COUNTY OF JEFFERSON
STATE OF WASHINGTON
In the Matter of Adoption }
of the Six-Year }
Transportation Improvement }
Program for 2010-2015 }
RESOLUTION NO. 42-09
WHEREAS, State law obligates the legislative authority of each county to adopt on an annual basis
a six-year transportation improvement program, holding a public hearing prior to adoption, the purpose of
which is to "assure that each county shall perpetually have available advanced plans looking to the future
for not less than six years as a guide in carrying out a coordinated transportation program" (RCW
36.81.121(1)), and;
WHEREAS, the Board of County Commissioners, Jefferson County, State of Washington, has
reviewed the transportation priority array and bridge condition report as prepared by the Department of
Public Works, and has conducted a public hearing on the corresponding proposed six-year transportation
improvement program;
IT IS HEREBY RESOLVED that the Board of County Commissioners does approve and adopt
the Six-Year Transportation Improvement Program for the years 2010 through 2015, inclusive.
IT IS FURTHER RESOLVED that, with respect to the items listed in the Program, the County
Engineer is authorized to make revision to individual project scope, length and termini, timing, and funding
sources, as may be required from time to time due to additional resources becoming available or unavailable
and in accordance with RCW 36.81.130 and WAC 136-16, without the Board of County Commissioners
having to conduct a public hearing or adopt a resolution to amend the Program.
ADOPTED and signed this 27th day of July 2009.
:t,><#:;,~~~-~'
fl:'l"lY to~
,ii'''" ""....,,-., 1,0/
~;~ '\t.. 11 ",",.. ~. ,
. ~"...
(t .,~ '. '$,
" " '\
J t ,,'
, ,-
'- . ' \., ,J I
..
\ ..
\..{'.
.j
:' ~, '!
JEFFERSON COUNTY
BOAdA&S
David Sullivan, Chair
'lIp \ (P\
J ~"
"-'. -,~ ~,-
.. . ',\
~ ,'f oJ J '1 ~,\ :.
.\ :
-1\2..-'\ )09
SEAL:
"'1 1..""\ \6\
ATTEST:
ql6-111Vl .t ffJJ;~'
oma L. Delaney
Clerk of the Board
JEFFERSON COUNTY PUBLIC WORKS
Six-Year
Transportation Improvement Program
2010-2015
'~)..~
,
~- .,-:,-::;-"",,=,-
~tr~,
~-
--------
,."........".:0
//
Conceptual rendering of the future Rick Tollefson Trail connecting
Chimacum and Port Hadlock through the Chimacum Valley.
623 SHERIDAN STREET
PORT TOWNSEND. WA . 98368
PHONE 360/385-9160 . FAX 360/385-9234 . www,co.jefferson.wa.us
~-
r
2010-2015 SiX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
TABLE OF CONTENTS
~ Board of County Commissioners:
Resolution to Adopt Six-Year Transportation Improvement Program 2010-2015
~ Project Locator Map & Narrative Summary of 2010-2015 Six-Year TIP
o For large map, visit www.co.iefferson.wa.us/publicworks/pdfITlP/201 0-2015/map.pdf
~ Project Data Sheets: 37 Capital Projects
~ WSDOT 2010-2015 Six-Year TIP Report with Instructions/Code Glossary
~ Budget & Funding
o 2010-2015 Six-Year TIP by Project Category
o Charts: Funding Breakdown by Program;
Secured v. Planned; Local Road Fund v. Other
o Table & Chart: Six-Year County Road Fund Projections 2010-2015
~ Bridge Condition Report
~ Glossary of Acronyms
JEFFERSON COUNTY PUBLIC WORKS
Strait 0
Juan :De fuca
...
~ CANADA
CLALILAM
COUNTY
\
-
FFERSON .
COVNTY /" sf(
r-z "51
S HARBOR I MASONl_'::.J
U~TY I COUNTY)
\ \
-1
i
I
--1
.~.,.""o"(.....,,
(
"'t'
~
T"""~/U..""
~
",,'
'"
l':~
~ ~
;;:
'it
~
.'
L..,
i
!
.!
Adinirafly
Intet
m
..
J'uget
Souna
;"'''11'"
Box numbers COrrespond 10 project
numbers in narrative summary.
{
Project Underway or
nitiated in 2010
Fund Status
'&
..
oS
IlS$H Olympic Discovery Trail (approx)
County Park
,. GelfCourse
r:J Military Reserve
r.:J National Forest
Slale Park
'MldlifeRefuge
"
).,,,^,~......
;' i Wo~:,dC:~GI5
, JJ,;o09
! MiI&,s
J 0 1 '
("- !
~-.,{...J 'flll"jil:;;U'llJU:~";
< .
Jefferson County
Transportation Improvement Program
2oro-20I5
J
2
2010-2015 SiX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
~ NARRATIVE SUMMARY OF 2010-2015 SiX-YEAR TIP:
37 CAPITAL PROJECTS
The 2010-2015 Six-Year Transportation Improvement Program (6-yr TIP) includes all planned capi-
tal transportation projects for the years 2010 through 2015. Below is a brief description of each
planned capital project.
There are 397.69 miles of county roadway in Jefferson County. The Priority Rating Program estab-
lishes a process and system for prioritizing projects. Priority ratings are established through needs
identification and screening, technical evaluation and ranking, and policy direction from the Board of
County Commissioners.
CAPITAL PROJECTS-FUNDING SECURED
1. LARRY SCOTT TRAIL - SEGMENT 4 ACQUISITION
Trail right-of-way acquisition from South Discovery Road at Discovery Bay Golf Course to South
Discovery Road at or near Milo Curry Road.
2. LARRY SCOTT TRAIL - MP 4.0 TO SOUTH DISCOVERY ROAD
Engineering and construction of multi-use trail from Cape George Trailhead to South Discovery
Road at Discovery Bay Golf Course.
3. DOWANS CREEK ROAD RELOCATION
Relocation of road segment to avoid landslide hazard area.
4. SOUTH DISCOVERY ROAD - MP 3.62-4.00
Minor horizontal realignment, grading and surfacing to provide adequate setback from continu-
ing natural bluff erosion.
5. RICK TOLLEFSON TRAIL - PHASE 1
Construction of multi-use, non-motorized trail connecting HJ Carroll Park to Bob Bates Fields
through Chimacum Valley.
6. QUIMPER TRANSPORTATION STUDY
Planning for intersection and other transportation improvements on the Quimper Peninsula, with
concentration on the Port Hadlock area.
7. EAST PRICE STREET UPGRADES - MP 0.00-0.25
Minor realignment and surface upgrade. Drainage improvements.
8. POLE CREEK CULVERT REPLACEMENT - MP 8.3
Culvert replacement on Upper Hoh Road with fish-passable box culvert. Project with Pacific
Coast Salmon Coalition.
9. LARRY SCOTT TRAIL - SEGMENT 4 CONSTRUCTION
Engineering and construction of multi-use trail from South Discovery Road at Discovery Bay
Golf Course to South Discovery Road at or near Milo Curry Road.
10. CENTER ROAD ASPHALT OVERLAY - MP 2.3-4.3 - PHASE 4
"Shovel ready" two-inch asphalt overlay for two-mile segment of rural major collector, Project
addresses deferred pavement preservation. 2009 construction.
JEFFERSON COUNTY PUBLIC WORKS
2010-2015 SiX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
CAPITAL PROJECTS. CONTINUED
11. OAK BAY ROAD REPAIR - MP 9.4
Reinforcement of existing retaining wall, stabilization of sloughing fill slope, and improvement of
roadway guardrails and surface conditions. Project close-out.
12. OAK BAY ROAD CULVERT REPLACEMENTS - MP 9
Replacement of two culverts in vicinity of MP g by slip-lining and/or horizontal boring.
13. ALDER CREEK TRIBUTARY BRIDGE
Culvert replacement at Upper Hoh Road MP 2.15 with fish-passable concrete bridge. Funded as
mitigation for MP 7.8 bank armoring.
14. DISMAL CREEK CULVERT REPLACEMENT
Culvert replacement at Upper Hoh Road MP 9.19 with fish-passable concrete box culvert.
Funded as mitigation for MP 4.0 bank armoring.
15. SPRUCE CREEK CULVERT REPLACEMENT
Culvert replacement at Upper Hoh Road MP 9.7 with fish-passable single-span concrete bridge.
Emergency Relief project.
16. WILLOUGHBY CREEK BRIDGE REPAIR
Damage repair to bridge approach and adjacent stream bank armoring at Upper Hoh Road MP
3.5,
17. SOUTH DISCOVERY ROAD - MP 2.65-3.64
Safety improvements including removal of roadside obstructions, widening and paving of shoul-
ders, restoration of base material, and road resurfacing.
18. PARADISE BAY ROAD - MP 0.37-1.53 - PHASE 2
Roadway structure rehabilitated and paved with asphalt concrete. Shoulder paved and widened
to four feet. Guardrail retrofitted and other roadside hazards mitigated.
19. SR 116/SR 19 INTERSECTION IMPROVEMENTS - PE
Engineering design for Ness' Corner/Rhody Drive intersection improvements, including control,
channelization, and pedestrian facilities. Partnership with WSDOT.
CAPITAL PROJECTS-PLANNED (UNFUNDED)
20. WEST UNCAS ROAD CULVERT REPLACEMENT - MP 0.78
Culvert replacement with fish-passable box culvert. Partnership with salmon enhancement
group.
21. CENTER ROAD ASPHALT OVERLAY - MP 4.3-6.8 - PHASE 5
"Shovel ready" asphalt overlay on major collector if additional Federal stimulus funds become
available.
22. CHIMACUM ROAD - MP 0.34-0.96
Roadway reconstruction. Pedestrian/bicycle facilities, improvement of intersections, potential
splitter islands and/or medians. Extension of Rick Tollefson Trail.
JEFFERSON COUNTY PUBLIC WORKS
2010-2015 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
CAPITAL PROJECTS. CONTINUED
23. SOUTH DISCOVERY ROAD - MP 4.25-4.84
Safety improvements include removal of roadside obstructions, widening and pavement of shoul-
ders, restoration of base material, and road resurfacing. Facility extension for Larry Scott Trail.
24. PARADISE BAY ROAD - MP 1.53-2.96 - PHASE 3
Roadway structure rehabilitated and paved with asphalt concrete. Shoulder paved and widened
to four feet. Guardrail retrofitted and other roadside hazards mitigated.
25. DABOB ROAD - MP 3.10-4.00
Rehabilitation of failing roadway structure and pavement with asphalt concrete.
26. WEST VALLEY ROAD NON-MOTORIZED & INTERSECTION IMPROVEMENTS
"Safe Routes to School" project including roadside safety, channelization, intersection and pe-
destrian facilities.
27. CEDAR AVENUE NON-MOTORIZED & INTERSECTION IMPROVEMENTS
"Safe Routes to School" project including roadside safety, channelization, intersection and pe-
destrian facilities.
28. OLYMPIC DISCOVERY TRAIL (ODT) RIGHT-OF-WAY ACQUISITION
Right-of-way acquisition for non-motorized trail connection between Clallam County line and the
Four Corners area.
29. UPPER HOH ROAD CULVERT REPLACEMENT - MP 3.338
Culvert replacement by horizontal boring.
30. THORNDYKE ROAD CULVERT REPLACEMENT - MP 7.18
Culvert replacement with concrete box culvert.
31. SNOW CREEK ROAD CULVERT REPLACEMENT - MP 0.84
Culvert replacement with larger culvert by horizontal boring.
32. WEST VALLEY ROAD CULVERT REPLACEMENT - MP 2.555
Culvert replacement at Naylor Creek with fish-passable cuivert.
CAPITAL PROJECTS-PROGRAMMATIC (FUNDED)
33. COUNTYWIDE SAFETY IMPROVEMENTS
Various safety projects countywide.
34. COUNTYWIDE CULVERT REPLACEMENT PROJECTS
Various cuivert replacement projects countywide.
35. COUNTYWIDE DRAINAGE IMPROVEMENTS
Minor drainage improvement projects countywide.
36. COUNTYWIDE SURFACING UPGRADES
Various paving and/or base stabilization of gravel and structurally deficient roadways.
37. COUNTYWIDE PEDESTRIAN & BICYCLE IMPROVEMENTS
Minor projects countywide that create or improve facilities for pedestrians and bicyclists.
JEFFERSON COUNTY PUBLIC WORKS
2010-2015 SiX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
~ PROJECT DATA SHEETS: CAPITAL PROJECTS 1-37
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPRO\lF=MFNT PRnC:;RAM ?n1n_?n1!)
LARRY SCOTT TRAIL-SEGMENT 4 ACQUISITION 1
Project Location and Setting
The Segment 4 project is located on the west side at the Quimper Peninsula near the Discovery Say shoreline. The acqui-
sition begins 4.7 trail miles southwest ot the Port Townsend city limits and 6.5 miles from the Port Townsend trailhead.
Project Scope
Right-of-way acquisition ot 1.6 miles between South Discovery Road milepost (MP) 2.87 and the Four Corners intersection
(SR 20 MP 6.24). This project will complete right-ot-way through residentially-zoned areas surrounding Port Townsend,
providing non-motorized access through densely populated portions ot the Quimper Peninsula.
Project Impetus
An extensive public review process documented the need for a public trail system in our county. The Larry Scott Trail Is
part ot a regional trail incorporated as a priority in the Jefferson County Non-Motorized and Recreational Trails Plan;. it will
provide a viable link with the rest otthe Olympic Discovery Trail system.
Status
Acquisition of 0.86 miles of trail completed through 2009. Route alternatives have been prioritized. Discussions continue
on with many property owners and preliminary negotiations are underway on several parcels.
Project Estimate 2010-2015
Right-at-Way................. $ 72,000
VICINITY MAP
PROJECT STATISTICS
Road Number ........... ........ 86010
Milepost Start......... ...................... 6.50
Miiepost End... ...........8.10
Totai Mileage........ ..................... 1.60
Project Timeline
Right-of-Way.............. ......2009-2010
Project Funding 2010-2015
Local Road Funds............ $ 72,000
TYPICAL TRAIL SECTION
'~VL
l~rv
<0 ~l
r'''>,'
o;N ~
10' wide main trail
ulfer
4'widehorse
trail
shoulder
",,,,",,,
shoulder
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
2 LARRY SCOTT TRAIL-MP 4.0 TO SOUTH DISCOVERY ROAD
Project Location and Setting
The project is located approximately 4.0 trail miles from its beginning in Port Townsend, and continues for approximately
2.0 traii miles. It will extend the Larry Scott Trail from the already constructed Cape George Trailhead to its intersection
with South Discovery Road.
Project Scope
Engineering and construction of the Larry Scott Trail from the southerly end of the Cape George Trailhead to South Dis-
covery Road at the Discovery Bay golf course. Funding comes from the Washington Wildlife and Recreation Program and
local Road funds.
Project Impetus
An extensive public review process documented the need for a public trail system in our county. The Larry Scott Trail is
part of a regional trail incorporated as a priority in the Jefferson County Non-Motorized and Recreational Trails Plan.
Status
Right-of-way acquired. Construction was completed on a small section (0.4 mile) in 2008. Work will continue in 2009 and
be completed in 2011 .
PROJECT STATISTICS
Road Number..........
.86010
VICINITY MAP
Project Estimate 2010-2015
Preliminary Engineering......$
Construction.................... $
TOTAL........... $
5,000
289,000
294,000
Project Timeline
Preliminary Engineering...... ....... .2010
Construction..................... 2010-2012
Project Funding
State (Washington Wildlife and Recreation Program)... $192,000
Local Road Funds ............................................... $102.000
Completed trail section showing main trail with separated horse path.
JEFFFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
DOWANS CREEK ROAD RELOCATION 3
Project Location and Setting
Dowans Creek Road is a gravel, local access road on the west end of Jefferson County. The project location is between
MP 0.84 and MP 1.47.
Project Scope
It is necessary to relocate at least % of a mile of Dowans Creek Road in order to provide secure access to residences at
the westerly end of the road. The new road will be gravel surfaced, and will be 14-16 ft. wide with turnouts. It is antici-
pated that funding will be 75% FEMA. 12.5% State, and 12.5% LocaL
Project Impetus
In January 2008 a landslide occurred at milepost 1.2, causing a ccmplete road failure, and cutting off access to residences
for approximately 1 week. Public Works responded immediately by ccnstructing a temporary detour around the slide, and
then began a process to develop plans, and obtain environmental permits and right-of-way for penmanent road relocation
away from the slide area.
Status
Public Works is currently working through environmental and right-of-way issues for the road relocation project. Due to
unresolved permitting issues, it is anticipated that road relocation will not occur until 2010 or later. Public Works is
monitoring and maintaining the temporary detour to provide access to residences until penmanent road relocation is
completed.
PROJECT STATISTICS
Road Number...... ..................... .146809
Milepost Start.............................. ..0.84
Milepost End... ..........,.......1.47
Total Mileage.................. ............ ..0.63
Existing Conditions
Lane Widths... ....................9 ft gravel
Shoulder Widths... .........0 ft
Traffic Count
2005 esti mate
..100ADT
Project Estimate 2010-2015
Preliminary Engineering.. $
Right-of-Way........... ........ $
Construction...... $
TOTAL............. $
35.000
35.000
587,000
657,000
Project Timeline
Preliminary Engineering... .....2010
Right-of-Way............. ................2010
Construction........................... .. ..201 0
Project Funding
Federal (FEMA) ..................$ 493,000
State (Emergency Management Department)
..............$ 82,000
Local Road Funds ...............$ 82,000
PROJECT MAP
Potential failure: This section of the roadway is under threat of failure
as a result of riverbank erosion.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
4 SOUTH DISCOVERY ROAD-MP 3.62-4.00
Project Location and Setting
This project is located between MP 3.62 and 4.00 on South Discovery Road adjacent to Discovery Bay.
Project Scope
The project is to construct a minor re-alignment of a portion of South Discovery Road to provide adequate setbacks from
the continuing natural bluff erosion at this location. Project includes engineering and right-of-way acquisition. Local Roads
and State Rural Arterial Program funds are secured for this project.
Project Impetus
Winter storms in the past several years have caused erosion of this section of Discovery Bay bluff, threatening this portion
of South Discovery Road. The road needs to be moved landward to provide sufficient driving surface and to increase
safety.
Status
Minor repairs since the last storm damage have been completed. This phase of the overall project is scheduled for com-
pletion in 2010, due to delays in acquiring rig.ht of way.
PROJECT STATISTICS
Road Number......... ... .........601508
Milepost Start....... ............... .......3.62
Milepost End............. ............ .4.00
Total Mileage............ ...0.38
Existing Conditions
Lane Widths.. 10 It paved (BS1)
Shoulder Widths .. ......... 2 It gravel
Pavement Rating (2006) ............ 84-95
Traffic Count
2008................................ 2,800ADT
5-Year Accident History (2004-2008)
Property........... ............ .... 2
Injury............................................ 2
Fatalities....................................... 0
Project Estimate 2010-2015
Construction.
TOTAL...... ..............
$ 792,000
$ 792,000
Project Timeline
Preliminary Engineering....... 2008-2009
Right-of-Way......................2008-2009
Construction...... ................ 2010
Project Funding
State (Rural Arterial Program)
............ $ 469,000
Local Road Funds.............. $ 323,000
VICINITY MAP
Natural erosion of the bluff along South Discovery Road is threatening the road-
way. This project will realign the roadway away from the bluff.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
RICK TOLLEFSON MEMORIAL TRAIL-PHASE 1 5
Project Location and Setting
The Bob Bates Recreational Fields are located next to the Sheriffs facility on Chimacum Road, about one-mile from cen-
tral Port Hadlock. This initial segment of the Rick Tollefson Trail will extend from the recreational fields westward through
the Chimacum Valley to HJ Carroll Park, crossing Chimacum Creek along the way.
