Loading...
HomeMy WebLinkAbout965400034 Geotech Assessmentr C.. PRELIlVIINARY GEOLOGICAL ASSESSMENT DISCOVERY BAY DEVELOPMENT ' DISCOVERY BAY VILLAGE JEFFERSON COUNTY, WA$HII~TGTON Prepared for: MR. STEVE FAGER AQUACULTURE SYSTEMS, INC. P.O. Box 417 SEQun~I, WA 98382 Prepared by: ALKAI CONSULTANTS, LLC 9465 PROVOST ROAD NW, STE. 204B SILVERDALE, WA 98383 Project No. ACL04-G102 September 13, 2004 ALKA~ coNs . U LTANTS, LLC. Environmental Engineering • Geotechnical Engineering • Wetland Consulting September 10, 2004 Project No. ACL04-G 102 Mr. Steve 1~ager Aquaculture Systems, Inc. P. O. Box 417 Sequim, WA 98382 Preliminary Geological Assessment of Slope Stability Proposed Residential Development Discovery Bay Village Jefferson County, Washington Presented herein aze the results of a preliminary geological assessment to evaluate potential erosion and landslide hazards at the referenced site in accordance with the requirements of the Jefferson County Unified Development Code, sections 3.6.4 "Environmentally Sensitive Areas District", 3.6.7 "Geologically Hazardous Areas", and 3.6.10 "Special Reports." The scope of the study was. developed during a site meeting on September 1, 2004 of this year, and outlined in my letter of proposal to you dated September 2, 2004. Fieldwork for the study was undertaken on September 1, 2004. Site Conditions and Proposed Development The subject pazcel is located to the west of State Highway 141 in Section 13 Township 29N Range 2W as shown on the Vicinity Map portion of Figure 1 of this report. At the time of the site visit Lots 33, 34, and 35 were the focus of this preliminary assessment. These lots are shown on Figure 2. It is~our understanding that initial grading on the three lots began approximately 2 yeazs .ago with final grading completed approximately 6 months ago. The three graded lots are located on a roughly west-east trending ridge with descending slopes towazd the south-southeast. A primitive dirt road off of Holland Drive provides access to the lots. The graded areas of the lots had been cleared with forested areas uphill of the lots and a small stand of fir trees on the bottom of lot 33. Amore detailed description for each lot is as follows: Lot 33 The native slope on the western (upper) portion of Lot 33 had been graded to an approximately 15 foot high slope with an approximately 1.SH:1.OV ratio. The fill slope on the eastern (lower) portion of the lot is approximately 12 feet in height with steep slopes terminating near Holland Drive. It is our understanding that the proposed residential structure for the lot will be a 2-story wood frame structure with a daylight basement. GEOLOGIC AND GEOTECHNICAL CONSULTING Project No_ ACL04-G102 Preliminary Geological Assessment Report Discovery Bay September 10, 2004' •' Page No. 2 Lot 34 A proposed building pad area for lot 34 had been developed on the top of a small ridge which is the dominant feature of the lot. The majority of the proposed building pad area was exposed dense native soils with one area of the lot having a fill slope (eastern portion) with a relatively steep slope. It is our understanding that the proposed residential structure for the lot will be a 2-story wood frame structure. Lot 35 The topography of lot 35 is a descending slope which terminates at Holland Drive. The natural slope is at a roughly 2H:1V ratio. A cut-fill pad had been developed near the top of the lot with the fill slope up to 7.0 feet in height and. graded to a 1.SH:1.OV ratio. It is our understanding that the proposed residential structure for this lot will be a 1-story wood frame structure. Methodology Soil and slope conditions of the subject property were visually. examined and evaluated using available soil exposures and road cuts in the site vicinity and reviewing soil logs. for water wells in the general site vicinity. The local soil stratigraphy is well exposed in the general site vicinity and dense to very dense soils are present at a shallow depth. The use of slope cuts and slope exposures in combination with the water well soil logs provided an improved view of the near surface site soils for evaluation. This on site information combined with various soil exposures around the site provided a basis for a general understanding of the local soil and geologic conditions as discussed below. Actual subsoil conditions and thickness may vary between observation locations or as exposed in excavations or slope exposures. In addition to the observation of available soil exposures and reconnaissance of the area, the readily available resources listed below were reviewed. Resources. used: 1. "Washington State Coastal Zone Atlas", Washington State Department of Ecology, Jefferson County Volume 11. 