GEOTECHNICAL REPORT
Prepared For Brian Vanloon
October 5, 2007
For the Property Described as
Tax # 6013422022
Johnson Road, Community of Coyle, Quilcene, WA 98376
Section 34, Township 26 North, Range 1 West, W.M.
Jefferson County, Washington
Prepared by
NTI Engineering and Surveying
l17 S. Peabody Street
Port Angeles, Washington 98362
Phone 360-452-8491 Fax 360-452-8498
Web Site www.nti4u.com
E-mail info@nti4u.com
~~~cC1E,d~%1(~,iC
lip 15 2007
EFER30N COUNTY err
~~
f~
www.nti4u.com
NTI ENGINEERING & SURVEYING
717 SOUTH PEABODY STREET, PORT ANGELES, WA 98362
Engineers ~ Land Surveyors ~_~ geologists
Construction Inspection ~~ Materials Testing
(360) 452-8491 1-800.654-5545 FAX 452-8498 E-Mail: info ,~nti4u.com
October 5, 2007
Brian Van Loon
54 Goliath Lane
Port Ludlow, WA 98365
Subject: Geotechnical Report for Tax # 6013422022, located in Section 34,
Township 26 North, Range 1 West, W.M., Jefferson County, WA
Dear Mr. Van Loon:
Background
0
At your request, NTI Engineering and Surveying (NTI) conducted a geotechnical
inspection at the above referenced property. The purpose of this inspection was to
visually examine the property in orderto provide an opinion regarding the presence of
landslide hazard areas and make recommendations in regards to the proposed
development of the property. The inspection consisted of office research of available
literature, previous reports completed by NTI, and geologic maps of the area and a site
visit made on September 24, 2007. This study was performed in general accordance
with the Jefferson County Unified Development Code.
It is our understanding that the property will be developed for seasonal recreational use
with the possibility of a cabin in the future. Potential building sites include locations at
the east and west ends, and in the center of the property.
Site Description
The subject property is located on Johnson Rd at the southern end of Toandos
Peninsula near the community of Coyle (Figure 1). Access to the propertywas via 505
Johnson Rd. The property is surrounded by rural residential, vacant timbered, and
forest designated lands (Figure 2). The property is partially cleared and existing
improvements include a driveway and septic system (Cover Photo).
The property slopes down towards the east at an average slope angle of approximately
9° (~16%) (Figure 3). There is a shallow seasonal drainage swale along the south side
of the property, another swale west of the property, and a ravine near the north side of
the property that has a spring in it. The head of the ravine is near the northwest property
corner. The steepest part of the ravine has a slope angle of approximately 30° and is
0
about 40' in elevation. Just a short distance from the head, the ravine widens and
becomes less steep. Vegetation on the property includes young to mature fir, cedar,
and alder with a brushy understory (Cover Photo).
Site Geology
The Washington State Department of Ecology's Coastal Zone Atlas maps the majority
of the property as Vashon lodgment till (Qvt1), and the eastern side, approximately
below the 200' contour line as Undifferentiated stratified sediments older than Vashon
lodgement till (Qpf) (See Appendix). The till is described as consisting mostly of a
compact mixture of boulder to sand size particles with some silt and clay. The Atlas lists
this soil as excellent forfoundation stability, good for seismic stability, and says that that
it stands in steep natural andlor cut slopes for long periods. The Undifferentiated
stratified sediments mainly consists of sand and gravel, but in some areas contains silt,
clay, peat, and possibly till. The Atlas maps the stability of the property as Unstable
(See Appendix).
The Department of Ecology's "Geology and Ground-Water Resources of Eastern
Jefferson County, Washington" maps the soils in the area of the subject property
essentially the same as the Coastal Zone Atlas.
According to the Soil Survey of Jefferson County Area, Washington (United States
Department of Agriculture, 1975), the majority of the property is in an area mapped as
Dabob very gravelly sandy loam (DaC). This unit consists of moderately well-drained
soil that formed in very gravelly glacial till. This soil is listed as having moderately rapid
permeability, but becomes very slowly permeable at ~20" to 36". Runoff is listed as slow
to medium and the hazard of erosion as slight to moderate. Other minor soils mapped
on the property include Alderwood gravelly loam (AmC) and Kitsap silt loam (KtE). The
Alderwood soil also formed in glacial till and is similarto the Dabob soil. The Kitsap soil,
mapped in the ravine to the north, is a silty, clayey soil that formed in glacial lacustrine
or marine sediments on canyon sides and ocean bluffs. The Soil Survey descriptions
pertain to the upper 5' of soil only.