Project Scope
Engineering, right-of-way acquisition and construction of a multipurpose trail connecting Chimacum Road near the Bob
Bates Recreational Fields to HJ Carroll Park. The trail length for this first phase will be approximately 1/2 mile and inciude
two bridge spans or one long span to cross the east fork and the mainstem of Chimacum Creek. Phase 2 will connect HJ
Carroll Park to the Chimacum School campus on West Valley Road through an improved crossing for SR 19. Phase 3 will
extend the trail through the Bob Bates Fields to the sidewalk along Chimacum Road in central Hadlock.
Project Impetus
Both HJ Carroll Park and the Bob Bates Recreational Fields are well-used facilities in our county. People wanting to travel
between them and to points beyond, such as to schools and the center of Port Hadlock, are forced to use the roadways on
Chimacum Road and SR 19. A relatively direct path for bicyclists and pedestrians connecting these amenities would en-
able non-motorized travel that avoids the roadways. The overall goal of the project is to construct an attractive, universally
supported, and well-used multi-use trail that is part of a non-motorized network connecting Port Hadlock with the Tri-Area
Community Center, Grange and Chimacum schools on SR 19 through HJ Carroll Park.
Status
Preliminary engineering is underway with construction in 2010-2011.
PROJECT STATISTICS
Project Estimate 2010-2015
Preliminary Engineering... .... $ 180,000
Right-of-Way................. ... $ 80,000
Construction ................. .... $1.000,000
TOTAL ........$1,260,000
Project Timeline
Preiiminary Engineering.. ...... 2009-2010
Right-of-Way...................... 2009-2010
Construction..........,............. 201 0-2011
Project Funding
Federal (STP) ................... $ 818,000
State (Pedestrian and Bicycle Safely Program)
............ ....$ 392,000
Local Road Funds .......... ..... $ 53,000
vvy !
/
~~""c'-
----:::-=-
VICINITY MAP
Leg""d.:
_ProposedTrailRoute
Th~ough Chirnacum Valley
-+-
S",l<ln ,~,
~
Conceptual rendering of the future Rick
Tollefson Trail connecting Chimacum and
Port Hadlock through the Chimacum Valley.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
6 QUIMPER TRANSPORTATION ANALYSIS
Project Location and Setting
The study area is the Quimper Peninsula north of State Route 104 and east of US 101. Concentration is on the Tri-Area.
Project Scope
Public Works and partners are studying current transportation conditions on the Quimper Peninsula and projecting future
conditions through a land use forecast and travel demand model. The objective of the study is to identify and prioritize
issues, and develop and analyze potential solutions and associated costs and benefits. Alternatives will be evaluated
through a public process. Next steps include engineering and construction of needed improvements, once priorities are
established and funding sources identified. This work is in conjunction with a SR 19/20 corridor planning process being
undertaken by the Washington State Department of Transportation (WSDOT). Funding is Federal and local.
Project Impetus
Building upon the City of Port Townsend's travel demand model. the County has developed a modei that covers the Quim-
per Peninsula in conjunction with urban growth area planning in the Port Hadlock area, an update of the Transportation
Element of the Comprehensive Plan in 2011, and a need to prioritize transportation improvements that will solve current
issues as well as prevent future ones. With the model's horizon year being 2031. the County will be able to reasonabiy
predict future traffic patterns and plan accordingly.
Status
Model development was initiated in 2007. The WSDOT SR 19/20 corridor study began in 2008. Comprehensive model
study results are expected in 2009. Minor funds are programmed in 2010 for project close-out
PROJECT STATISTICS
VICINITY MAP
Base Year ..... ........................ ....2007
Horizon year............. ...2031
-
-
-
-
Project Estimate 2010-2015
Preliminary Engineering...... ..$
TOTAL.. .........$
= Strait of
Juan VI! :FUCA
--._,'
.'~.
(
Quimpe< POIl!nsuIa
Tnusportation Model
Study Area
M"miraliy
InM/
i
5.000
5,000
!
Project Timeline
Preliminary Engineering...... .2007-2010
11 ,
.-
.. ~:.- .....
Project Funding
Federal (STP) ....... $
Local Road Funds................$
4,000
1,000
,
~
Pug"
suund'
,
~
Irondale
& Port
Hadlock
,
In a travel demand model, areas are divided
into "Transportation Analysis Zones" or TAZs.
-
:Jf""" !
Ca1U1J"
.
.- j
., -
~-_.-
---.---...
------
~ 1-
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
EAST PRICE STREET UPGRADES-MP 0.00-0.25 7
Project Location and Setting
This project is located in Irondale on East Price Street, between 7th Avenue and 5th Avenue.
Project Scope
The project is to construct a minor realignment and upgrade of a portion of East Price Street to bring it up to existing
pavement and drainage standards. Project includes engineering and right-of-way acquisition. Local Roads funds are pro-
posed for this project.
Project Impetus
East Price Street is the last through street in the lrondale area with a gravel surface. In addition, the road base matrix and
width are substandard, and the road has localized drainage issues.
Status
Preliminary engineering will occur in 2009 and 2010. Project completion is scheduled for 2010.
PROJECT STATISTICS
Road Number...........................667009
Milepost Start......... ...... ................0.00
Milepost End...... ...... ...... ...... ........0.25
Total Mileage.............................. 0.25
Project Estimate 2010-2015
Preliminary Engineering $
Right-of-Way...... .............$
Construction... ... ... ... ... ... ...$
TOTAL............. .......$
26,000
13,000
290,000
329,000
VICINITY MAP
Existing Conditions
Lane Widths (single lane).. ..12 fl gravel
Shoulder Widths........................ .N/A
Pavement Rating ................ .. N/A
Project Timeline
Preliminary Engineering...... 2008-2010
Right-of-Way............................ 201 0
Construction _..... ...... ...... ..........2010
Project Funding
Local Road Funds ........... $ 329,000
IRONDALE
ROAD
PROJECT
LOCATION
E. PRICE
STREET
The view west on E. Price Street from 5th Avenue.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
8 POLE CREEK CULVERT REPLACEMENT-MP 8.3
Project Location and Setting
Pole Creek Culvert is located at MP 8.3 on Upper Hoh Road in West Jefferson County, and has been identified by the
Washington State Dept. of Fish & Wildlife ryvDFW) as a fish passage barrier, and a high priority for replacement. Poie
Creek is a tributary to the Hoh River.
Project Scope
The Pacific Coast Salmon Coalition (PCSC) has secured a grant in the amount of $375,400 from the Salmon Recovery
Funding Board to replace the culvert at Pole Creek with a concrete box culvert, in order to improve fish passage, and
eliminate problems with culvert capacity. Jefferson County has agreed to contribute 10%. (up to a maximum of $50,000)
to the construction phase of this project. Jefferson County will also provide staff time for plan review, and project over-
sight.
Project Impetus
The Pacific Coast Salmon Coalition has sponsored this project, and is managing the design and construction.
Status
The PCSC is currently in the design phase of this project. Construction may occur in either 2009 or 2010.
PROJECT STATISTICS
Road Number ..........................914207
Milepost ......... .................. 8.3
Traffic Count
2005
.............. 500ADT
Project Timeline
Preliminary Engineering....... 2008-2010
Construction............................ .2010
Project Funding 2010-2015
Local Road Funds ............. $ 57,000
Pacific Coast Salmon Coaiition
............. $ 375,400
. .: . '\~ ..-
'~-' .
VICINITY MAP
PROJECT SCHEMATIC
w';'" ".'
;,.. ~ .
".
,'"". ...._"-......:>
~ "..
.' .
... -;-:.1."
....
"
2-" .......
.l....._ .J.
.--
15..
LOW FL.OW CHANEL
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
LARRY SCOTT TRAIL-SEGMENT 4 CONSTRUCTION 9
Project Location and Setting
The project is located approximately 6 trail miles from its beginning in Port Townsend, and continues for approximately 1.5
trail miles. It will extend the Larry Scott Trail (LST) from the crossing at South Discovery Road to the Four Corners area.
Project Scope
Engineering and construction of the LST from S. Discovery Road to Four Corners, including a small trailhead. Funding
includes Washington Wildlife and Recreation Program funding and local funds.
Project Impetus
An extensive public review process documented the need for a public trail system in our county. The Larry Scott Trail is
part of a regional trail incorporated as a priority in the Jefferson County Non-Motorized and Recreational Trails Plan.
Status
Right-of-way acquisition is partially completed and will continue in 2010 (see the infonmation sheet for project #1).
Engineering work is scheduled to begin in 2010, with construction in 2011 andlor 2012.
PROJECT STATISTICS
Road Number.................... .........86010
Project Estimate 2010-2015
Preliminary Engineering...... $
Construction .. ... $
TOTAL............ $
47,000
529,000
576,000
Project Timeline
Preliminary Engineering .......2010-2012
Construction .............. ...... 2011-2012
Project Funding
State (Washington Wildlife & Recreation Program)
$ 379.000
Local Road Funds ............ $ 197,000
VICINITY MAP
Example of undeveloped trail right of way.
TYPICAL TRAIL SECTION
1QU
~~0
JI~
in ..:;
+.;.
I
1'~
A
'C.
z:"
"-s,,
>v (_
f'
10' wide main trail Buffer 4' wide
shoulder shoulder horse trail shoukJer
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
10 CENTER ROAD ASPHALT OVERLAY-MP 2.3-4.3-PHASE 4
Project Location and Setting
The asphalt overlay project is located between MP 2.30 and 4.30 on Center Road in East Jefferson County.
Project Scope
This project will consist of pavement grinding and pre-leveling, followed by a 2-inch asphalt overlay, gravel shoulder dress-
in9, new intersection pavement markings, and new travel lane striping.
Project Impetus
Center Road is one of Jefferson County's most heavily used roadways, and this project is one phase of the ongoing
Center Road pavement maintenance and improvement program. This estimated $670,000 project will be substantially
funded (55%) through the recent Federal economic stimulus program, the American Recovery and Reinvestment Act
(ARRA). Additional funding (35%) will be provided through the regional allocation of the Federal Surface Transportation
Program (STP). The remaining funds (10%) will be by local road fund match.
Status
Lakeside Industries, Inc. of Port Angeles is scheduled to prepare and pave the project area beginning July 20, 2009. Road
shoulder finishing and lane striping is scheduled to conclude by August 14. 2009. At the request of the Washington De-
partment ofTransportation (WSDOT), the 2010-2015 TIP includes the ARRA funding in the first year for tracking pur-
poses.
PROJECT STATISTICS
Center Road:
project limits
Road Number........................ ...931507
Milepost Start............ ................... 2.30
Milepost End............... ............ ..... 4.30
Total Mileage............................... 2.00
Existing Conditions
Lane Widths......... .....11 It paved (BST)
Shoulder Widths.... ..... 8 It paved (BST)
Pavement Rating.... ............... 84-100
Traffic Count
2008..
.. ..................2,900 ADT
Project Timeline
Construction... .......................... .2009
Egg & I Road:
intersection with
Center Road
Project Funding
Federal (ARRA) ................ $ 358,000
Wheel path rutting on Center Road,
typical in both north and southbound
lanes due to heavy vehicle traffic.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
OAK BAY ROAD REPAIR-MILE POST 9.4 11
Project Location and Setting
The project is located at MP 9.4 on Oak Say Road in Port Ludlow, approximately 400 feet northeast of the intersection of
Oak Say Road and Paradise Say Road.
Project Scope
Oak Say Road has sustained ongoing damage to pavement surfaces at this location due to roadway fill slope settlement.
This project will consist of stabilizing an existing retaining wall and restoring the roadway surfaces and pedestrian facilities.
This repair project will be funded with local roads funds.
Project Impetus
Investigation by geotechnical and consulting engineers determined the existing retaining wall needs to be anchored to
prevent ongoing movement.
Status
Construction of the repair, including wall anchor installations and road surface improvements, is anticipated to occur in
autumn 2009.
PROJECT STATISTICS
Road Number............... ..........569908
Milepost.... ......................... ........9.4
Existing Conditions
Lane Widths.. .. .... 11 fl paved (SST)
ShoulderWidths...........8 fl paved (ACP)
Traffic Count
2008............................... ..2,850 ADT
Project Estimate 2010-2015
Contract Close-out .... $
TOTAL... ...$
10.000
10,000
Project Timeline
Construction
..... 2009
Project Funding
Local Road Funds ........... $ 10,000
VICINITY MAP
Right: Retaining wall.
Below: Jersey barrier on roadway shoulder.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
12 OAK BAY ROAD CULVERT REPLACEMENTS-MP 9
Project Location and Setting
Two culverts in need of replacement are located on Oak Bay Road at MP 8.947 and at MP 9.066. Both culverts are lo-
cated on small, unnamed drainages.
Project Scope
This project will consist of replacing or repairing the culverts at Oak Bay Road MP 8.947 and MP 9.066 to improve hydrau-
lic performance and to eliminate ongoing problems associated with failure of the existing culverts.
Project Impetus
The existing culverts are badly deteriorated, and have been identified through the Jefferson County culvert priority rating
system as high priorities for replacement.
Status
These projects are in the planning phase. A site topographical survey and preliminary design report for each site have
been completed.
PROJECT STATISTICS VICINITY MAP
Road Number...
Milepost ..
........... 569908
........... ..............9
Existing Conditions
Lane Widths......... .....11 It paved (BST)
Shoulder Widths..........8 It paved (ACP)
Traffic Count
2008............
........2,850 ADT
Project Estimate 2010-2015
Preliminary Engineering..... $
Construction.. ........... $
TOTAL............. $
40,000
200.000
240,000
Project Timeline
Preliminary Engineering .............2010
Construction... ............. .... 2011
Project Funding
Local Road Funds ........... $ 240,000
Deteriorated culvert at MP 9.066
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
ALDER CREEK TRIBUTARY BRIDGE 13
Project Location and Setting
Alder Creek Tributary culvert is located at MP 2.15 on Upper Hoh Road in West Jefferson County, and has been identified
by the Washington State Dept. of Fish & Wildlife ryvDFW) as a fish passage barrier, and a high priority for replacement.
Alder Creek Tributary is a tributary to Alder Creek. which is a tributary to the Hoh River.
Project Scope
This project will consist of replacing the culvert at Alder Creek Tributary with a WDFW- approved. fish passable structure.
The new structure will be a large box culvert, or a single span bridge.
Project Impetus
Jefferson County is required by WDFW to perform environmental mitigation for rlprap placed in the Hoh River during
emergency road repairs at Upper Hoh Road MP 7,7 to MP 7.8. Jefferson County and WDFW have agreed that this miti-
gation will be satisfied by replacing the culvert at Upper Hoh Road MP 2.15 with a WDFW-approved fish passable struc-
ture.
Status
Jefferson County is currently in the process of securing funding for this project from the Federal Highway Administration
(FHWA). Funding is anticipated to be 86.5% FHWA, and 13.5% Jefferson County Road fund.
PROJECT STATISTICS
Project Estimate 2010-2015
Preliminary Engineering..... $ 40,000
Right-of-Way................... $ 2,000
Construction.................... $ 1,191,000
TOTAL.................... $ 1,233,000
Project Timeline
Preliminary Engineering
Right-of-Way...... .............
Construction ...................
...2010
.... 2010
...2011
VICINITY MAP
Road Number...........................914207
Milepost ......... ..............2.15
Traffic Count
2005
.... 500 ADT
Project Funding
Federal Highway Administration-ER
............ $ 1,066,000
Local Road Funds ............ $ 166,000
PROJECT SCHEMATIC
CONCRETE
BARRIER
~~"':'::"''''''''";;",,,i,,,::~m:''~:1~
II I 30~ II
II II
" \ "
~ I PROPOSED II
U CHANNEL U
GUAR ORAI_
/
I
,
BRIDGE ELEVA,ON
APPRCK SCALE: 1" = 20'
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
14 DISMAL CREEK CULVERT REPLACEMENT
Project Location and Setting
The project is located at MP 9.19 on Upper Hoh Road in West Jefferson County. The existing culvert will be replaced with
a fish passable concrete box culvert. The Washington State Dept of Fish & Wildlife (VVDFW) has identified this culvert re-
placement as a high priority. Dismal Creek is a tributary to the Hoh River.
Project Scope
This project will consist of replacing the culvert at Dismal Creek with a WDFW- approved, fish passable structure. The
new structure will be a large box culvert.
Project Impetus
Jefferson County is required by WDFW to perform environmental mitigation for riprap placed in the Hoh River during
emergency road repairs at Upper Hoh Road MP 4.0. Jefferson County and WDFW have agreed that this mitigation will
be satisfied by replacing the culvert at Upper Hoh Road MP 9.19 with a WDFW-approved fish passable structure.
Status
Jefferson County is currently in the process of securing funding for this project from the Federal Highway Administration
(FHWA). Funding is anticipated to be 86.5% FHWA, and 13.5% Jefferson County Road fund.
PROJECT STATISTICS
Road Number......... ...... ............914207
Milepost... ...................... ...........9.19
Project Estimate 2010-2015
Preliminary Engineering.... $
Right of Way ................. $
Construction.................. $
Total ......$
15,000
2.000
473,000
490,000
VICINITY MAP
Project Timeline
Preliminary Engineering............... 2010
Construction... .......................... 2011
Project Funding
Federal Highway Administration-ER
...........$ 424,000
Local Road Funds ...........$ 66,000
,
"
lB'-C SPA~
1'-6"
""A
i
~
PROJECT SCHEMATIC
'm'
~
v'"
3/4D
ClVERD'CAIIATION
WDTH
SEeTIGi\
1/2"_1'_D"
CD
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
SPRUCE CREEK CULVERT REPLACMENT 15
Project Location and Setting
Spruce Creek Culvert is located at MP 9.71 on Upper Hoh Road in West Jefferson County. Spruce Creek is a tributary to
the Hoh River.
Project Scope
This project will consist of replacing the two culverts at Spruce Creek with a single span concrete bridge in order to im-
prove hydraulic capacity and fish passage.
Project Impetus
This site has had repeated damage during flood events due to insufficient culvert capacity and the large volumes of water
and bed material that are transported in this stream. In January, 2009, Jefferson County applied to the Federal Highway
Administration (FHWA) for emergency relief funding to replace the damaged culverts, and has received preiiminary fund-
ing approval.
Status
Jefferson County is currently in the process of securing funding for this project from the Federal Highway Administration
(FHWA). Funding is anticipated to be 86.5% FHWA, and 13.5% Jefferson County Road fund.
PROJECT STATISTICS
Road Number........................... 914207
Miiepost ......... .........,............9.71
Existing Conditions
Lane Widths. ..... 9 It paved (8ST)
Shoulder Widths.................. 2 It gravel
Traffic Count
2005............. ..................... 500ADT
Project Estimate 2010-2015
Preliminary Engineering.... $
Right-of-Way........ $
Construction......... $
TOTAL.................... $
Project Timeline
Preliminary Engineering
Right-of-Way...
Construction... .............
