Loading...
HomeMy WebLinkAbout947400034 Stormwater Mgmt ~ rJ. " ' ~"" '1 nn I ' : V!J.. ' ; r------ ~--=..., I. : ! I SEP 2 0 2006 . " .--1'~ L.' c'iVELOPMENT STORMWA TER POLLUTION PREVENTION PLAN stotmwat Requ\re For Aqua Culture Systems, Inc. Sequim, Washington Prepared for: Aqua Culture Systems, Inc. P.O. Box 417 Sequim, WA 98382 Prepared by: Zenovic & Associates, Inc. 301 East 6th Street, Suite 1 Port Angeles, W A 98362 (360) 417-0501 Fax: (360) 417-0514 Job Number 06210 September 2006 APPROVED STORMW A TER PLAN r\ en/!1,,' i)!\{ \'\ JEFFERSO DEPT OF . , SIGNATUR .. r ~ Proiect Overview Aqua Culture Systems, Inc. is planning to construct three single-family residences on 3 parcels totaling 1.53 acres located at 240,242, and 244 Holland Drive, Port Townsend, WA. Typical residential construction activities will take place, including grading operations, excavation, and concrete work. The development will necessitate the construction of two infiltration ponds and three infiltration trenches (one per residence), as well as several onsite ditches and biofiltration swales for routing stormwater runoff. Construction will result in approximately 0.34 acre of impervious area, or 22% of the 1.53 acre site. \J" ".'. ,!~. Due to ih\J.sropij;ofithe site (10-15% overall slope), extensive grading operations will take place to create' the building pad and driveway for each of the three residences. Approximately 500 cu. yd. (0.31 acre-ft) of soil will be moved, but no soil will be brought in or removed for cut-and-fill operations. The only areas that will not be involved in the grading operations are the preserved treed and native vegetation areas. No groundwater issues are anticipated, and there are no significant geographic features or environmentally sensitive areas on the site. The only notable geographic feature near the site is a potential erosion control hazard area to the northwest; no problems are anticipated related to this, as the area not adjacent to the site and all of the disturbed areas of the site will slope to the southeast. The soils onsite are primarily outwash-type soils, with a thin layer of sandy loam topsoil (up to 12") over fine sand and gravelly fine sand. The predeveloped site is treed and relatively undisturbed. The stormwater from the majority of the site drains to the souij1east and enters the roadside ditch along Holland Drive, which empties into the ditch alo~~ig,hw~v 101, and eventually into Discovery Bay. The natural slope on less than one- sixth of thenqrthwest portion of the site drains stormwater to the adjacent properties to the northwest. Very little water drains onto the site from adjacent properties. Slopes average 10-15%. The developed site will contain three homes totaling 0.15 acre of roof area, one shared gravel driveway totaling 0.11 acre, three individual gravel driveways totaling 0.07 acre, two retaining walls totaling 0.01 acre, lawn, landscaping, and native vegetation totaling 0.92 acre, preserved'treed areas totaling 0.24 acre, and infiltration ponds totaling 0.03 acre. Both native vegetation and treed areas are considered as lawn for the purposed of hydrological calculations. Three building pads will be graded at a maximum of 2% slopes, and a shared septic drainfield and reserve area will be installed near the southeast comer of the site. The stormwater from the disturbed areas will drain to the southeast, where it will be treated by biofiltration swales and infiltrated by infiltration ponds. The preserved treed ' areas will be located in the northwestern portion of the site, and will continue to drain to the northwest. The Stormwater Site Plan and Construction Stormwater Site Plan are attached. The Stormwater Site Plan is to be considered a part of this report. ~ '.' t"',\ (.1-- !' , !-,~ n \Ii' .- .. ~. \ \!J ,"'" I ; l S E P 2 0 2006 "..-/ ~ I \-.....-. ,)cVCl.OPMENT I SWPPP, Aqua Culture Systems, Inc., Holland Drive Page 2 of 11 .> emlim,narv ~Qndi~i9Jl' SUQ)mary ? r--,\ I '. I '. \ li2 " II 1-' . I' I SEP 2 0 2006 : ~/ '_' _J ; ; 1" L: uEVELOPMENT The site is bordered to the northwest, southwest, and northeast by undeveloped residential parcels and to the southeast by Holland Drive. The predeveloped site is treed and relatively undisturbed. The majority of the site slopes to the southeast; less than one-sixth of the northwestern portion of the site slopes to the northwest. The overall slope of the site is 10-15%. The site drops from an elevation of approximately 216 feet near the southwesterly border to 160 feet at the northeasterly comer. The runoff from the site currently enters roadside ditches along both Holland Drive and Honeymoon Lane (located beyond the properties to the northwest), both of which empty into the ditch alongside Highway 101, and eventually into Discovery Bay. gu-~l~' AnalXfll Residential land use typically increases the amount of TSS, nutrients, and pesticideslherbicides in stormwater runoff. Treatment for these pollutants will be accomplished by several biofiltration swales to prevent any detrimental affects to Discovery Bay, the ultimate receiving water. The biofiltration swales were sized to treat a minimum of 91 % of the runoff volume (as estimated by the methods outlined in the Stormwater Management Manual for Western Washington (D.O.E., August 2001 )). They were further sized to transport the flow rate generated by the 100-year storm. SWPPP, Aqua Culture Systems, Inc., Holland Drive Page 3 of 11 Stormwater detention will also be required to prevent coastline erosion of Discovery Bay and undue erosion of roadside ditching. Infiltration ponds were designed and will be installed to attenuate the flow rates of stormwater leaving the site. All stormwater from pollution-generating surfaces will be treated by the aforementioned biofiltration swales before it enters the infiltration ponds. To reduce the required size of the infiltration ponds, infiltration trenches will be installed for the runoff from the roofs of the three proposed residences. Groundwater contamination is not a concern in this area; hardpan soils effectively protect groundwater. The groundwater depth in this area is greater than 100 feet, as shown. by groundwater well logs from the area. Additionally, all stormwater runoff from pollution-generating surfaces will be treated by biofiltration swales prior to infiltration. There are no violations of water quality standards in Discovery Bay, the ultimate outfall for this project. There is one area of Discovery Bay that is listed as "Waters of Concern" in Washington State's Water Quality Assessment 303(d) list. That area is near the center of Discovery Bay, and the parameter of concern is dissolved oxygen. levels of dissolved oxygen can increase with excessive levels of nutrients. This project will not impact the dissolved oxygen concern in Discovery Bay because all contaminated runoff will be treated by biofiltration swales prior to infiltration. Risks of spills or discharges of priority pollutants are minimal. Residential sites pose little risk of priority pollutant release, and the biofiltration swales will prevent contaminated runoff from leaving the site. Analvsis and Desion Using the runoff treatment selection process set forth in the Stormwater Management Manual for Western Washington (D.O.E., August 2001), it was determined that only basic treatment is required for this site. Biofiltration swales were chosen to achieve this treatment for their ability to remove the target pollutants (TSS, nutrients, and pesticides/herbicides) and their ease of maintenance for the future homeowners. The biofiltration swales were designed and sized according to the methods set forth in the manual to treat a minimum of 91 % of the runoff volume, and to transport the flow rate produced by the 100-year storm. It was further determined that flow control measures are required according to the Stormwater Management Manual for Western Washington (D.O.E., August 2001). To meet these requirements, On-site Stormwater Management BMPs and Roof Downspout Controls will be employed. Additionally, flow control facilities in the form of infiltration ponds will be installed. These facilities were sized using the Western Washington Hydrology Model (v2.5f created by AQUA TERRA Consultants) to infiltrate the 100-year storm. , ,........... , '-'\' \: .'