Loading...
HomeMy WebLinkAbout09 September 06 JEFFERSON COUIlTY BOARD OF EQUALIZATION A.C. Dalgleish David G. Douglas Archie Barber. Jr.c-iO James A. DeLeo Chairman Vice-Chairman Member Alternate M I NUT E S 6 September 1985 Board met in the norning to complete scheduling of field inspections and to complete other paper work of the Board. The afternoon session was devoted to review and conclusions of some of the petitions. Carolyn Lea was sworn in as Clerk of the B.O.E. BE-85-12-R: The Board inspected this site in mid-morning of Thursday, the 5th of September, and Ms. Bliss assisted in the inspection. Evidence of perk test holes was found; however, !ls. Bliss acknowledges that there is no record of perk tests having been made prior to her purchase of the property. The Board concluded that there should be some adjustment in the land valuation con- sisting of the following: 1) 195 front footage 2) Adjustment due to 3) 4.5 acres of land @ $500/F.F. = $97,500 excess depth & width @ 30% = above R.P. @$5,000/acre Total land value IMprovements Revised valuation appraised = - 29,250 22,500 = $90,750 35,870 $126,620 ~ = " BE-85-14LO: The Board inspected this site in early morning of Thursday, the 5th of September, and r1rs. Broders assi sted in the i nspecti on. The property is 600 feet al cin'g^ the top of a 100 foot hi gh bl uff taperi ng in wi dth from 130 feet to 25 feet above 'crest of the bluff. THe Board judged to adjust the valuation of this property as 600 front feet at $300/front foot with a 50% ~eduction due to limitation of building set~back regulation. The adjusted valuation should be set at $90,000. BE-85-15R: The Board inspected this site in late morning of Thursday, the ~th of September, and !,lr. Nelson assisted in the inspeciton. The building was'.1'ound to be in a' very sad state of repairs due to lack of maintenance and extenuation drainage problems. The Board judged to retain the land valuation at $14,700 and to reduce the building valuation from $25,500 to $12,800 for a total valuation of $27,500. ~aving no further business, meetin9 was adjourned. APPROVED BY: DATE APPROVED:~d..c~l/L It,/9f?S- , Prepared by ARCJt~~R~~f; dJ-' ca{~~~2i~?~