70,000
2.000
924,000
996,000
...2010
.............2010
2011
Project Funding
Federal Highway Administration
............. $ 862,000
Local Road Funds ........ ,... $ 134,000
Spruce Creek, Upper Hoh Rd. MP 9.71
VICINITY MAP
,~
~
-- 'l :~-, ~"~
. . ~._. ~: : .'~f' '"',
""'-' w." i
"""J~ ,.,'
-YlY\ .'~ 4,1 ,
'"', "t-
"
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
16 WILLOUGHBY CREEK BRIDGE REPAIR
Project Location and Setting
Willoughby Creek Bridge is located at MP 3.50 on Upper Hoh Road in West Jefferson County. Willoughby Creek is a
tributary of the Hoh River. The bridge is located approximately 500 ft. upstream from the Hoh River.
Project Scope
Willoughby Creek Bridge sustained damage to the west bridge approach and abutment protection, and to a section of up-
stream bank protection. This project will consist of repairin9 these damaged elements. This project is funded at 86.5% by
the Federal Highway Administration.
Project Impetus
Damages to the bridge occurred as a result of flooding in January 2009. Jefferson County's intent is to repair the dam-
ages as quickly as possible while meeting the requirements for Federal funding.
Status
Jefferson County is currently in the process of hiring a consultant for the design and permitting of the bridge repairs. It is
anticipated that construction will not occur until 2010 given the permitting requirements and work windows.
Project Estimate 2010-2015
Preliminary Engineering..... $
Right-of-Way................... $
Construction.................... $
TOTAL......... .... $
Project Timeline
Preliminary Engineering ......2010
Right-of-Way.. ......................2010
Construction...... ................... ...2010
54,000
15,000
330.000
399,000
VICINITY MAP
PROJECT STATISTICS
Road Number.......... ...........914207
Milepost ........................... 3.5
Existing Conditions
Lane Widths...... 9 ft paved (BST)
Shoulder Widths.................. 2 ft gravel
Traffic Count
2005.....
.... 500 ADT
Willoughby Creek Bridge, Upper Hoh Rd. MP 3.50
Project Funding
Federal Highway Administration-ER
............. $ 345,000
Local Road Funds. ........... $ 54,000
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
SOUTH DISCOVERY ROAD-MP 2.65-3.64 17
Project Location and Setting
The project is located on S. Discovery Road between Douglas Way, at MP 2.65, and Cape George Road, at MP3.64, in
the vicinity of the Discovery Bay Golf Course.
Project Scope
The project will improve safety by removal of roadside obstructions, widening and paving of road shoulders to four feet,
restoration of the base material, and resurfacing to improve ride quality.
Project Impetus
This section of S. Discovery Road is substandard in terms of width and pavement condition. There are also drainage is-
sues, deep ditches, and obstacles in the clear zone, all of which present safety hazards.
Status
Engineering is planned for 2012-2013 with construction in 2014. This project has been awarded competitive Rural Arterial
Program funding.
PROJECT STATISTICS VICINITY MAp
Road Number...........................601508
Milepost Start... ...... ...................... 2.65
Milepost End........................ ........ 3.64
Total Mileage............................... 0.99
Existing Conditions
Lane Widths............10 It paved (BST)
Shoulder Widths......... .........2 It gravel
Pavement Rating (2006)...........67-100
Traffic Count
2006........... .....1,600ADT
5-Year Accident History (2003-2008)
Property.................. .......... ............ 8
Injury.... ...................... 3
Fatalities.. ...................... 0
Project Estimate 2010-2015
Preliminary Engineering.. ...$ 170,000
Right-of-Way....................$ 200,000
Construction..................... $ 1.305.000
TOTAL.................... $ 1,675,000
Project Timeline
Preliminary Engineering ...... 2012-2013
Right-of-Way.. .......................... 2013
Construction.. .......................... 2014
Project Funding
State (Rural Arterial Program)
.. $ 1,508,000
Local Road Funds ............$ 168.000
South Discovery Road looking north-
ward after the intersection with Cape
George Road at Discovery Bay. The
Golf Course is to the left in this photo.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
18 PARADISE BAY ROAD-MP O.37-1.53-PHASE 2
Project Location and Setting
The project location is Paradise Say Road from milepost 0.37 (Ludlow Creek) to 1.53 (Teal Lake Road).
Project Scope
The project will construct 4-ft.-wide shoulders and overlay the road with asphalt concrete pavement. Local Road Funds
and State Rural Arterial Program funds are secured for this project.
Project Impetus
Pavement condition and ride quality have deteriorated on this well-traveled rural collector roadway., Widening the road
shoulder to a 4-loot paved width will provide for a safer driving experience and allow for the safer use of the shoulder by
non-motorized users. The project was very competitive within the northwest region of counties and was awarded $992,500
in State Rural Arterial Trust Account grant funds in 2009.
Status
Engineering is planned for 2010 and 2011 with construction taking place in 2012.
PROJECT STATISTICS
Road Number... ...... ..................503608
Milepost Start...... ..................0.37
Milepost End..................... ....1.53
Total Mileage... .................... ......1.16
Existing Conditions
Lane Widths............ ...11 It paved (SST)
Shoulder Widths.......... 4 It gravel (ACP)
Pavement Rating (2006).............51-100
Traffic Count
2008........... .........3.100ADT
5-Year Accident History (2004-2008)
Property.................................... ...7
Injury... ................. ............ ..........0
Fatalities........................ ...... ... ......0
Project Estimate 2010-2015
Preliminary Engineering..... $ 347,000
Right-of-Way..... .........$ 203,000
Construction................... $1.241,000
TOTAL..... $ 1,791,000
VICINITY MAP
Project Timeline
Preliminary Engineering. .....2009-2010
Right-of-Way........... ...... ...........2011
Construction... ........2012
The Paradise Bay Road Phase 2 project be-
gins where the award-winning Phase 1 project
ended. The project will provide a safer travel-
ing experience and rehabilitate the road pave-
ment.
Project Funding
State (Rural Arterial Pr09ram)
............ $ 1,612,000
Local Road Funds ........... $ 179,000
TYPICAL ROAOWAY SECTION
CONST~UCTlON
4'
SHOULDE
11" LANE
11' lANE
4'
SHOULDER
...~
H S N "
1ST. PAVEMfNT
I
:
VARIES SEE PLAN
VARIES SEE PLAN
a
~
:
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
SR 116/ SR 19 INTERSECTION IMPROVEMENTS-PE 19
Project Location and Setting
Jefferson County is currently developing and applying a travel demand model for the Qulmper Peninsula, and collaborat-
ing with the Washington State Department of Transportation (WSDOT) on a corridor plan for State Route 19 and SR 20.
The County's focus is on the Tri-Area. One of the objectives of the Quimper transportation analysis and the WSDOT corri-
dor planning process is a prioritized list of transportation projects, including intersection improvements, along SR 19 and
20. The model identifies the intersection of SR 116 and SR 19 as one of the priority intersections along the corridor.
Project Scope
The project is intended to cover preliminary engineering design for intersection improvements, including channelization,
intersection control and pedestrian facilities. Proposed funding includes Federal Surface Transportation Program and local
funds. The project is in partnership with WSDOT.
Project Impetus
Traffic is anticipated to increase as the Tri-Area area develops, especially with a planned urban growth area in Port Had-
lock and Irondale. The intersection of Rhody Drive (SR 1 g) and Ness' Corner Road (SR 116) is a priority candidate for
improvements.
Status
Preliminary engineering is anticipated to commence in 2011. Construction will be dependent on future funding.
VICINITY MAP
PROJECT STATISTICS
Road Number..........................19 &116
Traffic Count
2006.... ..................5,000-14,000 ADT
Project Estimate 2010-2015
Preliminary Engineering.... $ 200,000
Project Timeline
Preliminary Engineering......... ...2011
Project Funding
Federal (Surface Transportation Program)
....$ 173,000
Local Road Funds ......... ... $ 27,000
SR 19 at SR 116 looking northerly. Peak hour delays for left-turn
movements from SR 116 make this intersection a candidate for
improved intersection controls.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
20 WEST UNCAS ROAD CULVERT REPLACEMENT-MP 0.78
Project Location and Setting
This culvert located under West Uncas Road has been identified by salmon restoration partners In the Chumsortium as a
barrier to spawning summer chum salmon at low fiows. The North Olympic Salmon Coalition and other partners have
proposed replacing this culvert with a box culvert or bridge.
Project Scope
The project will remove a deteriorating metal culvert and the "drop" at the outlet with a new box culvert or bridge that al-
lows unimpeded fish passage at all flows. The new structure will have a functional life of at least 100 years.
Project Impetus
Jefferson County has worked with numerous organizations for more than a decade to replace fish passage barriers at
county road culverts. These partnerships have resulted In highly competitive grant applications, which have allowed the
removal of these barriers while leveraging limited local funds to a very high degree.
Status
This project is ultimately dependent on a partner organization such as the North Olympic Salmon Coalition sponsoring the
project and the grant applications. Since it is anticipated that the project will be managed by a partner organization such
as NOSe, the funding in the TIP represents only the possible County contribution to the project and not the full project
amount.
PROJECT STATISTICS
Road Number ............ .......500209
Milepost ............. ........ 0.78
Existing Conditions
9 ft. x 15 ft. Metal Pipe Arch-
Deteriorating
Project Timeline
Preliminary Engineering.. ... 2012
Construction........................ .. ...2013
Dependent upon grant funding.
Project Funding
Local Road Funds.. $ 75,000
Restoration Partner Grant.... $ 500,000
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
CENTER ROAD ASHPALT OVERLAY-MP 4.3-6.8-PHASE 5 21
Project Location and Setting
The asphalt overtay project is located between MP 4.3 and 6.8 on Center Road.
Project Scope
This project will consist of pavement grinding and pre-leveling, followed by a 2-inch asphalt overlay, gravel shoulder dress-
ing, new intersection pavement markings, and new travel lane striping.
Project Impetus
Center Road is one of Jefferson County's most heavily used roadways. and this project is one phase of the ongoing Cen-
ter Road pavement maintenance and improvement program. Phase 5 would be the next phase of asphalt overlay for Cen-
ter Road should additional funds be available through the recent Federal economic stimulus program. the American Re-
covery and Reinvestment Act (ARRA).
Status
This Is a "shovel ready" project that would be possible if additional ARRA funds become available. Absent Federal stimu-
lus funding, it is unlikely that this project, which would cost $900,000, is possible in the timeframe of this Transportation
Improvement Pr09ram through traditional funding sources.
PROJECT STATISTICS
Road Number........................ ...931507
Milepost Start......... .. .... 4.30
Milepost End....... ...............6.80
Total Mileage.. ............... ...........2.50
Existing Conditions
Lane Widths.........
Shoulder Widths...
Pavement Rating
Traffic Count
.....11 It paved (BST)
8 It paved (BS1)
..............91-100
2008............
...... ..2,900 ADT
Project Estimate 2010-2015
Preliminary Engineering.. ..$
Construction ...... $
TOTAL.. ............ ......$
25,000
875.000
900,000
Project Timeline
Preliminary Engineering.... ........ 2010
Construction. ............ ........ 2010
Project Funding
Federal (ARRA). ............$ 900,000
Wheel path rutting on Center Road, ~
typical in both north and southbound
lanes due to heavy vehicle traffic.
Center Road:
project limits
SR 104:
intersection
with Center
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
22 CHIMACUM ROAD MP 0.34-0.96
Project Location and Setting
This project is located between MP 0.34 and 0.96 on Chimacum Road, from Church Lane to Redeemer Way.
Project Scope
Potential improvements include roadway reconstruction, shoulder widening, intersection treatments and non-motorized
facilities, including the extension of facilities for the Rick Tollefson Trail. Local, State and Federal funds are proposed.
Project Impetus
In addition to needed structural improvements for Chimacum Road, there is a recognized need for urban transportation
design improvements in and around the central area of the planned Irondale and Port Hadlock UGA. These include im-
proved pedestrian, bicycle and transit facilities.
Status
Preliminary engineering is scheduled to begin in 2012, with construction beginning in 2014. Community outreach will be
part of the planning process. This project is dependent upon securing outside funding.
PROJECT STATISTICS
Road Number........................ ...932507
Milepost Start............... ............ .... 0.34
Milepost End.................... ...0.96
Total Mileage............ ............ 0.62
Existing Conditions
Lane Widths..............11 It paved (BST)
Shoulder Widths.......... 3 It paved (BST)
Pavement Rating (2006)............ 71-100
Traffic Count
VICINITY MAp
,
,
-.~".. (
. ..
~ t>~.c...s<AOl'~V
~\ f~~ ~~. .Pdl1T~Bay
" ~:~ <: ... ~ . "
".....,~ '-.~~\.._.~ f:~ i
) ~-;.oi ~
d
(,';,
;':""''':
\~s'i ~
'il ~ "'_~'.__'
!ii. lit,,.. rJ
'\ ofT..<\
, '.
o
"':luoc~~""
PORT
HADLOCK
2008............ ...............4,500ADT
5-Year Accident History (2004-2008)
Property.................................. ..... 2
Injury......... ................................. 2
Fatalities...................................... 0
Project Estimate 2010-2015
Preliminary Engineering.......$ 160,000
Right-of-Way..................... $ 106,000
Construction..................... .$1 ,389.000
TOTAL.. ...... ......... ...$1,655,000
Project Timeline
Preliminary Engineering
Right-of-Way...
Construction.. .
l
.
ANPl.eso,"'"''''''
PROJECT
LOCATION
,
""""""""...'1
. I
i :r
! '
\,
\,
\
\
~-\
/ I Cfft~ACUM
,
I
I
...... 2012-2013
..............2013
.........2014
Project Funding
Federal (Surface Transportation Program)
............. $ 103,000
State (Rural Arterial Program)
............. $1,396,000
Local Road Funds ............. $ 156,000
Improved pedestrian, bicycle and transit facilities are planned for the county's second largest popula-
tion center in the Tri-Area. The project site, shown above, is located along Chimacum Road between
the intersection with SR 19 and Center Road to the south and SR 116 and lrondale Road to the north.
JEFFERSON COUNTY Puauc WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
SOUTH DISCOVERY ROAD-MP 4.25-4.84 23
Project Location and Setting
The project is located on the last 112-mlle stretch of S. DiscovelY Road on DlscovelY Bay. The project area begins just
west of Lower Adelma Beach Road and extends to the intersection with SR 20 and Four Corners Road.
Project Scope
The project will improve safety by removal of roadside obstructions, widening and paving of road shoulders to 4 feet, res-
toration of the base material, and resurfacing to improve ride quality. The project will also enhance pedestrian and bicycle
facilities as an extension of the LarlY Scot! Trail to Four Corners.
Project Impetus
This section of S. Discovery Road is substandard in terms of width and pavement condition. There are also drainage is-
sues and obstacles in the clear zone, all of which present safety hazards. Non-motorized improvements are warranted.
Status
Project initiation is planned for 2014. This project is dependent upon securing competitive Rural Arterial Program funding.
PROJECT STATISTICS
Road Number... ...........601508
Milepost Start................ ..............4.25
Milepost End................... ............4.84
Total Mileage................. ............. 0.59
Existing Conditions
Lane Widths........10-12 It paved (BST)
Shoulder Widths.... 2-3 It gravel
Pavement Rating (2006)...........72-100
Traffic Count
2008.. ............. ..... 2,800ADT
5-Year Accident History (2004-2008)
Property............. ................... ......1
Injury...... ........................... .........0
Fatalities. ................... .................0
Project Estimate 2010-2015
All Phases..................... $1,200,000
VICINITY MAP
Project Timeline
Initiate.
.........2014
Project Funding
State (Rural Arterial Program)
... $1,080,000
Local Road Funds .......... $ 120,000
South Discovery Road looking
eastward toward Four Corners
with Discovery Bay in the
lower right corner.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
24 PARADISE BAY ROAD-MP 1.53-2.96-PHASE 3
Project Location and Setting
The project location is Paradise Bay Road from milepost 1.53 to 2.96, extending improvements from Teal Lake Road,
where the Paradise Bay Road-Phase 2 project concludes. Phase 3 will end just south of Tala Shore Drive.
Project Scope
The project is to construct 4' wide shoulders and overlay the road with asphalt concrete. Local Roads and State Rural
Arterial Program funds are planned for this project.
Project Impetus
Pavement condition and ride quality have deteriorated on this well-traveled rural collector roadway. Widening the road
shoulder to a 4-foot paved width will provide for a safer driving experience and allow for the safer use of the shoulder by
non-motorized users.
Status
Project initiation is anticipated in 2014 with funding dependent on successful application for Rural Arterial Program funds
from the State of Washington.
PROJECT STATISTICS
Road Number...........................503608
Milepost Start............. ............ ....1.53
Milepost End............... .................2.96
Total Mileage............. ............. ...1.43
Existing Conditions
Lane Widths...............11 It paved (BST)
Shoulder Widths.......... 4 It gravel (ACP)
Pavement Rating (2006)......... ....51-100
Traffic Count
2008.... ............... ...2,150 ADT
5-Year Accident History (2004-2008)
Property... ... ... ... ... ... ....... ... ... ...... ..15
Injury..... ........... ............. ...........9
Fatalities......... ........... ...0
Project Estimate 2010-2015
All Phases.... ............ .... $ 1,500,000
Project Timeline
Initiate..............
...2014
Project Funding
State (Rural Arterial Program)
.. $ 1.350,000
Local Road Funds ....... ....$ 150.000
PROPOSED TYPICAL ROArYWAY SECTION
.'
SHOUlDER
~~s
CONST~UCTION
,,' l.ANE
11' LANE
.'
SHOU\.DER
~
=>
~
lsn x
JST. PAVOlENT
VARIES SEE PLAN
..,
~
VARIES SEE PlAN
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
DABOB ROAD-MP 3.10-4.00 25
Project Location and Setting
This project is located between milepost 3.10 and 4.00 on Dabob Road south of State Route 104 between Center Road
and Dabob Post Office Road.
Project Scope
Rehabilitate failing roadway structure and pave with asphalt concrete.
Project Impetus
Roadway has failing structure and requires rehabilitation and resurfacing.
Status
Engineering and construction are planned for 2012 using local funds..
PROJECT STATISTICS
Road Number ...................... .. 348808
Milepost Start....... ............3.10
Milepost End...... ...... ...... .............. 4.00
Total Mileage............................... 0.90
Existing Conditions
LaneWidths..............12 It paved (BST)
ShoulderWidths............ .....2 It gravel
Pavement Rating (2006)... ........37-100
Traffic Count
2006............... ........250ADT
5-Year Accident History (2004-2008)
Property... ... ... ... ... ... ... .... ...... ..... ... ...0
Injury............,..... ....0
Fatalities............ ................ .........0
Project Estimate 2010-2015
Preliminary Engineering... ...$
Construction ............... .....$
TOTAL.... ... $
25,000
225,000
250,000
Project Timeline
Preliminary Engineering... .....2012
Construction ............... .............2012
Project Funding
Local Road Funds
. .._. $ 250,000
VICINITY MAP
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
26 WEST VALLEY ROAD NON MOTORIZED & INTERSECTION IMPROVEMENTS
Project Location and Setting
This project is located on West Valley Road in the vicinity of the Chimacum School campus and including the intersection
with SR 19.
Project Scope
"Safe Routes to School" project including roadside safety, channelization, intersection improvements and pedestrian facili-
ties.
Project Impetus
The Jefferson County Traffic Safety Task Force, a coalition of partners including the Sheriffs Office, Public Works, State
Patrol, WSDOT Operations, County Library and the Chimacum School District-have identified this area as a good candi-
date for safety improvements for pedestrians and bicyclists, and in particular, school children.
Status
Engineering is planned for 2011 with construction in 2012. This project is dependent upon securing competitive "Safe
Routes to School" or similar grant program funds to be matched with local funds.