2. Stability Map of Northeastern Jefferson County, Washington", Washington Division of Natural Resources, Division of Geology and Earth Resources, 1976. 3: "Soil Survey of Jefferson County Washington", United States Department of Agriculture, 1960. 4. U.S.G.S. 7.5 minute series topographic map. 9465 Provost Road NW, Suite 204 6 • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 Project No. ACLA4-G102 Preliminary Geological Assessment Report-Discovery Bay September l0, 2004 - Page No. 3 5. The Washington Division of Geology and Earth Resource (WDGER), "Geologic Map of Washington - Northwest Quadrant" map. 6. The "Jefferson County Washington Resource Inventory Area 17 Generalized Su~cial Geology and Relative Hydraulic Continuity Potential" map. The base map for Figure 2, Site Plan was provided by the client and was prepazed by Roats Engineering (dated 1981). Regional Geologic Setting Site soils, topography and geology result from the advance and retreat of the Vashon Stade of the Frazier Continental Glaciation. During the last glaciation, the continental glacier advanced across the region with various mixtures of silt; sand and gravel being deposited ahead of and below the advancing ice sheet. These materials were in turn overridden by the advancing ice and compacted to the present dense to very dense condition by several hundreds of feet of moving ice. The unsorted portion of this highly compacted material became what is commonly referred to as glacial till, a material of mixed gradation, which has the general appearance of lean concrete. Materials below the till layer are generally identified as Advance Outwash or other pre-glacial deposits. Zones of dense to very dense, somewhat cleaner materials, materials showing some degree of sorting or bedding, or materials of a mixed or indefinite origin incorporated into the till unit or neaz the contact between the till and underlying pre-glacial deposits are commonly referred to as ice contact deposits or glacial drift. The Washington Division of Geology and Earth Resource (WDGER), "Geologic Map of Washington -Northwest Quadrant" map, dated 2002, indicates that the site is near the contact of glacial till (Qgt) and undifferentiated outwash (Qgo). GIacial Tiil consists of an unsorted, unstrat~ed, highly compacted mixture of clay, .silt, .sand, gravel and boulders deposited by glacial ice. Undifferentiated outwash is composed of stratified sand, gravel, and cobbles with occasional silt and clay-and originates in glacial outwash. The term `undifferentiated" indicates that the unit may consist of both advance and recessional outwash but the mapping unit does not distinguish between them. The "Jefferson County Washington Resource Inventory Area 17 Generalized. Surficial Geology and Relative Hydraulic Continuity Potential"_ map indicates the site is neaz the contact of basil till and coarser unconsolidated sediments (e.g. outwash, alluvium). This description appears to be consistent with the WDGER map (see Figure 3). Over time, through weathering, root disturbance and the deposition of organics, a layer of topsoil several inches to a foot or more in thiclrness may develop. 9465 Provost. Road NW, Suite 204 B • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 Project No. ACL(}4-G102 c Pteliminary Geological Assessment Report-Discovery Bay September 10, 2004 - Page No. 4 Site Soil Conditions The United States Department of Agriculture, Soil Conservation Service, Soil Survey of Jefferson County, 1975 (SCS) indicates that the site is located in areas mapped as Clallam gravelly sandy loam (CmD) and Hoypus gravelly loamy sand (HuD}, both with 15 to 30 percent slopes. The Clallam (CmD) deposits formed in glacial till and have a dense cemented layer with very slow permeability at 20 to 40 inches in depth. Runoff is medium and the hazard of water erosion is moderate. Perched water may be encountered above the cemented layer during the rainy season. The Hoypus (HuD) deposits formed in glacial outwash. Runoff is medium and the erosion hazazd is moderate. Based on the. observed soils, it is our opinion that the site soils are generally consistent with those indicated on the geologic and soil maps of the azea. Differences between the mapped and observed soil conditions aze generally minor and not unexpected, and appeaz primarily as a result of outcrop availability and mapping scale. Surface Conditions Present slope grades and surface conditions were examined across the property and adjacent properties. No evidence of land sliding or slope soil movement was observed. The "Coastal Zone Atlas of Washington", Volume 11, Jefferson County, Washington Department of Ecology, 1979 identifies slopes in the site vicinity as intermediate and unstable (IJ). Intermediate slopes are described as