\' \ LUr-- li; I, ' SWPPP, Aqua Cutture Systems, Inc., Holland Dri~ s: ~o_ :~,j Page 4 of 11 """) Y,. ~.. '..1. \VI ' ,- '.' '." I ' _:~uul W l~ 1',' :,,"\ \ ) I ,\ SEP 20 2006 i1J '..,.. ~ Reside.ntia.1 developments do not require oil control facilities or treatmen~ for J;$OlQval..of. phOj'w:'.e~~H Infiltration IS not a feasible form of treatment on this site because the sollt-areextrem , infiltrate too quickly to effect treatment of stormwater runoff. The only pollutant of concern for the receiving waters is nutrients. For these reasons, only basic treatment is required, and the biofiltration swales were designed to this end. As outlined in the Stormwater Management Manual for Western Washington (D.O.E., August 2001), the swales were sized to treat a minimum of 91 % of the runoff volume and to transport the flow rate produced by the 1 OO-year storm. A trapezoidal cross-section was chosen with 3: 1 side slopes. The bottom width will be 1 foot and the overall depth will be 1 foot with a 4" design depth. The top width of the swale will be 7 feet. Lengths vary among the four swales, but none is less than 100 feet of total travel length. Swale slopes may be more than 10% in places, so rip-rap ,check dams were designed for sections of swale that exceed 2.5% slopes. The check dams are to be placed such that the toe of the uphill dam is at the same elevation as the top of the downhill dam. Below 4" of swale depth, the biofiltration swales will be seeded with mix #1 as prescribed in the Stormwater Management Manual for Western Washington (D.O.E., August 2001), volume 5, chapter 9, table 9.4: 75-80% tall or meadow fescue, 10-15% seaside/colonial bentgrass, and 5-10% redtop. Above 4" of swale depth, a straw mulch or sod will be installed (this is above the design depth for treatment flow). For further details, refer to the Stormwater Site Plan. Basic Runoff Treatment Facilities Detailed calculations for the biofiltration swales are attached for reference. Flow Control BMPs As directed by the Stormwater Management Manual for Western Washington (D.O.E., August 2001), the On-site Stormwater Management BMPs were examined and selected, and Roof Downspout Controls were designed. The On-site Stormwater Management BMPs that will be employed on this site are: ' · BMP T5.13, Post-Construction Soil Quality and Depth The purpose of this BMP is to preserve the stormwater treatment and flow attenuation functions of the naturally occurring soils. The BMP calls for soil retention (retaining the duff layer and native topsoil) and soil quality (minimally maintaining the infiltration rate and moisture capacity of soils, and topsoil layers with a minimum 10% dry weight organic matter, 6.0-8.0 pH [or matching original soils], and minimum 8" depth). Development of this site will retain all native soils onsite; the grading required is balanced, requiring only the movement of onsite soils. This will lead to equal infiltration rates and moisture capacities as compared to the predeveloped condition. Additionally, good quality topsoil will be provided for all disturbed areas where the native topsoil does not meet the aforementioned criteria. . BMP T5.21, Better Site Design This BMP aims to use the natural topography and features of the site in development whenever possible rather than altering them. The guidelines call for defining the development envelope and protected areas, minimizing directly connected impervious areas, maximizing permeability, building narrower streets, maximizing choices for mobility, and using drainage as a design element. On this site, undisturbed areas will be clearly marked by work area barriers prior to construction to ensure their protection. The only impervious areas on the site are the roof areas and gravel driveways; the driveways have been arranged to minimize the directly- connected effect. Permeability has been maximized as much as is feasible by designing onlya SWPPP, Aqua Culture Systems, Inc., Holland Drive Page 5 of 11 gravel driveways (permeable pavement is not feasible in this development due to cost and maintenance requirements). There are no streets being installed, but the shared driveway is limited to 15 feet wide, rather than the typical 1 8-20 feet. Drainage was considered from the earliest stages of site layout, allowing for the use of natural topography in collecting and routing stormwater runoff. Mobility choices do not apply in this particular development, as it consists of only three residences. ' The Roof Downspout Control employed in this development is Downspout Infiltration Trenches. The trenches were sized according to the Stormwater Management Manual for Western Washington (D.O.E., August 2001), volume 3, chapter 3. The dimensions were adjusted from those dictated in the manual to better fit the space limitations of the site. The runoff from the 1,792 square foot roof ' area on lot 33 will be infiltrated by a 3 foot wide, 3 foot deep, 60 foot long infiltration trench. A 4 foot wide, 3 foot deep, 66 foot long infiltration trench will be installed on lot 34 to infiltrate the runoff from 2,635 square feet of roof area. Lot 35 will employ a 3 foot wide, 3 foot deep, 72 foot long infiltration trench to control the runoff from the 2,154 square foot roof area on that lot. For further details on the infiltration trenches, refer to the Stormwater Site Plan. Detailed calculations for the infiltration trenches are attached for reference. Flow Control Facilities J. ~; Infiltration ponds were designed only for flow control function by following the guidelines in volume 3, chapter 2 of the Stormwater Management Manual for Western Washington (D.O.E., August 2001). Because the soils are not suitable for infiltration as a method of stormwater treatment, upstream biofiltration swales will perform this function prior to emptying into the infiltration ponds. The Western Washington Hydrology Model (v2.5f created by AQUATERRA Consultants) was used to evaluate the hydrology of the predeveloped and developed sites, and to size the infiltration ponds. Two infiltration ponds were designed, one placed near the upper portion of the site (pond #1), and another placed near the roadway (pond #2). Pond #1 is 13 feet long and 3 feet deep, with a 2 foot tall overflow riser (2 feet of working storage volume). Pond #2 is 52 feet long and 2.5 feet deep, with a 1.5 foot tall overflow riser (1.5 feet of working storage volume). Both ponds are to be seeded with the following seed mix: 40% dwarf tall fescue, 30% dwarf perennial rye "Barclay", 25% red fescue, and 5% colonial bentgrass. For further details on the infiltration ponds, refer to the Stormwater Site Plan. The hydrology of the developed site is almost identical to that of the predeveloped site. Detailed calculations related to predeveloped and developed site hydrology and to the infiltration pondS are attached for reference. SWPPP, Aqua Culture Systems, Inc., Holland dnve~- Page 6 of 11 r-\' .~ il ~, :. \\' \L~;)r-~-'~l \ ! " SEP 2 0 2006J~\ , ')(:VElOPM~ .,..---,.--......:...