PROJECT STATISTICS
Road Number.......................... 514109
Milepost Start........................ .......0.00
Milepost End............. .............0.21
Total Mileage............................... 0.21
Existing Conditions
Lane Widths...... ...... ..13 It paved (BST)
ShoulderWidths..................3 It gravel
Pavement Rating (2006)................100
Traffic Count
2008.................. ............ ....3,000 ADT
5-Year Accident History (2004-2008)
Property................. ...... ........ ...2
Injury.................................... ........0
Fatalities............................... .. .......0
Project Estimate 2010-2015
Preliminary Engineering.... $
Construction.................... $
TOTAL.................... $
50.000
450,000
500,000
Project Timeline
Preliminary Engineering .............. 2011
Construction............. .... 2012
Project Funding
State (Safe Routes to School Program)
........ $ 375,000
Local Road Funds ............ $ 125,000
VICINITY MAP
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
CEDAR AVENUE NON MOTORIZED & INTERSECTION IMPROVEMENTS 27
Project Location and Setting
This project is located on the length of Cedar Avenue in Port Hedlock, with a focus in the vicinity of the Chimacum Creek
Elementary School and Jefferson County Library.
Project Scope
"Safe Routes to School" project including roadside safety, channelization, intersection improvements and pedestrian facili-
ties.
Project Impetus
The Jefferson County Traffic Safety Task Force, a coalition of partners including the Sheriffs Office, Public Works. State
Patrol, WSDOT Operations. County Library and the Chimacum School District-have identified this area as a good candi-
date for safety improvements for pedestrians and bicyclists, and in particular. school children and Library patrons.
Status
Engineering is planned for 2012 with construction in 2013. This project is dependent upon securing competitive "Safe
Routes to School" or similar grant program funds to be matched with local funds_
PROJECT STATISTICS
Road Number.......................... 637109
Milepost Start..... ..... ............_... 0.00
Milepost End...... ........... .............0.63
Total Mileage............................... 0.63
Existing Conditions
Lane Widths............ ..11 It paved (BST)
Shoulder Widths....... 4-B It paved (BST)
Pavement Rating (2006)................100
Traffic Count
2004,............. ...............2,000ADT
5.Year Accident History (2004-2008)
Property...... ........... .......................0
Injury....... ............. ............ 0
Fatalities.......... .............. ...............0
Project Estimate 2010-2015
Preliminary Engineering..... .$
Construction...... ...$
TOTAL...... ............. _$
50,000
450.000
500,000
Project Timeline
Preliminary Engineering........ ......2012
Construction...... ............. .........2013
Project Funding
State (Safe Routes to School Program)
...........$ 375,000
Local Road Funds ............. $ 125,000
ClilMACUM CREEK ELEMENTARY
Slt1_
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
28 OLYMPIC DISCOVERY TRAIL RIGHT-OF-WAY ACQUISITION
Project Location and Setting
Community trail advocates hope that the Olympic Discovery Trail will eventually lead from the Port Townsend waterfront to
the Pacific Ocean. This project involves the section between Four Corners Road and the Clallam County line.
Project Scope
Jefferson County has requested funds from the U.S. Congress for right-of-way acquisition to complete the Jefferson
County portion of the ODT. This project is a collaboration among partners, including the Peninsula Trails Coalition.
Project Impetus
The ODT serves as a tremendous recreational facility for the Olympic Peninsula. Completion of the trail system will in-
crease its value as a tourist attractor and amenity for residents. The Larry Scott Trail serves as the easternmost segment
of the ODT. The section between Four Corners and the Clallam County line is the portion that remains in Jefferson
County.
Status
The request for funding has been made to the U.S. Congress. lithe acquisition project is funded, work will begin in 2010.
PROJECT STATISTICS
Total Mileage ......... Approx. 17 miles
Project Estimate 2009-2014
Preliminary Engineering..... $ 225,000
Right-of-Way... ... $ 730.000
TOTAL. ..$ 955,000
Project Timeline
Preliminary Engineering............ 2010
Right-of-Way... .........2010-2015
Project Funding
Federal (Transportation, Community
and System Preservation)
.. $ 764,000
State (Washington Wildlife and
Recreation Program)
...... $ 115,000
Local Road Funds ..... $ 76,000
The specific route that the ODT takes
from Four Corners to Clallam County will
be determined through a planning proc-
ess and voluntary participation from
property owners. This image is from a
report produced by Chuck Preble, 2002,
Peninsula Trails Coalition, and is dis~
played here for example only.
VICINITY MAP
Jefferson County Route Study
Four Corners to DiscoveryJunction
ReY.12127102.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
UPPER HOH ROAD CULVERT REPLACEMENT-MP 3.338 29
Project Location and Setting
This culvert is located at an unnamed stream at MP 3.338 on Upper Hoh Road in West Jefferson County. The unnamed
stream is a tributary to the Hoh River.
Project Scope
This project will consist of replacing the culvert at Upper Hoh Road MP 3.338 with a new, larger culvert to improve hydrau-
lic capacity and to eliminate ongoing problems associated with failure of the existing culvert.
Project Impetus
The existing culvert is badly deteriorated, and is causing ongoing settlement of the roadway. It has been identified through
the Jefferson County culvert priority rating system as a high priority for replacement
Status
This project is in the planning phase. A site topographical survey and some preliminary ccnstruction ccst estimates have
been completed. Completion of project requires securing Federal funds with partners in the Olympic National Park.
PROJECT STATISTICS
2005....
......................... 500ADT
VICINITY MAP
Road Number...........................914207
Milepost. ............. ....................3.338
Existing Conditions
30"-Diameter Steel Culvert-
Sadly Deteriorated
Traffic Count
Project Estimate 2010-2015
All Phases..... .................. $ 500.000
Project Timeline
Initiate.. ...........
..........2011
Project Funding
Federal............. .. $ 432,000
Local Road Funds ...... $ 68.000
Upper Hoh Road culvert, MP 3.338,
showing deteriorated bottom chord.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
30 THORNDYKE ROAD CULVERT REPLACEMENT-MP 7.18
Project Location and Setting
This project is located approximately 9 miles southerly of the Hood Canal Bridge at MP 7.18 on Thorndyke Road, on the
Toandos Peninsula. The existing 24"-dlameter culvert crosses Thorndyke Road under approximately 70 feet of roadway
fill and is approximately 364 feet long.
Project Scope
This project will replace the existing culvert that carries an unnamed stream underneath Thorndyke road with a Wash-
ington Department of Fish and Wildlife (WDFW)-approved, fish passable structure. The new structure will be sized to
transport the anticipated sediment load (gravel) and provide for fish passage.
Project Impetus
This stream is priority #25 on the Fish Passage Priority list (WDFW 2000). The pipe is undersized for the sediment
load that it carries. This metal culvert is over 40 years old and is nearing the end of its useful life.
Status
Jefferson County is currently in the process of preparing preliminary designs and cost estimates for determination of the
best solution. No funding sources other than the Jefferson County Road Fund have been identified yet.
PROJECT STATISTICS
Road Number ....................... ..418708
Milepost .................... .........7.18
.~
:/
Project Estimate 2010-2015
Preliminary Engineering
Construction..
Total
$ 200,000
$ 1,500,000
$ 1,700,000
Project Timeline
Preliminary Engineering...
Construction... ...... ........
....2011
...........2013
Project Funding
Local Road Funds ..... ......$ 1,700,000
-
t
"
-c.
~
.....:-
';:;"" \ .
.~, ...~
q, STRUCTURE
I
PRECAST REINF. CONe.
THREE SIDED STRUCTUR~
20'
10'
10'
STREAMBED GRAVEL
-...
PRECAST FOOTINGS ----.--1
SECTION
1"=10'
A-A
Engineering drawing of Thorndyke Road
culvert, MP 7.18
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
SNOW CREEK ROAD CULVERT REPLACEMENT-MP 0.84 31
Project Location and Setting
This culvert is located at milepost 0.84 on Snow Creek Road on a tributary to Lake Leland.
Project Scope
Replace a deteriorating 24-inch steel culvert with and new and larger bored or jacked casing.
Project Impetus
The existing steel culvert is deteriorating and will eventually collapse. The culvert is located under a deep road fill. Due to
the costs of removing the fill and interruptions to traffic, the preferred repair is to bore or jack a new and larger casing un-
der the roadway.
Status
This is an "out-year" project as local funding for this project may not necessariiy be avaiiable. Engineering is programmed
to begin in 2015.
PROJECT STATISTICS
Road Number........
Milepost ................
.. 352909
.......0.84
Existing Conditions
Lane Widths............. g It paved (6S1)
Shoulder Widths......... .........2 It gravel
24"-Steel Pipe-Deteriorated
Traffic Count
2005......
.......500ADT
Project Estimate 2010-2015
All Phases.......... ............. $ 500,000
Project Timeline
Initiate............
....... 2015
Project Funding
Local Road Funds ...
... $ 500,000
MP 0.84 culvert outlet showing water
running out under deteriorated pipe.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
32 WEST VALLEY ROAD CULVERT REPLACEMENT-MP 2.555
Project Location and Setting
This culvert is located at milepost 2.56 on West Valley Road on Naylor Creek.
Project Scope
Replace a deteriorating steel culvert with and new fish passable aluminum or concrete box culvert.
Project Impetus
The existing steel culvert is deteriorating and will eventually collapse. The culvert is also listed as a barrier to fish.
Status
This is an "out-yeai" project as local funding for this project may not necessarily be available. Likely funding source (as
shown) would be from State salmon recovery programs. Engineering is programmed to begin in 2015.
PROJECT STATISTICS
Road Number.....
Milepost ..'
...........514109
..............2.555
Existing Conditions
Lane Widths... ___..
Shoulder Widths..,
g It paved (8ST)
...2 It gravel
Traffic Count
2005.......
500 ADT
Project Estimate 2010-2015
All Phases.. ........... $ 500,000
Project Timeline
Initiate............... ...................... 2015
Project Funding
State Salmon Recovery Programs
......$ 400,000
Local Road Funds ............. $ 100.000
Existing culvert showing severe deterio-
ration of metal in the lower chord. A drop
at the outlet is a barrier to fish migration.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
COUNTYWIDE SAFETY IMPROVEMENTS 33
Project Location and Setting
Countywide.
Project Scope
This is a programmatic category for various safety-related projects. Project selection is accomplished using the Local
Agency Safety Management System developed by WSDOT for local agencies. Staff compiles information from crash site
investigation and evaluates whether crash clusters indicate the need for countenmeasures at specific locations. Funding
may include Federal funds; State and local funds are shown at this time.
Project Impetus
Crash sites and clusters may indicate the need for countermeasures designed to prevent crashes. Safety is an ongoing
priority for the county transportation program.
Status
Information from crash investigations is continuously compiled. Development and prioritization of safety projects follows
evaluation of this information.
PROJECT STATISTICS
Project Estimate... . .
.......$ 180,000
Project Timeline .. ...............2010-2015
Project Funding
State ..
Local Road Funds.....
... $ 90,000
.. $ 90,000
Damaged guardrail as a result of a crash.
New guardrail after reconstruction.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
34 COUNTYWIDE CULVERT REPLACEMENT PROJECTS
Project Location and Setting
Countywide. There are approximately 2,800 culverts under Jefferson County roadways.
Project Scope
This is a programmatic category for culverts that are at the end of their useful lives and that require replacement with new
culverts or small bridges. This programmatic budget allocation allows for expenditure when needed during the planning
period. Local funding is targeted, though some projects could qualify for State or Federal funding.
Project Impetus
There are culverts in the county road system that warrant replacement due to their condition and the fact that they are
undersized or for other reasons.
Status
Culvert replacements are prioritized through a ranking system.
PROJECT STATISTICS
Project Estimate......... .......$ 180,000
Project Timeline...
...... .201 0-2015
Project Funding
Local Road
Funds
An example of a deteriorating culvert under the
Upper Hoh Road.
This culvert replacement project under Center Road
replaced an old, 4-ft diameter culvert with a 15-ft x 10-ft
culvert which restored fish passage up Tarboo Creek.
TYPICAL SECTION
c__~:..:....:~..~~_
.'''''''''''''''''....
~-----------.~
,
,
,
I
,
,
-.
~,,1(:H"""'G'''''''''
/ "'''''ED'''''''''",
/
'Lti
.
/
/
""",,,, ''''", t'Ul""'" t _ _F~~~:t'~;;~-;,.
-"'- Li1l<",,~
;,,-
_"",""o,",'\oIl-~""" ,
'I ~_,~t~::.~=;~_e:'~'~~"'~"
-- -- I ~,'J", I
~-,\
.' L'''''T<O,T\1'
"
"
...",-~.w.o""'T'ED
~""~i'~,~~~~~
...cm'....Q.l.
~
~
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
COUNTYWIDE DRAINAGE IMPROVEMENTS 35
Project Location and Setting
Countywide.
Project Scope
This is a programmatic category for small projects that aim to resolve drainage issues that are spot improvements above
and beyond regular maintenance. An example of a minor chronic drainage problem would be persistent ponding of storm-
water in cul-de-sacs. Projects can also arise as a result of winter weather. This programmatic budget allocation allows for
expenditure when needed during the planning period. Funding is local Road funds.
Project Impetus
Minor chronic drainage problems need to be addressed over time. Including this category in the TIP improves budget plan-
ning for these types of projects.
Status
Development and prioritization of minor drainage improvement projects is ongoing.
PROJECT STATISTICS
Project Estimate..... ...........$ 180,000
Project Timeline... .. ............2010-2015
Project Funding
Local Road Funds
County crews complete a minor drainage improvement along
Thorndyke Road.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
36 COUNTYWIDE SURFACING UPGRADES
Project Location and Setting
Countywide. There are currently 80 miles of gravel roadway in Jefferson County.
Project Scope
This is a programmatic category for projects selected through the gravel road priority system. Estimated expenditures are
for upgrades to be addressed over the planning period. Funding is local Road tunds.
Project Impetus
Gravel roads are reviewed periodically for maintenance and upgrade needs throughout the county road system.
Status
Projects will be identified and completed in the following years according to the gravel priority array and engineering judg-
ment.
PROJECT STATISTICS
Project Estimate
....$ 180,000
Project Timeline.
...2010-2015
Project Funding
Local Road Funds
Work scene from a gravel road upgrade completed on 6th Avenue in Irondale.
JEFFERSON COUNTY PUBLIC WORKS
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
COUNTYWIDE PEDESTRIAN & BICYCLE IMPROVEMENTS 37
Project Location and Setting
Countywide.
Project Scope
These funds are dedicated to minor projects countywide that create or improve facilities for pedestrians and bicyclists.
Examples include bicycle lanes on roadways and sidewalk segments. Local funds and various State sources intended for
pedestrian and bicycle projects are planned for these improvements.
Project Impetus
Facility needs for pedestrians and bicyclists are identified in the County's Non-Motorized Transportation and Recreational
Trails Plan. Major non-motorized projects are identified elsewhere in this program as individual projects. This project
categOl)' is for minor improvements in spot locations to be determined and completed during the planning period.
Status
Improvements will be completed during the six-year period.
PROJECT STATISTICS
Project Estimate................. $ 180,000
Project Timeline............ .....2010-2015
Project Funding
State... .............. $ 90.000
Local Road Funds ........ ... $ 90,000
.....
JEFFERSON COUNTY PUBLIC WORKS
201 0-2015 SiX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
~ WSDOT 2010-2015 SiX-YEAR TIP REPORT
The following report presents the Six-Year Transportation Improvement Program
in a format required by the Washington State Department of Transportation
(WSDOT). WSDOT uses the information for budget planning and to build the
Statewide TIP (STIP). This format is useful for summarizing information related to
the different types of funding sources for transportation capital projects.
JEFFERSON COUNTY PUBLIC WORKS
Six Year Transportation Improvement Program
Instructions for Completing the Form
Complete the form for the six year program in accordance with the fol/owing instructions.
Inc/ude aI/ transportation-related projects regardless of location or source of funds.
Heading
Agency
County Number
City Number
MPO/RTPO
Hearing Date
Adoption Date
Resolution Number
Amendment Date
Enter name of the sponsoring agency.
Enter the OFM assigned number (see LAG Appendix 21.44).
Enter the OFM assigned number (see LAG Appendix 21.45).
Enter the name of the MPO (if located within urbanized area) or
RTPO (if in the rural area).
Enter the date of the public hearing.
Enter the date this program was adopted by council or commission.
Enter Legislative Authority resolution number if applicable.
Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2-digit code denoting the Federal Functional
Classification. (Note: The Federal Functional Classification must be approved by FHWA.)
Description
00 - No Classification
Rural (under 5,000 population) Urban (over 5,000 population)
01 - Interstate 11 - Interstate
02 - Principal Arterial 12 - Freeways & Expressways
06 - Minor Arterials 14 - Other Principal Arterials
07 - Major Collector 16 - Minor Arterial
08 - Minor Collector 17 - Collector
09 - Local Access 19 - Local Access
2. Priority Numbers. Enter iocal agency number identifying agency project priority (optiona/).
3. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (C) Project
Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (Mile Post or
Street/Road Names); and (f) Describe the Work to be Completed.
4. Improvement Type Codes. Enter the appropriate federal code number(s).
Description
01 - New construction on 07 - Resurfacing 14 - Bridge Program Special
new alignment 08 - New Bridge Construction 21 - Transit Capital Project
02 - Relocation 09 - Bridge Replacement 22 - Transit Operational Project
03 - Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning
04 - Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training/Admin
05 - Minor Widening 12 - SafetylTraffic OperationlTSM 31 - Non Capital Improvement
06 - Other Enhancements 13 - Environmentally Related 32 - Non Motor Vehicle Project
5_ Funding Status. Enter the funding status for the entire project which describes the current status.
S - Project is 'selected' by the appropriate selection body & funding is secured.
P - Project is subject to selection by an agency other than the lead and is listed
for planning purposes and funding has not been detennined.
6. Total Length. Enter project iength to the nearest hundredth mile (or code "00" if not applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be
relocated or are impacted by the construction project.
C - Cable TV
G -Gas
o -Other
P - Power
S - Sewer (other than agency-owned)
T - Telephone
W - Water
Six Year Transportation Improvement Program
Instructions for Completing the Form
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering, including Design (or Planning)
RW - Right of Way or land acquisition
CN - Construction only (or transit planning or equipment purchase)
ALL - All Phases from Preliminary Engineering through Construction
(Use onlv in Years 4, 5, & 6)
9. Phase Start Date. Enter the month/day/year (in MMIDDNY format) that the selected
phase of the project is actually expected to start.
10. Federal Fund Sources. Enter the Federal Fund Source code from the table below.
FTA Discretionary for Capita/ Expenditures
- FTA Urban Areas
- Bus
- Fixed Guideways
- New Starts
- FT A Elderly/Disabled
- FTA Rural Areas
- FTA JARC Rural
- FTA New Freedom
- Rural Economic Vitality Program
- Safe Routes To Schools
- STP Statewide Competitive Program
- STP Transportation Enhancements
- STP Legistaltive Earmarks
- STP Safety Including Hazard and RR
- STP Rural Regionally Selected
- STP Urban Regionally Selected
- STP (WSDOT Use Only)
- Combined Border Infrastructure
- Bureau of Indian Affairs
- Bridge Replacement or Rehab.
- Community Development
Block Grant (HUD)
CMAQ - Congestion Mitigation Air Quality
DEMO - TEA-21 Demo Projects (Selected)
Discretionary - Ferry Boat Discretionary, Public Lands
Highway, Scenic Byways, etc.
