HomeMy WebLinkAbout#166 Second Avenue Bridge in IrondaleIN THE MATTER OF THE )
Before the Honorable Board
CONSTRUCTION OF A BRIDGE ) of County Commissioners of
Jefferson C o~anty
ACROSS CHIMACUM CREEK. )~ Washington.
PETITI ON.
Comes now your petitioner, Western Steel C orporati on,
a corporation organized and existing under the laws of the
State of Washington, and having its principal place of
business in the city of Seattle in said State, and
respectfully prays that it may be permitted and authorized
to construct a bridge across Chimacum Creek in Section 35
of Township 30 North of Range 1, West of the WillamYnette
Meridian, connecting Second Avenue in the plat of
Irondale filed for reeor d June 3, 1909, with Hilton an d
Carnegie Avenues in the plat of Irondale, Division Na. 6~
all as shown upon the map of Irondale hereunto attached an d
made a part hereof; said bridge should be approximately
eighty (80) Feet above the ground in the center of the
channel of Chimaeum Creek, and to run on a uniform grade
from one bank of said creek to the other, and to be
constructed 3n accordance with the plans and specifications
herewith submitted; said bridge to be constructed by said
Western Steel Corporation primarily for its o~~n use ~.d benefit
but to be at all times open to public traffic, subject only
to such restrictions as your Honorable Board and the
requirements of ordinary care and safety may impose;
said bridge not to be altered or removed by your petitioner
except after sixty (6(J) days notice in writing to the Board
of County Commissioners of Jefferson County.
Respectfully Submitted,
VffESTERN STEEZ CORPORATION
BY ~~!%~L~r~
lts A torney.
a.~.
SPECIFIC~iTIONS FOR BRIDGE OVER CHI]~dACUi~d CREEK
On 2nd Ave., in the town of Irondale,
Jefferson County, t~ashington.
The. nature of these specifications is to provide
for the furnishing of all material, tools and labor and
erecting bridge over Chimacum Creak in the town of Tr ondale,
as per the following specifications and plans hereto
attached, which are made apart of these speeifi.cations.
Height of bridge to be approximately 80 feet
-above the ground in center of channel over Chimacum Creek
and run on a level or uniform grade t o the bank on each bank
of said creek, the entire length of bridge to be 440 feet.
Bridge is to be capable of sustaining a 12-ton rolling load.
BENTS.
Bents to be composed of five piling to each bent
17 feet center to center with three horizontal and six sway
braces to each bent on all bents over 60 feet in height.
All bents under 60 feet to be sway braced with one set of sway
braces to each 20 feet in height.
PIZ ING .
Piling shall be of good sound fir and of sufficient
length to bring the bridge up to the aforesaid height after
being driven to a solid foundation, said foundation to be
determined by the penetration, said penetrationto be one
inch to a 12 foot fall of a 2000 lb. Homer or equivalent
thereto.
CAPS .
Caps to be 12" x 12" x 22' and drifted to each
Pile with one 3~4" a 22" drift bolt.
__ - --- STRINGERS.
Stringers to be of 3" x 1?" z 18', l0 stringers to
each bent well. spiked to each cap with ,two 60 D nails and
lapped at each end and well spiked to each other at ends.
FLOOR.
Floor t o be of 3" z 1~" x 20` surfaced. on one side
and 1~ d d.re~sed side dovm with 3~4" spaeaes and nailed with
two 60 ~ nails in each stringer.
RAID IT3 G.
Railing Posts 4" x 4" x 4~t, 8~' C to C and bolted
to outside stringer with two ~" a 8" bolts with washers.
RA 1I, ING
Hub guard 2 g 8 top Rails one 2 z 6 and one 2 x 4
as shown in plan, all material in railing to be S 4 S and
well nailed with 20 D nails and to have two coats of Princess ',
Metallic Paint.
TIMBERS
All timber used in the construction of the entire
structure to be of good sound fir free, from large or base
3~ots, decay, cap or any defects that would render it
unfit for the use intended.
I~ORBMANSHIP .
The wor~ianship must be first-alas in every respect.
ROADV~AY .
The roadway shall be 16 ft.wide and also a 4' side
walk with a wheel guard of a 6 x 6 laid o~ 2 x 4 blocks every
eight feet .
RUid BOARD OR TIE BRACE.
There shall be one tie brace of 3 a l2 the entire
length of bridge halfway from groand to decking well spiked
to piles with 80 D spikes.
BULKHEAD FOR EDaB~~'KMENT .
To be erected at each end of bride as support for
earth rill forming approach and to consist of a fir bulkhead
20' ft wide and of sufficient height to bring emban~ent
flush with roadway of the bridge, material to be such as is
available on the ground and sufficiently strong for reason able
safety.
TIME OF C C9~IPI,ETION.
The entire structure to be completed on or before
the 20th day of September 1910.
INSPECTION
The work and,. ma'tserial to be satisfactory to any
authorized engineer or agent of ~festern Steel Corporation.
BOND
The contractors must give a surety bond in the
amount of his bid for the faithful performance of the
work satisfactory to the Western Steel Corporation.