Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Mark McCauley, County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engineer
Agenda Date: August 29, 2024
Subject: Rural Arterial Program Final Prospectus
Paradise Bay Road Overlay M.P. 3.74 to M.P. 6.00
County Road No. 50360
Statement of Issue: Approval of Washington State County Road Administration Board
(CRAB), Rural Arterial Program (RAP), Final Prospectus for Jefferson County's Paradise
Bay Road Overlay M.P. 3.74 to M.P. 6.00 project.
Analysis/Strategic Goals/Pro's &t Con's: Paradise Bay Road is a Rural Minor Collector
that serves as the primary (non-truck) connection to the greater Port Ludlow
community. This project will complete the 2R asphalt overlay of a segment of Paradise
Bay Road from M.P. 3.74 (near the Andy Cooper Road/Paradise Bay Road intersection) to
M.P. 6.00 (the SR 104/Paradise Bay Road intersection). The Paradise Bay Road Overlay
project is a transportation improvement project that is included in the officially adopted
2024-2029 Transportation Improvement Program (TIP) as Item No. 26.
Fiscal Impact/Cost Benefit Analysis: Approval of the RAP Final Prospectus will facilitate
award of a RAP grant by CRAB for design and construction of this project.
Recommendation: The Board is requested to review the attached "Not for Signature"
copy of the Final Prospectus and authorize the Chair to e-sign the Final Prospectus. An
electronic version of the Final Prospectus will be sent directly from CRAB to the Board.
Department Contact: John Wayand, Project Manager, 385-9377.
Reviewed y:
0/1/
Mark McCaule , County Administra Date
WASHINUNTY ROAD GTONSTATE RURAL ARTERIAL PROGRAM
CO
ADMINISTRATION BOARD FINAL PROSPECTUS
Biennium 2025-2027
Region: North West County: Jefferson
IDENTIFICATION
Project Name: Paradise Bay Road Overlay MP 3.74 to MP 6.00
Six-Year T.I.P. Priority No: 26
Total Points: 86.000
Road Road Name(s) FFC(s) TRC(s) BMP(s) EMP(s) Legislative
Number(s) District
Paradise Bay 08 - Rural Minor Non Truck
50360 3.743 6 24
Road Collector Route
PROJECT TYPE
*Project Type: 2R - Resurface and Restore
DESCRIPTION OF PROPOSED IMPROVEMENTS -Attach Rating Worksheets
Roadway Structural Section, or Bridge Condition:
Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross
section. (Proposed structural section details may change based on final design.)
This project includes asphalt paving (0.17' thick) of the existing lanes (average asphalt thick 0.23') and
existing shoulders (average 0.125' thick) to provide increased structural strength. The cross-slopes of
the existing shoulders (varying cross-slopes) will be corrected to match the roadway lane cross-slopes.
Approximately 1320' of roadway lane surface will be planed to remove and correct the existing
substandard BST surface.
Horizontal Alignment:
(none)
Vertical Alignment:
(none)
Width:
The existing roadway lane width will be maintained at 11' wide. The existing shoulder widths vary from
3' to 4'; the shoulder widths for all segments will be improved to a minimum of 4' wide.
Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.:
Pavement marking and minor signing improvements are included in this project.
ESTIMATED FUNDING AND TIMING
Phase Est Total Cost RATA Amount Start Year End Year
Design/Prelim.
Engineering $84,000.00 $75,600.00 July 01, 2025 April 30, 2026
Right of Way $0.00 $0.00
Construction $1,351,000.00 $1,215,900.00 May 01, June 30, 2026
2026
TOTAL $1,435,000.00 $1,291,500.00 Schedule of CRAB reimbursements for
Construction will be or dependent on Project
SPECIAL CONSIDERATIONS THAT MAY AFFECT PROJECT SCHEDULE:
❑ Wetlands ❑ NMFS ❑ R.O.W. ❑ Shorelines ❑ USFWS ❑ BIA ❑ HPA
❑ RR ❑ USACE ❑ WDFW ❑ Cultural (Hist. Arch. ❑ Tied (Other agency work) ❑ Other
Palen.)
PROJECT NARRATIVE
Paradise Bay Road is a Rural Minor Collector that serves as the primary (non-truck) connection to the
greater Port Ludlow community. This project will complete the 2R asphalt overlay of a segment of
Paradise Bay Road from M.P. 3.74 (end of previous adjoining asphalt improvement segment) to M.P.
6.00 (SR 104/Paradise Bay Road/Shine Road intersection). This project includes: asphalt pre-leveling
of 2 road segments (approx. 4800') to correct lane surface rutting, asphalt overlay of existing
failing/rutted BST lane and shoulder surfaces, asphalt paving of approximately 28 road approaches
and driveway aprons, pavement marking, guide posts, and minor signing. Additionally, this project will
connect with WSDOT's construction of a new roundabout at the Paradise Bay Road (M.P. 6.00 and SR
104 intersection) at the west end of the Hood Canal Bridge in 2024.