- Department of Defense
- Interstate Construction
- Interstate Maintenance
- Indian Reservation Roads
- National Highway System
- FT A Job Access/Reverse Commute
CBI
BIA
BR
CBDG
000
IC
1M
IRR
NHS
3037
5307
5309(Bus)
5309(FG)
5309(NS)
5310
5311
5316
5317
REV
SRTS
STP(C)
STP(E)
STP(L)
STP(S)
STP(R).
STP(U)
STP
11. Federal Cost. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed funds to be used on this project.
CAPP - County Arterial Preservation Program PWTF - Public Works Trust Fund
CHAA - Route Transfer Program RAP - Rural Arterial Program
(formerly City Hardship Assistance Account) SCP - Small City Arterial Program
TPP - Transportation Partnerships Program (formerly Small City Program)
AlP - Urban Arterial Program SCPP - Small Cities Pavement Preservation
.(fofmerly Arterial Improvement Program FMSIB - Freight Mobility Strategic Invest. Board
PSMP - Sidewalk Program WSDOT - WSDOT funds
(formerly Pedestrian Safety & Mobility Program) OTHER - Any other unlisted state fund codes
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when
the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the
funds will be spent.
15. Total Funds. Enter the sum of columns 10,12, and 14. (This will auto-total in the STIP software program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures
(in thousands) of dollars by year. (For Loca/ Agency use.)
20. environmental Data Type. Enter the type of environmental documentation that will be required for this
project. Environmental determination must be completed before the Right-of-Way/Constfuction phase(s) can
be obligated. (This is reauired for Federally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. RIW Certification. If Right of Way acquisition is required, enter RIW Certification Date, if known.
(This is reauired for Federally funded projects.)
4~
E
III
I..
Cl
e
a..
-
t:
Ql
E
Ql
>
o
I..
Q.
E
t:
o
:;::;
III
t::
o
Q.
UI
t:
l:!
l-
I..
III
Ql
>-
.~
en
c
.2
;;
'&
..
.
c
.
(:
'0
C
.
E
.
.
..
.
"
.
;;
;;
c
o
0,
c
:c
.
~
10
~
C
N
o
-
c
~
C
N
E
o
I..
u..
d
o z
c W
g Cl.
~ Z
.. 0
, z
Q) 0
E Cl.
.. ...
z '"
o a
t.l Cl.
d :;;
o
c
o
~
~
..
,
<0
~I
~ 0 0
c Z z
& 0 ~
< (J C3
~
{g~
C 0
'0
~o
-"'0
~.~
.0
~ct
~
, il ~
'?= .
iOO::a-ro
,0::: Qlo~
I 0:::: c I
f---:-~-
i .g ~ 10
I c: >. 'N
wf--
s 0
.. z
c c
c: ~
o ~
~o
o "
" <l>
<( '"
l:!:1 ~
E 100
r[ :1;
I ..-"-t-
.
:;
'g-s:;
'" u
u c
'" <l>
.. '"
"'"
~-
;t:: ClJ
" U
C 0
......
Q,-
~
W
iii ~
'"
o
o
N
~
~I
G> ..
~ .s
ell
g>"
'i: C
.. ..
<l> E
J: <(
_0
..~
-0
o~
f--~
~Ir ~ll= ~
f 'l;j I
~ E $~:C"')
"0 5 .l!! 3 I~
c C <f.lu.
'0 -; :--~~T
~ ~: E ~ ~ '~
Dl en! COlJ.O
~ ~I-~I~A'~. r--
~ lJ.lt.!!~~ ~
1Il; u...
01 ",-
ij i~I'~]] I.~
'--' l..L. QllLO
~ r--:.~
I uflro
----~
sapo:) ,qlllln
416ua1lqOl
.n'''s~
(S)&d,(l
~u&wa^OJ!WI '<t
-g I
~ I
ci
z
.
ro
~
d5
~I
~
Cl.
"
'"
C
... :c
. C
.Q W
E .
~ l5
z'iO("7/
(; 0 G)
s::: Ql Q:: .c
.2 ~ E (; g
~~ ~c..i:
J:l ~ ~ 1: ~~
C ~ i= 0 c' Ql
,,_~alu~'2:f!!
Il.. lP ca .S ::; I
uz'~g~:gl
l ~ ~ : :J_
iii
JeqwnN
~po]Jd
ssel:J
IBUOtpun.::l
,--
N
N
~
j ~
J1,",;,--
~ 00
N
,
N
~
1:--
~I__~
il"')<J)
, 00
~
[ffiffi
rr
~c___
I
o
;:;
~
1--
155
t:ltI
I~'~~-
~
'"
I
----j - --1--
oou._J ;; _~ ~
'" .--1--"'---
! P:l
N
'"
I__(/)
m-l N
10
o
o
;:;
.12
fi
'<
~
"
.
}
"
.
~
"
~
.
e
~
o
~.
J~
EO
,g2
...",,0
u:i ~G
- >
o f:l&l
....~~
E8
'a.S!:!
5~
~i
~"
8~
~ ~~
~ 6,~
8 0 -ED
(./) o..r il,s
;::..".... .. ,0: g
1ij:i: E g>(I)
_-:-!.~_~_I:':I._S!__
~8
8ci
.Q~
~~
@)~~
~9o::
~~S
.~ &~
~ ~~
B ~ ~
Co
~.
~~~
i5 EO::
u~~
@8~
~~!!!
. Ql 50
.~ >8 ~o
..... ..~
8 is f~
Vl 0 U) 'Sa;
~o EE~
~:8 2&'8
N-.=---- --r N
-l----
1:5
"
~
'"
~
.~
"
;;
,
bl
"
c
"
~
I~
o
o
o
.
>-
w
o
N
I'- ltlltll'-
00 <')<')0;0
N ~
'<I" <J)ltll'-
Ol <'1<'10)
N ~
N '<1"'<1"<'1
o ~
N '<1"'<1"<')
m ~
""'"
,www
!~~~
1000
i---
1(0(00
INN~
1_-
, ~~~
. . .
o " "
.Q.Q ,Q
:www
; b b b
1555
I
1000
ioee
I'~!:::!!:::!
(f) "....".........
rn'
o:w:!:z
t-:o..o:::u
~
E
~ ~
~o
:-:~
s:g:
t:: 1i!
.Q .",
~ '0._
.Q
8' 0
""0 ~
& 8-
~ ~
~ '<1"0
00 "
g!ociB
;g 0;0 E g
9._~ .g_~
o
;:;
"
;;
CO
, ..
___1
!",
o
I
,
~IN
~ m
<.0,1'-
..
l:
o
+l
'5
.,
..
"
o
.;;
~
c.
..
.,
"C
.,
l'!
.,
c.
"
rn
N
m
~
...
.,;
,;
I'-~
~'m
OO~
N
m
~
~i~
!
i---
~I~
I~
I
~
N
~
m
~
~
Cl.
,~
:;:1
~,
.
'"
.
Cl.
,--
,
io
,~
.0
!~
,-
-"'I~
cul__
~1t5
I
''''
I~
o.l-S;U
00
~
<>
[f)
NCOI'--lC)
0000
.
l
~
.
~
~Q
0..
se-
mn
""
o ':ij""
8 ~ ~ ~
~ B ~ g
N -
M g'~
~ !i
" h
. Eo
& .g,'~
~ !~
~ fJ ,~~
.r.: 0 ~ ~ ~
2E Eg~
Vl w,g ;L'O
'"
o
o
N
"'
~
'3
~
'"
;;
o
t:
o
0.
.
"
E
III
...
Cl
o
...
0-
-
t:
CIl
E
CIl
>
o
...
c.
E
t:
o
:;:;
III
t::
o
C.
III
t:
~
I-
...
III
CIl
>-
.~
en
c
.2
..
~
~
..
.
c
.
{:.
'0
C
-
5
.
.
..
-
Q
-
1;
Ii)
c
o
g,
c
:c
-
~
.~
It)
....
o
N
o
-
I
o!
~I
E
e
u.
ci
u
c Z
o W
_ a.
& z
" 0
~ z
a> 0
E ..
~ ...
z '"
o a
ci (.) a.
u :0
c
o
~
&
"
~
o
~I g
o
>.
u
c
..
'"
<I:
c:i 0
z z
o ~
C,,) <3
c
o
f!,~
" E
'0
c ~I
i ll~
, '"
~ 5 OJ
il~:~
0, ~
t); ~
.~ ~
tJ__,-___
I
I
I
'"
~.?:-
cc
,;'0
.?:-ti
.-
al"e
ilo.
"'
G.i ci
.. z
c c
c 0
.2 :g
a.
0'0
." ill
<I: '"
'"
o
o
!:O!
....
N
;::
S .!
~ ~
c c
.~ -g
~ ..
.. E
J: <I:
?~-c
~'510~
a:: gO::E
0: _
.~ 8.
',..
.l)f--
..
-=
a:-s:;
.c u
u t:
'" ..
f '"
=""
~C;
." U
C 0
......
c,-
~
w
=~= ~
"f--'"
N
o
N
w
u
~ ~
'"
.
N
"
-"
.'"
15'
f--,;'
- .
g-g
--',;'
.-
-'"
..
U5~
- '" -
-c'"
$! :;J 0
"'"'U
~~:!:l
.- .
~:g[:
u.U
~"OQ)
:~ 5""8 ~
tfu-u
>;
. ~"
-"
(tIlll !O)
ifU5~
_ :t
~
, 00
!<O coo;)
I-
I
ggg
ll) .... ~
:.......
I
;!
~
r!j:::g
,.,
0:0::-"
www
~ ~F:~
000
;:
.m,.,
~.m
- ~
ii'ii'i?
itctit'
H->-
"''''"'
~~;::
000
~~C::!
aSB4d ~rOJd a;l ~ ~ 5
~~
~ ~
1.)<
!!:~
C .
. ~
::2.f
~:z
..0:
.2' -i
..
sapo:> 4mm ,....
416uel I~l : <0
SRJlQS
(S}edAl
JuaW&AoJdwl
d
z
.
'"
'"
~
'"
~
o
a:
~
..
:;
'"
j ~ ~I'
~ "08:
o ra C')
(I) ~ 1:[
E 0 .s II
~ D. ~
.! "CI :E 0
i= ~ .~~!,
(J ~ 2 .~
.~ ~ .m~
a.c;;cW~
ociLLiU:
iii
JeqwnN -II
^lPOPd N
- -'-~--I-
ssel~
leUOWJun,:j .......
~
>-
o
o
'"
;;;
"
o
Z
w
'-'
o
o
"
O~
.
N
o ~
.
~
o
~
l&j~
~
."
~
i<
a::
>-
'"
I-
I I
I~ :
f--o.
I
:~-~-h- ~
'"
"
I
N<'l
<'>-
o
o
~
i5
N
<'>
~ ~-I--~-.
~ I i m
i~
["g
J;;~
00
O~
~s
0: g-g
..., ~g
~::., ....03
~ QJ.,:,
~." ~ ~
o.~ ~ 8
C";J <:J:
fl {1 fi~
0: ~ ~ ~
ti 15 .~.~
~ .2~
~ ~ Cl'-
E.2 s ~
'3 ... E E ,E
o~ ,g_~__~_
~
N
0;
--+
I(f)
J_
I
I~
l() (01")0
N_m
N
~Iw~o
N~m
N
"
In__~
1000
000
i ~t::!'<:::!
I --~
\J),~T'""""
I'SI-~m
1~,~~5
-I
i8
.,.,0
N_m
N
<0....
00
:G
"
c
o
"
!!;
"
-!l 8
~ ~
! ~
~ I
~ g~
a:oO:~
"* ~ ~ ~
UJlO.:::::i:
....
I
i
I--~-
I
I
i--
I
I
I
1----
~i"'l:::J
~!
I
Q)I~
Nl ~
I")!
I
I
I
~I
I~I
! ~I
~I
g
"
.U
,,"
J!!I
~ ~.~
~ .& ~
g ~ @
~ dl~~
.~ 2~=>"
Q. ~
co ~g
~ ! >- r~
C; if ~ :iUs
C";l ,~-t: g-a,
1? ~ & ~~!
~ ~EOE",
r.n o.g lii '0*
'[i -0 U 8ii:
~~~~*
-'<: 1Il ..;;;:co
~ ~ ~ 15-g
.... r.n ,:::UCD '
-----1
"' I <0
-+-~~-
10
, 0
m ~
N ~
~
I-
I
I
i---
i
I--
I
I
,
I
i
,
I
I-~
'00
100
:~~
I
I
I
w'
'Si
o
,f--
if/)'
I~I~-~--
1-'0. 0
j---
I
I
i
I
I
~
(f)
<0<'>
o~
~
.
E
~
.~
o
,
~
e
~
"
~
a
~ ~
.; ~
Q ""l ~
~ ~ ~~
1:; ..... go.
<l> ~~
E 0 ~
~ J:~
~ ~:~
& :3-~
00
~ i~
(3 ~~
~ f"} i~
'" o. ~o
<l> "'I .. <lI~
-0 ~ E -5-~
_~,"Q)_.gt?_o.,_
~
~ ~
6 ii!
a
o .
-~
~
~
'"
....
o
.,
C
o
.,
:;;
..
.,
"
Q
'>
l!!
Q.
.,
..
"
<I>
~
<I>
Q.
"
Ul
....
on
,,:
N
.
'"
~
a.
'"
o
o
N
,,;
~
."
,
;;
;;
Cl
"
o
~
.
0:
E
~
Cl
o
....
ll.
-
s:::
CIl
E
CIl
>
e
c..
E
s:::
o
..
III
t::
o
c..
fII
s:::
~
I-
....
III
CIl
>-
.~
l/)
c
.!!
l!
~
"
~
c
.
l:-
e
c
.
E
t:
~
.
Cl
.
1;j
Iii
c
o
..
c
:c
.
~
4~
It)
....
o
N
o
-
o
....
o
N
E
e
LL.
o
o z
w
a.
Z
o
z
C
o
~
&
$
~I
;,;
E
.
z
.;
o "
o
C
o
~
&
$
~
~I ~I
~ ci ci
c z z
~ ci ~
< u <J
G; ci
~ ~
5 ~
g.-5
't:l ~
.. '"
'0 '0
0
'O~ o s::
cc :05!J~
';:0 0: ~ro
~~ 0""
0: ~
roO
~.E .~ d>
oa. > " ,0
~ tD~ N
,
1
,s 2,s t'"
~ '<t~(D .-
:;
't:l
~-s:; ~N
.r" '0 ~
" c io ~
11)$
~ 01
~<{
~"ii O~
'0 N~
't:l " c ~ ~
c 0 N
"-'
a,-
x , 0
W lID N
;'! 1'-
_0 ~~
ro'O ~N
-c :'! ~
{'.o
~
m
o
o
~
<::!
'"
-0
ro'O
u.
00
~~
s
.
"
01
C
1:
.
"
J:
$
.
C
't:l
C
~
E
..
c
~
~ EI $~
;3 .2 $ 5 ~
O'-;I~--~
.gi:: 2-g~
s:::J !9:J 0 ~
~ ~ l____~_~ ()
,g c I [ij >.
I- :J Ol'....o51
s: LL. .S 1~1ii lIJj-
~ ~ :~--~--~;~
"
'E
.
'0'
&:
~ ~"C .
"
''0 . C'O '0
I" '0 o 0 '-
!LL ~LLU
1
~
~ 1m 0_
.", ~
~!9t' 00
a..(I)t ! ~~
S
eseLld pefOJd !m wz
"-u
sapo:> ~!IIm ! r-.
--- ..----+
1
l.n6u''lle~oJ. ! CD
sn~~s
(s}edli.L
JUBweAOJdwl
i:i
Q,
....
'"
o
Q,
::;;
'0
.
o
0:
~
"-
"
'"
c
... :a
~ c
.0 W
E 0
o c
Z "C ~
15 ~ Q1 (")
HJH
~ 1! ~ -g ~~
~ ~ i= ~ c: eLl:
HUHI
~ _~~c-~,_~ LL I
J%~~'~~r~
ssel:J
leuOnOun.::l .-
ci
z
o
~
'C
m
ai
I:!
w_
_w
_w
M~
M
"Ii'a:
ww
II
f-f-
00
on
"
I
J
w
o
I I
ml--
~I
1__
::::!
~,
0'0<0
N:f\!M
. M
!""O<O
~ NM
~ M
I
~
m
m-
M!
OW
NM
M
~~
DOC'
"''''
I
I
I
i 00
I 00
""
I '0':
I! :;
w
o
N
<f)
<f)
N
'"
'"
o
~ g
, u
~~~
::2: ~ (;j
@)~~
~.o
w 8~
8'~ ~
.!:2 ~o:: I
~g ~ I
.- ~ 8 I
"gO )'
<II~5
!!! 15S
5:5 oS
u ti ~ I
@)s g I
~~0
- III 8'""
~ ~ ",8
t ~ ~ ~ !
8 .- .ND
t.;?~. H"~
\tl ~ ~ g>,~ 3
_~.c:o".:;:woa: __
m ! 0
5
ti
S
"
o
8
~
o
.
~
~
o
o
...
o
o
z
~. . I
--------
I <f)
I
,
~
~
~
~
~
N
~
.~-g
~.~
'"
2m
~~
~~
~~
!}l4>
EO.
(") ~~
~ "E
B ~~
."
~ ~,~
_.u
E~S
~~g
u1t'l~
c"O
6~2
~t)o
~[~-
"? ~ ~ ~
C"< a; 0....
~~~~
.<:: r 8 8
~
~
o
1;:
~
~
"
~
.0
~~
u:;J
-------j. ~
----
'"
o
I
I
I--
I
I
I
I ~
I
;?i~
m ~
M
w 1-;;-
~ -
M
,-
~1~8
N
;?
~ !ij!8
N
I~
o
<;
"
0_
00
~~
~
ID_
....0 wz
"-u
~
]9-
oz
....u
i
-I-
I
<ON
0_
, <f)
i
---,
! ~
f-g
~~
~c
g>.Q
.Q!6
~8
.~ ~
~ ~~
: ~i
-H
~E
.S''''
CO
~~
.:; OI~
0. ~ ~
.1i "
..... ~'O
~ oc
&": ~~
~ ~ ~ e--
~ g ~,9 ~9
fTJ $ E~:;; ~
OI.O,g !l::~_~
~
oi
~
+:
o
o
o
N
o
~
~
ID
15
....
i
~ g I
: ; I
EE:<ll 0> ~ I'
Be
"
,
~ :~ I
It 0
~ i I
<3 0
1:l ~rn
<II o_c
& "22 I
&omh J'
->c g.: E 2< 2
__.c3_~~l~
I
..
C
o
'"
:;;
'"
..
::l
o
'S:
~
Cl.
..
'"
"0
'"
f!
'"
Cl.
::l
UI
...
.n
,;
'"
"
co
.
Q,
'"
o
o
N
on
;,.
o
~
;,;
;;
o
'"
o
"
.
0:
E
~
Cl
e
a.
-
!:
Q)
E
Q)
>
e
Co
E
!:
o
..
C\l
1::
o
Co
rn
!:
~
I-
...
C\l
Q)
>-
><
(j)
~
.2
!i
~
..
.
c
~
'0
C
.
oS
.
.
..
.
c
.
;;
Iii
~
o
..
c
:c
.
~
C~
It)
....
C
N
o
-
c
....
~I
I
E
o
...
LI.
81 z
51 LU
Vl 0...;
& 21
Q)10!
"""')1 zl
Q.i 0
~ 0-
Z t;:;
o 0
0: U Q.
