDOT Local Agency Agreement. 2) There are no negative impacts to this change, as the trail is still materially located on the same land that was evaluated for cultural resources, wetlands, streams, wildlife habitat, and other critical areas. 3) Jeff Gray, Managing Senior Scientist at Otak, Inc. (Jefferson County Public Works’ design consultant) performed the environmental study, and completed the NEPA/CE form. Jeff Gray has assessed this change in the NEPA/CE and states that the original NEPA/CE is still valid. Jeff Gray (and Otak Project Manager Nico Vanderhorst) is copied on this message. Thank you, John John Fleming PE Project Manager Jefferson County Public Works 623 Sheridan St Port Townsend, WA 98368 Desk 360-385-9217 jfleming@co.jefferson.wa.us From: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Sent: Wednesday, February 28, 2024 7:53 AM To: John Fleming <JFleming@co.jefferson.wa.us> Cc: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov>; Ho, John <HoJohn@wsdot.wa.gov>; Eric Kuzma <EKuzma@co.jefferson.wa.us> Subject: RE: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you are not expecting them. Hi John, On the Project Submittal, it states that the Trail length and the end mile post is different from the approved NEPA. A NEPA re-eval will need to be done since the project length and end milepost are different. Please send an email explaining the changes (what has been deleted, etc) for the re-evaluation. Thanks! Marlisa Adams (she/her) Olympic Region Local Programs Office (564) 669-3617 Mailing Address: PO Box 47440 Olympia, WA 98504-47440 Physical Address: 7407 31st Ave NE Lacey, WA 98516 From: John Fleming <JFleming@co.jefferson.wa.us> Sent: Tuesday, February 27, 2024 6:50 PM To: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Cc: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov>; Ho, John <HoJohn@wsdot.wa.gov>; Eric Kuzma <EKuzma@co.jefferson.wa.us> Subject: RE: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail Hi Marlisa: Thank you for providing the latest Project Submittal Checklist. I have filled it out and attached it with the full submittal (13 files). Thank you, John From: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov> Sent: Tuesday, February 27, 2024 5:50 PM To: John Fleming <JFleming@co.jefferson.wa.us> Cc: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov>; Ho, John <HoJohn@wsdot.wa.gov>; Eric Kuzma <EKuzma@co.jefferson.wa.us> Subject: RE: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you are not expecting them. Hi John, Will you please use the latest Project Submittal Checklist (attached) Thanks! Marlisa Adams (she/her) Olympic Region Local Programs Office (564) 669-3617 Mailing Address: PO Box 47440 Olympia, WA 98504-47440 Physical Address: 7407 31st Ave NE Lacey, WA 98516 From: John Fleming <JFleming@co.jefferson.wa.us> Sent: Thursday, February 22, 2024 12:16 PM To: Archer-Parsons, Andrea <ArcherA@wsdot.wa.gov> Cc: Adams, Marlisa K. <AdamsMK@wsdot.wa.gov>; Ho, John <HoJohn@wsdot.wa.gov>; Eric Kuzma <EKuzma@co.jefferson.wa.us> Subject: [EXTERNAL] Request for review- draft prospectus package Olympic Discovery Trail WARNING: This email originated from outside of WSDOT. Please use caution with links and attachments. Dear Andrea: Jefferson County Public Works is requesting your review of the draft prospectus package for the Olympic Discovery Trail (ODT)- Anderson Lake Connection project. The package consists of the attached 12 documents. Status of other items in the package that will come to you later are: 1) Right of way- in process of acquiring one more trail easement, and revising the location of an existing trail easement through property owned by Jefferson Transit Authority; in process of updating trail lease with WSDOT. 2) Design approval- trail design consultant (Otak, Inc.) are working on 100% PS&E. 3) Environmental permits- under review and pending approval at USACE, SEPA and wetland mitigation plan at local agency; apply for HPA from WDFD after SEPA approval. Thank you for your consideration of this request, Andrea. Could you please reply that you have received this message and that you could access the attachments? Sincerely, John John Fleming PE Project Manager Jefferson County Public Works 623 Sheridan St Port Townsend, WA 98368 Desk 360-385-9217 jfleming@co.jefferson.wa.us