HomeMy WebLinkAboutEx Log SDP 2022-19 DrainagePlan for Termination Point final (002)EXHIBIT LOG
Shoreline Substantial Development application # SDP 22-00019
Stormwater Improvements to Serve the Termination Point Subdivision
with an outfall 20 ft landward of the OHWM of Squamish Harbor
May 8, 2024 Public Hearing
Exhibit 1 Staff Report dated April 4, 2024
Exhibit 2 Application received on October 26, 2022
Exhibit 3 Request for additional info dated November 23, 2022
Exhibit 4 Revised SEPA checklist dated April 14, 2023
Exhibit 5 Notice of Application and SEPA Notice dated May 10, 2023
Exhibit 6 JC Wilson Engineering Consultants LLC Stormwater Plan for Termination Point dated October 18, 2022
Exhibit 7 Geotechnical Report prepared by Stratum Group dated December 24, 2019 addressing Geologic Hazard Assessment of the Termination Point Properties
Exhibit 8 Marine Survey and Assessments FEMA Habitat Assessment and Mitigation Plan dated September 28, 2022 for a Stormwater Outfall in Shoreline Jurisdiction
Exhibit 9 Stratum Group Stormwater Review Response dated July 28, 2021 to Jefferson County Public Works comments dated February 23, 2021 on stormwater system
Exhibit 10 Letter from the WA State Department of Ecology dated June 9, 2023
Exhibit 11 E-mail from Kris Miller, Skokomish Tribe dated May 10, 2023
Exhibit 12 E-mail from Elena Rodriguez dated May 11, 2023
Exhibit 13 E-mail from Allie Taylor with the Jamestown S’Klallam Tribe dated May 31, 2023.
Exhibit 14 E-mail from Linda Colasurdo dated May 31, 2023
Exhibit 15 E-mail from Marilyn Showalter dated June 7, 2023
Exhibit 16 E-mail from Jan Wold comprised of three documents dated June 11, 2023
Exhibit 17 Letter from the Jefferson County Public Works Department dated June 29, 2022 addressing the Stormwater Site Plan Review and Recommendations for the Termination Point Subdivision
Drainage System for DCD Stormwater Permit (ZON 2021-00005)
Exhibit 18 Stormwater Application for ZON 2021-00005 for the stormwater system for Termination Point Subdivision
Exhibit 19 DCD Stormwater Checklist for Termination Point Stormwater System
Exhibit 20 Drainage and Erosion Control Plan prepared by NTI Engineering for the Termination Point Properties dated November 21, 2014
Exhibit 21 JC Wilson Engineering & Consulting LLC Second Stormwater Plan Review and Comments and Plans dated April 22, 2022
EXHIBIT LOG
Shoreline Substantial Development application # SDP 22-00019SHR 2017-10
Stormwater Improvements to Serve the Termination Point Subdivision
with an outfall 20 ft landward of the OHWM of Squamish Harbor
April 11, 2024 Public Hearing
Page 2
Exhibit 22 Stratum Group review of the Stormwater Plan of JC Wilson Engineers Plan dated April 19, 2022 for compliance with the Geologic Assessment dated December 24, 2019 (file number
9.24.19)
Exhibit 23 Table V-1..7 Rock Protection at Outfall from the 2019 Stormwater Management Manual for Western Washington
Exhibit 24 Resolution 21-14 related to eligibility of development of certain lots with the Termination Point Subdivision dated May 12, 2014 and related documents
Exhibit 25 Resolution 90-97 allowing development activity on Lots 1 to 4, 42 to 56, and portions of 22 to 56 within the Termination Point Subdivision
Exhibit 26 Certificate of Mailing, e-mail to interested parties, posting, and publication of the April 11, 2024 hearing.
Exhibit 27 Contour, hill shade and Critical areas maps of Termination Point
Exhibit 28 1994, 2000, 2005, 2011, 2017, 2021, & 2023 Aerial Photos of Termination Point
Exhibit 29 1977, 1994, 2001, 2006 & 2016 DOE Coastal Zone Atlas Maps
Exhibit 30 Assessor Parcel Info
Exhibit 31 Termination Point Subdivision recorded Volume 5 Page 25 of Long Plats
Exhibit 32 Jefferson County SMP Map & Shoreline Stability Map from the WA State Department of Ecology Coastal Zone Atlas
Exhibit 33 E-mail from Sue Corbett dated June 11, 2023
Exhibit 34 E-mail dated May 10, 2023 of the Notice of Application and SEPA checklist to agencies
Exhibit 35 E-mail dated September 26, 2023 from Lizzie Carp WA State Department of Ecology Shoreline Section
Exhibit 36 Final DNS issued April 17, 2024
Exhibit 37 Certificate of Mailing, e-mail to interested parties, posting, and publication of the dated April 17, 2024 for the May 8, 2024 Public Hearing and Final DNS.
Exhibit 38 E-mail dated April 16, 2024 from the Jefferson County Public Works Department on when TPS Roads were constructed
Exhibit 39 E-mail dated May 5, 2024 from John Magnuson
Exhibit 40 E-mail dated May 7, 2024 from Marilyn Showalter