U :;
c
o
~
&
w
~
C>
~ 8
C>
~ 0 ci
c z z
8, 0 ~
oCt (,) (3
~
. >-
-go
"0
"-.
.2'13
~.~
i~
"-
~~wf
1C2'g~~
~~
.!::::lD
,0.
LTI~
.! ci
.. z
o c
c ~
o "
:s.o
o .
." m
<( '"
J:: 2..1:: ~
~~co
m
-;;
."
~~
U ~
'" =
m '"
.."
:ee;
." u
c 0
m....
Q,-
~
w
~ ~
-g ~
N
'"
C>
C>
<::!
....
N
;:::
iii ~
Gi ..
-;; .!!
o c!:
0>
-2 -g
.. m
= E
:J: <(
- .
."
-c
~~
~~
0"
~.i:
c 1
.S! __----+_.__
~ ;;
~ E
gi.E
01.5_-
,=
.g; ~I $-g-8 ~
c: 5 .!!!;:} 0 .
~~f~.~
~ 31 0)11!!~~
~ IL .5 .g:tl~ ;:
.... 't) Ql oil.
J!3 13 u.(J
III ilL
o
o
~
u
.
~I
,
. .
-"
.. c
- ,
"'"-
Ii!! !:!-cQl
QJ WC"'C
"'0 "0:::1 0
a~_u
h~I'"
~ii.i~
E
-------'---$.-
sapo:) ^JII!m I,....
\R6ua-, l~Ol I {tJ
--t-
__ snJ~~ _ t~
(s)ed;;! !
lUaWOAoJdwl ""
"
..
o
0:
~
0.
:;
'"
c
... :c
. c
.a w
E
,
z
~
s::: ci lD
,2 z E
1; 1:;1 ~
;,,-~~~~
s::: ~ i= ~
Gl"'C _ a::
32 If ~ ~
- ~ "e t
g Q. Q. U,l
"2' cC 0 d
11.
o
z
.
'"
"
'C
OJ
iii
.
c
o
-gOM
o m
0: .a
~ .s
0. -l:
:; 0
",;:
c .
'c :9
.5 ~
i ~I
w u.:,
Jaqwn N
^l!JO!Jd
ssel:)
Jeuonoun:l
;;;
~
ON
..
ON_
..0 ~ ~
r
..
-
.0_
:e
~
.NO
M M
~
"'''''''
. . .
" " "
000
I.~ ~~~
000
. . .
Ciao
00_
000
~~~
w;:z
0.",,,
.
.
>-
o
<>
'"
;;;
"
o
<>
'"
'"
~
.
.
>-
w
u
w
()
0;
0;
M
~
..
N .N
..-
f!) li)NM
M _ ~
N ..
1
:8 NO,z
,
<!) (")"'101
ID _ 0
" ..
"'''''''
. . .
,1:<::0;::
000
~~~
, u u t;
i III VI ""
i5iSc
Joo-
I I'~~~
I ;::;::;::
~-------
O'W~Z
1-:a..e::::U
'"
I
-T
I
m-T",
",<0
_ C>
",<0
_ C>
~
~
'"
'"
1j
@
~
~
,0
~~
_ <{Ol
"'
~
o
~
i
.:;;0.
."
.~~
_ N E
~ ~~
BiZ
o.
~"
""
~~
8..2
0"
~g
~g
~~
B~
~-l:g
N!!:' <I>
.. a;@
E > 0
_,g 8_8.
.
"
J.
.-
< "
-5:5
.~ E
.0
m~"
~ ~~
. ~o
~ 0"0"
E: - &~
~ '6.2
~ =: 5
& r~
"t:: ::>?
<l> ~::l!
~ w
u l~
I ~o;;H
~~ e%g
_---'_____i:i__~__,g88
,-
;!:
....
C>
...
C>
w
()
M
~
~ ON
- ~
g,Rf'.I~
..' m
I
!
:8 OlO~
I
1--
'<t .....NO'l
~ <.D ~
"'''''''
. . ..
" " "
000
II~U
1000 __
loo~
I !,g~~
<II.............
Ig:
~!~~3
en
<0",
0_
on
....
C>
.
.
>-
o
<>
~
M
~
.
~
w
()
I
1----
..
N
m
;\
m
NI-~~-
I r--lllJ"-~
I ,
IDI'~
IJ'> .......(")
m M
1_-
'<f:r-.NLO
:; ..
I-
I
i
1------
NI~M.
lO ..........<:0
ro, N
"'''''''
.. . .
" " "
2.S! .2
~@21
I~~~
1---
000
, 000
Is::!l::!t.::!
lill-
lo'W:;:Z
I- 0.. 0:: U
I
_J__
I
-----j
H
"
-
"
I
.
o
E
~
~ 8
M .
..;:;
o .
-~
J ~
. e
~ g:
't:: .,,,,
'" -"
t E~
l!2 -sv
u ~~
::.. lll!::
~ Ill!!:.c
::>'0 M ~~
ON" "' I;;
~ ~~_4J
.
~
!
~ti
".
"i~
~o
r--oi'ii
m~&
~ 2"0 g
E ~.
~ ~ ~
~ ~E
~ ~~
" 0_
~ ~:g
, -.
~ *2
,~ ~ 8
'-' r-.: g.[
eo Ol ~ "1
&:1 E1~
U)m.,guo; I
---]
I~
+
....
C>
o
<>
~
;;
~
"
C
C
.,
'5
"
"
~
c
.;;
"
~
C.
III
"
'tl
"
f!
"
c.
~
en
I i
, I
, :
i
I
I
,
i
~I
ml
m
M
....
on
,;
~
~
..
M
..
~
0.
I ~I
!ro'
10
II--
'"
o
o
N
.,;
>-
..
,
0;
ro
a
"
o
0.
.
0:
E
III
"-
01
o
"-
c..
-
c:
a>
E
a>
>
e
Q.
E
c:
o
..
III
t::
o
Q.
III
c:
~
I-
"-
CO
a>
>-
.~
II)
e
.2
S
~
..
'"
e
.
~
~
o
C
.
E
.
~
..
&
.
1l
o
e
o
..
e
:E
'"
~
4~
It) I
~I
I
o
-
o
.....
o
N
E
e
LL.
ci
()
cl
~I
~
ci
() Z
c UJ
o "-
~ ZI
~ ~l
G.i 0
~ ..
z lie
o a
u ..
:;;
,
'"
~
;:.
u
e
"
'"
<
ci ci
z z
o g;
u u
~
.g:~
o 0
",0
~'"
= u
. .
~'e
."-
~
I ~
';;1j~[
I~ ~o~
~ ~
,.
.s g;
,TIf-
~ ~
c c
e 0
.2 :g
c.o
o '"
" ..
< '"
~~Iii I~ ~
~ I~ <U
~-I::
N
.
'5
-g::;
"'u
u c
.,,,
","
~'"
~-
= ClI
" U
C 0
.....
0.-
ill
" j",
'"
o
o
N
;:::
'"
....
.!i S
. ..
c c
go"
OJ; l:
. "
. E
:r <
-.
.~
-0
00
f-~
-. ,
~-g '~
00
c ~~
~ Ii 2jj~"
~'~I-- ~~-$'~
,'!l,' ~I 2-g~ N
c:::I $:;:1 0 ......
llI' 01 ",~<.l
., "'
5 j-g ---~"iii >- Q}
;0 oJ: , g> ~~ ~ I_
e: .-"'C 1/.1 J:: :......
'-, -g llJ8c..
! I 'If I,' ~,.~ ~ 't. ~
$.i ~ -g.ru
0, u...
~ ,
Q. __---1..-----'----___... ____
*~~ I'"
B:tn~
~__uS
eseLld pafOJd co
sepoi) J[~!I!m I ,....
LA6u<'lII!l-Ol co
SIlJe}S
(s)ed'(.l
~UDW1,,^OJdwl
o
o
81
'0
.
o
~
5
"-
'"
'"
c
'5
c
w
~
o
'Oc"
. .
fi.a
l5 S
"- ~
'" ~
'"
o .
.~ :@
's, g i
~ ~I
_~wLLI
JaqwnN I
~!JO!Jd N
o
Z
.
'"
~
'0
OJ
ai
~
.a
E
,
Z
(;
.
E
.
Z
. '0
" .
i=&
u '"
.~ e
. -
"-<t>
g 0
;z
. ~
u <
~ ~
c .
. ~
:5!~
1:)2:
.0:
'2.(
0.
ssel8
reU01PUn.::l
IN
j
,
i~
oo~
~oo
~ ....NM
'"
v
~o~
~oo
N::'
~O~
~NM
MO~
~~~
"-"-"-
<2<2<2
NM~
c;:c;c;
~~~
w;:z
"-0:"
m
m
o
"'
N"'....
~oo
m
5~
00
-8"'_
.~~
0>$
o.
OE
"$
~z
o.
~.g
lZ 'C~
M l?~
'ci!!
B~~
E"
.' .
~;:~I'
"0 ~ ~'2'
!II g:g 0.1
& ~2lf
~ fii"'<'>
~ E 15 0:;,
.~ LO ~~~
a lO ~~5
s g ':: .;~~
::. .... E J!!'C"tI'
~ f5 ~ $ ~ Q 1____
;1;
M
'"
~
N
~
~
'"
o
----I
I
~I
,~
1----
',:2; :;;
"
1'~8
NN
18
j~
1-
.0 1'-(")....
I'- ~o~
~ (")N~
a;l .oo~
~ M(\/~
a;l NMI'-
o ....a;l....
.0 l'1....;::
"-"-"-
<2<2<2
I~
O~N
000
,~~~
w;S:Z
"-0:"
~
"'
...."'N
OO~
.
o
!t~
MO-
~ '3
':":1]
.9 ~
"
o
.
!
:g
" ~
~ ~ '"
& ~ I
Q) ~ ~ E
{3 0 0- ~ '1' '"
~ 10 .. '" 1:'
-~~ ~ & ~
N
~
it
&l
~
"-
M
C
~
'"
1 ; _u
o
Z
:;
"
00
~ =
~ N
~
I-
e; 8
:0 N
~I~
~I
1-
IE!
li-
it;
"
g
~I;--
f-"-
NM
00
~~
i~
I-E wZ
If-, "-"
n I
l~u
"''''
o~
"'
c.DNC"\l.-
0..-....,....,
.
~
.,
E
M
"
~
8
j
I
.~
"
~
o
c:.1"!
g~
o.
n
e.
~~
i ~-
o_~
~.
" ,
;9 ~1
00
EO
t: 0_____
.2 (.),g
~ -~ 8 .1
~ ~.~g
.E -"'~
~ ~ .~~
Q: 0:: ~;~
~ ~ g'~,s-
~= ~~~
.. . E'~ e ~
Q: 0:: g>a.'t::
(/)_(I),g w_~g_
il'
~
~
.
E
~
I
~
N
o
o
~
..
l:
o
+:
:0
.,
..
::J
o
.;;
"
~
c.
..
"
."
.,
l!!
"
C.
::J
<Il
o
~
~
:e
o
o
N'
'"
.,;
:>
o\~
01....10
Ni
~
~
~ ~o
N ~~
~
~
M
~
'"
.
'"
.
"-
W
;ro
I~.
I
1
I
o
1
.,
o
.
~
E
i
1i
"
.
.
~>
1: "': a
~ ? ~
. o.
" - 0
~ ~
..... <<3-,-
t: :g
~ ~g
() .=<t>
"tl il:~
.e ~ g
_ E~
'" ~~
. .0
g :e ~~
~g ~j~ I
~ 0 O:l~ I
____~-l;::_~_~
,
~
~
c
~
'"
o
o
N
'"
~
'5
,
0;
"
o
"
o
~
.
~
o
'"
s
E
f!
Cl
o
I..
c..
-
C
Q)
E
Q)
>
o
I..
Q.
E
c
o
:;::;
~
o
Q.
IJl
C
Cll
I..
l-
I..
Cll
Q)
>-
.~
en
.
.2
Ji
~
"
o
.
.
;:
'0
C
.
.!i
.
.
"
.
Q
.
..
OJ
.
o
..
.
:c
.
~
.~
.."
....
o
N
o
-
o
....
o
N
E
e
u.
o
Ui z
51 UJ
0, CL
~i~
~, z
o
u
c
~I'
ii
~,
m 0
E 0-
~ ....
Z 0:
o 0
(,) 0-
::;
",I
'<'""i
~ 0 0
. Z z
& 0 ~
< 0 (3
u
~~
. .
",0
~J!J
~U
~.~
.2
ala.
u.
~~~~
; ::J<'\:j
! 0'0
, & S
.~ ~
Jj~
.! ci
~ z
a "
l:: g
,2 ::s
g.g
.., .
< 0:
J:: 2..1:: ~
~~iO
.
:;
'll"
.c "
" "
!/) .
. Ol
"<
:E70
-gg
.....
Q,-
X
W
~ ~
u ....
~
\ ~ ,~
'"
o
o
~
....
N
;:::
s s
~ ~
a a
go..,
'C t:
~ .
. E
J: <
- .
"~
- .
o ,
f-u.
1
1
I
,
I
51
e ""
"'I mill
~ E'," .....1:1
8021 c75~
o'=~--
In~! Q)U Q)
-g::ll 19 5"8 ~
lll,~l OOLl..O
, lu
Oil::
t:la!
.5
- .
~~
0.
"""'
J!l
~
o
1;
.
0"
Ci.~
~~8l
~~~
~QQ...
~
.
'i5
.
I~
I" -
.... ~"O Q)
III Q) C1:l
~ '"O::J 0
u.. 'Lfl.L.O
__--.L-___
~
~jf l~
f:4u
aSE4d ~afOJd i 0:>
sapo:) Atrmn ; I'-
u--i
L/16u911etOl 1.0
Sf'oll!l-S 'I{)
(sled,';.l r--.
lua_we^oJ~~~__1 ""_ _~_
I
I
o
z
.
Ol
u
oli
u
"
o
0:
iii
.
o
a.
,.
~
.
OJ :g
.0 W
E
,
z
(;
.
E
"
z
. ~
'" "
j:: 0
~o:
o "
. .
'2 ~
a. Ul
o
o
o!
0'
~~
~ ~
u:.i;
i;"j!
~ -8
:2~
z
~ ~
'[ -i
0.
.
.
o
'i a ('f)
o .
",.0
5.B
a.'"
~~
. .
'c :9
.~ ~
. .
OlO
cJowU:
JaqLUnN
,.l;l!JOiJd
sse\';)
leUO!pUn~
Lt>f'-.NNIDMi Nf'-.LONtD
OO.-MOOI ......00('<")0
-l-
I ~ .
t! " "0
~ o~ I .~ ~~
- -" :<:' lI;I-8
.g 5j ~ ~- ~ ' ~
E'" !:? e '* e
':; Ill-~ 0 t;:i;
g e~ i~ 8S
~ .~w .8 - _'0
~ <6~ o~;<) ~~
~ <.' ,(IS ~.:!S! 5r-g
g <0 ~~ ;;; l:: ~ "';tl
CX!&: Ol~~ ;;1j"i$ Z ~~'g
w~8 ci~o <!; -ie2l Q N..,i!!
0.... B,&~ 000= ..Q)-
.....[ ~ ~.~ ~ -~.g~ ~ 2:1
c :s.~ ~ ij~ 8 ~ liii5
~ ~~ ~ v, Q .... .., (I) ...: '"
~ CIlCll (') ~-.:: ~ O>Q)~ Q)~
o '5l~ 0 c..-~ ~~lii ~ ~~
~ e: ~ c ~ "2 ~~~ <;;,2
~ <ijE~:g &: ~55 "2 ~.9
f} 1 ~ "2 E jj ~ ~ ~.~ & i!! j
<:( & ~ &-.< ~ ~ ~ ~ ::.. U lii jl
~ ~. i! E v ~ i~ ~ '" e ~~, ~ ~ ~ j i
a::: _ 2 ~>.'gc Q ~~Q)!:::_'I Q) 'l"!",-gE
~oVOl~ OJoO~tlo ov-->o .:20.....<(1<(1..,
....."'.. >::; E""E'~~-m -S1O.""'~'t::U .i5m ..~~"
_<%;;;~g~ ~N CIlru= ;:'...Es,>",:l \.;MECIl~~
: ". .'f: ""'''I : " ':'t''''
N
o
Z
!~
w
u
w
(,)
owm
,<000;0
,......M
\ ~
ww
~~
w
o
o
m
I"'
I~
o OlDOl
o lDOo;o
Ol1T""...M
i ~
1--
!lD....Ol
I~
I~:ll~
1__.---
i~~~
ww
~~
w
;':
~
;:
WW
N~
W
o M
o 0
m
1
'0
:?:?
ll:ll:
""
00
00
S~
NMV
000
~~S
1---
'I....-i,i;~_~___
iCl..o:::U
WZ
0.0
w
N
-I i;l
o
____L
"-
"-
w
.
"
.
it
w
<0
"'
~
~
N
~
.
>-
M
;;
"
;;;
i'
..
"
o
:;::
:;;
..
..
::l
o
'S;
2!
Q,
..
..
'tl
..
~
..
Q,
::l
IJl
~ 8
~ ~
00
Riii
,~ ~
I I
1--
,
,
o
o
w
I-
I
~I~
w 0
~ ~
...
on
,;
I~ ~
I~
IBI~-
1
01--,;-
~ ~
o
o
w
w 0
~"
o
w
\~ ~
I~
I~
a.
ii
~
i?
~
"
M
0'
~I
I_-
I
I
li-
!~
,
1
I
i
I
Ij
....
<0
.
~
~
a.
I
!;--
if;
I~-~
....'Od
, '"
~
1 (ij:__
1''Oj
...."
---+m
. w
o
,
'---i---
I,:!
1
------- I.
0.
a.
U')<DI'--N
000.-
'"
o
o
N
'"
~
'S
~
0;
1i
o
'"
o
~
~
'"
E
C\l
...
Cl
o
...
0..
-
s:::
Q)
E
Q)
>
e
Co
E
s:::
o
:;::;
C\l
't
o
Co
VI
s:::
~
I-
...
C\l
Q)
>-
.~
lJ)
c
.
"
.
t:
.
..
.
c
~
'0
'E
.
.s
~
..
.
"
.
..
u;
Ii
i>
c
:i:
.
~
C~
It)
....
C
N
o
-
c
....
C
N
E
o
...
u..
o
(),
C'
~'I
&
"
~
Gi 0
E Q,
.. ...
z ..
81 8 ~
il ~I ~
>. 0 ci
g z z
~ ci i:'
<( () U
u
-8~
.c
",0
~~
~.~
"E
ala.
"-
c .
"S; g;
Jif-
.s ci
. z
c "
g ~
~-s
o '"
.. "
"" ..
.s~-s ~
"'f-'"
"
~
i-s:;
.c u
u C
U) "
"l>
~...
"-
"'''
.. u
" 0
"'-J
c.-
~
W
~:-F
u I~
~ ,.....
'"
o
o
N
;:::
~
~
I
t;
a; ..
-;0 .!!
ell
g>..
"C r::::
.. "
" E
:I: ""
- .
.u
I ~::
~u
o 5
c ~"-
2 _
f ;;
!! e' "*~
~ II' .17Su"'.
~ - 5 3"8 ~
:I cS U)LL ()
, '"
o c
.c ,
f- "-
.5O
$
.
.
"
1l
.
.~
a.
~~3l1
.-. -
"tlf5.J:;: I.......
~tJO',
----+'
~
.
'C
.
