Loading...
HomeMy WebLinkAboutPhase 4 - Stage 2 On-site Grinder Pump Installation for Port Hadlock UGA - 111224 go�...0\ rrlDepartment of Public Works 623SheridanStreet Port Townsend,WA 98368 Jefferson County, Washington 360-385-9160 .5'r/1NC+•o DATE: November 12, 2024 TO: Board of County Commissioners 'A FROM: Monte Reinders, P.E., Public Works Director/County Engineer SUBJECT: AWARD OF CONTRACT /vv Phase 4—Stage 2 On-site Grinder Pump Installation for Port Hadlock UGA, County Project No.405-2127-0, ECY Agreement No. WQC_2024_JCoPWE-00034 In the matter of awarding a construction contract for the above referenced work: • The Call for Bids was issued by the Board of County Commissioners on September 23, 2024. • Due notice of the Call for Bids was given as required by law. • Sealed bids were received and opened in public on October 30,2024 in the Commissioner's Chambers. • The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1) and project supplemental criteria in Special Provisions 1-02.14 Disqualification of Bidders. • Bid tabs are attached for reference. The Public Works Department recommends that the construction contract be awarded to the lowest responsive and responsible bidder: Earthwork Solutions,LLC.of Arlington Washington for their bid amount of$1,056,937.29,which includes 9.1% Washington State Sales Tax(WSST)for the Phase 4—Stage 2 On-site Grinder Pump Installation for Port Hadlock UGA, County Project No.405-2127-0, ECY Agreement No. WQC_2024_JCoPWE-00034. Approved (rr?V' //7(Z/z Kate Dean Date Chair, Board of County Commissioners Attached: Bid Tabulations Bid&Contractor Verification Summary ti„l~ON (O( Department of Public Works 623SheridanStreet Port Townsend,WA 98368 %. ` = Jefferson County, Washington 360-385-9160 o' S�/INGv MEMORANDUM DATE: November 1, 2024 TO: Monte Reinders, P.E. Public Works Director/County Engineer FROM: Samantha Harper, P.E`�water Project Manager SUBJECT: Phase 4—Stage 2 On-site Grinder Pump Installation for Port Hadlock UGA, County Project No.405-2127-0, Ecology Agreement WQC_2024_JCoPWE-00034 Attached for your review are the Bid Verification Summary and the previously reviewed Bid Tabulation for the above referenced project.There was a total of five bidders. The five bidders were checked for contractor Mandatory Bidder Criteria and Supplementary Bidder Criteria. . • w N LOW TONIGU BID ORDER c a y O i w w ? 1 j ^ •= 9 R. ° i x D �p 2 S A t D j R. P eT n } p F E m F T g B .'. 