HomeMy WebLinkAbout2961-348
Gj}:~ ,\
t.Ol'ft\IYl'\>>. ~
Michelle McConnell
]Atf I
From:
Sent:
To:
Cc:
Subject:
Attachments:
Rentz, Karen (Perkins Coie) [KRentz@perkinscoie.com]
Friday, January 30, 2009 3:33 PM
Michelle McConnell
Mackie, Sandy (Perkins Coie)
Comment re Shoreline Regulations
Jefferson County Planning Commission Itr #1.pdf; Drawing.pdf
~
To: Jefferson County Planning Commission c/o Michelle McConnell
See attached comment letter and attachment on behalf of Port HadlocklK.S.C., L.L.C.
Karen Rentz I Perkins Coie LLP
LEGAL SECRETARY TO SANDY MACKIE
1201 Third Avenue, Suite 4800
Seattle, WA 98101-3099
PHONE: 206.359.6140
FAX: 206.359.7140
E-MAIL: krentz((iloerldnscoie.com
<<Jefferson County Planning Commission Itr #1.pdf>> <<Drawing.pdf>>
NOTICE: This communication may contain privileged or other confidential information. If you have received it
in error, please advise the sender by reply email and immediately delete the message and any attachments
without copying or disclosing the contents. Thank you.
1
per~
Coie
Alexander W. Mackie
I'lIOHE: (206) JS9-86SJ
I!NAII.: AMackle@perkinscoie.com
1201 Third Avenue. Suite 4800
Seattle. WA 98101-3099
PHONI: 206.359.8000
FAX: 206.359.9000
www.perklnscoie.com
January 30, 2009
VIA E-MAIL MMCCONNELL@CO.JEFFERSON.WA.US
Jefferson County Planning Commission
c/o Michelle McConnell
Jefferson County Dept. of Community Dev.
621 Sheridan Street
Port Townsend, W A 98368
Re: Shoreline Regulation Changes Recommended
Dear Commissioners:
I am writing this letter to request that you make a minor modification in the proposed shoreline
regulations dealing with marine shorelines designated for intense use.
The intense use designations are targeted at areas that have existing development and where the
public access and necessary waterfront activities already exists. In this case my client, Port
HadlockIK.S.C., L.L.C., owns the Hadlock Marina and related uplands. See Parcel B on the
attached materials.
The concerns arise from the decision to impose a uniform 150-foot buffer on all salt water
shorelines. You should be aware that there is no scientific basis for the uniform marine buffer
requirement, as the work of Dr. Houghton in Pierce County showed. Similarly Dr. Lee's work
on waters and wetlands, approved by WDOE for wetland and FWHCA protection in the City of
Mount Vernon, showed that often uniform buffers only serve to lock in presently damaging
circumstances and prevent restoration, often in areas of existing development where restoration
and upgrade are needed most.
In the present regulations, the 1 SO-foot buffer is imposed by Section VI:
D. Regulations - Critical Areas and Shoreline Buffers
999!)9-9774ILEOALIS223094.I
ANCltORAGE . BEIJING. BELHVUE . BOISE. CHICAGO. DENVER. LOS ANGUES . MENLO PARK
OLYMPIA. PHOENIX. PORTLAND. SAN FRANCISCO, SEATTLE. SHANGHAI. WASHINGTON. D.C.
Perkins Coie LlP and Affiliates
Jefferson County Planning Commission
January 30, 2009
Page 2
I. Subject to the exceptions listed below, the Critical Areas
provisions of JCC Chapter 18.22, dated March 17, 2008,
Ordinance #03-0317-08, are incorporated by reference,
except that permit, nonconforming use, appeal, and
enforcement decisions within shoreline jurisdiction shall be
governed by this Program and not JCC Chapter 18.22.
2. In the event development or performance standards in JCC
Chapter 18.22 are inconsistent with standards and
requirements in this Program, this Program shall govern.
3. Unless otherwise stated, no development shall be
constructed, located, extended, modified, converted, or
altered, or land divided without full compliance with JCC
Chapter 18.22 and this Program.
