Loading...
HomeMy WebLinkAboutAward of Contract Grinder PumpDepartment of Public Works 623 Sheridan Street i Port Townsend, WA 98368 •�.tiy.�rxc�t� Jefferson County, Washington 360-385-9160 DATE: November 12, 2024 TO: Board of County Commissioners .n FROM: Monte Reinders, P.E., Public Works Director / County Engineer SUBJECT: AWARD OF CONTRACT Phase 4—Stage 2 On -site Grinder Pump Installation for Port Hadlock UGA, County Project No. 405-2127-0, ECY Agreement No. WQC_2024_JCoPWE-00034 In the matter of awarding a construction contract for the above referenced work: • The Call for Bids was issued by the Board of County Commissioners on September 23, 2024. • Due notice of the Call for Bids was given as required by law. ■ Sealed bids were received and opened in public on October 30, 2024 in the Commissioner's Chambers. • The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1) and project supplemental criteria in Special Provisions 1-02.14 Disqualification of Bidders. • Bid tabs are attached for reference. The Public Works Department recommends that the construction contract be awarded to the lowest responsive and responsible bidder: Earthwork Solutions, LLC. of Arlington Washington for their bid amount of $1,056,937.29, which includes 9.1% Washington State Sales Tax (WSST) for the Phase 4—Stage 2 On -site Grinder Pump Installation for Port Hadlock UGA, County Project No. 405-2127-0, ECY Agreement No. WQC_2024_JCoPWE-00034. Approved Kate Dean Chair, Board of County Commissioners Attached: Bid Tabulations Bid & Contractor Verification Summary Date '- Department of Public Works �Sfrr�c� Jefferson County, Washington MEMORANDUM DATE: November 1, 2024 TO: Monte Reinders, P.E., Public Works Director / County Engineer FROM: Samantha Harper, P.Ewater Project Manager J g 623 Sheridan Street Port Townsend, WA 98368 360-385-9160 SUBJECT: Phase 4 — Stage 2 On -site Grinder Pump Installation for Port Hadlock UGA, County Project No. 405-2127-0, Ecology Agreement WQC_2024_JCoPWE-00034 Attached for your review are the Bid Verification Summary and the previously reviewed Bid Tabulation for the above referenced project. There was a total of five bidders. The five bidders were checked for contractor Mandatory Bidder Criteria and Supplementary Bidder Criteria. BID & CONTRACTOR VERIFICATION SUMMARY Form Version Date: 7/172024 Jefferson County Public Works Bid Opening Date: 30-Oct-24 Project Name PHASE 4 - Stage 2 On -site Grinder Pumps for PORT HADLOCK UGA Bid Opening Time: 2:00pm C Otlnly Project No. 405-2127-0 y ` J f ij CJ. a i O 20 J 0 H W Z 0 Lu C o ILO y rn C ILL! '^ IL 0C U Vj 3 It W maQn - Q1 O IL C A W LL W (~.l C 3 CD W O ... OI V z O J m 10 � b m 0 _ f � a 0 MZ W N v! N Qm7 ° i y m r� W