Loading...
HomeMy WebLinkAbout022 08 CC'. P0.. 73{,1/0'6 Ireo5 J ST ATE OF WASHINGTON COUNTY OF JEFFERSON In the matter of: Creating a County project designated as 1805951757 x x x RESOLUTION NO. 22-08 IT IS HEREBY RESOLVED that the Chimacum Valley Trail Project, from H.J. Carroll Park to Old Hadlock Road at Chimacum Road, be improved as follows: Design, acquisition ofright of way, and construction of a 10 foot wide multiuse trail with 2 foot wide shoulders on a new alignment. Trail requires two bridges, over Chimacum Creek and the East Fork of Chimacum Creek. The proposed trail is part of a non-motorized transpiration network that avoids roads and connects recreational areas. IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purpose shown: PURPOSE APPROPRIATION Engineering $ 68.000.00 (58.820.00 FHwA STP(R) Grant) Right of Way Acquisition $ 40.000.00 (34.600.00 FHwA STP(R) Grant) Sub- Total $108.000.00 (93.420.00 FHwA STP(R) Grant) Construction: $400.000.00 (346.000.00 FHwA STP(R) Grant) TOTAL $508.000.00 (439.420.00 FHwA STP(R) Grant) ~This project is included in the officially adopted annual road program as Item No.~. _The project is hereby made a part of the officially adopted annual road program in accordance with R.C.W. 36.81.130. IT IS FURTHER RESOLVED that: -2QL The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq. -2QLThe construction is to be accomplished by County forces in accordance with R.C.W. 36.77.065 and WAC. 136.18. PASSED AND ADOPTED THIS 17th DAY OF March 2008 ---..... ... JEFFERSON COUNTY BOARD OF COMMISSIONERS David " ,,,n'{2:2J ~~ /1R~ ~ma L. Del ey I' Clerk of the Board . TRANSPORTATION IMPROVEMENT PROGRAM 2009-2014 , CHIMACUM TRAIL 5 Project Location and Setting The Bob Bates Recreational Fields are located next to the Sheriffs facility on Chimacum Road, about one-mile from down- town Port Hadlock. This initial segment of the Chimacum Trial will extend from the recreational fields westward to HJ Car- roll Park, crossing Chimacum Creek along the way. Project Scope Engineering, right-of-way acquisition and construction of a multipurpose trail connecting Chimacum Road near the Bob Bates Recreational Fields to HJ Carroll Park. Project Impetus Both HJ Carroll Park and the Bob Bates Recreational Fields are well-used facilities in our county. People wanting to travel between them and to points beyond, such as to schools and downtown Port Hadlock, are forced to use the roadways on Chimacum Road and SR19. A relatively direct path for bicyclists and pedestrians connecting these amenities would en- able non-motorized travel that avoids the roadways. The overall goal of the project is to construct an attractive, universally supported, well-used and fully-functional, multi-use trail that is part of a non-motorized network that connects downtown Port Hadlock with the Tri-Area Community Center, the Grange and Chimacum schools on SR 19 through HJ Carroll Park. Status The project is in the planning phase. Once preliminary feasibility analysis has been completed on potential trail routes, public outreach and design will begin. PROJECT STATISTICS Project Estimate Preliminary Engineering.........$ 68,000 Right-of-Way.............. ...... ...$ 40,000 Construction.................... ....$ 400.000 TOTAL........................$ 508,000 Project Timeline Preliminary Engineering........... .....2008 Right-of-Way........ ................... ...2008 Construction........... .,...,... ....... ....2009 Project Funding Federal (STP, Safe Routes to School) Local Siting of the first phase of Chimacum Trail is under- way. This is a typical view of the landscape heading east from HJ Carroll Park toward the ball fields. TYPICAL TRAIL SECTION 'I, ,;:,} :'\l \' ~\ (v,.~_. ..~"I. \v - - . -2ft- 10-ft multi-use trail -2ft. JEFFERSON COUNTY PUBLIC WORKS Department of Public Works o Consent Agenda' Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Frank Gifford, Temporary Interim County Administrator From: Monte Reinders, County Engineer 8: Temporary Interim Public Works Director ~ Agenda Date: March 17, 2008 Subject: Resolution for Chimacum Valley Trail County Project # 1805951757 Statement of Issue: The Resolution creating County project #18017570, Chimacum Valley Trail. Analysis/Strate~ic Goals/Pro's 8: Con's: This project is item number 5 on the 2008-2013 amended Six Year Transportation Improvement program and on the 2008 Annual Construction program. The purpose of this project is to create a new multi-use, non-motorized trail from H.J. Carroll Park to Old Hadlock Road. This trail is a key part of the non-motorized transportation network planned for the Tri-area. This project supports Strategic Goals #1 and #8. Fiscal Impact/Cost Benefit Analysis: The estimated total cost for this project is $508,000. An appropriation of $439,420 will be from Federal Highway Administration Surface Transportation Program Regional Allocation (FHwA STP(R) Grant). The balance of $68,580 will be funded by the County Road Fund. Recom mendation: The department recommends adoption by the Board, creating this project. The Board is asked to sign the three original Resolutions and return two to Public Works (attn: Gordon Ramstrom). 3 ;'lz/~te emporary Interim County Administrator "'