Loading...
HomeMy WebLinkAboutLow Pressure Sewer Collection Change Order No 4 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: November 25, 2024 Subject: Change Order No. 4, Phase 3 - Low Pressure Sewer Collection System for the Port Hadlock UGA, Project No. 405-2127-0, Commerce No. 22-96515-02, Ecology Agreement No. W QC_2024_J C o P W E-000 3 4 Statement of Issue: Change Order No. 4 with Seton Construction of Port Townsend, Washington. Analysis/Strategic Goals/Pro's &t Con's: This change order includes the increase in unit price for bid item 37 air vac and odor control, addition of a parallel 6-inch LPS line from east side of BFtR alignment to Cedar Ave and Mason St.; and 2-inch LPS line going north along Property 14 (Burgers Landing) which will serve properties 14, 16 (Stachworks) and 19 (Better Buds). Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 4 is $166,076.02. The contract amount will increase from $5,109,616.50 to $5,275,692.52. NOTE, the cost includes 9.1% sales tax. The project is funded at 100% by both Department of Commerce and the Department of Ecology combine funding. Recommendation: Public Works recommends that the Board authorize Change Order No. 4 with Seton Construction, and return one original to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Reviewed By: ///21 Val Mark McCauley ounty Administrator Date JEFFERSON COUNTY sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: CHANGE ORDER Order No. 4 Ordered by County Engineer under terms of nSection 1-04.4 of the Standard Specifications Contract No. Change proposed by Contractor To: Seton Construction Endorsed by: SETON CONSTRUCTION,INC. 4640 S. Discovery Rd. o ractorFi Name Port Townsend, WA 98368 11/18/2024 Signature Date PRESIDENT Title Consent given by Surety:(when required) Project Title Phase 3-Low Pressure Sewer Collection System By: for PHUGA Attorney-in-fact Date You are ordered to perform the following described work upon receipt of an approved copy of this change order: This change order includes the increase in unit price for bid item 37 air vac and odor control, addition of a parallel 6- inch LPS line from east side of B&R alignment to Cedar Ave and Mason St.; and 2-inch LPS line going north along Property 14 which will serve properties 14, 16 and 19. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT(incl.9.1%sales tax) AMOUNT(incl.9.1%sales tax) THIS ORDER(incl.9.1%sales tax) AFTER CHANGE(incl.9.1%sales tax) $ 4,997,707.00 $ 5,109,616.50 $166,076.02 $ 5,275,692.52 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE(Add) TIME 170 184 9 193 APPROV L RECOMMENDED APPRO • •ENDED P)11 4 ___Jjr /(2e) y..21 Pro Manager Date Coun Engineer Date Accepted by Ecology APPROVED N/A Date Chair,Jefferson County Commissioners Date JEFFERSON COUNTY Contract Nc 40521270 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: 11/8/2024 CHANGE ORDER ESTIMATE Order No. 4 NEW BID ITEMS Bid Unit Bid Item DESCRIPTION Unit Amount Qty Unit Bid Total 58 Clearing and Grubbing Property 14-OCR 02/COP 09 LS $ 7,339.00 1 $ 7,339.00 59 Seeding and Fertilizing by Hand-OCR 02/COP 09 SY $ 23.10 5.7 $ 131.67 Comb.Air Release/Vacuum Valve Assembly 2 In. (Sewer)- 65 COP 01 EA $ 17,806.00 11 $ 195,866.00 66 Upgrade for low profile/US made Odor Control-COP 01 EA $ 2,806.00 2 $ 5,612.00 CO 004 New Item Total $ 208,948.67 EXISTING BID ITEMS DELETED Bid Unit Bid Item DESCRIPTION Unit Amount Qty Unit Bid Total Comb.Air Release/Vacuum Valve Assembly 2 In. (Sewer) 37 COP 01 EA -$15,000.00 11 -$165,000.00 CO 004 Ex. Bid Item Deleted Total ($165,000.00) EXISTING BID ITEMS ADDED Bid Unit Bid Item DESCRIPTION Unit Amount Qty Unit Bid Total Traffic Control Lump Sum-OCR 02/COP 09 and OCR 4 03/COP 010 LS $ 4,460.00 1 $ 4,460.00 24 Shoring and Extra Excavation-OCR 03/COP 010 LS $ 2,530.00 1 $ 2,530.00 HDPE Low Pressure Sewer 2-inch Diam. DR 11-OCR 25 02/COP 09 LF $ 24.00 310 $ 7,440.00 HDPE Low Pressure Sewer 6-inch Diam. DR 11-OCR 28 03/COP 010 LF $ 40.00 1450 $ 58,000.00 Cleanout Assemble Type End-OCR 02/COP 09 and OCR 33 03/COP 010 EA $ 6,250.00 2 $ 12,500.00 35 Cleanout Assembly Type Wye-OCR 03/COP 010 EA $ 8,175.00 1 $ 8,175.00 38 Gate Valve 2-inch-OCR 02/COP 09 EA $ 1,825.00 1 $ 1,825.00 41 Gate Valve 6-inch-OCR 03/COP 010 EA $ 2,250.00 1 $ 2,250.00 42 Service Connection 2-inch Diam.-OCR 02/COP 09 EA $ 3,595.00 3 $ 10,785.00 43 Testing Low Pressure Sewer Pipe-OCR 02/COP 09 LF $ 1.00 310 $ 310.00 CO 004 Ex.Bid Item Added Total $ 108,275.00 ESTIMATED NET CHANGE SUBTOTAL: $152,223.67 9.1%Sales Tax $13,852.35 ESTIMATED NET CHANGE TOTAL: $166,076.02