generally steeper than 15 percent slopes, but can include areas of more gentle slopes where weak material or groundwater conditions reduce stability. It should be noted that the mapping was performed in the late 1970's and does not reflect more recent landslide activity (see Figure 4}. The "Stability Map of Northeastern Jefferson County, Washington" map by Washington Department of Natural Resources, Division of Geology and Earth Resources, 1976 indicates the site is neaz the contacts of class 2 and 3. Class 2 slopes are steep slopes believed to be stable. Class 3 slopes are considered to be areas of poor natural stability (see Figure 5). Based on ourobservations on and azound the site azea it is our opinion that the slope area is generally stable and has not been subjected to lazge-scale slope soil movement or landsliding. Fieldwork for this geotechnical study was undertaken during a dryer than normal summer, and na obvious indications of ground water flows, springs or seeps were observed back of the top of the slope or from the slope face. Withregazd to seasonal variations in the ground water levels based on vegetation types, it appears that the site is generally well 9465 Provost Road NW, Suite 204 B • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 Project No. ACL04-G102 Preliminary Geological Assessment Report-Discovery Bay September 10, 2004 - Page No. 5 drained but it is possible that perched water may periodically develop in the sandier layers within the till or along the contact between the near surface soils and the glacial till. CONCLUSIONS General Comments Based on our site observations and review of pertinent materials, it. is our opinion that the site does not meet the requirements of the Jefferson County Unified Development Code Section 3.6.7 for classification as a geologically hazardous area. Specifically, section 3.6.7.2 I (Erosion Hazard Areas), ii (Landslide Hazard Areas) and. iii (Seismic Hazazd Areas). However., as previously indicated, grading which has been performed on the site has resulted in the creation of fill slopes which will need to be regraded or require the construction of retaining wall structures. It is Alkai's opinion that the grading on lots 33, 34 and 35 does not pose a significant threat to the overall stability of the subject lots or adjacent lots and associated slopes. The proposed residential structures locations and associated site development will have no effect the slope stability or existing slope conditions across the site or on adjacent properties. . To varying degrees maintenance of slope vegetative can aid in slowing the overall rate of any potential slope degradation. The Washington State Department of Ecology (DOE) has three publications, which may be helpful in developing long-term slope vegetation maintenanceJprotection and landscape plans. 1. "Slope Stabilization and Erosion Control Using Vegetation: A Manual of Practice for Coastal Property Owners", May 1993, Publication 93-30. 2. "Vegetation Management: A Guide for Puget Sound Bluff Property Owners", May 1993, Publication 93-31. 3. "Surface Water and ground Water on Coastal Bluffs: A Guide for Puget Sound Property. Owners", June 1995, Publication 95-107. The site soils are moderately erodible in the disturbed state or under conditions of channelized water flow. During and after construction runoff from the building site and yard area should be controlled and not directed to or allowed to free-flow toward, across or over the slope area. It is recommended that through site grading, surface storm runoff should be directed away from the slopes and collected where possible for disposal. Similarly runoff from the buildings and surfaced azeas should be intercepted, collected, and tightlined away from all slope areas for disposal where down slope soils, slopes, and structures are not placed in jeopardy. On no portion of the site should drywells be used for the disposal of any collected storm water. From a geotechnical view tight lining of collected water to the tce of the slope would be an acceptable means of disposal. 