--- ____r..." Minimum ReQuirements Because this project is classified as a "Large Project" according to the Stormwater Management Manual for Western Washington (D.O.E., August 2001), all ten of the manual's minimum requirements must be met. . Minimum Requirement #1: Preparation of Stormwater Site Plans This report, along with the Stormwater Site Plan, the Construction Stormwater Pollution Prevention Plan, and the Construction Stormwater Site Plan were prepared to meet this requirement. . Minimum Requirement #2: Construction Stormwater Pollution Prevention Plan A Construction Stormwater Pollution Prevention Plan has been prepared and is included as Attachment A. . Minimum Requirement #3: Source Control of Pollution Because this project consists of three residential parcels, there are no applicable source control BMPs. . Minimum Requirement #4: Preservation of Natural Drainage Systems and Outfalls The natural drainage systems and outfalls were previously disturbed and are unknown. However, the existing drainage systems and outfalls were preserved to the maximum extent practicable. The areas that previously drained to the northwest continue to do so, and the areas that previously drained to the southeast were also preserved. . Minimum Requirement #5: On-site Stormwater Management On-site Stormwater Management BMPs, including Roof Downspout Control BMPs, are employed in this project as discussed in the Analysis and Design section of this report. . Minimum Requirement #6: Runoff Treatment Basic treatment is required for this project. Biofiltration swales have been designed to meet this minimum requirement as described in the Analysis and Design section of this report. . Minimum Requirement #7: Flow Control Flow control is achieved by the two infiltration ponds designed using Western Washington Hydrology Model (v2.5f created by AQUA TERRA Consultants). These ponds were described previously in the Analysis and Design section of this report. . Minimum Requirement #8: Wetlands Protection The project does not contain wetlands, nor does it discharge into any wetlands, either directly or indirectly; this minimum requirement is not applicable. . Minimum Requirement #9: Basin/Watershed Planning There is no applicable basin or watershed plan. L_ SWPPP, Aqua Culture Systems, Inc., Holland Drive Page 7 of 11 ....)... " p.!, tl.n r., \, I ! \ " (l \ll I \ Ii..' r--,-, M-l , .! SEP 2 0 2006 ' .jL ... . .' ,~~ '".._~,~.. JtV~i.OPMENT · Minimum Requirement #10: Operation and Maintenance An Operations and Maintenance Manual has been prepared and is included as Attachment B. SDecial Reports and Studies No special reports or studies have been prepared for this site. However, prior to installation of infiltration trenches or infiltration ponds, additional soils testing is required. The results of these tests must be provided to the design engineer a minimum of two weeks prior to planned facility installation for review and verification of facility design. For further details regarding soils testing report contents, refer to the Stormwater Site Plan. Other Permits The septic permit has already been approved by Jefferson County authorities. The location of the septic facilities has a direct impact on the location of infiltration pond #2; the septic On-site Wastewater Plans have been reviewed by the design engineer, and according to these plans there is sufficient space for pond #2 to be located as designed. Construction Stormwater Pollution Prevention Plan A Construction Stormwater Pollution Prevention Plan has been prepared and is included as Attachment A. Maintenance and ODerations Manual An Operations and Maintenance Manual has been prepared and is included at Attachment B. ij ., -,.",. ~ ~l 1....1.-. ',-- '". \ - 1 I SEP 2 0 2006 ..J I .e .-J t ~-- SWPPP, Aqua Culture Systems, Inc., Holland Drive Page 8 of 11 .' , r ufVELOPMENT Relevant Calculations [0).....,. .:, .l.""'.I,.'.".I... \\n ,.,' " '19 l./,r-'- 1'\; I SEP 2 0 2006 .. ,:"" I ._J lJEVELOPMENT SWPPP, Aqua Culture Systems, Inc., Holland Drive Paee9of11 DETERMINATION OF FACILITIES REQUIREMENTS Aquaculture Systems, Inc. - 240, 242, and 244 Holland Drive Effective Pollutlon-Generating 1m rvlous Surfaces 7664.77 0.1760 Pollution-Generating Pervious Surfaces 11119.71 0.2553 Effective Converted 1m rvlous Surfaces Pervious Surfaces 14654.80 25900.90 0.33E)4 0.5946 N' (""'OW '\ IIi i/r--- ',_-, 1\ . J \ I SEP 2 0 2006 ; '_../ ,~. L~, I .". ,:~ \ citVELOPMENT Page 1 of 1 b\()~'L T~A\\OAJ S\...JALf... tJE..S\GN AQ v A<:-v L" 0~t. \-\CJLLAAlb tJR. CEJ) WAWR Q0AL.\T~ O€-~\G,.0 ~L..Ow R~T~ ~. Q) ~~s; par fuS>.- WW\.\f():d..o.f\o..\~ S,'S. ~. U$<L- d.. "1' . v () M 1"h30-.-TR-~ . <;- \0--,.) t-~-T1<..- c..O(\ VQ..J'$~of\\ f\ '.lo\v{'f\~ 5, <:-"'a..~~\" 4) T ~~ \~ l..\. \ E:. \ A ~ ~ \, C\. //0 "'-7. R C>...-\--; 0 :: 0, -a. ~ '3'3 . . Qw<4 = Q'Q. )( O,~'d.~<g = (o.?";)~~)(G.O':.t4\'a.) Qw~ ~ 0 ,O\G> S '8'~c-r;. 5 ~- ~ LO.N(o\T0b\A,)A'- SL()~€.S. ~ ~ N~~b c-r\E.~ \)AJf\$ \~~o ~ \5% ([~ \.) ~€.. SE.8D /'<I \)( .l:f \) "Q\V~~ S) <-~C!,~-tQ...\ ~.) T CA~\~ q.,.~: 1- S - <60 % +-0..\ \<:)(' -(V\,<-~dow ~Q...'$c...<.)l2- . \ <:) - \5 ~ SiLC>.,$~Je./ ~o\o<",~\ 'e~"'3~S$ s - \() ~ \'~&~op ~ \ N OS\" A\..\...l\T\ON~E..R TA\:)LE. ~ 1l..\.AJO,e:;.S cQ~ U'SE.. 4" tf\A X'. T~~A\ Jf\<C=-NT De~T\-\ (\,AJ f"\?.€~0EtJ, AO~\Nb AN"T\<L\~ATE.\)) <b-~ O\d.~ t<\At0I0\)J(..ISN o "\~"<r~t:.O\\JAL 5wl\LE ~\?.o-f\\.-E ~ {] _. LJ II _ ""~'i-I - Y"3' s ~ 0, \0 -:c..="3 <Q3) L ~ "d..SQ", ?:.'J \' U \,'-i~("(\.G.-:t)(50'S) - ., - T ::. 'D +-. ~ ~~ -:. ~ I [0)'...".' I......~' !0 r WJ. r.':~l'\ I~"'-" ..._....' ".. I .. I ~ S€: ~ ::t:::~E=T ~::~ CAL:0 I~.'..'."'.......'..I\...()....'.....N.s.. EPS2.. o. ...2..0.o...~Jbl n 1 1 -J S ~ .,.. L2:~-''',:'~"" I", ll~:V~i.OPMENT @ \j -:. CYA -=- O,()~'-\~ ~/$ o L ~ \k. eGO ?/fY\,'()) W~e.-\L t -::: 1...\l.\fV\:f\ L- -- G,.~ ~1" o NOT A\>?L\G~~Lt:. ~3> Q,ClC>: (0. \ L\ \<i5S ~ c--9~) (\ I~') ~ o. "d.""d.-:ro <-~s ~ rA\~ c-o-JE.~AG,~ @ ~" -7 L~vJ Rb.TA\~.JJAN<-[. CD') ~:-~ !f\ AX \ t<\ 0/(\ " E. L. 0<:.-\ "\ ~ ""3 tys ~~ o \) ~ o.cpS v R~' 0.<=0 ~ lM-~s ~ ~c-=}) R ~ O,~1-33 ~ \I R :: \. ~G, R \ .~ ,. s o.s;: 0 . ce '). ~ 1- ~:/$ ~s:j) v'R:: o\~~ ~r$ - 0 \ ~~ '37- ~+%; ;- S;-/O @ V:: VYR = ""'d- ,1..\ '\ ~vs ~C--~ A = CV" - (). Q~ \:) sq, t"t (fc~ AS\) E.-S \ G N E. D A -=- D . Co q s~ \';- '/ ') A:::. Q ,0<1. s'\ ~"" ~ wA\~~ ~0A\....\T'i \:)E..S\G,A,} \S AC-c-t:t:>TA~LE ~ A:: 't>"'( + C. 'i~ ~ "f":. a. (J -::r l..1 ~ "{, ~ Y3 ~-T + ~~;- -\(><..~ boO-..\~ -'Y uSE. "fT - . \ ~T ~ R~ b~ . -T t 'frd- . \> -\- ~'fT (~d- T \') 0.5 o ,S '-\ Co\ ~-T .~ A";. D~T -\- C ~T""^ -:: _ \ ' '-\ ~ A R O'~T b C. 'So Q- . '" . L\ 'S~ 4 s . -:;;)~ ~~'S < <- 0.'00 @) 4 C-\-\ECK\:.>Aif'\S(V)vST .~. \AJSTALLeD -t \ tJ STAL\- ~€.~ T A{b\J.E. q,l..\ NOT8S . .'~.V . !)EYEt.OPMENT ,; ... .m2E!IJ~TIQ~ SWAbe cALcULAr~ Aquaculture Systems, Inc. - 240, 242, and 244 Holland Drive Owq = 0.0166 cfs Y = 0.~3 ft R = 0.3333 hydraulic radius b= "ft A = sq. ft. t = 44.0000 min. s = 0.1000 slope n = 0.2400 manning's n z = 3.0000 side slopes T="ft V = ftls b= -0.8677 ft = Use b = 1.0000 ft T= 3.0000 ft A= 0.6667 sq. ft. V= 0.0249 ftls L= 65.69 ft -10.41 in 0100 = 0.2270 cfs napprox = 0.065 manning's n Vmax = 3.0000 fps VR = 0.8200 Iffs R = 0.273333 ft VRactual = 0.8287 fffs 0.7872 .... 0.8701 VR fits within this range. Vactual = 2.4860 fps Arequired = 0.0913 sq. ft. This is << than A as designed above. Y = ft A = sq. ft. Ytotal= 0.8333 ft = Ytotal = 1.0000 ft Use y total = 1 foot. 10.00 in R= 0.5461 ft Aworst case = 4.0000 sq. ft. Ocapability = 5.2361 cfs Q capability >>Q 100' _ = cells that reference other cells = cells containing calculations _ = cells in which a spreadsheet function was used Page 1 of 1 ri.J:' n. u.n r~::: r':" : i \!.Il~ ,'I .. 1 EP 2 0 2006 :: ~ ~- L - ; ~; : ' '-;':".{ Uf.VELOPMENl Lot 33 34 35 ~ INFILTRATION TRENCH CALCULATIONS Aquaculture Systems, Inc. - 240, 242, and 244 Holland Drive Required: sq. ft. of roof area Lt. of infiltration trench per 75 1000 INFIL TRAnON TRENCH SIZING Standard Standard Req'd Depth Width Length ft ft ft 2 2 134 2 2 100 2 2 1~ f mil Ii} j:'l r.,,? n WJ ';'l :-:'~j : I '. 1 { . , SEP 2 0 2006 , 6J' __J 'j L_ ,.. deVELOPMENT Page 1 of 1 WESTERN WASHINGTON HYDROLOGY MODBL V2 PROJECT REPORT Project Name: Aquaculture Systems, Inc. Site Address: 240, 242, and 244 Holland Drive City Port Townsend Report Date 8/21/2006 Gage Port Angelis ,Data Start 1948 Data End 1993 (adjusted) Precip Scale: 0.80 PREDEVELOPED LAND OSE Basin Flows To GroundWater: Land Use OUTWASH FOREST: Basin 1 Extender 1 No Acres - 0.069327 Basin Flows To GroundWater: Land Use OUTWASH FOREST: Basin 2 Extender 1 No Acres 0.17514 Basin Flows To ,GroundWater: Land Use OUTWASH FOREST: Basin 4 Extender 2 No Acres - 0.467097 Basin Flows To GroundWater: Land Use OUTWASH FOREST: Basin 5 Extender 2 No Acres - 0.790331 ~.'j.......... :.1 ,.,? n o/J r~', , (\ "....: "\ I ' " ,.:lO . I, ;,' r-'- '-1 ,.'.. . '. SEP 2 0 2006 i .