Loading...
HomeMy WebLinkAboutBid Award - PW - Supply of Aggregate for County's BST Program in 2025 and 2026 - 081224 tiU Department of Public Works 623 Sheridan Street Port Townsend,WA 98368 %. Jefferson County, Washington 360-385-9160 �•siirNo DATE: August 12, 2024 TO: Board of County Commissioners FROM: Monte Reinders, PE, Public Works Director/County Engineer SUBJECT: AWARD OF CONTRACT Project : Supply of Aggregate for Bituminous Surface Treatment in Calendar Years 2025 & 2026 County Project No. 180 20390 In the matter of awarding a construction contract for the above referenced work: • The Call for Bids was issued by the Board of County Commissioners on July 8,2024. • Due notice of the Call for Bids was given as required by law. • Sealed bids were received and opened in public on Thursday, July 25, 2024 in the Commissioner's Chambers. • The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1)and project Special Provision 1-02.14 or WSDOT Standard Specification 1-02.14. • Bid tabs are attached for reference. fhe Public Works Department recommends that the construction contract be awarded to the lowest responsive and responsible bidder Bruch and Bruch Construction, Inc of Port Angeles, Washington for their hid amount of $555,067.00, for the: Project, Supply of Aggregate for Bituminous Surface Treatment in Calendar Years 2025 &2026 County Project No. 18020390. And, authorize the County Engineer to execute change orders for the project, due to unforeseen conditions only, for up to 10%of the contract amount,or$55,067,for a total contract value, not to exceed$610,574. Approved P-Az Kate n Date Chair,Board of County Commissioners Attached: Bid Tabulations Bid& Contractor Verification Summary • BID TABULATIONS SUPPLY OF AGGREGATE for BITUMINOUS SURFACE TREATMENT in JEFFERSON COUNTY in CALENDAR YEARS 2025 5 2026 1 BIDDER 1;APPARENT LOW BIDDER 2 BIDDER 3 BID OPENING DATE:JULY 25,2024 ENGINEERS ESTIMATE BRUCH a BRUCH CONST ALLEN SHEARER TRUCKING INC. NORTHWEST ROCK INC COUNTY PROJECT 180 20390 BED OPENING TIME: 1 00 PM 242 E SNIDER RD PA P O BOX 789 BELFAIR 642 NEWSKAH RD ABERDEEN WA 98363 WA 98528 WA 98520 ITEM .. QUANTITY UNIT ITEM DESCRIPTION UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO BID BID BID BID B!U BID BID BID SURFACING 1 8.500 TON CRUSHED AGGREGATE,3/8-U S.No 4 HADLOCK► $54 60 S464.100 00 S54 46 S482.910 00 S55.20 $489 200 00 $59.00 $501 500 00 2 1,700 TON CRUSHED AGGREGATE,1/2-U.S No 4 jCAPE GEORGE) S54.60 S92,820.00 $54 21 $92,157 00 $58 00 $90,800.00 $62 00 $105,400 00 3556.920.00 3555.067 00 S567,800.00 * 3806.900.00 Prepared by Pro►ect Manager: P 7 w6 ly Coax Ferry a • Reviewed by Eng.Sent Manager 1 Y10`,0 Eric Kama Date: * t,c,94.rrATA) INIA T to a. u N LOW TO HIGH BID ORDER O '"D m c .2. a z g Z7 co M CI z 0 Re m 1 ?° to n n 111 + 0 D 0 in Ari 2 s Z Z —I O Z D A O coor 7a m XI -11 mN n m y� BID AMOUNT(W/O Sales Taa) w r 2 2 u OT Z > V) x APPARENT LOW BIDDER G 3 73 m 3 m r m D BIDS ENTERED IN BID TABULATION SHEET 3+v, rn U m > JJ -n 1 x rr MATH VERIFIED 0 vi 21 -- _ to m m rrr ADDENDUMSACKNOWLEDGED BY CONTRACTOR rn to ce Z t_ m m m rrrr PROPOSAL SIGNED -n co t» v: T m xi to u (A 0 C, • Z m -§ C-; FEDERAL I.D.NO. z a m ` 0 b 4 C m m rrr 6%PROPOSAL BOND INCLUDED N to ti 0 . N tn m m m NON-COLLUSION DECLARATION RETURNED WITH BID PROPOSAL oN N N cn > > > CERT.FOR FEDERAL AID