9465 Provost Road NW, Suite 204 B • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 Project No. ACI.04-G102 t Preliminary Geological Assessment Report-Discovery Bay September 10, 2004 - Page No. 6 As to expectations for future slope behavior, it should be expected and anticipated that over time some minor degradation of the present slopes will occur, particularly in areas of steeper slope. ff conditions remain unchanged it can be reasonably anticipated that any future soil movement will be limited to primarily minor erosion. Stability and Erosion Concerns Based upon our site observations and review of pertinent materials, it is our opinion that the potential for large scale sliding on the slopes, resulting solely from the proposed residential construction, is low. From our current level of study it appears that without significant modification to the slopes, both the short and long termed stability of the slopes will be primarily controlled by ground saturation. Ground saturation will result primarily from storm rainfall and ground water migration through the site and adjacent properties. Erosion of the exposed soils will be most noticeable during periods of rainfall and may be controlled by the use of normal erosion control measures, i.e., silt fences, hay bales, mulching, control ditches or diversion trenching, and contour furrowing. Storm water management is discussed in a following section. Seismic Concerns Although the property is located in seismic zone 3 as defined by the Uniform Building Code (UBC), as is the entire Puget Sound region, it reportedly received no observable damage resulting from the magnitude 6.8 earthquake of February 28, 2001. The site soils appear well drained and not of the sort normally associated with liquefaction or loss of soil strength. But, in the event of an earthquake of adequate magnitude and/or duration some soil movement on the steeper slopes is possible if other conditions are right. However, the potential for soil movement on this property is no greater than that for properties elsewhere with similar slope and soil conditions. The conclusions and recommendations contained in this report were developed cdnsidering the potential for slope faihire. Also, it is expected that all work and designs will be completed in accordance with current UBC seismic zone 3 requirements, or potentially more stringent future requirements. Reference to the USGS seismic mapping indicates a PGA (peak ground acceleration} of 0.29g for the 10 percent probability of exceedance in 50 years (475 year return period event). RECOMMENDATIONS As previously noted it is our opinion that the property does not meet the ordinance requirements for identification as a geologically hazardous area. However, due to the presence of steeply sloping fill slopes we are providing the following additional development and construction recommendations to aid in the satisfactory completion of the 9465 Provost Road NW, Suite 204 8 • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 Project No. ACIA4-G10Z Y Preliminary G~logical Assessment Report-Discovery Bay September 10, 2004 - Page No. 7 project. The following site preparation and foundation design recommendations should be incorporated into future site planning, design and constriction. It is recommended that a representative of Alkai Consultants review proposed grading plans and retaining wall design. Site Preparation and Grading Pavement, fill or building azeas should be stripped of all sod, organic soil, existing fill and debris. In most areas, a stripping depth of about one-foot should be anticipated. Deeper excavations maybe required to remove buried tree root balls, stumps, or pockets of unsuitable soils or fill. Stripped soils, contaminated with organics or debris, should be wasted off site or used in landscape areas. Although little if any filling for site development is anticipated the following recommendations should be followed for all fill placement. Following stripping of the site, and prior to the placement of any fill, the exposed subgrade should be proof rolled and compacted to a fin,n, unyielding condition using equipment of appropriate size and type. Compaction of the stripped subgrade should be continued until field density tests show that a minimum compaction of 95% of the maximum dry density, as determined by ASTM method U 1557, has been achieved in all fill, building, roadway, and parking areas. Any soft or weaving areas .disclosed during proof rolling should be excavated and replaced with compacted structural fill. Areas, which are to be filled to bring the building or pavement grades up td the desired elevation, should be filled with compacted granulaz material free from roots, trash or other deleterious materials. It is our opinion that the native till or mixed soils will be only mazginally suitable for use as wet weather fill due to their inherent moisture sensitivity. The till soils and those having a high fines content are sufficiently fine grained, such that with the addition of small quantities of water they become overly saturated and are difficult or impassible to compact to the desired density. As a result, we recommend that all site grading and prepazation be undertaken and completed during. dry weather. If grading in building or pavement areas is necessary during wet weather and time does not permit allowing the soils to drain, we recommend that all excavated soil be