LOCAL PROJECT APPROVAL
NOT FOR NOT FOR
RAP Project Prospectus prepared under the
supervision of: SIGNATURE SIGNATURE
Signature-County Engineer Date
NOT FOR NOT FOR
RAP Project Prospectus submitted to CRAB with SIGNATURE SIGNATURE
the approval of: Signature of Chair of the
Board of County
Commissioners or County Date
Executive
N
Qv N
0
p/
V /
2/ 00
,
4//
w
0
J
=
x
cn
a Ir
-J
- o G o J
a lal X o W
_ ^ J w Z 0 O 0
I-
W I— o Q
o (D
cr 1.1J 2 a
�'/^)
CO U •
i V/ MN Q
I
w _ �z 0 p
3 X -I-'a
d' (7 M
a F U a < N
vi r CO M
XCT
w w 3 \T
>- 'J I K N N 0-
x I- 0
N
M I W a Z Ct
Q
= z Cdo 0-
- < PS
- ce�
w
W sp
9 C.) U ZZ
O a N- Die
Jp
(_ = O
► ► �J �D
U
ce
\ Z
a\ a D
0�\ h
O\ r 0
y\ o
�J„\ I-w
f� Z a
41' \t",,,, .
2 °xX
y 0 O x Z
�aJ a
Q "D CC
mOoo <
w 1--a z
u'� z 2
W n n
4 cl : W
f a ° a
t-e,..*„......, am
3 v,
mam �
r. d a
�c o
cc
*. y TO
c0 O
o a.
>
co
a.
0
ro 6
6 t
-C3
mM '., - 0
rtt
Egli
v
•
11111
•
}
5
C
a
C
—0 O Y
C� O
x
CO CG
CD Cf) 1
i
C� C� � � x
xxF
K.K
J ' m p
cc
a. G —
J w ''
Q 2 W
7 'T'- k ?
'r 't �--y ▪ r iJ..1. ' Y-_Yrram
r
-zr � tt . s xti ' ^^t. ' ,Fte ay . 1� "'§9 . s � u3�.f
' 1 ,, E '4,\,., `, ' / <• �- -` .... 9s ,
— ` y .4 • .- T rAs {r+ ten ° - �.-,;-F x �.% = .
- +"r '„-- 'gym 'e'- ,"n v ., .£f` r'''. 1 's .a:� k'"
:"• *`ram m 3 *—"•-.. n` '".*4x '- , '4 ;4c-- �'
i I - a "' - ,„ ,r C-yy.. .F ,,,#'
144`1;y: c� ai r. r _ - -`' -...,.'n `� s, ,,'�.
its
rc C
r
x 6 -ate ��
-
* .` r .-�^`'"` a <'+c`u,..ce- x Vx�e- b� " .'* -
,."' �, T.' ? cry - '.
.*,,
ram' _ ?,, ' .. j�# 4,
g"- .ate '•.s+.a�_
%akria '�'�• �-�, l r rya f �'� -�"3-,n.� s y. - 'f
d's
•
6 �. '.!a". ,y w:g,* S 1.- .cam 2'. t:N,,_ i" >; - k�a?
`?fi r . r?"wow-�`'-`.w'i �•SA ,?e? � r ,'" '.`�-2 y`'t.0-.7.y.a--ts _-`x$-,_,., .t' =� t`...x' _.
b .r"" S � ` e? r ti 1 'rM�A'z ry � s. t ," nri ,, �.f d x-s f �S�2 r� a� S.
4.
+fi g, ti t e r fi ,,, y,lil'A ,,1 t i`s .:.� 1' < -� :t r';- 'r sib �-� ;'F.
f'z: ? Icy !�i"'} � f' ..iy 4 c' �', r -a,'.+ r' 51,G 1 '.:
'it ,t s ,- 1 yi�'Yv - ., a{"',, r,3;!?' . ,i i c r'v 7 if.. ,4 ,�,, ua rs.
"' /�u 0:,-4, • .turf ' z A� r �� ! �' r .
{ i`tfib „_ •r`•: `9 ?x.V, 4 - r u
i,.''l'dr, fc+l v.. St f •-„W- -a.S rr f.
.0 v7.rs ipi-e i y + f 3-.L �.a'x'42.. -, 4m to f+��- P`
t E " v " �,z. Ear >4� ��tA��' � • �,
t+3 4 'F B ,,W ri.1 • ?J t - .rj s • b ;4 u r
n,�- c\44L - .w iit ar r'��r .P ?r � r r .0 4:., ,11 A - ,_
°yP t q CSyt k�+hG3 ?� j ti k N t� A 2 ��
j ct+s •• c " r` ,r" C d ri r ''a .4 �`"E E ,, yf",r^—
w.• ,' c 't % x x h S_,C'` * '"u1 k 3^ r>. 1- ,,."' S, x r 1 :1,}C -.`'�., - f-
`;'�'.I j--1 h+ y flY x''f^i7h} ;im,� �£ , 'v ! i +l+y + -� `�yf r , '3l - ss
3�`� t J r n>'tr ry' o .+ 1 r t.� � , �• �_. • 41,7 J i �o k f-" a�5
{ ,! rl; ! }'� M J" Y. Ylt f' ,,, Z2�'l ,t5?',, 't ,.,^fX� ` t' 5 `
54 is`j J 3 f tj t( '' -, :a4 fy,3 F 1. 7. i fi i p .4 ',; k `. '3>
l ,Yr,,,) -, 1 t.til-f 4 enX c, 0. �', , , f 5�i1 , S, '..� ry4 .. ` . - -''
:� S 4 r t • 3 4 ze 1'" ,, ✓;= !t EEv >sr ,3 --- 1.,,- •.,._V
t y a \--yt +: ...- a al < `,�v, �.� *+-P,
•
S 4 t 1;W:. �' -t t 1 ti �,yx ,
+ e+ � 4 if Q•.4= � �"^. - -4_'" r = i ,-4 -, , ii z+ z t r n + N � `