"
"-
~ I~"'C Q)
_~JjH ~
;::; i
~,,;:: I
~!!~ 10l
a."'i'j I
S
ase4d pafOJd
sapo:) ^l!mn
4lBua'lelOl
Stl}l!lS
(s)ed,(l
lUaWG^oJdWI
z
w
a.
Z
0'
z!
o
z
"
'"
'"
'l:
m
ai
u
.
o
It:
~
..
"
~
.
.. :0
. .
.0 W
E
,
z
~
c: 0 Q)
.2 z E
<<i" ~
u:;;::__._.
t; -"
r:: ~ i= ~
Gl'g t);:.
~ ~ .~ ~
~ ii: If. (j)
e
Q,
.
.
o
-geM
. .
0: .0
~ S
a. -!'
~.~
" .
02 :9
.5 ts
'" .
,lU:
c:( u ci u..i u.:
JaqLUnN
^l!JO!Jd
ssel:)
JBUO!pun::l
N
o
N
~
'",
'-
j:!
I
''''
'-
OJ ~t5
~
~~
NN
N
..
NN
N
~~
NN
N
NN
00
~t::!
I
I
r
I
I
----1-
:7;1
NI
o
~
~
00
. ~
~
o
~
I
f---
oiClo
:51L()~
~ MM
N
J"",
r--:MM
M; M
0:0:
WW
II
f-f-
00
I
1---
iNn
100
It:!t'!
is:;
00
m
(5 wz
f- "0
N
00
:8~-=-:~- 8~
----
'"
I;
IN
1
1---
I~
1---
I
o I=-
~[~-
O:<"'lM
101..........
N _
;coco
MM
M
0:0:
WW
II
be
~N
00
$~
00
rn__
o wz
f- "0
,
,------j---
"'
N
'"
o
..
o
8
~
M
g,
1ii
.,
~o
.818
il;\
.
~
"
.
~
.,
.
E
~
.
0"
o~
'<ilij
0: !!!
-~
~
!
~
~
.
"
c
02
;::;~ai
E~~
,g~8
"
o
.
.
~
e
~
~
~ ~.
~ .- ~~
~ ~ ~~
~ .8 g>~
<u 'g"$
.!:;! ~~
" ~
~ i~
::: .o..~
"
~ 8~
~ "5 ~
0:: ~K
i; 0 i-~
~ 0::> 0
.... 0 ci ~~
"l .-- .. oS! ~
._J~~~,~
<0
N
_.-;------!-~-
o 0
I
~---t ~-- !
: ---..I ~ .1
1
~I
. ,
~ I
u
o ,
. . '
0:: ~
?~
a~
o~
~8
]!'aj
0"
g .8 1:1.~_
~
.~ ~
~ ~
<< c
, ;>. 'U g ~
~ ~ :g <; ~
f':: ~ a:: ~ <;
c 0 ~,g::
~~ ~-~~
~.g 8~-g
, is -g ;;~:
i .@.E J: ~~ I
i ~~ d;s!
_1__~~1J--~.~--~--
, C'\l !
c
~
~
.
~
o
~
~
"
o
.
~
j
t
~
<')~~
<0: --g-g
~ 2-;
.e~~
'.
,,~
.50 :!:.
u~
. c
o.
.c.~
g~
~~
~o
2 ~i
~ g ~ g
~ 0 ci ~'U
S ~ 1~,,!
o
o
TI
~
"
.s
"
."
.
N
'0
"
~
"
~
~
N
~
.
>-
;:;
"
;;
~
'"
"
o
+:l
'5
'"
'"
::I
o
.;;:
'"
~
Cl.
U)
'"
'0
'"
l:?
'"
Cl.
::I
III
w
()
o
~
~
o
~
o
M
M
....
Iii
,;
,
1-- -
I~O
NO
N~
o~
g:g:f2
,
~I-;;;-~
~ .....0.0
w
~
~ ~w
~ N~
M
~
I
10'0:-
jWW
'II
H-
:00
O~
~oo
_w
~
w
~
i-~i::-
I. .
C 0
'00
~~
u u
. .
00
~
.
~
.
a.
I
I
I 00
00
III~~
~(O
~i--
I~i~~
,
00
m
'5
f-
N
'"
~-
.~
l
'"
o
o
N
"'
>
'S
,
,
__n____
2
.
o
"
o
~
.
0:
o
o
E
ltI
...
Cl
o
...
0-
-
c:
<II
E
<II
>
o
...
c.
E
c:
o
:;::;
ltI
1::
o
c.
VI
c:
~
I-
...
ltI
<II
>-
.~
en
c
,g
..
1:
o
0.
-
C
.
!=
'0
C
.
E
1:
.
0.
.
Q
.
..
"'
c
o
..
c
:c
-
~
C~
It)
.....
o
N
o
-
o
.....
o
N
E
o
...
u..
o
u
z
W
a.
Z
o
z
c
o
~
'"
~I
G.i 0
E a.
.. >-
Z '"
ci a
0: 0 a.
u :IE
c
o
~
,;g
'"
,
o
"', 0
"-i g
~ c:i ci
c z z
& 0 ~
c( 0 U
~
~~
cc
';:0
.?;on
".
(D"e
'lla.
u.
~
;;h~
a:: g-O;:e:
" ~
.~ ~
c~
wf-
.s 0
.. z
c C
l: g
.!2 :J
a
o g
." '"
.. '"
~i~ii\j.~
. >-
I ___
o
"E !o:J ~
C") '.....
~--
'"
3
."
!~
" c
II) .
. '"
~<(
~ia
." "
co
.""
0.-
~
W
t? ~
-g ~
N
'"
o
o
f:!
~
....
S i
.. ..
c c
r~
:; .
. E
:J: ..
- '"
..~
15C
f-"
U.
"B{l
.3~
c
o
e ~
!! E
8 .E
'O.E
.
- ~
" ,
c 0
: '"
, "
o c
'" ,
f- u.
.5
II
-
o
'"
'0
.
.~
a.
.-
-~
.. c
- "
"'u.
.~ .
-c"
2:Jo
U)u.u
----rlo'-;" (1)
0),......00
.~ '~ti~ ~
g ~8D-
U. '"
l~h-1l10 .~
ff_~~r= l
~~f!O) ~
a.U)'i!
S
asetjd pafOJd
sapo:) ^l\I\lO II'-
4;6",11~:~-j "'
snlVlS l,I')
(s)edh
~uawe^oJdWI
"
..
o
"
~
a.
'"
'"
c
... :c
. c
.Q W
E .
, c
z 0
0... -g C t")
o .
c ci Cl 0:: .0
o z E 15 .s
~ "tI C\'I ~
...._" ~ z a.. ""I:"
~ -g ~~
:g~i=Oc'Cl
.,,_<Pj~~'g:g
... Q) Q) .- (.)
t': Z '0' f Cl (fj
~ ii: Q: W III ClI
"i :a:W:N : : I
N.UOUd IN
.c-' --.L
ssel:) I
leUO!pun~
o
z
.
'"
"
~
oj
N
o
N
o
o
;~ LO
;':
ro
ro
1
'M
~
N
M
~
J
ro ;t
o
Z
W
U
o
o
.
gl~--
o
.
o~o
000
LO N~
:3 gg
N:'l
N
,'"
I~
!
:::~
00
sg
'"
m
,0 w z
~ ~()
v
a. a.
'"
o
"
.
E
B
..
l
"
~
()
"
.e ~
- ro ~
-l:: M!
~ <">.,
"'o<"J~
~ ~ E ~
_:?Oi,ga
;g
"
" !l.
a.. :E g
::E (:Q '<t ~
'E ;::: ~ 1; 6 ~
~.8~ ~ o~
<11.8 ~ - ~
l ~ &: ~
t 8 ~ rn
~ "5 $
(3 j ~ i
-g ~ & ~
& [13 -lC 8
.m (:Q ~ ~ '<t ~
. I -a- 0 ;:~ . u 0 6 ~
-j- gU~ -!_UIL_
--< : ---"~ :
o 0
---...----,
'"
o
ro
M
M
M
'l;
'"
N
....
o
ro
M
M
M
.2g'
:s
)
"
00
00
. .
o
.
o
.
00
00
~ ~
gig
~ ~
I--
I
1---
.
"
S
-
m_
0:::1
,I-I <C
1
-~--
j-a._
'"
, 0
.-!--
I
I
I
!
~
00
:i':j2
,
00
00
. .
00
00
~
o
o
~
0:
W
:z:
f-
iO
,
I
I
,
!
,
!
!U1
io
I~
, "'I'~
1-
l~i:J---
I-i;i
a.
'"
o
.~
2
~
.
E
B
..
l
~
,
()
"
~
;g
~
~o
"~
-~~
N
'"
---1--
I~
I~
,
I
",I
"ffii
<51
>-
~
N
'l;
~
<l
.
~
. ~
~ ~
10":
N$
.9~
I
iJ
o
~
z
.
~
:g~
<q~
N~
E~
o ,
~ D_~__
'"
l:
o
'"
'5
Ql
.,
::l
Q
';;
2!
c.
'"
Ql
"
Ql
l!!
Ql
C.
::l
<Il
...
.,;
,,;
ro
.
'"
..
a.
'"
o
o
N
on
~
'3
,
~
1i
o
"
o
~
.
"
E
C'lI
...
Cl
e
ll.
...
s:::
Q)
E
Q)
>
e
c..
E
s:::
o
:;:;
C'lI
1::
o
c..
III
s:::
E
I-
...
C'lI
Q)
>-
><
in
c
.2
1;
1::
o
"
'"
Ii
!=
.
C
.
s
a
.
Q
.
1;
OJ
~
...
c
i
~ >.
l,) ~
4tt J s
It)
....
o
N
o
...
o
....
o
N
E
o
...
LL
o
u z
II !
Q; 0
~ 0.
Z !i:
o 0
c::i U a..
u ~
c
o
I!'
>I! I
.941
J
"'10'.
.- 81
---------,
~==I:
-~---- I
I
I
~
~~
cc
",0
~tl
l:!.~
.0
~O:
u.
.~ ~ 0
c~ N
w>--
s 0
.. z
o c
a ~
~-a
o "
'" .
< '"
o
m
J:: 2J:: ~
~~$
010
m m
.
:;
i-s::
="
"c
.,,,
. '"
~'"
:E'C6
'" "
c 0
....
c.-
x
w
~l~g
Mf
~:::
~r!g
I
i
01.;;-
~ ~
I
ill
o
o
t;
....
t;
....
0'[
M ~
I
00
~~
ill ..
1ii !
o Cl
g'",
'C I:
.. "
. E
:I: <
o
I ~:.~ ~ ~
"'-1l1~ g
I (.) c: .
c' _.3~
o
E ~ (ll en :$
~ E: 1iI-g ~
'0 .
~ ~I U3~
III B (ll"U (I)' ffi
-g3! $5"8~~
mi~! (f.HU.,) 0
" "-I
"g c ro~Q)
~!"'Ifl~~ ~
81' !~ I~"'C (ll I
1) .~ lD C'C i~
.9!.1 ~ ,~tZ8
~ L-~~--'-T
I ~t ~ I ~
, ~i!!~ OJ ~
a...r./)~ ._
S
o
;;
,~
'"
,m_
'0 ::l
il-:<(
!
00
m~
o
m
1-
~
aseljd pafOJd (0 ~
upO:>Allllln r-..
In6u811lq0.1
'"
snJelS
.,
'"
(s)edh
lUaW,MOJdWI
..
~
,;
z
.
'"
"
;jj
oj
."
..
o
'"
~
o
"
"
'"
c
'6
~ .n CII
E c
" 0
:z:-go(")
HI!
",;:
t il
. .
000
u.i u.:'
a ci
~z
.."
~<
+-E
c .
. ~
3:!.f.
1:)2:
" a:
.2' c(
0.
1;
.
E
~
z
~ ~
i= ~
1; "
. .
02' ~
0. '"
" .
.~ ~
~ .. ~
.:2 B c:.8 8
~ ~ ~ ~
~ ~ <;,J'~
e ~ ~ ~
~ 8 ~ ~
.h tl 't:::-::
~ lI> ~ ~
t5 [ (,) t
% f ~ ~
l~ . .1 !.~ ~
g~Eg g'~E.g
[") u>g~I-::.r U>.i?
N :~______+__=
o 0
oc
o
z
~
c:;
Jaqwn N
~!JO!Jd
ssel:]
jeuo!pun.::l
00
mm
00
M M
01'0
~ M
i
gig --
i
i
,-
0;0
~ ~
,
010
~,~
1--
,
I
1-
i-
10
I~
1"=
,lI):
I~~---
~
..
.t3 ~
~ .8 8
I i
~ lii
~ ~
s K
a ~
{: ~
!g: ~
<:: 0 .. ~
5 -~ ~_~
Q>..:::~
'"
'"
o
o
010
!Ol 01
I
!
g!-g-
00
Ml<">
I
!
1----
gig
i
~I~
00
~ ~
,
I
1
'0
!o
'*I'~
oj
:1-1<(
11'1
o
m
'"
<:
o
'"
'6
GI
fA
::l
o
'S;
GI
~
Q,
'"
GI
'C
GI
f?
GI
Q,
::l
II)
o
M
o
M
:i
:r
~.
~,
.....
on
,:
I
I
I
].$
,(I]
:0
>--
m
.
m
.
0.
If)
....
o
o
.
~
o
~
~
~
.
o
o
.
0;
~
..~
-26
~
~
~
.
~
"
-1!
~
"
g
"
S
~ i
'" m
. 0
" >
! ~ ~~
<::: 0 ,_ ::l \l!
;:" -;:: E2 ~
_ <'3 ~.,g_~1
m
o
o
N
.,;
~
."
~
'"
;;
o
t:
o
~
w
'"
o
o
E
~ It)
....
Cl 0
0 N
...
0-
- 0
r:: -
C1I
E 0
C1I
> ....
0 0
... N
C.
E
r:: E
0 e
; u.
ell
1::
0
c.
rn
r::
~
I-
...
ell
~
><
en
'0
.gz.
~~
"0
u.0
~U
~~
~'2'
-go.
u.
.~ ~ 0
J]~ N
0
~ 2~ m
-~- ~
"f-'"
0
'E M
'" :e
0
'0 M
C ::
N
0
M
'" ';!
en
c
0
""
:;;
G>
en
"
0
0 ~ .;;
m 0 l!!
"
'" 0.
en
0' N G>
M ~ 'tl
'" G>
'" f!
G>
0 ~ 0.
M N "
'"
'" Ul
"
~
0 N ....
M '" .,;
~
,,; ,;
0 '"
~ '"
0
,;
N
0 N
'" N
..
..
0 ..
m 0
'"
'"
N
..
~
..
~
~
~
~
a.
.;
()
i ~
, 0
I~d
0; lLI
I-'~
.e
o
..
o
I-
"
~
~
"
----
(s)ed'<.l .. N
~Uewe^oJdWr '"
----r-- --
I .
'0 I c
e - I t
.!! ,; 0
% '"
!! . "
0> 0 ;,
~ "-
0 :g '" '" j
.. ili
0 <) ~ C
C Z ~ . M
. ~ iii E
1= 0 w " '0 ~ ~
~ a. . ~
Z .c w e
'0 ~ E . ~ ~
~ 0 ~ ~ 0';:
C 0
~ Z Z '0 Q .. -0
. ~ - '" ~ *
S 0 .
<; 0 ~ 6 . '" .c ." ~
'"
i E 0 z E ~ 3
a. " '" g
- f- - " ~ ,,-i! c
z
. Z Cl: ~ .: . ~~ . ~
Q ,3 0 '" .. " '0 " ~
- .
. a. i cp ;:: 0 ~ . 1':
.. 0 :;; . -g ~ '" 'c .c ,f 8 ~
0' 0 " .~
Iii :!!~ . . ~
d .- 0 ~ y~ 0
tl~ H: 0> 0 N
a 0' . .
1'1 ~ .. "-'" ale !. '" e~ ,,;
.. ~ C> '5" . oj d W ",~! I ~
c ';! C> - .: u:
:c ~ C> a. ~~8>,g~i '5
~ I C> ,
. JaqwnN
~ .... ;,;
:;. ci .; AlPOPd N '" 1ij
u Z ------.~.- Q
.~ e Z
~ .; ~ ssel8 C> "
'" leuo!pun.::l ! 0
<( 0 C3 C> Q,
~
'"
:~1*~ :N
OC'(lIO~
'" -
s .;
.. z
c ~ ~
c 0 '5
.2 - "
~
a. '0 ~~
0 0 u ~
" ~ CIl ~
<( f '"
~<t
g;1 =ii
" u
~ 0
~.,J
C> Q,-
N "
;::: w
'"
....
_0 0
~ 0'0 ~ ~
S -~
o ~
C - f-u.
C
.~ -g 13~ 0
.. m
- ~ .3~ ,..-
::: E ~
J: <( ~
~ 0 ~0 0
.!! E m
_'0 ~
'0 ~~
.!! -~
Q "'u.
1; .5
e '"
. ~'O ~ "'
." ~, iac"'O ~ r
· 'Ii _~o b
"'u.u
~ '0
il~ f ~~~
~- ~ ;:
'0 0~
tf8a..
o I ~ ~-o.v
~ I ~ ~~'O ~
~i ~ 'O~o
'2" lL tfLLU
"-
~ 0
8lt::5:: "
~2~ 0> ~
"-"'l!
E
----=-t- ~
aSeljd pafOJd '" ~
'"
sej)oo A1mm ~
"'--'---
L1~Ua1IlQOl '"
..--
snJlqS ,'" a.
-~._----_.-
201 0-2015 SiX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
~ BUDGET & FUNDING
2010-2015 SiX-YEAR TIP BY PROJECT CATEGORY
Road & Intersection Improvements
Non-Motorized Improvements
Emergency Repairs & Mitigation
Culvert Replacement
Planning & Countywide Programs
CHARTS: FUNDING BREAKDOWN BY PROGRAM;
SECURED v. PLANNED; LOCAL ROAD FUND V. OTHER
TABLE & CHART: SiX-YEAR COUNTY ROAD FUND PROJECTIONS 2010-2015
Note: The County Road Fund Projections 2010-2015 included with the 6-yr TIP depicts the entire
"Roads" budget projections for the same period, including non-capital project expenditures.