Visual observations of the surface exposures of soil are generally consistent with the
above descriptions.
Figure 2
,:
. ~~
~~
'~ ~r t ~ ~a
Figure 3
Conclusions and Recommendations
The subject property appears grossly stable and the project seems feasible from a
geotechnical perspective. We flagged one area in the northwest corner of the property
(Figure 3) as a landslide hazard area with white flagging tape. We recommend a
minimum 30' building setback from the top of this slope. We further recommend a
reduction of the landslide hazard area vegetative bufferwithin the building setback to
15' for this area.
Other moderately steep slopes exist on the property. For slopes greater than 18.5°
(33.3°/a), we recommend that building foundations comply with Section 1805.3 of the
International Building Code (IBC) which deals with footings on or adjacent to slopes.
That text and related illustration can be found in the appendix of this report.
Several dead trees were noticed in the vicinity of potential building sites, including the
site at the west end of the property near the landslide hazard area. These trees could
pose a danger to structures or people if they fell. They also could cause significant soil
disturbance if their root balls were ripped out of the ground. We recommend that dead
and diseased trees be removed from the vicinity of structures, even within the landslide
hazard area vegetative buffer.
The following recommendations should also be considered with regards to the proposal:
1. Itwill be necessary to maintain ground coveron the slopes and on the flatter
areas in order to reduce erosion from surface runoff. Any bare areas that
develop should be revegetated. Native deep-rooted vegetation that requires little
or no irrigation would be the most beneficial. Please consult the enclosed
publications forfurther information.
2. Heavy irrigation or other activities that would contribute large quantities of water
to the soil in the vicinity of the steep slopes should be avoided.
3. Surface runoff from hard surfaces such as roofs, driveways, walkways and
patios should be controlled and routed to a drainage control device such that
surface water discharge to adjacent properties does not significantly exceed
predevelopment conditions. It may be feasible to control release this waterto the
existing natural drainage corridors with quarry spalls or perforated pipe.
4. Surface water should not be allowed to flow freely down the face of the slopes
and cause erosion of the slopes. If this occurs, the water should be directed
away from the slopes and/or conveyed to a safe discharge area, possibly into
the natural drainage corridors mentioned above.
5. Footing and/or curtain drains maybe beneficial if the ground around the selected
home site is excessively wet.
6. Silt fences or other sediment control devices maybe needed during construction
so that sedimentation to adjacent properties does not significantly exceed
predevelopment conditions.
7. Drainage control devices should be maintained in good working order and
inspected at least once a year.
8. All drainage control features should conform to the current regulations that apply
to the development of this property and be constructed in accordance with
standard engineering practice in orderto insure that surface waterdischarge or
sedimentation to adjacent properties does not exceed predevelopment
conditions.
Forfurther information please review the three publications (included with the original of
this report) published by the Washington State Department of Ecology (DOE) entitled:
"Slope Stabilization and Erosion Control Using Vegetation", "Vegetation Management: A
Guide for Puget Sound Bluff Property Owners" and "Surface Waterand Groundwater on
Coastal Bluffs". These publications can also be viewed on the DOE website at:
http:Ilwww.ecy.wa.gov/biblio/sea.html under the 1993 and 1994 year heading. The DOE
website also contains additional useful information regarding slope stability and site
development, and this reference is highly recommended.
Limitations
This report has been prepared for your exclusive use in conjunction with the above
referenced project. The report has not been prepared for use by others orfor other
locations. It may be used by others only with the expressed written permission of the
Engineer.
Within the limits of scope, schedule and budget, this report was prepared in general
accordance with accepted professional engineering and geological principles and
practices in this or similar localities at the time the report was prepared. An analysis of
the potential for large scale earth movements was not performed. If you desire a more
detailed analysis of you site, you are encouraged to obtain such services. No other
warranty, expressed or implied, is made as to the conclusions and professional advice
included in this report.