You provide exemptions from the buffer provisions, but only in limited circumstances:
3. Water-oriented UseslDevelopment: When otherwise
consistent with this Program and JCC Chapter 18.22, the
following water-oriented uses/developments may be permitted
within a shoreline buffer without a shoreline variance. The
amount and extent of buffer modification shall be the minimum
needed to accommodate the allowed use/development This
allowance for water-oriented uses/developments within
shoreline buffers without a shoreline variance may apply to the
primary use and/or to the following accessory uses/structures:
i. Primary uses and structures that meet the definition of a
water-dependent or water~related use/development as
defined in Article 2.
ii. Boating facilities accessory to a single-family residential
development including rails, docks, piers and floats;
iii. Boathouses accessory to a single-family residential
development provided that all of the following are met:
a. The boathouse is used to store watercraft and shall not
be used as or converted to a dwelling unit. The County
shall require a notice on title indicated such; and
99999-97741LEOALl5223G94.1
Jefferson County Planning Commission
January 30, 2009
Page 3
b. The boathouse has a maximum footprint of 300 square
feet and a maximum height of 15 feet above average
grade; and
c. The primary doorway/entryway faces the water; and
d. The structure is located entirely landward of the
ordinary high water mark.
iv. Pedestrian beach access structures; and
v. Public access structures, including but not limited to docks,
piers, floats or pedestrian beach access structures accessory
to commercial, industrial, port or other allowed
uses/developments; and
vi. Certain utilities and essential public facilities as specified in
Article 8, Section 11.
The terminology is confusing in that the heading makes reference to "water-oriented" uses and
developments, but then limits the easing of the buffer standards to" primary uses and structures"
meeting the definition of , \vater -dependent" and "water-related," which would certainly include
marinas but effectively limits related development as "accessory uses" are limited to '~ublic
access structures", effectively prohibiting marina offices, showers and restroom facilities, or the
marine store or marina-oriented food service so commonly found in marina areas. In addition,
the language would seem to also prohibit the very type of mixed use urban development
envisioned in the tourist related zone contemplated for the Port Hadlock intense use shoreline.
(See proposed zoning map scheduled to go into effect once the sewer issues are resolved for the
Tri Area.) We believe the regulations are overly broad and unduly burdensome when other
approaches are available to the County to achieve a more comprehensive and environmentally
superior result.
One better approach would be for the County to encourage redevelopment in the few "intense
development" designated shorelines by extending the critical area "stewardship program", now
presently limited to residential development, to the few marine shorelines approved for intense
use.
Such an approach would encourage the redevelopment of the intensely developed shorelines,
which means upgrading storm water control, meeting all modem environmental standards, and
assuring no net loss of function and value, but without hamstringing the nature of that
development. All development still needs to meet the base criteria of the Shoreline Management
99999-9774/LEGALI S223094.l
Jefferson County Planning Commission
January 30,2009
Page 4
Act, but would facilitate a broader range of uses, encouraging greater shoreline use and access in
areas where intense development has already occurred.
We believe the amendment requested goes a long way to achieving Governor Gregoire's aim of
a "ftshable, S\\~mable, digable" system of inland waters offering a wide variety of water oriented,
water enjoyment. Water related and water dependent uses centered in the areas of exi$ting
development.
Your time and attention are appreciated.
Sincerely yours,
11/f~
Alexander W. Mackie
A WMIkr
Enclosure
cc: Paul Christensen w/enc.
Richard Gress w/enc.
99999-9774/LEGALlSm094.1
~Q':~
Sf>~~, p6
NB2-J75S.W
153.12'
UJ
.
N-
j!'l ~
Ql .
p'"
OC1l
ON
Z
PARCEL B
mvPUMP HOUS
~.
1~~
~~
z
S89'02'26PE
589"02'26"E
ElCIS1l>I<:AllPHAt.TIlOo\D
HADLocK Il4Y IlOAD
PARCEL A
30' EASEMENT FOR INGRESS,
-E~E.a!; -ANo...um.llIE5- _ _ _ _ _ _ _ _ _ _ _ _ _
448.40' 30' EASEMEN FOR INGRESS,
-UUWIlES._____
-----------
RESULTANT
PARCELS