Loading...
HomeMy WebLinkAboutChange Order Seton phase 3 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: November 18, 2024 Subject: Change Order No. 3, Phase 3 - Low Pressufe Sewer Collection System for the Port Hadlock UGA, Project No. 405-2127-0, Commerce No. 22-96515-02, Ecology Agreement No. WQC_2024_JCoPWE-00034 Statement of Issue: Change Order No. 3 with Seton Construction of Port Townsend, Washington. Analysis/Strategic Goals/Pro's Et Con's: This change order includes increase in cost for extension of low pressure sewer (LPS) line west on Blanche Ave; increased diameter of LPS line on Christney Rd.; modification to stormwater work on Ness' Corner Rd (SR 116) at Henery Hardware and Building Supply eastern driveway; and extension of LPS line to provide a sewer lateral stub for vacant lot at Equipment Rental. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 3 is $98,639.21. The contract amount will increase from $5,010,977.29 to $5,109,616.50. NOTE, the cost includes 9.1% sales tax. The project is funded at 100% by both Department of Commerce and the Department of Ecology combine funding. Recommendation: Public Works recommends that the Board authorize Change Order No. 3 with Seton Construction, and return one original to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Reviewed By: Mark McCain , County Administrator Date JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change 3 Date: CHANGE ORDER Order No. Ordered by County Engineer under terms of Election 1-G4.4 of the Standard Specifications Contract No. Change proposed by Contractor To: Seton Construction Endorsed by: SETON CONSTRUCTION, INC. 4640 S. Discovery Rd. tractoZ r Name Port Townsend,WA 98368 11/8/2024 ignoture Date President Title Consent given by Surety:(when required) Project Title Phase 3-Low Pressure Sewer Collection System By: for PHUGA Attorney-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: This change order includes extension of low pressure sewer(LPS) line west on Blanche Ave; increase of LPS line diameter on Christney Rd.; modification to stormwater work on Ness' Corner Rd (SR 116)at Henery Hardware and Building Supply eastern driveway; and extension of LPS line to provide a sewer lateral stub for vacant lot at Equipment Rental. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT(incl.9.1%sales tax) AMOUNT(incl.9.1%sales tax) THIS ORDER(incl.9.1%sales tax) AFTER CHANGE(incl.9.1%sales tax) $ 4,997,707.00 $ 5,010,977.29 $98,639.21 $ 5,109,616.50 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE(Add/Del) TIME 170 174 10 184 APP OV L RECOMMENDED APPROVAL MMENDED ct Manager Date County Engineer Date Accepted by Ecology APPROVED El N/A Date Chair,Jefferson County Commissioners Date JEFFERSON COUNTY Contract No 40521270 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: 10/23/2024 CHANGE ORDER ESTIMATE Order No. 3 NEW BID ITEMS Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total 60 Catch Basin Type 1L-COP 07 EA $ 2,300.00 1 $ 2,300.00 61 Structural Ex. Cl. B Incl. Haul -COP 07 Cy $ 23.00 105.38 $ 2,423.74 CO 003 New Item Total $ 4,723.74 EXISTING BID ITEMS DELETED r � Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total 27 HDPE Low Pressure Sewer 4-inch Diam. DR-11 -COP 06 LF $32.00 -550 -$17,600.00 38 Gate Valve 2-inch -COP 06 EA $1,825.00 -1 -$1,825.00 CO 003 Ex.Bid Item Deleted Total ($19,425.00) EXISTING BID ITEMS ADDED Bid Item Unit Bid No. DESCRIPTION Unit Amount Qty Unit Bid Total 4 Traffic Control Lump Sum -COP 05 LS $ 7,617.00 1 $ 7,617.00 6 Clearing and Grubbing-COP 08 LS $ 2,300.00 1 $ 2,300.00 8 Sawcutting for Pavement Removal -COP 05 LF $ 4.00 540 $ 2,160.00 9 Remove Existing Pavement-COP 05 Sy $ 15.20 180 $ 2,736.00 25 HDPE Low Pressure Sewer 2-inch Diam. DR-11 -COP 06 LF $ 24.00 250 $ 6,000.00 26 HDPE Low Pressure Sewer 3-inch Diam. DR-11 -COP 05 LF $ 31.00 540 $ 16,740.00 28 HDPE Low Pressure Sewer 6-inch Diam. DR-11 -COP 06 LF $ 40.00 550 $ 22,000.00 39 Gate Valve 3-inch-COP 06 EA $ 1,880.00 1 $ 1,880.00 42 Service Connection 2-inch Diam. -COP 05 & COP 06 EA $ 3,595.00 12 $ 43,140.00 43 Testing Low Pressure Sewer Pipe-COP 05 LF $ 1.00 540 $ 540.00 CO 003 Ex.Bid Item Added Total $ 105,113.00 ESTIMATED NET CHANGE SUBTOTAL: $90,411.74 9.1%Sales Tax $8,227.47 ESTIMATED NET CHANGE TOTAL: $98,639.21