35 MO AMOUNT M1WI IOW Taal a'ID i $ b 5 Y k g b N 2 B W x x APPARENT LOW(SOBERa C 3 o a ai $ a H BIOS ENTERED INBIO TABULATION SHEET A p E a a g a H MAIN VERIFIED 1 I I _ a N ADDENOUMSACKNOWLEDGED BY CONTRACTOR 3 a a a x g y PROPOSAL NONE° g -o A 'ia i FEDERAL LB.NO. ~_ 6 0 a a g a N 8%PROPOSAL BON°INCLUDED F a a a g a N NON-COLLUSION DECLARATION RETURNED'PATH RIO PROPOSAL i i 1 i i i p CERT.FOR FEDERAL AID CONTRACT!RETURNED WON BD PROPOSAL a a g ,a E N WAGE LAW CERTIFICATION SIGNED a a a a p SUBCONTRACTOR LIST PLAY RMLEW(MOM a a g g a p DBE SUBCONTRACTORUTNYATNW FORM(TORSI SIDON a a I a 3 N DBE SUBCONTRACTORPERPORNIAXCE FORM(FORM 81004) ii i i I i 1 DBE OOPS FOP WOO(OM/OaamMMM W MI IN caawN 9 a g •• PRIME CONTRACTOR DBE STATUS. M 3 .p. R R i mo MN:(NasUDLD.SDUUParRDrWMYREIOREArwIAIVI SUBCONTRACTOR DBE PRMISI CERTFIED eV NAME ZN 'ww..anwDa.w.BovMlrecaryAC(aMeac a E E E % MSUBCONTRACTOR DBE ORM(!)CHECKED ON LIST OF SUSPENDED FIRMS: C C MIMDd.wa.gov/PaNwrsIOMWBEIDBEDtrectwy/ p g a a $' WA STATE UNIFIED BUSINESS IDENTIFIER NO.WWI: S 5 v w 5 FERNJIFaeuCJM.wagoVlwMyl E G y $ 8 gp S ¢ Y STATE E2aRE TAX REGISTRATION NO.(MAY BE SAME AS USG RIL 5C y - M IA NIm.eureED..w.g0.IgteunaotWIn F 5 3 M LMA at balloon a(LNIwmlulbn saga C p A A Y I{ CONTRACTOR LICENSE NUMBER 4. a z 7. % C iE f111 CONTRACTOR"LICENSE EXPIRATION DATE: gSIGsw LW IIFecu .lnl.wa.9ovNeGIT, l A a g a N CONTRACTOR LICENSE VERIFIED ON W WEBSTE MtPNIIacrrw.InLOO.SAvMrllvl gl ea E RI 11 pp WDU INDUSTRIAL INSURANCE PREMIUM STATUS: a I a i s i 3 nnP.:naeo�I._mLw..ge.ne..yl a a a a COXIRACTOP CHECKED ON W DE BARRED NWT: TO RACTOL as 5 9 TI R E R E Mmlm w.IIvv .rrwaeaLMenelryvrevwag.....ABwDMMDammD 1 R C I E 3 _ € Lerm«m..reaa aro 2 _ W'.1 3 a a f -. v N CONTRACTOR CHECKED ON FEDERAL SYSTEM FOR AWARD le < Y MANAGEMENT WEBSITE: ma.IFwwx.alloCcapw YR g ;a 3 g P.. G EMPLOVIENTRECulm DEPARTMENT NO.: g p emau:puollowosoRg0aD.wa.Ow phone:IMD: I RSO.lase 3 > r R El 'g (VERIFICATION O ACTWE UNEMPLOYMENT ACCOUNT F E E E 2 COMPLIANCE WITH APPRENTICEMIR UTNRATION REQUIREMENTS OF ROW MALMW I MN(WA TOE AgWM I I ITROT RI D 3 al CONTRACTOR TRAINING VERIFICATION per NCR MM]B(1MO(AIRIER. 3 Y 3 II, ...I.Me)NMLbd an um VWYMNan page:MM0JMecunMLwa.govnerIyl E E E E E z � MANDATORY PRE-BD WALK THROUGH " 03 i4. SUPPLEMENTAL BIDDER CRITERIA lP R .1.(SUBCONTRACTOR a' X I a4 S RESPONSIBILITY,CLAIMS AGAINST RETAJNAOE AND BONDS,PUBLIC as BIDDING CRIME,TERMINATION FOR CAUSE OR DEFAULT,LAWSUITS BID TABULATION SUMMARY PHASE 4-Stage 2 On-She Grinder Pump ECY Agreement No.WOC-2024-1CoPWE-00034 COUNTY PROJECT 4052127-0 ENGINEER'S ESTIMATE $held Exwatl BID OPENING DATE:October 30,1026 ng Seton Construction Nordland Construction Strider Construction Earth Works Solutions BID OPENING TIME:2:00 pm. REM QUANTTTY UNIT ITEM DESCRIPTION UNIT TOTAL UNIT TOTAL UNIT TOTAL J UNIT TOTAL UNIT TOTAL UNIT TOTAL • N0. BID BID BID 810 BID BID BID BID BID BID BID BID 1 1 CALC Minor Change and Force Account $ 20,000.00 5 