~ Basin 3 Point of Compliance No Basin Flows To GroundWater: Land Use OUTWASH FOREST: ~ 0.032978 L_ JtVELOPMENT WWHM2 Report, Aquaculture Systems, Holland Drive - Page 1 of 9 DEVELOPED LAND USE Basin Flows To GroundWater: Land Use OUTWASH GRASS: IMPERVIOUS: Flow Soil Type Outwash Till Saturated Basin 4 Pond 4 No Acres 0.340527 0.066032 Credits: Infiltrate Disperse Porous Pavement 100 0 0 o o o o Basin Flows To GroundWater: Land Use OUTWASH GRASS: IMPERVIOUS: Basin 1 Extender 1 No Acres 0.064828 0.0045 Basin Flows To GroundWater: Land Use OUTWASH GRASS: IMPERVIOUS: Basin 2 Extender 1 No Acres 0.170641 0.0045 Basin Flows To GroundWater: Land Use OUTWASH GRASS: IMPERVIOUS: Flow Soil Type Outwash Till Saturated Basin 5 Pond 5 No Aores 0.558394 0.141122 Credi ts : Infiltrate Disperse Porous Pavement 100 0 0 o o o o Basin Flows To GroundWater: Land Use OUTWASH GRASS: IMPERVIOUS: Basin 3 Point of Compliance No M ." ""\ f i 1"'\-'- !' ' r= n '1\n . r 'I , \!J '''''I i "-1 ~ 0.029112 0.003866 I SEP 2 0 2006 ~_j i IJ '~\!'~='ENT '...''1..;. '.~LL-., hi'! L_ WWHM2 Report, Aquaculture Systems, Holland Drive - Page 2 of 9 RCBRES (POND) INFORMATION Pond Name: Pond 4 Pond Type: Trapezoidal Pond Pond Flows to : Basin 5 Pond Rain / Evap is not activated. Dimensions Depth: 3ft. Bottom Length: 13ft. Bottom Width: O.Olft. Side slope 1: 2 To 1 Side slope 2: 2 To 1 Side slope 3: 2 To 1 Side slope 4: 2 To 1 Volume at Riser Head: 0.003 acre-ft. Discharge Structure Riser Height: 2 ft. Riser Diameter: 12 in. Pond Hydraulic Table , 8taqe(ft) Area(acr) Vo]:ulIl8(acr-ft) Dschrcr(cfs) Infilt(cfs) 0.000 0.000 0.000 0.000 0.000 0.100 0.000 0.000 0.000 0.001 0.200 0.000 0.000 0.000 0.003 0.300 0.000 0.000 0.000 0.004 0.400 0.001 0.000 0.000 0.006 0.500 0.001 0.000 0.000 0.008 0.600 0.001 0.000 0.000 0.010 0.700 0.001 0.000 0.000 0.011 0.800 0.001 0.000 0.000 0.013 0.900 0.001 0.001 0.000 0.016 1.000 0.002 0.001 0.000 0.018 1.100 0.002 0.001 0.000 0.020 1.200 0.002 0.001 0.000 0.022 1.300 0.002 0.001 0.000 0.025 1.400 0.002 0.002 0.000 0.027 1.500 0.003 0.002 0.000 0.030 1.600 0.003 0.002 0.000 0.032 1.700 0.003 0.002 0.000 0.035 1.800 .0.003 0.003 0.000 0.038 1.900 0.004 0.003 0.000 0.041 2.000 0.004 0.003 0.000 0.044 2.100 0.004 0.004 0.308 0.047 2.200 0.004 0.004 0.871 0.050 2.300 0.005 0.005 1.600 0.053 2.400 0.005 0.005 2.464 0.056 2.500 0.005 0.006 3.443 0.060 2.600 0.006 0.006 4.526 0.063 2.700 0.006 0.007 5.704 0.067 2.800 0.006 0.007 6.969 0.070 2.900 0.007 0.008 8.315 0.074 3.000 0.007 0.009 9.739 0.078 "l' '; F.:1 n 'VI17 .. \1 r--' . -~l ! SEP 2 0 2006 :_~' ~_J - L_ " i..IEVEl.OPMENT --~,_....._~---- WWHM2 Report, Aquaculture Systems, Holland Drive - Page 3 of 9 Pond Name: Pond 5 Pond Type: Trapezoidal Pond Pond Flows to : Point of Compliance Pond Rain / Evap is not aotivated. Dimensions Depth: 2 . 5 it . Bottom Length: 52ft. Bottom Width: O.Olft. Side slope 1: 2 To 1 Side slope 2: 2 To 1 Side slope 3: 2 To 1 Side slope 4: 2 To 1 Volume at Riser Head: 0.006 acre-ft. Discharge Struoture Riser Height: 1.5 ft. Riser Diameter: 12 in. Pond Hydraulio Table Staqe(ft) Area(acr) Volume(acr-ft) Dschrq(~s) I:nfilt(cfs) 0.000 0.000 0.000 0.000 0.000 0.100 0.000 0.000 0.000 0.006 0.200 0.001 0.000 0.000 0.011 0.300 0.001 0.000 0.000 0.017 0.400 0.002 0.000 0.000 0.022 0.500 0.002 0.001 0.000 0.028 0.600 0.003 0.001 0.000 0.034 0.700 0.004 0.001 0.000 0.040 0.800 0.004 0.002 0.000 0.046 0.900 0.005 0.002 0.000 0.052 1.000 0.005 0.003 0.000 0.058 1.100 0.006 0.003 0.000 0.064 1.200 0.006 0.004 0.000 0.071 1.300 0.007 0.004 0.000 0.077 1.400 0.007 0.005 0.000 0.084 1.500 0.008 0.006 0.000 0.090 1.600 0.009 0.007 0.308 0.097 1.700 0.009 0.008 0.871 0.104 1.800 0.010 0.008 1.600 0.110 1.900 0.010 0.009 2.464 0.117 2.000 0.011 0.011 3.443 0.124 2.100 0.012 0.012 4.526 0.131 2.200 0.012 0.013 5.704 0.139 2.300 0.013 0.014 6.969 0.146 2.400 0.014 0.015 8.315 0.153 2.500 0.014 0.017 9.739 0.161 r 17'0' if' n Wi :_: r.~.l\' II; )r-'--l II \ SEP 20 2006 i.~ -~ L. ur.VFi.OPMENT WWHM2 Report, Aquaculture Systems, Holland Drive - Page 4 of 9 ANALYSIS RESULTS Flow Frequency Return Return Period 2 year 5 year 10 year 25 year 50 year 100 year Periods for Flow (cfs) 0.00023 0.000292 0.000319 0.000343 0.000356 0.000365 Predeveloped Flow Frequency Return Return Period 2 year 5 year 10 year 25 year 50 year 100 year Periods for Developed Unmitigated Flow (cfs) 0.07412 0.093739 0.105981 0.120803 0.131463 0.141852 Flow Frequency Return Return Period 2 year 5 year 10 year 25 year 50 year 100 year Periods for Developed Mitigated Flow (cfs) 0.014294 0.018062 0.020412 0.023255 0.0253 0.027292 Yearly Year 1949 1950 1951 1952 1953 1954 1955 '1956 1957 1958 ,1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 ,1970 1971 1972 1973 1974 1975 1976 1977 1978 ,1979 Peaks for Predeveloped and Developed-Mitigated Predeveloped 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Developed 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 L_ rG .<. Ii} r-~-' II Wi lc~ l SEP 2 0 2006 ,__I~-! Uc:VELOPMENT WWHM2 Report, Aquaculture Systems, Holland Drive - PaQe 5 of 9 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Ranked Yearly Peaks for Predeveloped and Developed-Mitigated Rank Predeveloped Developed 1 0.0003 0.0001 2 0.0003 0.0001 3 0.0003 0.0001 4 0.0003 0.0001 5 0.0003 0.0001 6 0.0003 0.0001 '7 0.0003 0.0001 8 0.0003 0.0001 9 0.0003 0.0001 10 0.0003 0.0001 11 0.0003 0.0001 12 0.0003 0.0001 13 0.0003 0.0001 14 0.0003 0.0001 15 0.0003 0.0001 16 0.0003 0.0001 17 0.0003 0.0001 18 0.0003 0.0001 19 0.0003 0.0001 20 0.0003 0.0000 21 0.0003 0.0000 22 0.0003 0.0000 23 0.0002 0.0000 24 0.0002 0.0000 25 0.0002 0.0000 26 0.0002 0.0000 27 0.0002 0.0000 28 0.0002 0.0000 29 0.0002 0.0000 30 0.0002 0.0000 31 0.0002 0.0000 32 0.0002 0.0000 33 0.0002 0.0000 34 0.0002 0.0000 35 0.0002 0.0000 36 0.0002 0.0000 37 0.0002 0.0000 38 0.0002 0.0000 39 0.0001 0.0000 40 0.0001 0.0000 41 0.0001 0.0000 42 0.0001 0.0000 43 0.0001 0.0000 44 0.0001 0.0000 . ,.... n ~\'JIJI r-.' \:J t'.:::l i , I j -1 SEP 2 0 2006 " >; -.J'- In' ' II, 'Jr-- I i I 1-_~,_ u:VELOPMENT WWHM2 Report, Aquaculture Systems, Holland Drive - Page 6 of 9 1/2 2 year to 50 year Flow (CFS) Predev Final Percentage Pass/Fail 0.0001 286 0 .0 Pass 0.0001 278 0 .0 Pass 0.0001 267 0 .0 Pass 0.0001 260 0 .0 Pass '0.0001 254 0 .0 Pass 0.0001 250 0 .0 Pass 0.0001 244 0 .0 Pass 0.0001 239 0 .0 Pass 0.0001 235 0 .0 Pass 0.0001 232 0 .0 Pass 0.0001 225 0 .0 Pass 0.0001 221 0 .0 Pass 0.0001 217 0 .0 Pass 0.0001 213 0 .0 Pass 0.0001 209 0 .0 Pass 0.0002 205 0 .0 Pass 0.0002 202 0 .0 Pass 0.0002 197 0 .0 Pass 0.0002 192 0 .0 Pass 0.0002 188 0 .0 Pass 0.0002 182 0 .0 Pass 0.0002 173 0 .0 Pass 0.0002 170 0 .0 Pass 0.0002 169 0 .0 Pass ,0.0002 159 0 .0 Pass 0.0002 157 0 .0 Pass 0.0002 150 0 .0 Pass 0.0002 148 0 .0 Pass 0.0002 148 0 .0 Pass 0.0002 146 0 .0 Pass 0.0002 141 0 .0 Pass 0.0002 137 0 .0 Pass 0.0002 136 0 .0 Pass 0.0002 129 0 .0 Pass 0.0002 125 0 .0 Pass 0.0002 121 0 .0 Pass 0.0002 116 0 .0 Pass 0.0002 113 0 .0 Pass 0.0002 110 0 .0 Pass 0.0002 106 0 .0 Pass 0.0002 103 0 .0 Pass 0.0002 99 0 .0 Pass 0.0002 88 0 .0 Pass 0.0002 86 0 .0 Pass 0.0002 80 0 .0 Pass 0.0002 80 0 .0 Pass .0.0002 75 0 .0 Pass 0.0002 72 0 .0 Pass 0.0002 69 0 .0 Pass ,----- 0.0002 67 0 .0 Pass !r':\ r:~ n Wi ~..,. -'" . , i p, r 0.0002 63 0 .0 Pass ./ J l.=> I 11 " 0.0002 59 0 .0 Pass I. --1. H 0.0002 56 0 .0 Pass I SEP 20 2006:J 0.0002 52 0 .0 Pass I ' ,..../ 0.0002 49 0 .0 Pass -,c"r2"NT 0.0002 47 0 . 0 Pass 0.0003 45 0 . 0 Pass L... 0.0003 44 0 .0 Pass -~-- 0.0003 38 0 .0 Pass 0.0003 36 0 .0 Pass WWHM2 Report, Aquaculture Systems, Holland Drive - Page 7 of 9 0.0003 34 0 .0 Pass 0.0003 32 0 .0 Pass 0.0003 31 0 .0 Pass 0.0003 29 0 .0 Pass 0.0003 26 0 .0 Pass 0.0003 22 0 .0 Pass 0.0003 21 0 .0 Pass '0.0003 20 0 .0 Pass 0.0003 18 0 .0 Pass 0.0003 13 0 .0 Pass 0.0003 11 0 .0 Pass 0.0003 9 0 .0 Pass 0.0003 9 0 .0 Pass 0.0003 9 0 .0 Pass 0.0003 8 0 .0 Pass 0.0003 8 0 .0 Pass 0.0003 5 0 .0 Pass 0.0003 4 0 .0 Pass 0.0003 3 0 .0 Pass 0.0003 3 0 .0 Pass 0.0003 2 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0003 0 0 .0 Pass 0.0004 0 0 .0 Pass 0.0004 0 0 .0 Pass 0.0004 0 0 .0 Pass F) '':> -:::-~ n 'W r-"~ II " ~ : \ \I' j 1 Water Qual.ity BMP Fl.ow and Vol.ume II SEP 20 2006 J is I \ On-line facility volume: 0 acre-feet I On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. L- uf.VELOPMENT Off-line facility target flow: 0 cfs. -, .~."'