removed from the site and that materials used as structural fill (fill placed on~ slopes or under buildings or pavements) consist of free draining gravelly sand having a maximum size of 1-1/2 inches. and with not more than 5.0% fines, material passing a U.S. No. 200 sieve. All imported fill material should conform to the above. recommendation regazdless of the weather. It is reconunended that permanent cut slopes not exceed 2H:1 V (50%). Fill slopes should not be steeper than 2H:1 V (50%) for fill placed in accordance with the requirements of appendix chapter 33 of the Uniform Building Code (1997 edition) or 3 to 4H:1V (33% to 25°k) for uncontrolled fills of moderate quality material. In areas where steeper slopes are required, retaining structures should be provided.: In areas where fills are to be made on slopes steeper than 5H:1 V the subgrade should be benched and prepared in accordance with UBC (1997) requirements prior to fill 9465 Provost Road NW, Suite 204 6 • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360).613-2408 Project No. ACIA4-G102 Preliminary Geological Assessment Report-Discovery Bay _ September 10, 2004 __._ Page No. 8 placement. Benches should be cut at a maximum vertical height of 18 inches. It should be anticipated that, if steeply cut, the near surface soils may be subject to caving, and sloughing will occur as the soils aze exposed to drying. All temporary cuts and excavations should be sloped or shored in accordance with local, state and federal requirements. Additionally, slope grades (both cut and fill) in driveway traffic areas should comply with appropriate county and local regulations. All structural fill (fill below buildings, roadways or parking areas, or fill placed on slopes) should be placed on a firm, properly prepared subgrade. Fill materials should be placed in layers approximately 8 inches in thickness, conditioned to a moisture content suitable for compaction, and compacted to 95% of the maximum dry density as determined by ASTM D-1557. Retaining Structures As previous discussed the existing fill slopes created from grading activities.willaeed to be regraded and/or have retaining structures at the toe of the slopes such as cast in place concrete walls, ecology block walls or Reinforced earth walls utilizing grid systems such as tensaz. The final decision on the retaining structure design will be dependent on fmal slope heights. Surface and Ground Water Only minor storm water related problems are anticipated if site grading and preparation are undertaken during the normally drier portions of the year. If the site work is undertaken during wet weather the contractor should be fully prepared to deal with soil and water problems normally encountered in these materials during wet weather work including the filtering of runoff, as needed to prevent the siltation of down slope areas. To aid in minimizing potential erosion it is recommended that the building site not be stripped and left unvegetated or without erosion protection for an extended period of. time prior to the actual start of construction and/or landscaping. Silt fencing and other erosion control devices and measures may be required to control water runoff and sediment transport off the site. Ground water related problems are not anticipated on the presently proposed building site. However, it should be anticipated that perched water flows may develop in some areas. In that we are unable to predict where or when this might occur we recommend that any development of incidental seeps be treated as a construction or maintenance problem. To preclude the possible build-up of ground water or storm runoff in the soils adjacent to the structure, it is recommended that afour--inch diameter, perforated, rigid pipe be placed, perforations down, around the outside of the 9465 Provost Road NW, Suite 204 B • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 Project No. ACIA4-GlOZ e Preliminary Geological Assessment Report-I}iscovery Bay September 10, 2004 - Page No. 9 building foundation at the footing subgrade elevation. All of the drainage system should be bedded in a drainage sand .and gravel and designed to carry any accumulated water away from the structure to an appropriate discharge azea. Roof drainage should not be connected to the footing drains but may use the same outfall piping if connected well away from the building such that roof water will not backup into the footing drains. The free flow of water toward or over the slopes is to be avoided due to potential erosion concerns. Landscaping. should not be designed to direct runoff into these areas. Additionally, all runoff from roofs, driveways, patios and hard surfaced areas should be intercepted, collected and disposed of away from