CONTRACTS RETURNED WITH RID PROPOSAL m rrrr n WAGE LAW CERTIFICATION SIGNED(272.009) :n tr N Z D D SUBCONTRACTOR LIST RCW 39.30.060(272-009) Z L z DBE UTILIZATION CERTIFICATION COMPLETED(272-056) > D > 7 z Z DBE WRITTEN CONFIRMATION DOCUMENI COMPEL T101472.0311 > D P DD D DBE'Goon Faith Effort'(GFF)Documentation(if necessary) Oz 0 j -r PRIME CONTRACTOR DBE STATUS: D D >O O O Iiltp.i;wsdot.wa.gov,PartnersiUMWUL/DOEDlrectory/ o m m n m r. Z Z z SUBCONTRACTOR DBE FTRM(S)CERTIFIED BY OMWBE: D T 3- www.onwvbe.wa.gov!dtrectoryof•certdied•hrms r ZO -C r-0 SUBCONTRACTOR DBE FIRM(S)CHECKED ON LIST OF SUSPENDED FIRMS' -4 0 -4 C 'o ht1p:�.Mrsdot wa govrPartneMOMWBE/DBEDirectury, z z Z n' 8 a, ii s ' WA STATE UNIFIED BUSINESS IDENTIFIER NO.(UBI): co Mips r/securs.lm.wa.govrvenfy: STATE EXCISE TAX REGISTRATION NO.(MAY BE SAME AS UDI): Q gn TTg:: httpa:/Isecure.dOr.wa.govlgteunauth!/Y7 bi § -r Link at bottom of LIE verification page ifS 75 N z Q. z a m r M I 0 I CONTRACTOR LICENSE NUMBER p O 0 r) a 1 (• CONTRACTOR'S LICENSE EXPIRATION DATE: bltps://sec ure.lni.we.goviverify/ to ix A -c m CONTRACTOR LICENSE VERIFIED ON UM WEBSITE y y y httpn:fleecure.lni.wa.gov/verify/ n n A AA A • LILT INDUSTRIAL INSURANCE PREMIUM STATUS: 2 a Z y z y https:/fsecure.Ini.we.gov/verifyl 1 1 -I 03 03 C z z CONTRACTOR CHECKED ON L8l DEBARRED CONTRACTORS LIST: a a htt :i www g.Ini.wa. ovlTratielLiceneing/PrSvWagelAwaroingAgeneies/DebArrr .O O O p rD Z Z Z r r r dContrectors/defeuWasp 0 > > ni -i y - t0 t0 j 0z z 0 0 3 g 0 i m m m ta m m O000NTRACTOR CHECKED ON FEDERAL SYSTEM FOR AWARD yE�3i MANAGEMENT(SAM)WEBSITE: httpeJ/wwvu.sam.NovrSArd• m m 0 0 0 C C C Z Z Z O O O O co EMPLOYMENT SECURTIY DEPARTMENT NO.: A v email:publicworks)esd.wa.gov phune.(380)890.3499 N Q (VERIFICATION OF ACTIVE UNEMPLOYMENT ACCOUNT) c sN. $ i 1 c 0 N N A A Z Z Z COMPLIANCE WITH APPRENTICESHIP UTILIZATION REQUIREMENTS > > D OF RCW 39.04.320&49.04 IN/A for projects c 1 million S) '^ L&I CONTRACTOR TRAINING VERIFICATION per RCW 39.04 350111(1) �r Fi (effective July 1.2019)Included on LNI Verification page. 't 1 https:/)secure.Ini.wa.yov/verily/ Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator l From: Monte Reinders, P.E., Public Works Director/County Engineer/ V J Agenda Date: August 12, 2024 Subject: Bid Award for Supply of Aggregate for the County's BST Program in Calendar Years 2025 a 2026 Statement of Issue: Award of Contract to Bruch and Bruch Construction, Inc. of Port Angeles, Washington for their bid of $555,067.00 for the above referenced project. Analysis/Strategic Goals/Pro's Et Con's: The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1) and project Special Provision 1-02.14 or WSDOT Standard Specification 1-02.14. Bid tabulations and Bidder verification documentation is attached. Fiscal Impact/Cost Benefit Analysis: The Bid amount is $555,067.00. This project is funded with the road operations budget. Recommendation: Public Works recommends that the Board authorize the Award of Contract to Bruch and Bruch Construction, Inc., and authorize the County Engineer to execute necessary change orders for the project for up to 10% of the contract amount by signing the attached document and returning it to Public Works for further processing. Department Contact: Conor Ferry, Eng. Tech. II, 360-385-9168 Reviewed By: Mark McCauley ounty Administrator Date