-~-----'- Adjusted for 15 min: 0 cfs. Program and accompanying documentation as provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. AQUA TERRA Consultants and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall AQUA TERRA Consultants and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the user of, or inability to use this program even if AQUA TERRA Consultants or the Washington State Department of Ecology has been advised of the possibility of such damages. WWHM2 Report, Aquaculture Systems, Holland Drive - Page 8 of 9 Yearly Peaks for Predeveloped Yearly Peaks for Developed w/ Ponds .. ..... x Developed willi FacHity Durations Yearly Peaks for Developed w/o Ponds Flow Frequencies " :':',,) Ie n. 'M r:;: r..:,\ \\/' ,. \\ W b "\1 ':"-1\, , \ ',\ ,\ SEP 2 0 200~~ .....y :', DE~ELOPMENT l::.::T~,:..:?,r,..~~' . @'...llf.?, L;. r , 'CY~>~. \. ~.. ' WWHM2 Report, Aquaculture Systems, Holland Drive - Page 9 of 9 Attachment A ." r.:::s n WJ r,... ~~ r..::; -~ If I ~_M~. I :'."". '\ 1'.::0 I 1 ' SEP 2 0 2006 : ..-J , -~ ,:Y , 12.')',g.. UEVELO~AENT J ~~ l.~::1 c'~ ] "" k ;! " SWPPP, Aqua Culture Systems, Inc., Holland Drive Page 10 of 11 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN For Aqua Culture Systems, Inc. Sequim, Washington Prepared for: Aqua Culture Systems, I P.O. Box 417 Sequim, W A 98382 Prepared by: Zenovic & Associates, Inc. 301 East 6th Street, Suite 1 Port Angeles, WA 98362 (360) 417-0501 Fax: (360)417-0514 ~.;' Job Number 06210 .~r:. '.,,:," .. September 2006 APPROVED STORMW A TER PLAN \inii '1 7 j\j ,) v (0)' rnt. 1')\ I !"'\ ,1 r--"~ , ,,' \ Ii L_,_ :iTY lkVELOPMENT Proiect Overview Aqua Culture Systems, Inc. is planning to construct three single-family residences on 3 parcels totaling 1.53 acres located at 240, 242, and 244 Holland Drive, Port Townsend, WA. Typical residential construction activities will take place, including grading operations, excavation, and concrete work. The development will necessitate the construction of two infiltration ponds and three infiltration trenches (one per residence), as well as several onsite ditches and biofiltration swales for routing stormwater runoff. Construction will result in approximately 0.34 acre of impervious area, or 22% of the 1.53 acre site. Due to the slope ofthe site (10-15% overall slope), extensive grading operations will take place to create the building pad and driveway for each of the three residences. Approximately 500 cu. ft. (0.31 acre-ft) of soil will be moved, but no soil will be brought in or removed for cut-and-fill operations. The only areas that will not be involved in the grading operations are the preserved treed and native vegetation areas. No groundwater issues are anticipated, and there are no significant geographic features or environmentally sensitive areas on the site. The only notable geographic feature near the site is a potential erosion control hazard area to the northwest; no problems are anticipated related to this, as the area is not adjacent to the site and all of the disturbed areas of the site will slope to the southeast. The soils onsite are primarily outwash-type soils, with a thin layer of sandy loam (up to 12") over fine sand and gravelly fine sand. The predeveloped site is treed and relatively undisturbed. The stormwater from the majority of the site drains to the southeast and enters the roadside ditch along Holland Drive, which empties into the ditch alongside Highway 101, and eventually into Discovery Bay. The natural slope on less than one- sixth of the northwest portion of the site drains stormwater to the adjacent properties to the northwest. Very little water drains onto the site from adjacent properties. Slopes average 10-15%. The developed site will contain three homes totaling 0.15 acres of roof area, one shared gravel driveway totaling 0.11 acre, three individual gravel driveways totaling 0.07 acre, two retaining walls totaling 0.01 acre, lawn, landscaping, and native vegetation totaling 0.92 acre, preserved treed areas totaling 0.24 acre, and infiltration ponds totaling 0.03 acre. Both native vegetation and treed areas are considered as lawn for the purposed of hydrological calculations. Three building pads will be graded at a maximum of 2% slopes, and a shared septic drainfield and reserve area will be installed near the southeast comer of the site. The stormwater from the disturbed areas will drain to the southeast, where it will be treated by biofiltration swales and infiltrated by infiltration ponds. The preserved treed areas will be located in the northwestem portion of the site, and will continue to drain to the northwest. The Construction Stormwater Site Plan is attached and is a part of this report. I '....1"'.. n... WI.'.'" r-"'" --, 11 ,. ' , : i l;:" \\ l I SEP 2 0 2006 , ...-;' H -.J ,TV DEVELOPMENT r.;'\ \1)) I \ :' '\ '-. ~ I""'" " ~::','~.~,~.~-" CSWPPP, Aqua Culture Systems, Inc., Holland Drive Page 2 of7 f.m.lill!in~fV ~qOd~tJ9D' ~MrnroiUY The site is bordered to the northwest, southwest, and northeast by undeveloped residential parcels and to the southeast by Holland Drive. The predeveloped site is treed and relatively undisturbed. The majority of the site slopes to the southeast; less than one-sixth of the northwestern portion of the site slopes to the northwest. The overall slope of the site is 10-15%. The site drops from an elevation of approximately 216 feet near the southwesterly border to 160 feet at the northeasterly comer. The runoff from the site currently enters roadside ditches along both Holland Drive and Honeymoon Lane (located beyond the properties to the northwest), both of which empty into the ditch alongside Highway 101, and eventually into Discovery Bay. Ad~'~'l\t~rei~ The site is bordered to the northwest, southwest, and northeast by undeveloped residential parcels and to the southeast by Holland Drive. The site is within % mile of Highway 101. ~.'.'..::t... n. WI r.,'" r-.... ~ I' " ~, ~,.' \<1-" ""1' : SEP 2 0 2006 ',_~ ._J CSWPPP, Aqua Culture Systems, Inc., Holland Drive Page 3 of 7 L._ . JfV::LOPMENT J .- ......-..-..--.......---'---- Critical Areas There are no critical areas on this site, including streams, wetlands, or other natural waterways. The site has little hazard of erosion. The only geographic feature near the site is a potential erosion control hazard area to the northwest; no problems are anticipated with this area, as it is not adjacent to the site and all of the disturbed areas of the site will slope to the southeast. Soils The only soils testing that has been performed onsite was the testing that accompanied the septic system design. These tests showed that the soils onsite are primarily outwash-type soils, with a thin layer of sandy loam topsoil (up to 12") over fine sand and gravelly fine sand (logs go up to 66"). This supports what is shown in the soil survey for Jefferson County. The survey shows Clallam gravelly sandy loam and Hoypus gravelly loamy sand in this area. The groundwater depth in this area is greater than 100 feet, as shown by groundwater well logs from the area. Additional soils testing is required before installation of the infiltration facilities described in the Stormwater Pollution Prevention Plan. Potential Erosion Problem Areas Because the site is grossly stable, there are few erosion-related concems. The main erosion-related problem will be with the sandy nature of exposed soils, particularly in areas that are re-graded. Silt fence will be installed downhill of these disturbed areas to prevent sediment from leaving the site, and straw wattle will be installed in all construction-phase ditching to retain sediment as well. Another concern will be keeping the infiltration ponds free of sediment during construction; the ponds will be protected with silt fence. Construction Stormwater Pollution Prevention Plan Elements The Stormwater Management Manual for Western Washington (D.O.E., August 2001) requires that twelve elements be addressed by all Construction Stormwater Pollution Prevention Plans: . Element 1: Mark Clearing Umits The clearing limits will be clearly marked by work area barriers. Two areas of existing trees will be preserved near the northwest border of the site, along with several areas of native vegetation (BMP C101). The southeastern site boundary, near Holland Drive, will be effectively delineated by siltation fencing. . Element 2: Establish Construction Entrance The only route available for vehicles to enter and leave the site is near the center of the eastern border of the site at Holland Drive. A stabilized construction entrance will be installed here (BMP C105). rLV,--IJ:J W "'1r- , " , , ' ' SEP 2 0 2006 ; __~ ,~ CSWPPP, Aqua Culture Systems, Inc., Holland Drive Page 4 of 7 L._ ....v ~ I ufVELOPMENT , rnl.;" w~ ~ w [~~ ~:,~\ I L,'l r"-'" T: , 1",0' : : . Element 3: Control Flow Rates 1.1 UCl SEP 20 2006 \ JlJ For stormwater runoff flow rate attenuation during construction, the infi tratiQn.po~c;ts ..