Loading...
HomeMy WebLinkAboutBLD1994-00715 Stormwater • • . . HILL9401 Oalt Bay Road • Port Ludlow,WA 98365 DESIGN AND 360.437.9637 • Fax 360.437.0314 CONSTRUCTION JANUARY 30, 1996 JEFFERSON COUNTY-DEPT OF PUBLIC WORKS - STORM WATER DRAINAGE CONTROL PLAN PROPOSAL . FOR: • PERMIT#BLD - 0715 125 TWINSVIEW COURT (LOT 17) ;PORT LUDLOW IMPERVIOUS SURFACE CALCULATIONS HOUSE &GARAGE 2,117 CONCRETE SURFACES 700 TOTAL IMPERVIOUS SURFACES 2,817 • ASSUMPTION...TOTAL RAINFALL IN 24 HOURS...ONE INCH 2,817 FT. SURFACE X 144 TN PER FT-235 CU FT OF WATER IN 24 HOURS. DRYWALL REQUIREMENT • NONE ti�soN co JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 4, o Tel:360ridan Street, Port 360 Townsend,WA 98368 dcdnneco.ieff rsoneWarson.wa.uslcommunitvdevelopment SHI NG'C l- SquareONE Resource Center I Building Permits & Inspections I Development Review I Long Range Planning August 20, 2015 MEMORANDUM TO: BLD Files and interested parties FROM: Carl Smith, Community Development Director and Building Official RE: BLD 94-0715 (Houser residence; 125 Twinsview Court, Port Ludlow) BLD 98-0066 (Fleming residence; 112 Twinsview Court, Port Ludlow) A review of each of these building permit files shows that based on the information provided by the applicants or applicant's agents, each permit was processed correctly according to applicable codes. • SMALL PARCEL EROSION CONTROL PLAN Attached is the "Small Parcel Erosion Control Plan" required for completion of your project. This page contains information you need to know before proceeding. Please refer to Flowchart 1 showing steps for developing the plan. The small parcel erosion and sedimentation control plan is the minimum plan for storm water control. If your development exceeds the threshold for a small parcel plan notify the Department of Public Works. Land disturbing activities mean any activity that results in a change in the existing soil cover (both vegetative and nnnveg tative) and/or the existing soil topography. Land disturbing activities include, but are not limited to demolition, construction, clearing, grading, filling and excavation. Site Plan: Pages 2 & 3 show an example of a typical site plan and trench section detail. Your site plan should provide this type of information. Plan Review: Plans will be reviewed within as soon as possible after submittal. One red-lined or stamped "Approved for Construction" plan will be returned to you. Plans required correction should be re-submitted as soon as possible. Copies: Submit two (2) copies of the site improvement and drainage plan on 8 1/2 by 11" paper. Inspection: Contact the department five (5) days in advance for inspection. Contact the inspector for the Public Works Department at 206.385.9160. If at all possible,the inspector will make provision to meet with the applicant on site. Fees: The charge for review and inspection is$35.00 per hour. A final bill will be sent to upon final approval of the storm drainage system. Questions?: Contact the Jefferson County Department of Public Works, P.O. Box 1220, Port Townsend, WA 98368, Telephone 206.385.9160. If you wish to review the Storm Water Management Manual for the Puget Sound Basin you may do so at the offices of the Department of Public Works, or the County Library. You may purchase a plan from the Washington State Department of Ecology (call Helen Pressley at 206.407.6456). REMEMBER: No land disturbing activities may be done without plan approval, and a set of approved plans must be on site during development. For Departmental Use Only: Critical Areas: [ ] Date Received: Building Permit: [ ] By: Subdivision: [ ] Department: 1 1YP?C,�L SiTE IMPROVE' ENT & DRAINAGE PLAN -------- — 702 / 100 E SVULE m 101 MACE Waal' 700 --.....„ _ rur ! LE_ Of6cr Au RUNOFF r HE4DCx — —SD— EM IL CRAW TO FILTER PERO Toi F our , — —=mn,c , yA CONSTUCTTON---/ 102 —._wATFR t.55 , \1f =AR — --aoctt1tr caa SAVE 104 4..... -SS—s+xovrr 2k4t • 704 — RocFa ooaw '.FOUR a Mai I LYWN Gl4i RW44 — —� PROPOSED =rams 104 . 102 E>C�x ElE1tAT1015 706 SS x Row K6tow \ * •F �— 7 r 103 106 PROPOSED V&RQ1 I � i 110 a :I ,5670 N.E. 5.501 ST. ELEV. 07.00 , 106' � uDER I ice cR' 106 / gg �j.\ RELIOVE LL / 1 REliOVE ;M, • 1� — L _, r - 31 .......) 4 104 i r ROC.'••111■01' pcouy} ORAN \ / 104 SEE DUAL DETAIL WE NO CCRT. MOO Roos son. OR \- END ROCKERY.DEBRIS TO BE TRACKED \:93." HOMONYM. TO GROUND TO THE STREET 1 FT. VERT 102 ' 3 � toe oasr c.o. t_—m wATER METER ! 51 MAU< w/ ROLLED C1JRB i ss �w w ss . TS N.E. 85TH STREET - \--IMPROVED') �TO BE J■CED 2 — 1 STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN Figure III-2.22 - Flow Dispersal Trench PIPE O.D. I'-0r;1 ■r-91, i MINI MIN FLOW TO SECOND DISPOSAL -- END CAP OR PLUG TRENCH IF NECESSARY CLEAN OUT WYE FROM PIPE ,, rrww o II 4" OR 6" PERF. PIPE ri s ►- I LAID FLAT/LEVEL 4I I- TYPE I CB I I r I ' W/SOLID COVER (LOCKING) 11 , 50' ,y, A 1 A 1� _ —� INFLUENT PIPE L;1111= r ___741, (MAX. DESIGN J FLOW = 0.5 CFS , TYPE I CB WITH PER TRENCH) 111 SOLID COVER a ° n 4CLEAN OUT WYE FROM PIPE FLOW TO OTHER BRANCHING CB'S AS NECESSARY PLAN nts PIPE NOTES: O.D. 1. THIS TRENCH SHALL BE I�p' 2�°b MPx CONSTRUCTED SO AS TO PREVENT POINT DISCHARGE 20% MAX- MI� r AND/OR EROSION. j ��� •,IN` 2. TRENCHES MAY BE a - ' 10\ PLACED NO CLOSER THAN ? a '' / \\�// 50 FEET TO ONE ANOTHER. - 2 2'E. E ; 0 11.4 3. TRENCH AND GRADE TREATED ,, 2 A I CLEAN (s 5% FINES) BOARD MUST BE LEVEL; N CO auoE li o % %"-1'/:" WASHED ROCK aawo f °o ) , I ALIGN TO FOLLOW I CONTOURS OF SITE. 4" OR 6" PERF. PIPE 4. GRADE BOARD SUPPORT 6" `'° ° o ' LAID FLAT WITH HOLES UP POST SPACING AS MIN_ _ °o " L o .. , (PER GRAVEL BEDDING REQUIRED BY SOIL REQUIRED, IF CRUSHED CONDITIONS. ` FILTER ROCK BACKFILL USED FABRIC SECTION A-A nts 111-2-44 FEBRUARY, 1992 3