O E c z 0 3 m z LL z m 0 O r" o O J o ? w Z Q LL N m V p= a 7 a W Vs C 0 0 m F a z CL C m m 7 U rn w e a G E ivL CW7w W F Z W r� LL C O O C O O z ¢ H' 3 ¢ w M, 1 sZ tl y 4 aQ x O 7 to o 0 u m u: X m W O N r)% CO)}iir Z c w f= O a Q Qcn rn U F. F ro z y O Fw UO u: Cu z J f ¢LL J a z of 7 d c 2 wa z w U o o z tii iD I O z 7 m a w w U } o Q a E W Y 2 z z t n 0 a Q t) '.o-. f, rail Q m m Q Z ,.s F 9 ] �m V w Om w zt A O f p w 2 J x a LL r" O �K c o z r 0 m w o f-3 ° 3 0 05a rc aQ o w c t a w`o a" K 5 w 0 R WU' w _p z0 n o O ¢0 p f� N F? c w K w K d d wl- LL oz F¢ F FaZ N O J ~ O Z F W W ~ Ln a. O yUJI QQ a•ia m LL W,cK W �' Z J Z W W olw Uz �_ wt70 > > w to Z' '� K E X �` �' W p w ¢ j U O O K 7 LL tJ m C LL y IL N Z j fA 1T V z W 0 >> Z 0 O N O m G W W? Z z J V a F O a 0 o 3 V ¢ ¢ N O O c r w w r o w o w m S w> > w w W } 0 ma o z e 3 w 9 z y m z 0 z W J V J H F w N m 9 m q °1 > Z Z° w 0 7 CI Y~ he 3 K y V LL 0 ° 0 0— i Q o a o_ o LL m a rc w rn p .t. m Z Y W O K K F 0 K O 0 0 O X i Z W V LC w@@ (A L�oo f 7 m 3 C U Z O m Z W O W QU pi O of Q W F¢- J V J j U 5 ? 3 S ?�j 2y LU 0LL FO K 0 yt mOF x O w W ¢ fJ Z J w W V r K U V IL 'c w 9 `O 7 m 'E J •E J- U A m U m �` Q 3 ,^, OF a a ui F J to to N U z z m I0j �° Z- U` E w K- . H Pz x 7 z Lu R j J J O J K 3 U U na Z O a o W] t) ] O O] OF ] ] O c E O Iy W u O o m K z m a w I L ri U. LL F 2 N 0 ~ V U C F J f f w Lu z 0O O O LL > > o z 2 E z ¢ y y a Q w w 7 0 Q ° w ] ¢ m z N w z U' O w O ril rQs� O g z m m o v 3 c I- y y° QU faa) C) to u tQy)� V Lu a Q z a; U 3 ¢ ¢a y f C a W Za 2 f U N N -U' LOU 0 o L) N y w 2 A F F Z y F ¢ OJ a LL LL O O- p J O Z_ O LL p Oy. W O w ¢ m W W W z w 6 a a 6 C T Z IL IL a N O O a m m a 6 a aY Z z Z Z 2 Z LL'q a f V' G CONTRACTOR — ¢ m a LL z u > o pm Q at y OL aZ ~tom O OL O� as OL o 0a W �W OO N ¢ Iwo i Provide date Submitted, Account is No records found YES or of meeting Sent or Not Example $1,234.567.00 X YES YES YES YES 91-1234567 YES YES YES YES YES YES 1 YES N/A Not a DBE YES Not on list 123456789 123456789 ABCDEF•123YZ 1/1/2018 YES current Not on list by SAM 654321-00 1 Null Exempt attended Required Account is 1 Seton Construction $1,431,110.58 Yes Yes Yes Yes 91-0910295 Yes Yes N/A Ves Yes Yes Yes N/A Not a DBE N/A N/A 600120687 600120687 SETONCI1fi50A 10/30/2025 Yes current Not on list Yes 10/31/2024 N/A Exempt 10117/2024 Sent Account is 2 JEarthwork Solutions LLC $1,056,937.29 X Yes Yes Yes Yes 82-1782651 Yes Yes N/A Yes Yes Yes Yes N/A Not DBE N/A N/A 604131773 604131773 EARTHSL8300K 9/12/2025 Yes current Not on list Yes 10/31/2024 604131773000 N/A Exempt 1011712024 Sent Accountis 3 Shold Excavating Inc. $1,367,716.97 Yes Yes Yes Yes 91-1058363 Yes Yes N/A Yes Yes Yes Yes N/A Not DBE N/A N/A 600327189 