structures and site slopes, and discharged where the water will not effect down slope structures, walls, or properties. From a geotechnical perspective, tight lining of the collected runoff to the area below the slope would be an acceptable means of disposal. However, such a disposal system should comply with all applicable regulations and the pipe should dischazge into a manifold-type structure'or onto an energy dissipater such as a pad of crushed: rock to aid in minimizing erosion. if an energy dissipation pad is used it should be a minimum of three feet on a side, one foot thick, and comprised of two to four inch crushed, rock inside a staked frame to prevent down slope migration of the rocks. It is suggested that cleanouts be provided at convenient locations along the length of the storm drainage system for maintenance. All piping for the drainage. system should be ridged and smooth walled. Corrugated, ADS-type piping should not be used. Alternatively, if infiltration of the storm water is required, the infiltration system should be constructed as faz away from the bluff as possible, preferably at the west end of the lot. However, specific recommendations for and design of a storm water disposal system are beyond the scope of our services and should be prepared by other consultants fully familiar with Jefferson County design and discharge requirements. Foundation Design We recommend that all foundations be designed to bear on the medium dense to very dense native soils or structural fill placed and compacted as previously described. Continuous footings should nat be less than 14 inches wide and isolated footings should not be less than 18 inches in their smallest dimension, regardless of the resulting bearing pressure. Additional foundation sizing and design considerations should be in accordance with Uniform Building Code requirements, as modified by local codes and regulations, in effect at the time of construction for structures within seismic zone 3 as defined by the Uniform Building Code. All footings on gentle slopes (<15%) should bottom a minimum of 18 inches below the lowest adjacent exterior grade and 12 inches below the lowest interior grade. Footings on slopes steeper than 15°~ should be designed to bear a minimum of three feet below-the finished exterior surface soil grade and be at least six feet horizontally back of the finished soil face of the slope. It is recommended that all foundation excavations be inspected prior to placing 9465 Provost Road NW, Suite 204 B • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 Project No. ACIA4.G102 Preliminary Geological Assessment Report-Discovery Bay September 10, 2004 Page No. 10 concrete, to verify that the bearing surface has been properly cleaned, prepared and soil conditions are as anticipated. All foundation subgrade areas should be recompacted following excavation. Bearing surfaces should be firm and free of sloughed orwater-softened soil. Standing water should not be allowed to accumulate in the foundation excavations For spread footing foundations designed and constructed as outlined above, an allowable soil bearing pressure of 2,000 PSF may be used for foundations bearing on the medium dense insitu soils or properly placed and compacted structural fill. For foundations bearing on the dense to very dense insitu soils an allowable soil bearing pressure of 4,000 PSF may be used. We estimate that total settlement for foundations designed and constructed as outlined above will be an inch or less, with differential settlement between similarly loaded foundations potentially approaching the total settlement. It is anticipated that most settlements will occur as the foundations are loaded. Failure.to properly place structural fill or prepare the subgrade areas may increase settlement resulting from loading and/or shaking resulting from an earthquake.. Slabs-on-Grade Slab-on-grade floors may be supported on properly placed and compacted structural fill or on the medium dense to very dense insitu native soils following preparation as outlined above. A capillary break/drainage layer consisting of six inches of pea gravel, or clean crushed rock should be placed below the floor slab. The capillary break material should contain less than 1.0% material passing a U.S. No. 200 sieve and less than 4.0% materialpassing a U.S. No. 10 sieve. A visqueen vapor barrier having a minimum thickness of 6-mils should be placed between the capillary break ' and the floor slab. We understand that a sand cushion between the vapor barrier and the base of the slab may improve the curing of the slab concrete. If a sand cushion is placed between the capillary break material or the vapor barrier and the slab, it should not contain free moisture when the