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.0D $ 20,000.00 $ 20,000.00 5 20,000.00 $ 20,000.00_$ 20,000.00 $ 20,000.00 $ 20,000.00 2 1 EST As-built Drawings($5,000 Minimum) $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 3 1 15 Mobilization $ 20,000.00 $ 20,000.00 $ 150,650.00 $ 150,650.00 $ 85,725.00 $ 85,725.00 $ 225,000.00 S 225,000.00 $175,000.00 $175,000.00 $101,264.40 $101,264.40 4 1 LS Project Temporary Traffic Control $ 10,000.00 $ 10,000.00 5 11,385.00 $ 11,385.00 $ 24,200.00 $ 24,200.00 5 25,000.00 $ 25,000.00 $ 7,500.00 $ 7,500.00 $ 862.50 5 862.50 5 1 L5 Clearing and Grubbing $ 25,000.00 $ 25,000.00 $ 5,002.50 $ 5,002.50 $ 20,000.00 $ 20,000.00 $ 25,000.00 $ 25,000.00 $ 12,000.00 $ 12,000.00 $ 750.00 $ 750.00 6 2,234 IF Sawcutting for Pavement Removal $ 3.50 $ 7,819.00 $ 3.56 $ 7,953.04 $ 4.70 $ 10,499.80 $ 4.00 $ 8,936.00 5 4.00 $ 8,936.00 $ 4.02 $ 8,980.68 7 3,453 SF Remove Existing Pavement $ 8.00 $ 27,624.00 S 5.23 $ 18,059.19 $ 6.25 $ 21,581.25 $ 10.00 $ 34,530.00 $ 4.00_5 13,812.00 $ 1.67 $ 5,786.51 8 160 SF Remove Cement Conc.Pavement $ 8.00 $ 1,280.00 $ 16.32 $ 2,611.20 5 7.50 $ 1,200.00 $ 10.00 S 1,600.00 $ 9.00 $ 1,440.00 $ 4.73 $ 756.80 9 1 LF Remove and Replace Fence $ 9.00 $ 9.00 $ 10,534.00 5 10,514.00 $ 9,500.00 $ 9,500.00 $ 15,000.00 $ 15,000.00 $ 4,003.00 $ 4,000.00 $ 2,743.90 $ 2,743.90 10 52 EA Pothole(visiting Utitties $ 500.00 $ 26,000.00 5 513.% S 26,725.92 $ 420.00 $ 21,840.00 $ 750.00 $ 39,000.00 $ 400.00 $ 20,800.00 $ 262.95 $ 13,673.40 11 170 CY Import Trench BackRll $ 60.00 $ 10,200.00 $ 69.00 $ 11,730.00 $ 39.00 $ 6,630.00 $ 60.00 $ 10,203.00 $ 40.00 $ 6,800.00 $ 32.43 $ 5,513.10 12 1 L5 Locate Private Utilities S 7,000.00 $ 7,000.00 $ 11,960.00 $ 11,960.00 $ 9,700.00 $ 9,700.00_$ 25,000.00 $ 25,000.00 $ 18,600.00 $ 18,000.00 5 5,750.00 $ 5,750.00 13 174 TON Crushed Surfacing Top Course $ 135.00 $ 23,490.00 $ 127.33 $ 22,155A2 $ 73.00 $ 12,702.00 $ 125.00 $ 21,750.00 $ 135.00 $ 23,490.00 $ 49.46 $ 8,606.04 14 76 TON Crushed Surfacing Base Course $ 130.00 $ 9,880.00 5 158.43 $ 12,040.68 $ 73.00 $ 5,548.00 $ 120.00 $ 9,120.00 $ 105.00 $ 7,980.00 $ 52.18 $ 3,965.68 15 60 TON Commerical HMA $ 4130.00 $ 24,000.00 $ 416.30 $ 24,978.03 $ 434.00 $ 26,040.00 $ 560.00 $ 30,000.00 $ 400.00 $ 24,000.00 $ 221.14 $ 13,268.40 16 1 LS Shoring and Extra Excavation(Sewer) $ 5,000.00 $ 5,000.00 $ 5,750.60 $ 5,750.00 $ 5,250.00 $ 5,250.