JEFFERSON COUNTY PUBLIC WORKS
PROJECT
t
r /
t (" / d' N M t . d)
Road & In ersee Ion morovemen s me u m on- oonze
SOUTH DISCOVERY ROAD - MP 3.62- 4 S 2010 792 323 469 0
4.00
EAST PRICE STREET UPGRADES - MP 7 S 2010 329 329 0 0
0.00-0.25
CENTER ROAD ASPHALT OVERLAY- 10 S 2010 358 0 0 358
MP 2.3-4.3 - PHASE 4
OAK BAY ROAD REPAIR - MP 9.4 11 S 2010 10 10 0 0
SOUTH DISCOVERY ROAD - MP 2.65- 17 S 2012 1,676 168 1,508 0
3.64
PARADISE BAY ROAD - MP 0.37-1.53- 1$ S 2010 1,791 179 1,612 0
PHASE 2
SR 116/SR 19 INTERSECTION 19 S 2011 200 27 0 173
IMPROVEMENTS - PE
CENTER ROAD ASPHALT OVERLAY- 21 P 2010 900 0 0 900
MP 4.3-6.8 - PHASE 5
CHIMACUM ROAD - MP 0.34-0.96 22 P 2012 1,655 156 1,396 103
SOUTH DISCOVERY ROAD - MP 4.25- 23 P 2014 1,200 120 1,080 0
4.84
PARADISE BAY ROAD - MP 1.53-2.96- 24 P 2014 1,500 150 1,350 0
PHASE 3
DABOB ROAD - MP 3.10-4.00 25 P 2012 250 250 0 0
WEST VALLEY ROAD NON-MOTORIZED 26 P 2011 500 125 375 0
& INTERSECTION IMPROVEMENTS
CEDAR AVENUE NON-MOTORIZED & 27 P 2011 500 125 375 0
INTERSECTION IMPROVEMENTS
Category Sub- Totals 11,661
1,962
8,165
1,534
Non-Motorized Improvements
LARRY SCOTT TRAIL - SEGMENT 4 1 S 2010 72 72 0 0
ACQUISITION
LARRY SCOTT TRAIL - MP 4.0 TO 2 S 2010 294 102 192 0
SOUTH DISCOVERY ROAD
RICK TOLLEFSON TRAIL - PHASE 1 5 S 2010 1,260 50 392 818
LARRY SCOTT TRAIL - SEGMENT 4 9 S 2010 576 197 379 0
CONSTRUCTION
OLYMPIC DISCOVERY TRAIL (ODT) 28 P 2010 955 76 115 764
RIGHT-OF-WAY ACQUISITION
Category Sub- Totals 3,157
497
1,078
1,582
FUND STATUS: S=Secured (Funded); P=Planned (Unfunded)
PROJECT
Emerqencv Repairs & Mitiaation
DOWANS CREEK ROAD RELOCATION 3 S 2010 657 82 82 493
ALDER CREEK TRIBUTARY BRIDGE 13 S 2010 1,232 166 0 1.066
DISMAL CREEK CULVERT 14 S 2010 490 66 0 424
REPLACEMENT
SPRUCE CREEK CULVERT 15 S 2010 996 134 0 862
REPLACEMENT
WILLOUGHBY CREEK BRIDGE REPAIR 16 S 2010 399 54 0 345
Category Sub-Totals 3,774 502
82
3,190
Culvert ReD/acement
POLE CREEK CULVERT REPLACEMENT 8 S' 2010 57 57 0 0
OAK BAY ROAD CULVERT 12 S 2010 240 240 0 0
REPLACEMENTS - MP 9
WEST UNCAS ROAD CULVERT 20 P' 2012 75 75 0 0
REPLACEMENT - MP 0.78
UPPER HOH ROAD CULVERT 29 P 2012 500 68 0 432
REPLACEMENT - MP 3.338
THORNDYKE ROAD CULVERT 30 P 2011 1,700 1,700 0 0
REPLACEMENT - MP 7.18
SNOW CREEK ROAD CULVERT 31 P 2015 500 500 0
REPLACEMENT - MP 0.84 0
WEST VALLEY ROAD CULVERT 32 P 2015 500 100
REPLACEMENT - MP 2.555 400 0
Category Sub-Totals 3,572 2,740
400
432
'* Not all funding passes through Jefferson County.
Plannina & Countywide Proarams
QUIMPER TRANSPORTATION STUDY 6 S 2010 5 1 0 4
COUNTYWIDE SAFETY IMPROVEMENTS 33 S All 180 90 90 0
COUNTYWIDE CULVERT 34 S All 180
REPLACEMENT PROJECTS 180 0 0
COUNTYWIDE DRAINAGE 35 S All 180
IMPROVEMENTS 180 0 0
COUNTYWIDE SURFACING UPGRADES 36 S All 180 180 0 0
COUNTYWIDE PEDESTRIAN & BICYCLE 37 S All 180
IMPROVEMENTS 90 90 0
Category Sub-Totals 905
721
180 4
PROGRAM TOTALS 23,069
6,422
9,905 6,742
2
FUND STATUS: S=Secured (Funded); P=Planned (Unfunded)
IU---
2010-2015 SIX-YEAR TRANSPORTATION PROGRAM FUNDING
BREAKDOWN PERCENTAGES BY REVENUE SOURCE
FEDERAL
29%
5TATE
43%
LOCAL
28%
2010-2015 SIX-YEAR TRANSPORTATION PROGRAM EXPENDITURE
BREAKDOWN AMOUNTS BY PROJECT CATEGORY
Culverts
$3,572
Countywide
Programs
$905
Emergency &
Mitigation
$3,551
Non-Motorized
$3,157
Dollar Values in $l,OOOs
Road5 &
Intersections
$11,661
2010-2015 TIP FUNDING:
SECURED V. PLANNED (UNFUNDED)
Planned
(Unfunded),
$10,735
Funding
Secured,
$12,334
Dollar Values in $1,0005
2010-2015 TIP SECURED PROJECTS:
LOCALV.OTHERFUNDS
Federal & Slale,
$9,357
Local Road Fund,
$2,977
Dollar Values in $1,0005
2010-2015 TIP PLANNED PROJECTS:
LOCAL V. OTHER FUNDS
Federal & Slale,
$7,290
Local Road Fund,
$3,445
Dollar Values in $1,0005
6-Year County Road Fund Projections 2010-2015
ACTUAL ACTUAL BUDGET PROJ PROJ PROJ PROJ PROJ PROJ
DESCRIPTION Incr. 200' 200' 200. 2010 2011 2012 2013 2014 2015
Div....lon (Traffic Enforcement) 3.0" -476,613 -634,764 -653,807 -673,421 -693,624 -714,432 .735,865 -757,941 -780,680
PROPERlY TAXES: 1.0% 3,339.239 3,466,621 3,555,407 3,590,961 3.662.425 3,735,314 3,809,654 3,885,474 3,962,802
J PROPERTY TAXES: 1%(1-747) 1.0% 35-,554 38,265 36,987 37,723 38.474 39,239
TIMBER TAX 0.5% 299,571 197,919 201,500 202,508 203,520 204,538 205,560 2~,588 207,621
FEDERAL FOREST YIELD 2,697,980 7,402 1,289,000 I 1.160.0I?0 1,044,000 500,000 0 0 -,-~
-".
QNR TIMBER SALES -1.0% 82,343 178,858 150,000 148,500 147,015 -- 145,545 144,O8~ 142,649 --_!~
l!' FUEL TAX 0.0% 1,354,999 1,349,606 : 1,395,953 1,394,824 1,394,824 1,394,824 1.394,824 1,394,824 1.394,824
I C~!,..~~NDS 0.0% 159,968 .' 154,588 165,000 163,281 163,281 163,2a"l '\63,251 163,281 ~63,2~~
J!'!~~!MENT INTEREST 1,614 5" '50 500 500 500 500 SOO 500
-
PERMITS & FEES 2.0% 63,783 53,332 18,150 18,513 18,883 19,261 1~~ 20,039 20,440
0 ". 500 !
OTHER MISC. REVENUE 4,610 17,818 2,000 500 500 500 500 500
,
REIMBUSIBLE SERVICES 58,569 16,591 45,771 40,000 40,000 40,000 40,000 40,000 ,",000
TOTAL OPERATING REVENUES: 7,586,262 4,808,767 6,169,724 6,061,71i 6,017,589 5,526,317 5,079,913 5,1U,387 5,189,750
Extraordinary Capital Revenues
FHWA 670,816 739,571 520,000 2,697,000 0 0 0 0 0
-
FEMA 112,571 2~,192 553,000 575,000 0 0 0 0 0
-
OTHER 0 0 78,000 0 0 0 0 0 0
Exlraordinary Subtotal: 783,389 1,033,763 1,151,000 3,272,000 0 0 0 0 0
J Regular Capital Revenues ,
Ei<loro!
FHWA - (STP-R) 37,562 65,023 166,000 518,000 242,000 I 593,000 0 0 0
FHWA. Enhancement 73,650 24,032 107,000 0 0 0 , 0 0
- -
I Federal Discretionary 434,000 0 0 0 0 0
--
lJ ReO, etc. 32,686 176,767 139,000 201,000 317,000 53,000 0 0 --~
RAP FUNDS 0 126,691 550,000 559,000 406,000 1,194,000 257,000 1!175,000 0
mO'OT - Ped. SafetvlSafe 8011001 Routes 0 0 0 54,000 41,000 386,000 30,000 30,000 30,000
Regular Subtotal: 144,098 396,513 1,396,000 1,332,000 1,006,000 2,226,000 287,000 1,205,000 30,000
TOTAL CAPITAL REVENUES: 927,487 1,430,276 2,547,000 4,604,000 1,006,000 2,226,000 287,000 1,205,000 3O.GOO
TOTAL REVENUES 8,513,749 6,239,033 , 8,718,724 10,685,719 7,023,589 7,752,317 5,38&,913 6,339,387 5,219,750
~_IlIl.;Mln. I i} ii... . . ...
RE~5ERVICE$ 0,0% 46,912 1(,\1.1: ""~~i 4O,iIOO_ ",,000 4O;0Q(I-1, 40,000 .tIJ.,OOO .0,000
REGut.Al<~ 3.0% 3,297,202 3.$97,* 3;i$5,~f 3,$09;092 4,~,a65 4,147..-) 4.271,570 4-.._,711!l <4;531,709
GENEAAl_l1!ATlQN 2.01M 681,218 .,98$- i:l:t.Oitl 7~ '1i3,29.l 788;lIO$ 7-._ 79$.-401" t 815,388
T_~~ 2.0% 655.3-4$ ~,~ .- 1Q!I.~-4i 820,84'/ ~ -- fll;8,!l4ll1 67~j:Q3:5
I~-i;"- ,0.0% 12..000- '0 0 0 0 <l 0 0 0
40",87'$ 4~ I.~ ...... ........... ......7l'll '1.141_ .,m.... ....,122
CAPlTAL~-
LOAN_A_S~~... .... 41,053 >40,_ ,41,111_ - "'.~76 3$,1$4 31i3al 36,403 3S,49S
EXTRAORDlNAAY_RES 747,241 ~1j ,~~ 3,185,000 0 0 0 0 0
~rr~CrE ;41'.:64$ mAl" ....~l*".f UllO,!lOQ 1,443,DOO .2;55&,00Q 3U:llIJO 1-,455,000 30,000
CAP'T~ F_m. . 1 ....<l (J IllQ,,*, 0 0 0.. 0 0, 0
CAPlTAl'EQ 0 I~ 50.000 2/;,GOO 21<000 '""""" a""" ". . :>S,"""
TOTALCAPttAL 1.m.840 ~'jll -- .." It'i. 1618.A03 lIO.483
1~"""-"'~""""" ......, I~= ....;,.~,*) 5f11;27~ $$.1$4 .$O,1i3;!t 311,403 : 60,1193
_ ........;..".,.1-. 51" . . -' 'lmJl I!$ l'$l< ~I -
1'O'fAL_ ',. "221,$1. L: 11ill1~l1t, ..147.180: .-.w. ..!'tUb 7......... "1""
I BEGINNING FUND BAlANCE 3,048,305 5,340,539 4,996,900 4,641,396 3,765,545 3,641,354 3,385,599 2,633,949 1,558,967
REVENUES LESS EXPENDITURES 2,292,234 1343,6391 (355,504) (875,851) 75,809 (455,755) (751,649) (1,074,982) (929,865)
END.lNG FUND BALANCe 5,340,.539 4,996,900 4,U1,m 3,,766,646 3,841,354 3,salS,m 2,m,M't', 1,m,H7 _6~
,
CASH RESERVE GoAL (25%) 25.0% 1,172,919 1,244,091 1,290,508 1,324,072 1,360.126 1,397,195 1,435,306 1,474,491 1,514,780
..-
;;: ~
0
0 N
~ '"
W ~
Z () -'
Z <{
0 ::5 0
.2l <{ (.9
lD W
U 0 >
Gl z 0: M
'0' ::;) w ~
en 0
... u.. W N
Q. (.9 0:
"'C z I
Gl 15 en
"'C z <(
c w ()
:I + +
II..
N
II) ~
0
.... N
0
N
.
0
....
0
N
Ul ~
C ~
0 0
:;::l N
U ~
Gl ..
'0' ~
...
Q.
"'C
C 0
:I ~
II.. 0
"'C N
OS
0
"
~
C
:I O'J
0 0
() 0
N
...
OS
~
.
(l)
<Xl
0
0
N
"-
0
0
N
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0' 0' 0' 0' 0' 0'
0 0 0 0 0 0
0 0 0 0 0 0
cD '" -<i M N
SJellOa
'"
~
o
N
2010-2015 SiX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
~ BRIDGE CONDITION REPORT
Jefferson County has 28 bridges on its Bridge Inventory. Each bridge is inspected
every two years by a State Certified Bridge Inspector in accordance with the National
Bridge Inspection Standards. During these inspections, various bridge conditions are
evaluated, such as: erosion around the bridge foundation, cracks at stress points, and
cracks along the road surface at the bridge ends.
Bridges were last inspected in 2007 and have been or will be inspected again in
2009. A copy of the 2008 Bridge Report follows.
Barlow Bridge washed out in 2003 and was temporarily
shored up until funding for the new bridge could be secured.
The new Barlow Bridge was replaced with Federal funds
through the Bridge Replacement Program.
JEFFERSON COUNTY PUBLIC WORKS
JEfFERSON COUNTY
DEPARTMENT OF PUBLIC WORKS
PO. Box 2070
623 Sheridan Street
Port Townsflnd, WA 98368
(360) 385-9160
hank (Wurd. PutiiiG WOlks Director
Monte fleinders, PC County EngliiiJlJf
MElVIORANlJUM
TO:
Board of County Commissioners
Monte Reinders, P .E" County Engineer f!1fv
FRO:l1:
HATE:
February 4, 2008
SUBJECT:
Bridge Condition Report 2008
In accordance with WAC 136-20-020, and the National Bridge Inspection Standards, the
routine biennial bridge inspection for all county bridges was conducted in 2007. As with
all even-numbered ycars, routine inspcetions will not be conducted in 2008. An update
of the bridge condition, and non-routine inspection effort are hereby furnished to the
county legislative authority per WAC 136-20-060.
Structurally, all ofthc county's bridges are in good condition with no major deficiencies
and require only routine maintenance, and minor rC'jJairs.
The Little Quilcene Bridge on Center Road will receive a new handrail, to replace the old
h~ndrail which was in very poor condition due to rust and chipping paint. Thc Cassel
Creek Bridge on Oil City Road will get new compression seals bctwccn thc concrcte dcck
panels, in order to protect the underlying steel girders from corrosion, Also, thcre is
various minor guardrail damage that will be repaired at a nwnber of bridges,
Subsequent to the high stream flows and flooding that occurred on Dccember 3-4, 2007,
selected bridges in East Jefferson County, and all bridges in West Jclferson ClJunty were
inspectcd for scour damage. Scour damage was discovered at two bridges in West
Jef1erson County, Tower Creek Bridge on Upper Hoh Road, and! lcmphill Creek Bridge
on Dowans Creek Road. Scour damage was not discovercd at any other bridges.
At 'rower Creek Bridge, it was discovered that the stream had down. cut approximately 4
feet, under the bridge, and undermined a pOltion of the new, riprap abutment protection
that was installed during emergency repairs in January, 2007. This damage does not pose
an immediate threat to the bridge, but may pose a threat in the future. Public Works
plans to engage a hydraulic engineering consultant to analyze this problem and make
recommendations.
2()(J8 Bridge Condition Report
Page I of2
Hecyci(;(IPapel
At Hemphill Creek Bridgc, it was discovered that a portion of the west bridge approach
was undermined, leaving a void underneath the left halfofthe road adjacent to the
bridge. The bridge, and bridge approach was restricted to one lane for a short time, and
subsequently repaired by County Forces.
As stated m previous reports, the Linger Longer Bridge, No. 23E, is functionally
deficient because it creates a restriction to the flow of the Big Qui1cenc River. This
situation has the potential to threaten the integrity ofthe structure by scoming at the
abutments, and is being monitored, The recently completed Linger Longer Feasibility
Study indicated, among its' findings, that a longer bridge is necessary. Public Works
continues to investigate various solutions to this problem, and funding alternatives.
cc: bndge report file
2008 Bridge Condition Report
Page 2 of2
TRANSPORTATION IMPROVEMENT PROGRAM 2010-2015
GLOSSARY OF ACRONYMS
AAOT Annual Average Daily Traffic (a 24-hour two-way traffic volume count on an aver-
age day of the year, determined either by continuous count or seasonal adjustment)
AASHTO American Association of State Highway and Transportation Officials
ACP asphalt concrete pavement, now called Hot Mix Asphalt (HMA)
AOT Average Daily Traffic (the average number of motor vehicles that travel on a given
surface during a specified 24-hour time period)
BST Bituminous Surface Treatment "chip-seal" pavement
CAPP County Arterial Preservation Program (State funding program)
CON or CN construction and construction phase of project
CRAB County Road Administration Board
FHWA Federal Highway Administration
FEMA Federal Emergency Management Agency
GMA Washington State Growth Management Act
HSP Washington State Highway System Plan
MP milepost
PE preliminary engineering and PE phase of project
PRTPO Peninsula Regional Transportation Planning Organization
PS&E plans, specifications, and estimates
RAP Rural Arterial Program (State funding program)
RCO Washington State Recreation and Conservation Office
RCW Revised Code of Washington (State law)
ROP Route Development Plan
ROW or RW right-of-way and ROW acq uisition phase of project
RTPO Regional Transportation Planning Organization
SR State Route
STIP Statewide Transportation Improvement Program
STP, STP(E), STP(R) Surface Transportation Program (Federal funding program with sub-categories for
Enhancement, Regional, etc.)
TAZ Transportation (or Traffic) Analysis Zone (for building forecast models)
TOM Transportation (or Travel) Demand Management (coordinated strategies to reduce
demand for motor vehicle use)
TIP Transportation Improvement Program
VMT Vehicle Miles Traveled
VPD Vehicles per Day
VPH Vehicles per Hour
WAC Washington Administrative Code (State rules that implement State law)
WWRP Washington Wildlife and Recreation Program, funded through Recreation and Con-
servation Funding Board (formerly Interagency Committee for Outdoor Recreation)
WSOOT Washington State Department of Transportation
WSF Washington State Ferries
WTP Washington Transportation Plan
JEFFERSON COUNTY PUBLIC WORKS
Department of Public Works
o Regular Agenda: 10:00 AM
Page 1 of 1
Jefferson County Board of Commissioners
Agenda Request
From:
Board of Commissioners
Philip Morley, County Administrator
Frank Gifford, Public Works Director fIon
To:
Agenda Date:
July 27, 2008
Subject:
2010-2015 Six-Year Transportation Improvement Program
Statement of Issue:
Conduct a public hearing for the purpose of receiving public testimony concerning
adoption of the 2010-2015 Jefferson County Six-Year Transportation Improvement
Program (6-yr TIP).
Analysis I Strategic Goals I Pros 8: Cons:
RCW 36.81.121 requires the annual adoption of a six-year transportation improvement
program after holding a public hearing. The purpose of the law is to "assure that
each county shall perpetually have available advanced plans looking to the future for
not less than six years as a guide in carrying out a coordinated transportation
program" (RCW 36.81.121 (1 i). Conducting a public hearing and adopting a Program
meets strategic goals 4b, 6a, and 7a.
Fiscal Impact I Cost-Benefit Analysis:
The actual impact depends on how many projects are completed and the amount of
proposed grant funding that is received. The total cost of the projects listed on the
2010-2015 Six-Year Transportation Improvement Program is $23,069,000. Twenty-
eight percent of the revenue for the projects is anticipated from local Road Funds.
The remaining 72% is anticipated from State and Federal sources.
Recommendation:
Approve by Resolution the proposed Six-Year Transportation Improvement Program.
Return a signed copy of the Resolution to Public Works for further processing.