RE: SMP: Clarifying Leader article
I have the newspaper clipping and hope to get it scanned on posted online soon. Once it's available on our website I'll
be sure to let the emaillist know...
Or you could contact the Leader directly.
<><><><><><><><><><><><><><><><><>
Michelle McConnell, Associate Planner - LRP Lead
Shoreline Master Program (SMP) Update Project Manager
Direct: 360.379.4484
Web: http://www.co.iefferson.wa.us/commdevelopmentlShorelinePlanning.htm
NEW OFFICE HOURS: 9 a - 4:30 p Monday - Thursday; Closed on Friday
<><><><><><><><><><><><><><><><><>
NOTE: All e-mail sent to this address will be received by the Jefferson County e-mail system and are subject to Public Disclosure under Chapter 42.56 RCW.
From: Martin DeBono [mailto:martindebono@yahoo.com]
Sent: Monday, March 16, 2009 6:51 PM
To: Michelle McConnell
Subject: Re: SMP: Clarifying Leader article
Michelle,
Is there a way to get the original article?
Thanks,
Martin
From: Michelle McConnell <mmcconnell@co.jefferson.wa.us>
To: Michelle McConnell <mmcconnell@co.jefferson.wa.us>
Sent: Monday, March 16, 2009 5: 13:44 PM
Subject: SMP: Clarifying Leader article
Hi All,
Forgot to include this item in the previous message:
The Leader newspaper ran a good article on 3/4/09 about the SMP update that requires some clarification:
1. The standard buffers proposed are 150'on stream/river and marine shorelines, and 100' on lake shorelines.
There is also an additional building setback of 10' from all buffers.
2. Staff, consultants and committees have been working on the current SMP Update effort since 2006. The
two advisory committees that assisted preparation of the Preliminary Draft SMP were not Planning Commission
committees/sub-committees but rather formed by and advisory to DCD staff and consultants. They were named
the Shoreline Technical Advisory Committee (STAC) and the Shoreline Policy Advisory Committee (SPAC). Two
members of the Planning Commission's SMP Update Committee participated on the SPAC - Bill Miller as the PC
representative, and Peter Downey as the Aquaculture representative.
3. The state legislature requires all jurisdictions in the state to update their SMP by 2014.
1
4. The 'residents per shoreline mile' estimates are derived from a simple calculation of total population
divided by total shoreline miles and does not accurately reflect the density or distribution of residential
development along waterfront parcels.
5. The Planning Commission has requested additional time to review the Preliminary Draft SMP proposal in
light of the public comments received.
6. There are roughly 6,200 parcels potentially affected by the new SMP. GIS mapping analysis shows there are
about 750 lots that are too small to meet the proposed new 150' marine shoreline buffer.
7. The Shoreline Inventory & Characterization Report cites over 200 scientific and technical papers. As part of
the process to assign shoreline environment designations (SEDs), Ecology's shoreline aerial photos were used to
'ground truth' the findings of the Inventory.
8. The Preliminary Draft SMP specifically proposes to prohibit "The extraction of quarry rock, sand, gravel,
and/or cobbles from any marine or freshwater lake shoreline for any commercial or industrial purpose" (page 8-
20).
9. Site Plan Advance Approval Determinations (SPAADs) do vest a development proposal to the code existing
at the time of issuance, and are good for 5 years. However, SPAADs are not the only way to 'avoid' the
proposed iSO' marine shoreline buffer - proposed options include 1) Common line Setback, and 2) Non-
conforming Lots standards for lots that are too small for the proposed new buffer, and 3) Buffer
Reduction/Averaging to reduce buffer by up to 25%, 4) Critical Area Stewardship Plan (CASP) for parcels greater
than }.l acre, and 5) Shoreline Variance Permit.
You have received this message as a member of the Jefferson County Shoreline Master Program (SMP) Interested Parties Email
Distribution List. If you do not wish to receive further project notices, reply to this message with "UNSUBSCRIBE" as the subject and
body text. Anyone who wants to be added to the list may send an email with "SUBSCRIBE" as the subject and body text. Please note:
Recipient names and email addresses are not shown to keep that information private.
<><><><><><><><><><><><><><><><><>
Michelle McConnell, Associate Planner - LRP Lead
Shoreline Master Program (SMP) Update Project Manager
Direct: 360.379.4484
Web: www.co.iefferson.wa.us/commdevelopment/ShorelinePlanning.htm
Jefferson County Department of Community Development
Long Range Planning Division
621 Sheridan St., Port Townsend, W A 98368
Front Desk: 360.379.4450
Fax: 360.379.4473
NEW OFFICE HOURS: 9 a - 4:30 p Monday - Thursday; Closed on Friday
<><><><><><><><><><><><><><><><><>
NOTE: All e-mail sent to this address will be received by the Jefferson County e-mail system and Is subject to Public Disclosure under Chapter 42.56 RCW.
2