600327189 SHOLDI.224LT 7/9/2026 Yes current Not on list 60327189000 N/A Exempt 10/16/2024 Sent Account" 4 1 Strider Construction $1,544,710 90 Yes Yes I Yes Yes 91-1418799 Yes Yes I N/A Yes Yes Yes Yes N/A Not DBE N/A N/A 5011tx1050 601100050 STRIDCC121OZ 6/23/2025 Yes current 7onYes 11/1/2024 N/A Exempt 10/17/2024 Account is s Nordland Construction $1,706,186.53 Yes Yes Yes Yes 41-2182880 Yes Yes N/A Yes Yes Yes Yes N/A Not DBE N/A N/A 602529765 602529765 NORDLCN953NT 11/10/2025 Yes current Not on list Yes 11/1/2024 N/A Exempt 10/17/2024 ENGINEER'S ESTIMATE (with 9.1%sales taxi 91,473,258.03 BID TABULATION SUMMARY PHASE 4 - Stage 2 On -Site Grinder Pump ECY Agreement No. WQC-2024-JCoPWE-00034 COUNTY PROJECT405-2127-0 BID OPENING DATE: October 30, 2024 ENGINEER'S ESTIMATE Shold Excavating Seton Construction Nordland Construction BID OPENING TIME: 2:00 p.m. Strider Construction Earth Works Solutions ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT TOTAL UNIT TOTAL UNIT NO. BID BID BID BID BID TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL 1 1 CALC Minor Change and Force Account $ 20,000.00 $ 200000.00 $ 20,000.00 $ nn,,,,AD $ 20,000.00 $ BID 20,000.00 BID BID BID BI BID BI BID BID 2 1 EST As -built Drawings ($5,000 Minimum) $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ S,000.00 $ 20,000.00 $ 20,000.00 $ 2 D0.Otl 0,000.00 $ 20,000.00 0,000.00 $ 2 D0.00 0,000.00 $ 20,00D.00 0,000.00 3 1 LS Mobilization $ 20,0D0.00 $ 20,000.00 $ 150,650.00 $ 150,650.00M 00 $ $ 5,0D0.00 $ 5,0D0.00 $ 5,00D.00 5 $ $ $ 4 1 LS Project Temporary Traffic Control $ i0,D00.D0 $ 1D,tl0D.00 $ 11,385.00 $ 11,385.p00 85,725.00 $ 225,000.00 $ 225,Og0.0D $ 175,000.00 $ 175,000.00 $ 101,264.40 $ 101,264.4D 5 i LS Clearing and Grubbing $ 25,000.00 $ 25,000.00 S 5,002.50 $ 5,gp2.500 $ 2A,20D.00 $ 25,000.00 $ 25,000.00 $ 7,50D.p0 $ 7,500.00 $ 862.50 $ 862.50 6 2,234 LF Sawcuttin for Pavement Removal $ 3.50 $ 7,819.00 $ 3.56 $ $ 20,000.00 $ 25,p00.00 $ 25,000.00 $ 12,000.00 $ 12,000.00 $ 750.00 $ 750.00 7 3,453 SF Remove Existing Pavement $ 8.00 $ 27,624.00 $5.23 $ 7,953.D40 18,059.1958 $ 10,499,80 $ 4.00 $ 8,936.00 $ 4.00 $ 8,936.00 $ 4.02 $ 8980.fi8 1fi0 SF Remove Cement Conc. Pavement $ 8.00 $ 1,280.00 $ 16.32 $ 2,611.200 $ 21,581.25 $ 10.00 $ 34,530.00 $ 4.00 $ 13,812.04 $ 1.67 $ 5,7fi6.51 9 1 LF Remove and Re lace Fence $ 9.00 $ 9.00 $ 10,534,00 $ 10,534.00 010 $ $ 1,200.00 9,500.00 $ 10.00 $ 1,600.00 $ 9.00 $ 1,440.00 $ 4.73 $ 756.80 52 EA Pothole Exisiting Utilties $ 500.t1D $ 26,000.00 $ 513.96 $ 26,725.92 $ 15,000.00 $ 15,p00.00 $ 4,000.00 $ 4,000.00 $ 2,743.90 $ 2,743.90 11 170 CY Import Trench Backfill $ 60.00 $ 10,200.00 $ 69.00 $ 11,730.00 $ 0 $ 21,840.00 5 750.00 $ 33,000.00 $ 