Loading...
HomeMy WebLinkAbout082924 - Agenda Request for WSDOT Local Agency Federal Aid Project Prospectus for Construction Funding for Olympic Trail (0002) Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: August 29, 2024 Subject: WSDOT Local Agency Federal Aid Project Prospectus for construction funding for Olympic Discovery Trail- Anderson Lake Connection project, County Project No. 18019893, Road No. 850200 Statement of Issue: As part of administering Federal Grant funding for Public Works projects, Washington State Department of Transportation (WSDOT) requires the use of the Local Agency Federal Aid Project Prospectus document to describe Jefferson County's Olympic Discovery Trail- Anderson Lake Connection project, Project No. 18019893, Road No. 850200. Analysis/Strategic Goals/Pro's Et Con's: Jefferson County was allocated Federal funding through the Surface Transportation Block Grant. The proposed trail project runs from the south end of Larry Scott Trail to the northern boundary of Anderson Lake State Park. Construction funds will be obligated this year. Fiscal Impact/Cost Benefit Analysis: The grant amount is S1,519,332. Construction will be funded at 33% by this grant. The remaining construction funding is from WA State Recreation and Conservation Office (RCO) WA Wildlife and Recreation-Trails grant #20-1745. Recommendation: Public Works recommends that the Board Chair sign the WSDOT Local Agency Federal Aid Project Prospectus and return to Public Works. Department Contact: John Fleming, P.E., Project Manager, 360-385-9160. Reviewed By: S0//,,Y Mark McCaul , County Administrator Date , Washington State Local Agency Federal Aid � Department of Transportation g y Project Prospectus Prefix Router I Date 8/15/2024 rFede Aid STBGR- DUNS Number 179278197 II Project Number 1 Local Agency 18019893 ( WSDOT ) Federal Employer 91-6001322 Project Number Use Only Tax ID Number Agency ICAAgency Federal Program Title Jefferson County Public Works i Yes ❑No [✓120.205 ❑Other Project Title Start Latitude N 48.049736 Start Longitude W 122.826253 OIympicDiscovery fnail AndersonLkConnection End Latitude N 48.020432 End Longitude W 122.813403 Project Termini From-To Nearest City Name Project Zip Code(+4) Larry Scott Trail- Anderson Lake St. Park Port Townsend 98368-9366 Begin Mile Post End Mile Post Length of Project I Award Type 7.35 10.5 3.15 4 Local❑Local Forces['State❑Railroad Route ID Begin Mile Point End tit lc Point ^ City Number County Number I County Name 850200 7.35 10.5 N/A 16 Jefferson WSDOT Region Legislative Distrid(s) Congressional District(s) Urban Area Number Olympic Region 24 6 N/A Total Local Agency Phase Start Phase Estimated Cost Funding Federal Funds Date (Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year P.E. $0 $0 $0 - - R/W $0 $0 $0 - - • Const. $4,621,415 $3,102,083 .$1,519,332 10 2024 • Total $4,621,415 $3,102,083 $1,519,332 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes No existing trail in this location. Description of Proposed Work _ Description of Proposed Work(Attach additional sheet(s)if necessary) Construction of an Olympic Discovery Trail segment connecting the Larry Scott Trail, through Jefferson Transit Park & Ride,to Anderson Lake State Park. Local Agency Contact Person Title I Phone John Fleming PE Engineer 3, Project Manager i 360-385-9217 Mailing Address City State Zip Code 623 Sheridan St art Townsend WA 98368-2439 Y \ Project Prospectus Approving Authority Title Director of Public Works/County Engineer Datec. ‘ DOT Form 140-101 Page 1 Revised 01/2022 Previous Editions Obsolete 1 Agency Project Title Date Jefferson County Public Works OlympicDiscoveryTrail-AndersonLkConnu 8/15/2024 Type of Proposed Work Project Type(Check all that Apply) Roadway Width Number of Lanes ✓ New Construction ✓ Path I Trail ❑ 3-R 10' to 16' 1 ❑Reconstruction n Pedestrian / Facilities El 2-R ❑Railroad El Parking El Other El Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ✓ Principal Arterial Federal ❑ Minor ArterialUrban El Minor Arterial Functional ❑✓ Rural al ❑an Collector Rural ❑Collector Classification ❑ NHS ElMajor Collector ❑ NHS ❑ Major Collector ✓ Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ✓ Flat ❑Roll ❑Mountain ✓ Flat ['Roll ❑ Mountain Posted Speed 35 mph & 40 mph _50 mph (35 mph advisory) Design Speed - - Existing ADT 2592 & 2765 5400 to 6000 Design Year ADT - - Design Year - - Design Hourly Volume (DHV) - - Performance of Work Preliminary Engineering Will Be Performed By Others Agency - % Constn.ction Will Be Performed By Contract Agency Contractor 100 % 0 Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ✓ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment(EA) ['Project Involves NEPA/SEPA Section 404 Interagency Agreements Ery ronmental Considerations 0.104 acres of wetland will he impacted and mitigated. DOT Form 140-101 Page 2 Revised 0112022 Previous Editions Obsolete Agency Proect Title Date Jefferson County Public Works OlympicDiscoveryTrail-Andcrsonl.kConng 8/15/2024 Right of Way • ❑ No Right of Way Needed ✓ Right of Way Needed *All construction required by the ,/ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities Railroad ❑ No utility work required ✓ No railroad work required ❑All utility work will be completed prior to the start ❑All railroad work will be completed prior to the start of of the construction contract the construction contract ✓ All utility work will be completed in coordination All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Pour(4) existing electrical service poles and cables, and two (2) fire hydrants will be relocated by the Public Utility District#1 of Jefferson County. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? It,Yes ❑ No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Jefferson County Board of Commissioners By L�°�ivt g/2v/2 y Date g 2,7/2 y Mayor/Chairperson DOT Form 140-101 Page 3 Revised 01/2022 Previous Editions Obsolete