HomeMy WebLinkAboutCONSENT Change Order 2 Water reclamation Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: December 16, 2024 Subject: Change Order No. 4, Phase 2 - Water Reclamation Plant for the Port Hadlock UGA, Project No. 405-2114-0, Commerce Project No. 22-96515-026 Statement of Issue: Change Order No. 4 with Interwest Construction of Burlington, Washington. Analysis/Strategic Goals/Pro's Ft Con's: This change order includes the changes from the original plan were done to 1) provide a drain to the foul air line from the biofilter system to the EQ tank; 2) add a concrete knee wall due to the change in elevation of the biofilter system; and 3) replumbing the drain line from the yard drain station. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 4 is $29,269.49 (includes 9.1% Washington State Sales Tax). The contract amount will increase from $10,183,042.53 to $10,212,312.02. The project is funded at 100% by the Department of Commerce. Recommendation: Public Works recommends that the Board authorize Change Order No. 4 with Interwest Construction, and return two originals to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Reviewed 42 4`1 Mark McCaule ounty Administrato Date JEFFERSON COUNTY Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change 4 Date: 12/2/2024 CHANGE ORDER order No. Ordered by County Engineer under terms of ❑X Article 9 and it of the General and Supplemental Conditions rbtl, 7 j t�l I) Contract No. Change proposed by Contractor To: Interwest Construction Endorsed by: 4575 Fey Rd W:��— Contractor Firm Name Port Angeles,WA98363 Z �{ jjSl— ture Date V i'l� f(r a G Vt Title Consent given by Surety:(when required) Project Title Phase 2-Water Reclamation Facility for By: the PH Sewer Attorney-in-fact Dote You are ordered to perform the following described work upon receipt of an approved copy of this change order: The changes for this change order are to installation a concrete knee wall around the bjofilter system as the elevation was changed by approximately 1.5-ft and the addition of a drain on the foul air line,the line is between the biofilter and the EQ tank.,and replumbing the drain line from the yard drain station due to the biofilter elevation Increasing. All work materials and measurement to be In accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT(Intl,9,1%sales tax) AMOUNT(Intl.9.1%sales taxi THIS ORDER(Ind.9.1%sales tax) AFTER CHANGE(Intl.9.1%sales taxi $ 10,020,835.00 $ 10,183,042.53 $29,26%49 $ 10,212,312.02 ORIGINAL CURRENT CONTRACTTIME NEW CONTRACT CONTRACTTIME CONTRACTTIME CHANGE(Add/Del) TIME 502 o N/A N/A VP' ECOMMENDED APPROV E MENDED z/q I'�� l P► CctM pager Date County Engineer Date APPROVAL RECOMMENDED APPROVED Engineering Services Manager Date Choir,Jefferson County Commissioners Dote JEF_FERSON COUNTY _ _Contract No 405-2114-0 Sheet 2 of 2 _ DEPARTMENT OF PUBLIC WORKS -- -- --- Change ...__._..-- .._.. Date: 12%2j2024 -----CHANGE ORDER E--STIMATE Order No. 411 ESTIMATED ESTIMATED UNIT UNIT QUANTITY AMOUNT MEASURE PRICE CHANGE CHANGE COP No. DESCRIPTION The biofilter elevation was raised,thus 015 needing a concrete knee wall LS $19,893.35 1 $19,893.35 019 Drain for the foul air line LS $4,122.96 1 $4,122.96 FA-02 Replumbing of the drain line form yard drain LS $2,811.82 1 $2,811.82 CO 004 Subtotal $26,828.13 ESTIMATED NET CHANGE SUBTOTAL: $26,828.13 9.1%Sales Tax - $2,441.36 ESTIMATED NET CHANGE TOTAL: $29,269.49