400.00 5 20,800.00 $ 262.95 $ 13,673.4D 12 1 LS Locate Private Utilities $ 7,00D.OD $ 7,000.00 $ 11,960.00 $ 11,96D.D0 $ 39.00 9,700.00 $ $ 6,630.00 $ 60.00 $ 10,200.00 $ 4D.00 $ fi,8D0.00 $ 32.43 S 5,513.10 13 174 TON Crushed Surfacing Top Course $ 135.00 $ 23,490.00 $ 127.33 $ 22,155.42 $ 9,700.00 $ 25,Op0A0 $ 25,000.00 S 18,000.00 $ 18,000.00 $ 5,750.00 $ 5,750.00 14 76 TON Crushed Surfacing Base Course $ 130.00 $ 9,880,00 $ 158.43 $ 12,040.68 $ 73.00 $ 12,702.00 $ 125.00 $ 21,750.00 $ 135.00 $ 23,490.00 $ 49.46 $ $,606.04 15 60 TON Commerical HMA $ 4p0.tl0 $ 24,00p.00 $ 416.30 $ 24,978.00 $ 73.00 $ 5,54$.00 $ 120.00 $ 3,120.00 $ 105.00 $ 7,98D.00 $ 52.18 $ 3,965.68 16 1 LS Shoring and Extra Excavation {Sewer) $ 5,000.Dp $ S,DOD.00 $ 5,750.00 $ 5,750.00 $ 434.00 $ 26,040.00 $ 500.00 $ 3D,000.00 $ 400.00 $ 24,000.00 $ 221.14 $ 13,268.40 17 3,071 LF HOPE Low Pressure Sewer 2-inch Diam. DR it S 25.00 $ 76,775.00 $ 35.25 $ 108,252.75 $ 5,250.00 $ 5,250.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,750.00 $ 5,750.00 18 712 LF HDPE Low Pressure Sewer 1-1/4•inch Diam. DR 11 $ 50.00 $ 35,600.00 $ 39.03 $ 27'789.36 $ 44.00 $ 135 124.00 , $ 24.00 $ 73,704.00 $ 28.00 $ 85,988.00 $ 19.98 $ 61,358.58 PVC Gravity Sanitary Sewer Lateral Pipe 4 In. Diam. SDR 41.00 $ 29,192.00 $ 49.00 $ 34,888.00 $ 50.00 $ 35,600.00 $ 34.70 $ 24,706.40 19 485 LF 35 PVC Gravity Sanitary Sewer Lateral Pipe 6 In. Diam. SDR $ 45.00 $ 21,825.00 $ 61.53 $ 29,842.05 $ 71.00 $ 34,435.00 $ 44.00 $ 21,340.00 $ 46.00 $ 22,310.00 $ 38.57 $ 18,706.45 20 21 47 16 LF LF Se Sewer Cleanout $ $ 52.00 500.00 $ $ 2,444.00 8,000.00 $ $ 133.11 $ 6,256.17 $ 71.00 $ 3,337.00 $ 51.00 $ 2,397.00 $ 49.00 $ 2,303.00 $ 92,66 $ 4,355.02 22 1 LF Grease Interceptor $ 5,000.00 $ 5,000.00 $ 002.50 13,472.Z5 $ $ 6,44q.tlD 13,472,25 $ $ 600.00 $ 9,600.00 $ 750.00 $ 12,000.00 $ 400.00 $ 6,4D0.OD 5 306.18 $ 4,898.88 23 24 EA Collection Vault Cleanout $ 3,100.00 $ 74,400.00 $ 3,276.35 $ 78,632.40 $ 20,500.00 S 20,500.00 S 20,000.00 $ 20,ODD.00 $ 20,000.00 $ 20,000.00 $ 18,975.00 $ 18,975.00 24 26 EA Grinder Pump Valve Vault and Cleanout $ 3,350.D0 $ 87,100.OD $ 3,746.59$ $ 97,944. $ 3,110.00. $ 74,64D.00 $ 3,000.00 72,000.OD $ 3,1DD.00 $ 74,40D.00 $ 3,658.SS $ 87,79S.fi0 25 3 EA Grinder Pump Mutli Discharge Detail $ 5D0.00 $ 1,500.00 $ 1,648.33 $ 4,944.99 9 $ $ 84,980.00 $ 3,300,00 $ $5,800.00 $ 3,350.00 $ 87,100.OD $ 3,783.50 $ 98,371.00 26 23 EA Type 1 Grinder Pump Assembly $ 12,000.00 $ 27fi,000.OD $ 7,675.00 $ 176,525.00 $ 1,660.00 1,fi60.00 11,000.00 $ 4,9$0.00 $ 1,000.00 $ 3, 000.00 $ 310.00 $ 930.00 $ 386.40 $ 1,159.20 27 1 EA Ty e 2 Grinder Pump Assembly $ 17,OOO.pD $ 17,000.00 $ 15,174.25 $ I i,174.25 $ 22,000.00 $ 253,000.00 $ 