~ prescribe~ by the Stormwater.Pollution Preven!ion Plan wi~1 be installed ~:~'~inr:s~L~t~~;i~ ~y PENT construction process, along With four construction-phase ditches as shW Stormwater Pollution Prevention Plan. The ditches are all located where either ditching or biofiltration swales will be located in the developed condition. In this way, the same amount of stormwater runoff flow rate attenuation will be achieved during construction as is required for the developed site. · Element 4: Install Sediment Controls Siltation fencing will be installed along the southeast border of the site, downhill of the areas to be disturbed, as well as around the infiltration ponds for their protection (BMP C233). Straw wattle will also be installed in the construction-phase ditching for further protection of the infiltration ponds (BMP C235). · Element 5: Stabilize Soils From October 1 st through April 30th, exposed soils that remain unworked for more than 2 days must either be seeded (BMP C120), mulched (BMP C121), netted/blanketed (BMP C122), covered with plastic sheeting (BMP C123), and/or sodded (BMP C124), as is appropriate. From May 1st through September 30th, exposed soils that remain unworked for more than 7 days must be similarly protected. . Element 6: Protect Slopes All construction-phase ditching will be either seeded or lined with sod to create grass-lined channels which will aid in preventing channel erosion (BMP C201). The straw wattle will also serve to slow water in downhill ditching. If the straw wattle proves to be insufficient, rip-rap check dams will be installed as prescribed in the permanent Stormwater Pollution Prevention Plan. Additionally, all exposed soils on slopes will be protected with permanent seeding as soon as the final grade is established (BMP C120). · Element 7: Protect Drain Inlets No storm drain inlets are present onsite or downstream of the site. This element is not applicable. . Element 8: Stabilize Channels and Outlets All construction-phase ditching will be either seeded or lined with sod to create grass-lined channels which will aid in preventing channel erosion (BMP C201). If the grass-lining erodes, the channels will be protected with either blankets or rip-rap (BMP C202). The straw wattle will also serve to slow water in downhill ditching. If the straw wattle proves to be insufficient, rip- rap check dams will be installed as prescribed in the permanent Stormwater Pollution Prevention Plan. The only pipe outlets that will be present onsite are the outlets from the two infiltration pond overflow risers. Both of these outlets will be protected from erosion by quarry spall pads (BMP C209). · Element 9: Control Pollutants The only potential pollutants that will be present onsite are the oil and fuel in the heavy equipment, and the materials related to the concrete work needed for the home construction. No maintenance or equipment fueling will be performed onsite to minimize the potential for fuel or oil spills. If one should occur, the spill will be cleaned immediately with appropriate CSWPPP, Aqua Culture Systems, Inc., Holland Drive Page 5 of 7 absorbing materials and all contaminated soils will be removed and disposed of. To minimize the risk of pH contamination by concrete materials, the following guidelines will be followed (BMP C151): o Concrete truck chutes, pumps, and internals shall be washed out only into formed areas awaiting installation of concrete or asphalt. o Unused concrete remaining in the truck and pump shall be returned to the originating batch plant for recycling. o Hand tools including, but not limited to, screeds, shovels, rakes, f1oats,and trowels shall be washed off only into the formed areas awaiting installation of concrete or asphalt. o Equipment that cannot be easily moved, such as concrete pavers, shall only be washed in areas that do not directly drain to natural or constructed stormwater conveyances. o When no formed areas are available, washwater and leftover product shall be contained in a lined container. Contained concrete shall be disposed of in a manner that does not violate groundwater or surface water quality standards. o Containers shall be checked for holes in the liner daily during concrete pours and repaired the same day. . Element 10: Control De-watering No de-watering is anticipated for this project. Should dewatering be required, all waters will be discharged into a sediment trap. . Element 11: Maintain BMPs All stormwater and sediment control devices, including but not limited to, work area barrier, drainage ditching, siltation fencin~, straw wattle, and infiltration ponds shall be inspected daily from October 1 st through April 30 ,weekly from May 1 st through September 30th, and following all major storm events. Any required repairs will be performed immediately. . Element 12: Manage the Project Aqua Culture Systems, Inc. will manage the project and assure that all activities abide by the permanent Stormwater Pollution Prevention Plan and the Construction Stormwater Pollution Prevention Plan. They will ensure that all seasonal work limitations are abided by, including both those enumerated in this plan and those required by the local and county governments. Aqua Culture Systems, Inc. will further coordinate between utilities and other contractors to ensure that there is as little land disturbance and exposed soil as is necessary, and will be responsible for the inspections and maintenance required by the Construction Stormwater Pollution Prevention Plan. They will also be responsible for updating the Construction Stormwater Pollution Prevention Plan throughout the construction process, as required. Calculations Calculations associated with predeveloped and developed site hydrology, and to the infiltration ponds are attached for reference. The calculations associated with the biofiltration swale sizing were referred to in sizing the construction-phase ditching and are attached also. All of these materials are also a part of the permanent Stormwater Pollution Prevention Plan. CSWPPP, Aqua Culture Systems, Inc., Holland Drive Page 6 of 7 L- ,'., r \ ~ ... i", fIT.... ,..'.. ...'.., .'..;:0..... I.. ',' '" '... r-J) '. · .., ;~", ' \' . ...'.., .. ..... , " ,.:::11 .... I, , \," '.,' .. -1 f iSEP 2 ~ 2OO~~ I . ' .'.'V , " ,J"vEt,OPMENT ; ,-.. . .... \.. .-_..,--_..,'-;--~ Relevant Calculations [7;) , ,) F"'1 li.i r--- .' , fl W: \, ' i' . ; L l,~ 1 \ I: SEP 2 0 2006 : ~. CSWPPP, Aqua Culture Systems, Inc., Holland Drive "i~ Page 7 of 7 L~_.._.::_ UiO",.;",' ut:VELOPMENT WESTERN WASHJ:NGTON HYDROLOGY MODaL V2 PROJECT REPORT Project Name: Aquaculture Systems, Inc. Site Address: 240, 242, and 244 Holland Drive City Port Townsend Report Date 8/21/2006 Gage Port Angelis Data Start 1948 Data End 1993 (adjusted) Precip Scale: 0.80 PRBDEVELOPBD LAND OSE Basin Flows To GroundWater: Land Use OUTWASH FOREST: Basin 1 Extender 1 No Acres 0.069327 Basin Flows To GroundWater: Land Ose OUTWASH FOREST: Basin 2 Extender 1 No Acres 0.17514 Basin Flows To GroundWater: Land Ose OUTWASH FOREST: Basin 4 Extender 2 No Acres 0.467097 Basin Flows To GroundWater: Land Ose OUTWASH FOREST: Basin 5 Extender 2 No Acres 0.790331 Basin Flows To GroundWater: Land Ose OUTWASH FOREST: Basin 3 Point of Compliance No ~.'" n f\.fJ > 19!'I<\.. :~ p W'" ../. r----..~. 1 ~ c"'.,", '; ,- i: \: SEP 2 0 2006 Acres 0.032'978 \ i ,--3 L.. ,.' L_: -- .., ., ,-;:,~V~t.Dc~..