slab is constructed. Excess moisture in the cushion -could cause impervious floor coverings to bubble. Construction Considerations _ As a preliminary guideline for temporary cuts less than 10 feet in height, we recommend temporary slopes be made no steeper than 1H:1V for the dense to very dense glacial till and no steeper than 2H:1V in medium dense soils or structural fill placed and compacted as outlined above. For temporary cut slopes in loose materials or over 10•leet in height we recommend temporary slopes no steeper than 2H:1 V for the full height of the cut. Temporary slopes or excavations should be benched as required by safety regulations in effect at the time of construction. These temporary slope recommendations are for native soils and fill materials; flatter slopes may be required in wet weather or if soil conditions other than those previously described are encountered. The contractor should be aware that slope height, 9465 Provost Road NW, Suite 204 6 • Silverdale, Washington 98383 • (360j 613-2407 • Fax: (360) 613-2408._ Project No. AGL>04-G102 ~ Preliminary Geological Assessment Report Discovery Bay September 10, 2004 Page No. 11 slope inclination, and excavation depths (including utility trench excavations) should in no case exceed those specified in local, state, or federal safety regulations; e.g., OSHA Health and Safety Standards for Excavations, 29 CFR Part 1926, or successor regulations. Such regulations are strictly enforced and, if not followed, the owner, the contractor, or the earthwork or utility subcontractors could be liable for substantial penalties. The contractor should be made responsible for the stability of all excavations and slopes during construction because he is continually on site and can observe the stability of the exposed soils. In .addition, the contractor should be prepared to shore any ' unstable slope area and provide shoring as required by local, state, or federal laws or codes. ' In a disturbed condition the site soils ,may be easily eroded by channelized water or sheet flow storm runoff. Therefore, it is recommended that all site preparation and excavation work be completed during the normally drier portion of the yeaz. During periods of heavy rainfall, ditching should be used to divert water away from stripped areas and visqueen should be used to cover the slopes and soil stockpiles to aid in preventing excessive surface erosion. This covering also aids in preventing infiltration of water into the unprotected soils. All disturbed soil areas and slopes should be replanted with fast-growing, deep-rooted grass, shrubs and other ground cover as soon after final grading as possible. ff the vegetation is not fully established prior to the on set of wet weather, the slopes should be covered with visqueen to aid in preventing excessive erosion and water infiltration. REPORT LIlVIITATIONS This preliminary report has been prepared for the exclusive use of Aquaculture Systems, Inca and their agents for use in planning of the referenced development. The conclusions and recommendations in this report are based on our interpretation of site conditions, as they presently exist, anticipated future construction activities, and the expectation that the exploratory efforts adequately define the subsurface conditions across the site. The soil conditions described in this report and the conclusions and recommendations contained in this report are provided for this specific site only and should not be expanded for use on adjacent properties without additional exploration .and review of those sites by our firm. The data and. report should be provided to prospective contractors for their biddingor estimating purposes, but the report conclusions and interpretations should not be construed as a warranty of the subsurface conditions. There are possible variations in subsurface conditions. In the event that the scope. or location of the project should change or subsurface conditions different from those encountered during this study be observed or suspected, we should be advised. At that time a review of the changed conditions will be made, and alternative or remedial recommendations given as required. NOTE: We have not explored subsurface conditions as part of this study, nor have we evaluated the site for the potential presence of contaminated soil, and have not evaluated or addressed ground water conditions or concerns 9465 Provost Road NW, Suite 204 B • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 .Project No. ACL.04-6102 c Preliminary Geological Assessment Report-Discovery Bay September 10, 2004 - Page No. 12 except as noted in this report. The evaluation of possible environmental or geo-environmental considerations is beyond the scope of this report. The