11,800.00 $ 271,40p.00 $ 12,000.pD $ 276,000.00 $ 7,050.QD $ 162,150.00 28 2 EA 'Type 3 Grinder Pump Assembly $ 27,00D.0D $ 54,400.00 $ 29,429.08 $ 58,858.16 $ 31,700.00 $ 22,ODD.00 $ 20,500.00 $ 20,500.00 ;� 25,000.00 $ 25,000,00 $ 24,150.06 $ 24,150.00 29 581 EA Schedule 40 conduit 1-1/4 In. Diam. $ 180.00 $ 104,580.00 $ 57.40 $ 33,349.40 $ 45.00 $ fi3,400.00 $ 33,450.00 $ 66,9D0.0D $ 32,DOD.00 $ 64,000.00 $ 32,200.OD $ 64,400.00 30 270 EA Schedule 80 conduit 1-1/4 In. Diam. $ 180.00 $ 48,600.00 $ 21.30 $ 5,751.00 $ $ 26,145.00 $ 74.00 $ 42,994.00 $ 45.00 $ 26,145.00 $ 1.29 $ 749.49 31 26 EA Grinder Pump Control Panel $ 5,00D.00 $ 130,000,00 $ 3,755•g0 $ 97,653.40 $ 45.00 5,200.00 $ 12,150.00 $ 74.00 $ 19,980.00 $ 63.00 $ 17,010.00 S 1.37 S 369.90 32 1 EA Remobilization $ 15,000.00 $ 15,000.00 $ 2,760.00 $ 2,760.00 $ $ 135,200.00 $ 5,000.00 $i 130,000.00 $ 6,000.00 $ 156, 0,00 $D $ 5,405.00 $ 140,530.00 Connection of On -site Grinder Pump system to the 4,475.00 $ 4,475.00 $ 25,D0D.00 $ 25,00D.00 $ 15,000.00 $ 15.000.00 $ 1,725.00 $ 1,725.00 33 34 26 EA Existing Building Drain $ 1,500.00 $ 39,000.00 $ 969.76 $ 25,213.76 $ 950.00 $ 24,700.00 $ 18 EA Cement Conc. Pavement $ 200.00 $ 3,600.00 $ 170.00 $ 3,060.00 $ 1,500.00 $ 39,000.00 $ 1,500.00 $ 39,000.00 $ 336.95 $ 8,760.70 35 1 LF CSWPPP and TESC Plan $ 2,000.00 $ 2,000.00 $ 1,840.00 $ 1,840.00 $ 275.00 620.00 $ 4,950.00 $ 250.00 $ 4,500.00 $ 325.00 $ 5,850.00 $ 104.65 $ 1,883.70 36 1 LF Temporary Erosion and Sediment Control $ 24,0DDA0 $ 24,000.00 $ 14,260.D0 $ 14,260.00 $ 4,900.00 $ 620.00 $ 2,000.00 2,000.00 $ 1,500.DD $ 1,500.00 $ 575.00 $ 575.(70 37 873 EA and Fertilizing by Hand $ 4.00 $ 3,228.00 $ 2.85 $ 2,299.95 $ $ 4,900.00 $ 20,000.00 $ 20,000.00 $ 7,500.00 $ 7,500.00 S 1,150.00 $ 1,150.00 38 73 LS Topsoil Topsoil Type A $ 250.00 $ 18,250.00 $ 176.36 $ 12,874.28 $ 3.00 89.00 $ 2,421,00 $ 5.00 $ 4,035.00 $ 4.00 $ 3,228.00 $ 1.77 $ 1,428.39 39 26 EA Decommission Existing Septic $ 2,800.00 $ 72,800.00 $ 3,517.01 $ 91,442.26 $ $ 6,497.00 $ 200.00 $ 14,600.00 $ 165.00 $ 12,045.00 $ 80.76 $ 5,895.48 40 5 LF Bollards $ 1,5Dp.D0 $ 7,500.00 $ 1,274.20 $ 5,371.00 $ 2,550.00 1,380.00 $ 66,300.00 $ 2,700.00 $ 70,200.00 $ 2,$00.00 $ 72,g00.0q $ 1,150.00 $ 29,900.00 Subtotal $1,350,504.00 $1,267,008.72 $ 6,900.00 $ 1,500.00 $ 7.500.00 $ 1,200.00 $ 6,000.00 $ 426.65 1 $ 2,133.25 9.1%Sales Fax $122,895.86 $115,297.79 $1,311,742.05 $1,563,874.00 $1,415,g67.00 $968,778.45 Total Lump Sum Bid Amount $1,473,339.86 $1,382,306.51 $119,368.53 $1,431,110.58 $142,312.53 $128,843.90 $88,158.84 SI, 706,186.53 $1,544,710.90 $1,056,937.29 repared by Project Manager; Samantha Harper Date: 11/1/2024 Serv. Monte Reinders, P.E. W.// /(/r" - Date: -•