Loading...
HomeMy WebLinkAboutRESOLUTION re Van Trojen Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer r Agenda Date: May 28, 2024 Subject: Resolution to Create County Project Van Trojen Road Bituminous Surface Treatment MP 0.08-1.30 Statement of Issue: Create a county project known as Van Trojen Road Bituminous Surface Treatment (BST/chip seal). The project will convert a 1.22 mile-long segment of Van Trojen Road from gravel surfacing to chip seal. Analysis/Strategic Goals/Pro's Et Con's: Jefferson County maintains approximately 400 miles of county roadways of which about 70 miles are gravel or earth surfaced. Gravel roads can be very cost-effective to maintain, particularly when carrying very low traffic volume. The County has no obligation to upgrade gravel county roads to chip seal surfaces. However, in accordance with Public Works prioritization procedure, there is occasionally adequate justification to perform the conversion. Conversion of Van Trojen Road from gravel to chip seal surfacing was considered and determined to be warranted. Although chip sealing is performed by the County Road Maintenance Department, the conversion is considered a capital (not maintenance) project and therefore required to be included on the 6-year TIP. This project is #17 on the 2024-2029 Transportation Improvement Program with the conversion anticipated to be completed in 2025. Fiscal Impact/Cost Benefit Analysis: The estimated project cost is $154,600 and funded by the Road Fund. Recommendation: The Board is requested to sign one original of the Resolution to Create County Project. Department Contact: Eric Kuzma, 385-9167. Reviewed ,,�� Mark McCauley, ounty Administrator Date STATE OF WASHINGTON COUNTY OF JEFFERSON In the matter of: Creating a County x project designated as Van Trojen Road x RESOLUTION NO. Bituminous Surface Treatment x IT IS HEREBY RESOLVED that Van Trojen Road, County Road No. 520009, from M.P. 0.08 to M.P. 1.30, be improved as follows: Convert road from gravel surfacing to Bituminous Surface Treatment (BST/Chip seal) surfacing. IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purpose shown: PURPOSE PREVIOUS APPROPRIATION PRESENT APPROPRIATION Engineering $ 0 $ 0 Right-of-Way Acquisition $ 0 $ 0 Sub-Total $ 0 $ 0 Construction: $ 0 $ 154,600 TOTAL $ 0 $ 154,600 This project is included in the officially adopted annual road program as Item No. . X The project is hereby made a part of the officially adopted annual road program in accordance with R.C.W. 36.81.130. IT IS FURTHER RESOLVED that: The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq. X The construction is to be accomplished by County forces in accordance with R.C.W. 36.77.065 and W.A.C. 136.18. PASSED AND ADOPTED THIS DAY OF JEFFERSON COUNTY BOARD OF COMMISSIONERS SEAL: Kate Dean, District 1 ATTEST Heidi Eisenhour, District 2 Carolyn Gallaway, CMC Greg Brotherton, District 3 Clerk of the Board Revised 4/2024