owner and the contractor should make themselves aware of and become familiaz with applicable local, state, and federal safety regulations, including current OSHA excavation and trench safety standards. Construction site safety generally is the sole responsibility of the contractor. The contractor shall also be solely responsible for the means, method, techniques, sequences, and operations of construction operations. The firm, Alkai Consultants, LLC is providing the preceding information and recommendations solely as a service to Discovery Bay Village Water Company. Under no circumstances should the provision of this information or recommendations beconstrued to mean that the firm Alkai Consultants, LLC (or subcontractors) are assuming responsibility for construction site safety or the contractor's activities; such responsibility is not.implied and should not be inferred. Within the limitations of scope, schedule, and budget for this work, it is warranted that the work has been done in accordance with generally accepted practices followed in this area at the time this is report was made. No other warranty, expressed or implied is made. Should you have~any questions or concerns, which have not been addressed, or if we may be of additional assistance, please call our office at (360) 613-2407. sincerely, Shawn E. Williams L.E.G., R.E.A. Senior Licensed Engineering Geologist 9465 Provost Road NW, Suite 204 B • Silverdale, Washington 98383 • (360) 613-2407 • Fax: (360) 613-2408 - -- - h;{{ ' r..5.'-{ ~ 1 ~ ~, ~ +•~.} ~j it i''F 71 mss.. ~.~, .,! 't 3 t '. r' ~, ~ t 2 .:. _ °_ . '' 21~ ~ ~2~ ~fe :.: .- -_, '~ ~! ._J ~ '`i Y 7 _ -. ~ ti3it }', ' ~ '_ ;_ ~,. _ +j~.r' d t~ 1iM' +: .; . a fr~r ~t c i ~ _.~' T ~ !!13N €~InS ~ fi1~: Subject Site . ~.' Ya '~i~ '. ,. ~ ;. a ~ "~ 4 }``~ .. r~, x. !~ iQgY `r t S •i y 1• 4 r l~. ~ ~ + ~~ ~` ~. 1~ ert?nuik.s ~ ~ ~ i • t -. _>wC t t w ~1 ~'1'Y 1~1 ~ ,FF"1f5"f ! ~ ~~ '~ ~ ~~~~ ! 4 r °ii.. ~ t ? "; • ~ -` ~~,, e llipric~l~.:, yep •Fi+t!• . • j~ ~o@ f M~h~~~% F ~+ ,. ~' r i~: 1 Note ~~ from T /~ L K A ~ CONSULTANTS, LLC. Environmental Engineering • Geotechniwl Engineering • Wetland Consulting FIGURE 1 VICINITY MAP Project Name: Discovery Bay Developmen N Location: Jefferson County, Washington Project: ACL-G102 Client: Mr. Steve Fager Date: 9/10/04 +. ., < ~ N _~ O ~ ~ ~ ,..~ . 3 M. ~ ~ D ~ ~ ~^^,, 1~ m ~ 3 ^~ OQ ~ ry. a . ... .~ °Q o ~ ~ .. c~ o ~ `~ m n ~--~ ~ ~ dQ '~ w ~ ~ ~ ., cr a (p J r °; r- o ~ ~ t~ ~ .. V 'T°' Ny~ ~t.i. ^~,, ~ . ` ~~: r: .w K:- ~ Z :.: t. ~ ~ ~ ~ ~ •. ~ ~ • ~ ~ ~ ®~ ® ~ ~ ~ ~ ~ ® ~ ~' ~ ~ ~~~_ ~ ~ _~ ~ ~~ ~ y ~ ~_ ~ . r.. _ . ~ '' tai ~ I •~ ~ 'z ;;,,. .: p ~~:. ~ ~., ~.. _ • _..:~ .: •~; • ~ b _ .. u~ ~ '~ ', ~ _ L ~ ., e~~ i .~ ~''` ?a Q,q, • ~,~ ~' ,v ~~~~OOOI I~: ~~~ ~q'6/ w4' . :. %~ I ~~ I-IWY 101 . ~ 5r =a- t u '? ~~ Subject Site ~~r - i~ ~ ~ ~ i~ Legend Bedrock Coarser Unconsolidated Sediments (e.g. outwash, alluvium) Finer Unconsolidated Sediments (e.g. lacustrine, undifferentiated glacial deposits, ablation till.) Basil till ~1 1 ~~ • Note: Map adapted from Jefferson County Washington Resource Inventory Area 17 Generalized Su~cial Geology and Relative Hydraulic Continuity Potential Map. FIGURE 3: Surficial Geoloay Project Name: Discovery Bay Developmen A LK A I CONSULTANTS, LLC. Location: Jefferson County, Washington Project: ACL-G102 Environmental Engineering • Geotechnical Engineering • Wetland Consulting Cherlt' Mr. Steve. Falter. Date:.9/10/04 S ,,' _ '':1 a•anna~ _ .. S •rc ~. w~wwror..... '•«. ww r 2, r _ ' Subject Site t ;..2 ~.. PIWY 101 '~~... ,..- iei' U -~ . . -. ~. ~, . i , .i ~, •• ~, ~ tlrs~ a. U ~ .i ,_~_ , s j rs i ~ ~rs f `~ _ S ,r~~ ~ ":~ '~ ~ - ..t .S ~ Scale 124,000 o .5 i Miles 1 , 0 9p0 1000 I,WO Metres • t Note: Ma ada ted from De t. of Ecolo Coastal Zone Atlas of A LK A I CONSULTANTS, LLC. Environmental Engineering • Geotechnical Engineering • Wetland Consuking ~ington, Volume 11, 1979 (Jefferson County) FIGURE 4 Coastal Zone Atlas Project Name: Discovery Bay Developme Location: Jefferson County, Washington N Project: ACL-G102 Client: Mr. Steve Fager Date: 9/10!04 Note: i~ from "Stability Map of Northeastern A LK A I CONSULTANTS, LLC. Environmental Engineering • Geotechnical Engineering • Wetland Consulting nty, Washington", 1976, Washington D.N.R. FIGURE 5 Jefferson County Slope Stability Project Name: Discovery Bay Developmen N Location: Jefferson County, Washington Project: ACL-G102 Client: Mr. Steve Fager Date: 9/10104 Legend ^ .Class 2: Steep slopes believed to be stable. ^ Class 3: Areas of poor natural stability ALKAI Consultants, LLC. 9465 Provost Road NW Suite 204 6 Silverdale, WA 98383 Phone (360) 613-2407 Fax (360) 613-240$ Environmental • Geotechnical En~ineerin~ • Wetlands Consulting