PRE08-00041
Pre-application Conference
Paula Frial
Residential Construction
Attendees:
Paula Frial, Applicant; Henry Souza, Representative for Applicant, Vaughn Everitt,
Wetland Biologist for Applicant, Donna Frostholm, Jefferson County Development Review
Division; Cara Leckenby, Jefferson County Development Review Division.
Pre-application Meeting Date/Time/Location:
December 1, 2008/1:00/DCD Conference Room
Applicant:Representative:
Paula Frial Henry Souza, Designs by Souza, Inc.
2312 Delmar Drive East 164 Swanson Avenue
Seattle, Washington 98102 Port Townsend, Washington 98368
Description of Proposal:
Construct an attached garage and ADU to existing residence on Lots
8 and 9 (north), and build another residence for her relative on Lots 9 (south) and 10.
The Jefferson County Code is available on-line at http://www.codepublishing.com/.
DEVELOPMENT REVIEW
Land Use:
?
Zoned – Rural Residential 1:5.
?
SEPA – Not required.
Shoreline Master Plan:
?
Shoreline Designation – Suburban
?
Application will be processed as a shoreline exemption under Jefferson County Code
(JCC) Chapter 18.25 – Shoreline Master Plan (SMP). Construction of residential
structures is exempt under JCC 18.25.090(5).
Environmentally Sensitive Areas:
?
Wetlands – Parcel mapped as wetland; submit wetland delineation report based on JCC
Chapter 18.22 (Article VII. Wetlands). At this time, mitigation is not required.
?
Fish and Wildlife Habitat Conservation Areas. No report needed at this time.
?
Geologically Hazardous Areas (seismic). A drainage and erosion control plan needs to
be submitted.
?
Aquifer Recharge Area – Susceptible. Must meet Protection Standards in JCC
18.22.130.
?
Coastal Seawater Intrusion Protection Zone – At Risk. Must meet Protection Standards
in JCC 18.22.130.
Stormwater:
?
All projects are required to address stormwater. All stormwater plans submitted must
comply with requirements in the Stormwater Management Manual for Western
Washington (2005).
Setbacks/Buffers:
?
South Beach Drive is a minor collector requiring a 20-foot setback from the road right-of-
way.
?
A 5-foot setback must be maintained from adjacent lots. Given the proposed location of
the development, a declaration of restrictive covenant would be needed for Lots 8 and 9
and a declaration of restrictive covenant would be required for Lots 9 and 10.
?
A standard shoreline setback for residential structures is 30 feet, or 1 foot for each foot of
bank height up to 100 feet.
Frial Pre-application Conference (PRE08-00041)
December 1, 2008
Page 2 of 2
?
At this time, wetland buffer widths will not be applied to the project. Note that this has the
potential to change depending upon future legal decisions.
ADU Performance Standards:
In order to build a structure as an ADU, the performance standards of JCC 18.20.020(2)(a-g)
must be met, including:
?
Maximum Size 1,250 Square feet
?
Owner Occupied
Septic:
?
A second pre-application conference is recommended with Environmental Health. The
pre-app fee is $140.00
?
Applicant must provide assurance that there is a connection available for the expansion
and the new residence.
?
Applicant must have a septic designer to develop plans for tanks and transport lines.
?
Applicant must have a septic designer evaluate the minimum land area requirements.
Application and Fees:
?
Complete application for each project includes (note – multiple copies of special reports,
site plans, drainage and erosion control plan and structural plans may be required.
Please work with a PERMIT TECHNICIAN the Department of Community Development
to complete the application and determine the number of copies of items required):
Master Permit Application
o
Site Plan
o
Wetland Report
o
Stormwater Calculation Worksheet
o
Drainage and Erosion Control Plan
o
Building permit application packet
o
?
Fees for each project:
$367 (shoreline exemption fee through December 31, 2008)
o
Building permit fees are calculated at the time of application and are
o
based on the estimated cost of the project (contractor’s bid price, fair
market labor and materials, taxes should not be included in this
estimate).
OTHER REGULATORY/LAND USE CONSIDERATIONS
?
Jefferson County Department of Environmental Health – Septic and Water.
?
Jefferson County Building Department – a Building permit will be required.
?
Hydraulic Project Approval (HPA) from Washington Department of Fish and Wildlife may
be needed.
?
This project may need a permit from the U.S. Army Corps of Engineers. This agency has
jurisdiction over waters of the U.S., including wetlands, and issues permits pursuant to
Section 404 of the Clean Water Act. The Corps contact is Ronald Wilcox (Seattle
District/Regulatory): Ronald.J.Wilcox@usace.army.mil .
?
This project may need an NPDES from Washington Department of Ecology.