The observations, conclusions and recommendations presented in this report were
based on our visual observations of the subject property at the time of our site visit; no
subsurface exploration or laboratory tests were performed. Soil and geologic conditions
can vary significantly between test holes andlor surface outcrops. If there is a
substantial lapse of time, conditions at the site have changed or appear different than
those described in this report, we should be contacted and retained to evaluate the
changed conditions and make modifications to our report if necessary.
Sincerely,
NTI ENGINEERING &SURVEYING
r
Robert A. Leach, P.E., MBA
Principal Engineer
Y
Bill Payton, L.E.G.
Engineering Geologist
B:IReportslVANL0701.geotech.34(26-1).Coyle.doc
!o -5-07
~ EXPIRES 12130/2008
vvaa~a~ ~~~~a n~~a~ v~ ~~a~~~~~~y~v~~ - v~v~vyy
LJI
1
0
0
1805.3 Footings on or adjacent to slopes. The placement of
buildings and structures on or adjacent to slopes steeper than
one unit vertical in three units horizontal (33.3-percent slope}
shall conform to Sections 1805.3.1 through 1805.3.5.
1805.3.1 Building clearance from ascending slopes. In
general, buildings below slopes shall be set a sufficient dis-
tancefromthe slope to provide protection from slope drain-
age, erosion and shallow failures. Except as provided for in
Section 1805.3.5 andFigure 1805.3.1, the following criteria
will be assumed to provide this protection. Where the exist-
ing slope is steeper than one unit vertical in one unit hori-
zontal (100-percent slope}, the toe of the slope shall be
assumed to be at the intersection of a horizontal plane drawn
from the top of the foundation and a plane drawn tangent to
the slope at an angle of 45 degrees (0.79 rod) to thk° horizon-
tal. Where a retaining wall is constructed at the roe of the
slope, the height of the slope shall be measured frc ~m the tap
of the wall to the top of the slope.
1805.3.2 Footing setback from descending slope sur~
face, Footings on or adjacent to slope surfaces shall be~
founded. in firm material with an embedment and set back
from. the slope surface sufficient to provide vertic al and lat-
eralsupport for the footing without detrimental settlement.
Except as provided for in Section 1805.3.5 and Figure
1805.3.1, the following setback is deemed adequate to
meet the criteria. Where the slope is steeper than 1 unit ver-
tical in 1 unit horizontal (100-percent slope), the required
setback shall be measured from an imaginary plane 45
degrees (0.79 rod) to the horizontal, projected upward
from the toe of the slope.
1805.3.3 Pools. The setback between pools regulated by
this code and slopes shall be equal to oneā¢half the building
footing setback distance required by this section. That por-
tion of the pool wall within a horizontal distance of 7 feet
(21.34 mm}from the top of the slope shall be capable of sup-
porting the water in the pool without soil support,
1$05.3.41'oundationelevotion. ~n graded sites, the top of
any exterior foundation shall extend above the elevation of
the street gutter at point of discharge or the inlet of an
approved drainage device a minimum of 12 inches (305
mm) plus 2 percent, Alternate elevations are permitted sub-
ject to the approval of the building official, provided it can
be demonstrated. that required drainage to the point of dis-
charge and away from the structure is provided at all loca-
tions on the site.
1805.3.5 Alternate setback and clearance. Alternate set-
backsand clearances are permitted, subject to the approval of
the building official. The building official is permitted to
require an investigation and recommendation of a registered
design professional. to demonstrate that the intent of this sec-
tion has been satisfied. Such an investigation shall include
consideration of material, height of slope, slope gradienC,
load intensity and erosion characteristics of slope material.
FACE OF
FODTJNG
TOP OF
SLOPE
........
.,.
FACE OF ~E--~-, .,...,,...
STRUCTURE
TOE OF H/3 BUT NEED NOT N
SLOPE EXCEED d0 FT.
MAX.
For SI: l foot = 3(k~.& mm,
N/2 BUT NEED N07 EXCEED 15 FT MAX.
FIGURE 1805.3.1
FOUNDATION CLEARANCES FROM SLOPES
2006 INTERNATIONAL BUILDING CODE
SOILS AND FOUNDATIONS
347
i~