~E ~,-,. WWHM2 Report, Aquaculture Systems, Holland Drive - Page 1 of 9 DZVBLOPED LAND USB Basin Flows To GroundWater : Land Use OUTWASH GRASS: IMPERVIOUS: Basin 4 Pond 4 No Acres 0.340527 0.066032 Flow Credits: Soil Type Infiltrate Disperse Porous Pav_ent OUtwash 100 0 0 Till 0 0 Saturated 0 0 Basin Flows To GroundWater: Land Ose OUTWASH GRASS: IMPERVIOUS: Basin 1 Extender 1 No Acres 0.064828 0.0045 Basin Flows To GroundWater: Land Ose OUTWASH GRASS: IMPERVIOUS: Basin 2 Extender 1 No Acres 0.170641 0.0045 Basin Flows To GroundWater: Land Ose OUTWASH GRASS: IMPERVIOUS: Flow Soil Type OUtwash Till Saturated Basin 5 Pond 5 No Acres 0.558394 0.141122 Credits: Infiltrate Disperse Porous Pavement 100 0 0 o o o o Basin Flows To GroundWater: Land Ose OUTWASH GRASS: IMPERVIOUS: Basin 3 Point of Compliance No rR)~~..~.~ ! \ , l 1 I 2006 ~~ 1 '~U"(\'\'ENT _,C 'fLL rr... I I WWHM2 Report, Aquaculture Systems, Holland Drive - Page 2 9f 9 Acres 0.029112 0.003866 SEP 2 0 L._ RCBlU!:S (POND) INI'ORMATZON Pond Naae: Pond 4 Pond ~: Trapezoidal Pond Pond Flows to : Basin 5 Pond Rain / Evap is not activated. Diaensions Depth: 3ft. Bottom Length: 13ft. Bottom Width: O.Olft. Side slope 1: 2 To 1 Side slope 2: 2 To 1 Side slope 3: 2 To 1 Side slope 4: 2 To 1 Volume at Riser Head: 0.003 acre-ft. Discharge Structure Riser Height: 2 ft. Riser Diaaeter: 12 in. Pond Hydraulic Table staQe (~t) Area (aor) Volume (aor-ft) Dschrcr (cfs) J:nf:i.l t (cfs) 0.000 0.000 0.000 0.000 0.000 0.100 0.000 0.000 0.000 0.001 0.200 0.000 0.000 0.000 0.003 0.300 0.000 0.000 0.000 0.004 0.400 0.001 0.000 0.000 0.006 0.500 0.001 0.000 0.000 0.008 0.600 0.001 0.000 0.000 0.010 0.700 0.001 0.000 0.000 0.011 0.800 0.001 0.000 0.000 0.013 0.900 0.001 0.001 0.000 0.016 1.000 0.002 0.001 0.000 0.018 1.100 0.002 0.001 0.000 0.020 1.200 0.002 0.001 0.000 0.022 1.300 0.002 0.001 0.000 0.025 1.400 0.002 0.002 0.000 0.027 1.500 0.003 0.002 0.000 0.030 1.600 0.003 0.002 0.000 0.032 1.700 0.003 0.002 0.000 0.035 1.800 ,0.003 0.003 0.000 0.038 1.900 0.004 0.003 0.000 0.041 2.000 0.004 0.003 0.000 0.044 2.100 0.004 0.004 0.308 0.047 2.200 0.004 0.004 0.871 0.050 2.300 0.005 0.005 1.600 0.053 2.400 0.005 0.005 2.464 0.056 2.500 0.005 0.006 3.443 0.060 2.600 0.006 0.006 4.526 0.063 2.700 0.006 0.007 5.704 0.067 2.800 0.006 0.007 6.969 0.070 2.900 0.007 0.008 8.315 0.074 3.000 0.007 0.009 9.739 0.078 [0)'., r; n u.n ;;" , "'\ i1', '. , W c::=o 1\ I L.' r----,. 1 . ,-\ , SEP 2 0 2006,_ ~. I ~_._- LitVE;,OPMENT WWHM2 Report, Aquaculture Systems, Holland Drive - Page. 3 of 9 Pond Name: Pond 5 Pond Type: Trapezoidal Pond Pond Fl.ows to : Point of Compliance Pond Rain / Evap is not activated. Dimensions Depth: 2.5ft. Botto. Length: 52ft. Botto. Width: O.Olft. Side sl.ope 1: 2 To 1 Side sl.ope 2: 2 To 1 Side sl.ope 3: 2 To 1 Side sl.ope 4: 2 To 1 Vol.uae at Riser Head: 0.006 acre-ft. Discharge Structure Riser Height: 1.5 ft. Riser Diameter: 12 in. Pond Hydraul.ic Tabl.e staGe (~t) Area (.or) Volume (aor-~t) Dscbrq (ofs) %nfilt (ofs) 0.000 0.000 0.000 0.000 0.000 0.100 0.000 0.000 0.000 0.006 0.200 0.001 0.000 0.000 0.011 0.300 0.001 0.000 0.000 0.017 0.400 0.002 0.000 0.000 0.022 0.500 0.002 0.001 0.000 0.028 0.600 0.003 0.001 0.000 0.034 0.700 0.004 0.001 0.000 0.040 0.800 0.004 0.002 0.000 0.046 0.900 0.005 0.002 0.000 0.052 1.000 0.005 0.003 0.000 0.058 1.100 0.006 0.003 0.000 0.064 1.200 0.006 0.004 0.000 0.071 1.300 0.007 0.004 0.000 0.077 1.400 0.007 0.005 0.000 0.084 1.500 0.008 0.006 0.000 0.090 1.600 0.009 0.007 0.308 0.097 1.700 0.009 0.008 0.871 0.104 1.800 0.010 0.008 1.600 0.110 1.900 0.010 0.009 2.464 0.117 2.000 0.011 0.011 3.443 0.124 2.100 0.012 0.012 4.526 0.131 2.200 0.012 0.013 5.704 0.139 2.300 0.013 0.014 6.969 0.146 2.400 0.014 0.015 8.315 0.153 2.500 0.014 0.017 9.739 0.161 \0)....".'...".. ;...,~ ~) . I,,: I \;",' : s/ w~w '\ 1\ 1 I SEP 20 2006 J0 ',TV uE'VEl.OPMENT WWHM2 Report, Aquaculture Systems, Holland Drive - Page 4 of 9 ANALys:rs RESULTS F~ow Frequency Return Periods for Predeve~oped Return Period 2 year 5year 10 year 25 year 50 year 100 year F~ow(cfs) 0.00023 0.000292 0.000319 0.000343 0.000356 0.000365 F~ow Frequency Return Periods for Deve~oped Unmitigated Return Period F~ow(cfs) 2 year 0.07412 5 year 0.093739 10 year 0.105981 . 25 year 0.120803 50 year 0.131463 100 year 0.141852 F~ow Frequency Return Periods for Deve~oped Mitigated Return Period 2year 5 year 10 year 25 year 50 year 100 year F~ow(cfs) 0.014294 0.018062 0.020412 0.023255 0.0253 0.027292 Year~y Peaks Year 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 for PredeveJ.oped and Deve~oped-Mitigated Predeve~oped 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Deve~oped 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 ff] ,__F r ! ,.'. . WI -.-.. _.- I:':: 1 ..", l~:lII1 I 1 :.1 SEP 2 0 2006 : ' ~'-J UtVfLODMENT WWHM2.Report, Aquaculture Systems, Holland Drive - Page 5 of 9 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.,000 0.000 Ranked Yearly Peaks for Predeveloped and Developed-Mitigated Rank 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Predeveloped 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 . 0.0002 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 Developed 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 re n ~n ~,~ \ ~ ., ,\!!", II \ I, i} r-- ---~l SEP 2 0 2006. I " .~ \ _".._.' ,'.._, .._,,_~~2~~ _GrL~~!iU WWHM2 Report, Aquaculture Systems, Holland Drive - Page 6 of 9 1/2 2 year to 50 year Flow (CFS) Predev Final Percentage Pass/Fail 0.0001 286 0 .0 Pass 0.0001 278 0 .0 Pass 0.0001 267 0 .0 Pass 0.0001 260 0 .0 Pass 0.0001 254 0 .0 Pass 0.0001 250 0 .0 Pass 0.0001 244 0 .0 Pass 0.0001 239 0 .0 Pass 0.0001 235 0 .0 Pass 0.0001 232 0 .0 Pass 0.0001 225 0 .0 Pass 0.0001 221 0 .0 Pass 0.0001 217 0 .0 Pass 0.0001 213 0 .0 Pass 0.0001 209 0 .0 Pass 0.0002 205 0 .0 Pass 0.0002 202 0 .0 Pass 0.0002 197 0 .0 Pass 0.0002 192 0 .0 Pass 0.0002 188 0 .0 Pass 0.0002 182 0 .0 Pass 0.0002 173 0 .0 Pass 0.0002 170 0 .0 Pass 0.0002 169 0 .0 Pass 0.0002 159 0 .0 Pass 0.0002 157 0 .0 Pass 0.0002 150 0 .0 Pass 0.0002 148 0 .0 Pass 0.0002 148 0 .0 P~ss 0.0002 146 0 .0 Pass 0.0002 141 0 .0 Pass 0.0002 137 0 .0 Pass 0.0002 136 0 .0 Pass 0.0002 129 0 .0 Pass 0.0002 125 0 .0 Pass 0.0002 121 0 .0 Pass 0.0002 116 0 .0 Pass 0.0002 113 0 .0 Pass 0.0002 110 0 .0 Pass 0.0002 106 0 .0 Pass 0.0002 103 0 .0 Pass 0.0002 99 0 .0 Pass 0.0002 88 0 .0 Pass 0.0002 86 0 .0 Pass 0.0002 80 0 .0 Pass 0.0002 80 0 .0 Pass 0.0002 75 0 .0 Pass 0.0002 72 0 .0 Pass 0.0002 69 0 .0 Pass 0.0002 67 0 .0 Pass 0.0002 63 0 .0 Pass ~:" ff' n WI .' r-"\ . r'~ r---'::' \ 0.0002 59 0 .0 Pass 1.1.::!1 j \ 0.0002 56 0 .0 Pass 1 0.0002 52 0 .0 Pass i: ! 0.0002 49 0 .0 Pass SEP 20 2006 I .....) 0.0002 47 0 .0 Pass ~. 0.0003 45 0 .0 Pass 0.0003 44 0 .0 Pass L_ ' !),'VfLOPMENT I 0.0003 38 0 .0 Pass .....-._..~--~.~.__. 0.0003 36 0 .0 Pass WWHM2 Report, Aquaculture Systems, Holland Drive - Page 7 of 9 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0004 0.0004 0.0004 34 32 31 29 26 22 21 20 18 13 11 9 9 9 8 8 5 4 3 3 2 o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass \\f~r<~pW2: ::l~ .~ Wat.er Quality BMP Flow and Volume On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 ain: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. "v JEVELOPMENT I ~..~.,. --'-- --""_.~~._-_.--~---" Program and accompanying documentation as provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. AQUA TERRA Consultants and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not l~ted to implied warranties of program and accompanying documentation. In no event shall AQUA TERRA Consultants and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the user of, or inability to use this program even if AQUA TERRA Consultants or the Washington State Department of Ecology has been advised of the possibility of such damages. WWHM2 Report, Aquaculture System~, Holland Drive - Page 8 of 9 Yearly Peaks for Predeveloped Yearly Pealts for Developed wI Ponds .... x Developed UIIiIh Facility .. Our.tioas Yearly Peaks for Developed wlo Ponds Flow ~tmcies " f"r'" n Wi :;-,. I~" \0)". 1:'" H :-., , t '\ l. ~... ~::::S 1 \ I L.' r-'- ."u,_ 1 ! ..' ! SEP 2 0 2006 "._ ,~ !: ~::\/r ~<j ~)p/,E Nl WWHM2 Report, Aquaculture Systems, Holland Drive - Page 9 of 9 b\()~' L T~AT\ON S~ A\..f- t:>E...S \GN AQ0Ac.VLT0R~ \-\() LL AN\) t>R . C9 WA~R Q0AL.