Loading...
HomeMy WebLinkAbout010 09 ct '. t(iW ,,~ ? c?l3jifi 1\ eo.:..J )' ST A TE OF WASHINGTON COUNTY OF JEFFERSON In the matter of: Creating a County project designated as CR 1827. x x x RESOLUTION NO. 10-09 IT IS HEREBY RESOLVED that Center Road. County Road No. 931507 , from M.P. 0.00 to M.P. 6.86, and Chimacum Road, County Road No. 932507, from M.P. 0.50 to M.P. 1.57, be improved as follows: Re.surface with 2 inches (approximate) of hot mix asphalt and renew pavement markings. The proiect includes all engineering, construction. and inspection. IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purpose shown: PURPOSE LOCAL ROAD FUNDS FEDERAL HIGHWAYS FUNDING (fHWA) Engineering $ 20,000 $ 0 Right of Way $ 0 $ 0 Construction: $ 338,000 $ 2,162,000 TOTAL $ 358,,000 $ 2,162.000 _~ This project is included in the officially adopted annual road program as Item No._. X The project is hereby made a part of the officially adopted annual road program in accordance with R.C. W. 36.8 I.I 30. IT IS FURTHER RESOLVED that: X The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq. The construction is to be accomplished by County forces in accordance with R.C.W. 36.77.065 and W.A.C. 136.18. PASSED AND ADOPTED THIS 2nd DAY OF February, 2009. ,~- JEFFERSON COUNTY BOARD OF 79M~ERS , I~/~~L David W~ Sullivan, hair (~r/ Phil Johnson ember ~~ ~ ATTEST: ,.' ... Department of Public Works o Consent Agenda Page 1 of 2 Jefferson County Board of Commissioners Agenda Request From: Board of Commissioners Philip Morley, County Administrator Frank Gifford, Public Works Director :;:!r:9h To: Agenda Date: February 2, 2009 Subject: Resolution to Create a Road Project Center Road 8: Chimacum Road Asphalt Overlay Statement of Issue: Adopt a Resolution creating county road project CR1827 to resurface portions of Center Road (MP 0.00 to MP 6.86) and Chimacum Road (MP 0.50 to MP 1.57) with hot mix asphalt. Analysis/Strategic Goals/Pro's & Con's: The Highways and Local Programs (H8:LP) division of the Washington State Department of Transportation (WSDOT) will distribute any economic stimulus funding made available through the Federal Highway Administration to local governments. Public Works has been working with H8:LP to position Jefferson County for receipt of potential economic stimulus funds for transportation projects. Projects must be under contract for construction within 90 days to be accepted by H8:LP. Projects requiring right-of-way or which do not fall within federal programmatic environmental permitting criteria are not eligible due to the "fast track" nature of the funding. This asphalt overlay project can meet the H8:LP requirements and will rehabilitate two of Jefferson County's most heavily used roadways, adding decades to their service life. This project was added to the 6-Year Transportation Improvement Program (TIP) by the Board in late January. Fiscallmpact/Cost Benefit Analysis: Any portion (or none) of the economic stimulus package may materialize. The project as envisioned would re-surface approximately 8-miles of roadway for a cost of $2,520,000. The funding may require local match of between $0 and $358,000. It is ..... JI' '" Department of Public Works o Consent Agenda Page 2 of 2 possible that the stimulus package could make a reduced portion of the requested funding available, in which case the project limits would be modified to reflect the available funding. Any local match required will come from the Road Fund. Recom mendation: The Board is asked to approve the Resolution creating county road project CR1827 for the purpose of re-surfacing Center Road and Chimacum Road. Return a copy of the Resolution to Public Works. Department Contact: Monte Reinders, County Engineer 385-9242 Reviewed By: I &-If 1:V?, Date