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,750.00 $ 5,750.00 17 3,071 LF HOPE Low Pressure Sewer 2-inch Dlam.DR 11 $ 25.00 $ 7977500 $ 35.25 $ 108,252.75 $ 44.00 $ 135,124.00 $ 24.00 $ 73,704.00 $ 28.00 $ 85,988.00 $ 19.98 $ 61,358.58 18 712 LF HDPE Low Pressure Sewer 1-1/4-inch Nam.DR 11 $ 5000 $ 35,600.00 $ 39.03 $ 27,789.36 $ 41.00_$ 29,192.00 $ 49.00 $ 34,888.00 $ 50.00 5 35,600.00 $ 34.70 5 24,706.40 PVC GraWry Sanitary Sewer Lateral Pipe 4In.Di3tn.SOR 19 485 LF 35 $ 45.00 $ 21,825.00 $ 61.53 $ 29,842.05 $ 71.00 $ 34,435.00 $ 44.00 $ 21,340.00 5 46.00 $ 22,310.00 S 38.57 $ 18,706AS PVC Gravity Sanitary Sewer Lateral Pipe 6 In.Diem.SDP 20 47 IF 35 $ 52.00 $ 2,444.00 5 133.11 $ 6,256.17 $ 71.00 $ 3,337.00_$ 51.00 5 2,397.00 5 49.00 $ 2,303.00 $ 92.66 5 4,355.02 21 16 LF Sewer Cleanout $ 500.00 $ 8,000.00 $ 402.50 $ 6,440.03 $ 600.00 $ 9,600.00 $ 750.00 $ 12,000.00 S 400.00 $ 6,403.00 $ 306.18 $ 4,898.88 22 1 IF Grease Interceptor 5 5,000.00 $ 5,0130.00 $ 13,472.25 $ 13,472.25 5 20,500.00 $ 20500.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 18,975.00 $ 18,975.00 13 24 EA Collection Vault Oeanout 5 3,100.00 $ 74,400.00 $ 3,276.35 $ 78,632.40 $ 3,110.00 $ 74,640.00 $ 3,000.00 $ 72,000.00 $ 3,100.00 $ 74,400.00 $ 3,658.15 $ 87,795.60 24 26 EA Grinder Pump Valve Vault and Cleanout $ 3,350.00 $ 87,100.00 $ 3,746.59 $ 97,411.34 $ 3,110.00_$ 80,860.00 5 3,300.00 $ 85,800.00 $ 3,350.00 $ 87,100.00 $ 3,783.50 $ 98,371.00 25 3 EA Grinder Pump Muhl Discharge Detail $ 500.00 $ 1,500.00 $ 1,648.33 S 4,944.99 $ 1,660.00 $ 4,980.00 $ 1,000.00 $ 3,000.00 $ 310.00 S 930.00 $ 386.40 $ 1,159.20 26 23 EA Type 1 Grinder Pump Assembly $ 12,000.03 $ 276,000.00 $ 7,675.00 $ 176,525.00 $ 11,000.00 $ 253,600.00 $ 11,800.00 $ 271,4130.00 $ 12,000.00 $276,000.00 $ 7,050.00 $162,150.00 27 1 EA Type 2 Grinder Pump Assembly $ 17,000.00 $ 17,000.00 $ 15,174.25 $ 15,174.25 5 22,000.00 $ 22,000.00 $ 20,500.00 $ 20,500.00 $ 25,000.00 $ 25,000.00 $ 24,150.00 S 24,150.00 28 2 EA Type 3 Grinder Pump Assembly $ 27,000.00 $ 54,000.00 $ 29,429.08 $ 58,858.16 $ 31,700.00 $ 63,400.00 $ 33,450.00 5 66,900.00 $ 32,000.00 $ 64,010.00 5 32,200.00 S 64,400.00 29 581 EA Schedule 40 conduit 1-1/4 in.DUm. $ 180.00 $ 104,580.00 $ 57.40 $ 33,349.40 $ 45.00 $ 26,145.00 $ 74.00 $ 42,994.00 $ 45.00 $ 26,145.00 $ 1.29 $ 749.49 30 270 EA Schedule 80mnduhl-1/4In.Diam. $ 180.00 $ 48,600.00 $ 21.30 $ 5,751.0D $ 45.00 $ 12,15000 $ 74.00 $ 19,980.00 $ 63.00 $ 17,010.00 $ 1.37 $ 369.90 31 26 EA Grinder Pump Control Panel $ 5,000.03 $ 130,000.00 $ 3,755.90 $ 97,653.40 $ 5,200.00 $ 135,200.00 $ 5,000.00 $ 130,000.00_ $ 6,000.00 $156,000.00 $ 5,405.00 $140,530.00 32 1 EA Remoblllratlon $ 15,000.00 $ 15,000.00 $ 2,760.00 $ 2,760.00 $ 4,475.00 5 4,475.00 $ 25,000.00 $ 25,000.00 $ 15,000.00 $ 15,000.00 5 1,725.00 $ 1,725.00 Connection of On-site Grinder Pump system to the 33 26 EA Existing Building Drain $ 1,500.00 5 39,000,00 $ 969.76 $ 25,213.76 5 950.00 5 24,700.00 $ 1,500.00_$ 39,000.00 $ 1,500.00 $ 39,000.00 S 336.95 $ 8,760.70 34 18 EA Cement Conc.Pavement $ 200.00 $ 3,600.00 $ 170.00 $ 3,060.00 $ 275.00 $ 4,950.00 $ 250.00 _$ 4,500.00 $ 325.00 $ 5,850.00 $ 104.65 $ 1,883.70 35 1 LF CSWPPP and TESC Plan $ 2,000.00 $ 2,000.00 5 1,840.00 $ 1,840.00 $ 620.00 $ 620.00 $ 2,1300.00 $ 2,000.00 $ 1,500.00 $ 1,500.00 5 575.00 $ 575.00 36 1 LF Temporary Erosion and Sediment Carmel $ 24,000.00 $ 24,000.00 $ 14,260.00 $ 14,260.00 $ 4,900.00 $ 4,900.03 $ 20,000.00 $ 20,000.00 $ 7,500.00 $ 7,500.00 $ 1,150.00 $ 1,150.00 37 807 EA Seeding and Fertilizing by Hand $ 4.00 5 3,228.00 $ 2.85 $ 2,299.95 $ 3.00 $ 2,421.00 $ 5.00 5 4,035.00 $ 4.00 $ 3,228.00 $ 1.77 $ 1,428.39 38 73 15 Topsoil Type A $ 250.00 $ 18,250.00 $ 176.36 $ 12,874.28 $ 89.00 $ 6,497.00 $ 200.00 5 14,600.00 $ 165.00 $ 12,045.00 $ 80.76 $ 5,895.48 39 26 EA Decommission Existing Septic $ 2,800.00 $ 72,800.00 5 3,517.01 $ 91,442.26 $ 2,550.00 5 66,300.00 $ 2,700.00 5 70,200.00 $ 2,800.00_ $ 72,800.00 $ 1,150.00 $ 29,900.00 40 5 LF Bollards $ 1,500.00 $ 7,500.00 $ 1,274.20 5 6,371.00 $ 1,380.00 $ 6,900.00 5 1,500.00 $ 7,500.00 $ 1,200.00 $ 6,000.00 5 426.65 5 2,133.25 Subtotal S1,350,504.00 $1,267,008.72 $1,311,742.05 51,563,874.00 51,415,867.00 $961,778.45 9.1%Sales Tax S122,895.86 $115,297.79 S119,368.53 $142,312.53 $128,843.90 $88,156.84 / � Total Lump Sum Bid Amount $1,473,399.86 $1,382,306.51 $1,431,110.58 $1,706,186.53 $1,544,710.90 $1,056,937.29 Prepared by Project Manager:Samantha Harped✓ t\ Date:11/1/2024 xMewed by Eng.Serv.Manager:N/A /� y Reviewed by County Engineer: Monte Relnders,P.E. Date: e S Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: November 12, 2024 Subject: Phase 4 - Stage 2 On-site Grinder Pump Installation for Port Hadlock UGA - Award of Contract Statement of Issue: Award of Construction Contract to Earthwork Solutions, LLC, of Arlington, Washington for their bid amount of $1,056,937.29, which includes 9.1% Washington State Sales Tax (WSST) for the above referenced project. Analysis/Strategic Goals/Pro's It Con's: The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1) and project supplemental criteria in Special Provisions 1-02.14 Disqualification of Bidders. Bid tabulations and Bidder verification documentation is attached. Fiscal Impact/Cost Benefit Analysis: The Bid amount is $1,056,937.29, which includes 9.1% WSST. This project is funded with Department of Ecology State Revolving Loan fund and Centennial Grant. Recommendation: Public Works recommends that the Board authorize the Award of Contract to Earthwork Solutions, LLC, and return signed award document to Public Works for further processing. Department Contact: Samantha Harper, P.E., Wastewater Project Manager, Ext. 175 Reviewed By: ./4,,e4/ .(/ Mark McCaule nt Administrator Date t Y, Y