\T~ D€..b\G~ ~LOw RA-TE. . -=-. Ql e-\'$ ~~ ww\-\,N):;Ao..f\c..\'1 s;s ~ U$<4- d. 'If V\'H~.. \';-\3~~. ' \=-. \0.. --J. t"CA.*. -'<-. <"0(\ \/""-. f'$~Q{\ .: f\ v.oo\v{V\.JL, ~ '\ c....~~~~\ l.\} T~'D\~ Li. \ ~ \ A -:. ~ \,~ X ~. R.o..+; 0 :: O. d-~ 3'8 Qw<4 = Q-a. x O'~d.~<6 = (o.~~'8)(o.O=tL\Y'~~.) Qw~ ':. O,O\c-. S<g<g e-f;:s p<'-f" <F- 'Q.) LO.N<;\T0b\/0AL- 'SLO~€.S. -::. 4 ~~'6.~ <:-'r\E:.c..K t>A}(\$ \!$' '.So ~co ':. . % @;~ \.)5.€.. S€I.6D M\'X ~') "O\0~~ S) c..-~c..~Kr ~') T~~\L '\.\: t S ... <60 ^ +0..\ \ ~(' {V'\Q...o..~QW ~Q..Sq..<.)~ \ 0 - ,s A SJL~s~J~/ ~O\O{'h'~\ ~~"'.3\o"SS S - \() % \~~~? -7 \ N 'S, AL\.. ~\\ON ~e..~ TA\)LE. ~.'-\ A>O,€.S ~ u'St:. 4 /I fi\A'X. Ti?..<C-A\fi\CCNT De\:>TH (\;J f"~E.Q.0EN\ (\0....,..) \N(; AN'T\<L\~ ATE~) ~ ()\d.~ t<\ANN\N~lS N o T~"~E.:~O\\)AL 5wt\LE t>~o~\L.E ~ o _ u" _ "'~i-' - Y3' ..5> ':. O. \0 c.=3 -Op SE.t. L -:::. "d.,S Q\\ _ t: \I. -=- \' IJ \, l.o\9. ( '( \.G.-:t) ($ O.S ), I T ~ 'D -\- ~"{ -=t. -:. 3 'S\>~CCA\)S\\E.ET ~o~ C.l\LC0L ,.o:, ,~ n W ,-. ,..., n" C i". ,"\ \.,i ( I" L(,.l ! ....~.._..."...". 1" \QNS .o.. i SEP 2 0 2006 :. '.J.! ' ,~~ ~ A ~ b'l + t: "I":). = ~/~ S9. ~.,.. ~ ry L_, IA:VELOPMENT @ o \j -:. ~A.-=- O,(J~,-\~' ~/$ L -::. 'I-t.. ((po ?/tv\,'f\ ') W~e-\L L- -- G,.~ ~;- t ~ '-\.' L\ -(VI : f\ .. . o ' N 0\ A ~~L\C- f\\)Lt:. 0~3 Q'Qc): (0.\ L\ \~S""). cJ;~) (\ ,G') -:;:. 0 .d.d.1-0 <-~s ~ TA\~ c-o\J.E.~AG,~ ~ ~" -7 L~vJ R,~TA~\)ANC-t. CD') ~L~ !f\AX\fY\01f\ v€.L-OC-\\'"'{ '"::... "3 t"V5 ~~ ~ ~ G>'-~ \) ~ O,GS VR ~ () .~6). H~:$ R.~ 0, ~-:r33 ~ \I R :: \.~ R\'c;" S 0.5:: 0 . ~ ').~ i- ~;-s ~<::j) vi R:: 0 ,'t> ~ ~rs - 0, ~ d.. '67- ~-%; -r S //0 ~ ~C-- ~ ~c.1D ~ ~ V::. v7'"R. = '""d. . ~ '\ 9Vs A = CV" - (). O~\~ 'S~ ~T AS\) E..S \ G AJ 'C. D A- -=- D . Co --=l- s~ ~ + ') ') A=:O , o~ s~ ~T ~ wAIG.~ ~vAL\"T'-{ \JE.S\GN \S AC-C...E:~\A\:,LE A ~ 't> 'i -\- t:. 'i";). ~ '{":. a,CJ-=tyG;. !C~'W[~~' \r----' .'-'" -- 1 i '-~ , I '" h OSE~ (\2. 0 axJ6 ~ ~ '~i-Y L~,_:..___ ;". uEVELOPMEN ~,~ Y3~" 1-- ~~"t" \(S<.Q.. boQ",\~ ., ~, uS€.. "IT - . \ ~T ~ R~ 'o~ -T t 'frd- \:> + 'iT (t:."'d- T \')0,5 o. S '-\ Co\ ~-r .~ A";. D~T -\- C '{TA -:: L\ "S~. h A.. =. . \ ' '-\ ~ A 1<. O'~T b C. s , =- \...X . '" S , -:;;)'-\ c-~<s < ( 0. '00 @) .., c-\-\EcK \:.>AMS (v)uSTC>E-. \AJSTALL€D -t \ N STAU- ~€.~ T A{)\-E. q,\...\ NO\t..S r0.). '...... p"'n WJ r: ,",~\ li; r-.-------1 I' . . I . \" i , SEP 2 0 2006 ; I;;;) \ , ~ I .. . L.--,.,.-....~ 'Y , . ""V"cL' OPMENT ' ,'.1 Jt:_~ T Aquaculture Systems, ,Inc. - 240, 242, and 244 Holland DrIve ~= Y= R= b= A= t= 0.0166 0.3333 0.3333 ds ft hyclraulic radius ft sq. ft. min. 44.??oo b= -0.8677 ft = Use b :;: 1.??oo ft T= 3.??oo ft A= 0.6667 sq. ft. V= 0.0249 ftJs L- 65.69 ft 0100 == 0.2270 cfs ".,... = 0.085 manning's n s= n= z. T== V= 0.1000 0.2400 3.??oo sIq)e menning's n side slopes It ftIs -10.41 in V_ == 3.??oo Ips VR :;: 0.8200 Iffs R == 0.273333 ft VR.... - 0.8287 rtfs 0.7872 - 0.8701 VR fJts wiNtin ". ,.",.. V....II: 2.4860 Ips ~ II: 0.0913 sq. ft. This is << then A as ..s:igned above. YII:":ft A II: ' sq. ft. YtIIta.1I: 0.8333 ft == V... = 1.??oo ft the y,,*, == 1 foot. R == 0.5461 ft Aw-t_ = 4.??oo sq. ft. Oc.P.~1lty II: 5.2361 cfs Q~>>Q*. 10.00 in _1 II: cells that reference 0Iter cells - cells containing caIcuIetions _ - cells in which . ~ funetion WIll UMd Page 1 of 1 n Wi t, !'-,\: , ,f_, ''''' 1 1\ o 2006 i ~! ,~ v L__ \.,. : -.....-'...--..--.. uEVELOPMENT .;( ~. IE (C ~ 0 ~ [E fni....; n 1 l[i; ,J U'L' SEP 20 2006 :\.0 i,.",~ .,-,~ , <"" ." ""TY l~f.Pl. ~'J"'c::-! ~\i:;i,:;' DE;VELOPMENT , , OPERATIONS AND MAINTENANCE MANUAL for STORIYIWATER FACILITIES For, Aqua Culture Systems, In . Sequim, Washington Prepared for. Aqua Culture Systems, Inc. P.O. Box 417 Sequim, W A 98382 Prepared by: Zenovic & Associates, Inc. 301 East 6th Street, Suite 1 Port Angeles, W A 98362 (360) 417-0501 Fax: (360) 417-0514 Job Number 06210 September 2006 APPROVED STORMW A TER PLAN ~ ~ i~: \, l "7 p;r\f'i'f , f? n t\n i "\ \f5) r-:C '.. W 1 " ., SEP 2 0 200~,'::; L:- / .tVf:l.DPIc1ENT ~ --- ---- Responsible Parties Contact Information Aqua Culture Systems, Inc., Developer Name: Steve Fager Cell Phone: (360) 460-6437 Office Phone: (360) 582-9461 NOTE: Aqua Culture Systems, Inc. is responsible for operations and maintenance during construction and until each lot is sold. AFTER THE SALE OF EACH LOT, THE NEW OWNER ASSUMES RESPONSIBILITY FOR PROPER MAINTENANCE OF DRAINAGE FACIL TIES. Aqua Culture Systems, Inc. is responsible for furnishing this information to the new lot owner. Maintenance and Repair Log Record any required maintenance or repair on the attached log. Stormwater Site Plan A copy of the Stormwater Site Plan is included for informational purposes. It is to be considered a part of this manual. ___,_,,_,""""~ .,.__.__.___~'."^'_. m_ r=:.:,-'------. \'V} II) SEP 2 o~= I --' \ u..:" ., ~ . . ~.~~----'-'"''"'<. I I ..~ ,'{ utVELOPMENT O&M Manual, Aqua Culture Systems, Inc., Holland Drive Page 2 of 5 , Wet Season Weekly Inspections Checklist: 1. Inspect any and all drainage ditches located on your lot. Remove excess accumulated silt as necessary. Repair any erosion damage to ditches with sod or soil stabilization fabric as appropriate. 2. Inspect any and all biofiltration swales located on your lot. Remove accumulations of silt and sediment as necessary. DO NOT use equipment such as a backhoe or dragline to accomplish this - it will damage the biofiltration swale. Repair any damage to the grasses with seed or sod as appropriate - refer to the Stormwater Site Plan for proper seed/sod specifications. 3. Inspect the infiltration pond if one is located on your lot. Remove excess accumulated silt as necessary. Repair any damage to the grasses with seed or sod as appropriate - refer to the Stormwater Site Plan for proper seed/sod specifications. 4. Inspect the grass length of any and all biofiltration swales located on your lot. If grasses are 5- tall or higher, mow to no less than 4" tall. Collect clippings and dispose of appropriately. Wet Season Monthly Inspections Checklist: 1. Inspect the tightline systems for your downspouts. Clean out as necessary. 2. Inspect outlet structures of the infiltration pond if one is located on your lot. Cleanout as necessary. ~i:~, .ULIP \ \ SEP 2 0 i . O&M Manual, Aqua Culture Systems, Inc., tiolland Drive Page 3 of .5 'W ,"", --1 '\ Ii I 2006 i ...-' \ ~J \ .' :~_Yj,:~ E lnJ Dry Season Bi-weekly Inspections Checklist: 1. Inspect any and all drainage ditches located on your lot. Remove excess accumulated silt as necessary. Repair any erosion damage to ditches with sod or soil stabilization fabric as appropriate. 2. Inspect any and all biofiltration swales located on your lot. Remove accumulations of silt and sediment as necessary. DO NOT use equipment such as a backhoe or dragline to accomplish this - it will damage the biofiltration swale. Repair any damage to the grasses with seed or sod as appropriate - refer to the Stormwater Site Plan for proper seed/sod specifications. 3. Inspect the infiltration pond if one is located on your lot. Remove excess accumulated silt as necessary. Repair any damage to the grasses with seed or sod as appropriate - refer to the Stormwater Site Plan for proper seed/sod specifications. 4. Inspect the grass length of any and all biofiltration swales located on your lot. If grasses are S- tall or higher, mow to no less than 2" tall. Collect clippings and dispose of appropriately. Dry Season Bi-monthly Inspections Checklist: 1. Inspect the tightline systems for your downspouts. Clean out as necessary. 2. Inspect outlet structures of the infiltration pond if one is located on your lot. Cleanout as necessary. .--- I \,....-- ..,,--'._,_..~,~ O&M Manual, Aqua Culture Systems, Inc., Holland Drive Page 4 of 5 M~NJ.5.tjA~G&..LOG- KE~PCl-EAN ~t1QIQcO~ PORT ANGELES HARDWOOD, LLC Date Item/Facility Description Performed by Comments .' "" ~ ";. i'! Il \! WI i_ \ iL))~. .' 1 i "', - ---- I I , ; , ~tt- LV LUUU ...-/ i ~. .", ,.:; (<Ol,."::l-.r L~,~~- ,-_:,~:__._.__._,...--.:-::---- O&M Manual, Aqua Culture Systems, Inc., Holland Drive Page 5 of 5