Loading...
HomeMy WebLinkAbout1177 7.000.00 I ~98 COMMISSIONERS' PROCEEDINGS-N JEFFERSON COUNTY. WASHINGTON THII LIlADIUI 0 Resolution No. C-262 was signed for the purpose of making a survey down the north bank of the Hoh River for the purpose of estimat.ing cost for road construction to elim- inate swi~ing bridge across the Lower Hoh River - RESULUTION NO. C-262 WHEREAS, The Jefferson County Road Department proposes to make a survey for a road locati on down the north bank of the Hoh River througtl sectio ns 5 and 6 of Township 26 North, Range 12 West, W. M., and Sections 12, 14, 15 and 22 in Township 26 North, Ra~ge HI West, W. M. i to get an estimate of cost for road construetio n thus eliminating the swinging bridge across the Lower Hoh River 1n Section 22, Township 26 North, Range 13 West, W. M. WHEREAS, the Peninsula Plywood Corporation of Port Angeles, Washington has offered to stand one half of the expense of the survey and to do the work involved in making said survey. BE IT THEREFORE RESOLVED, that the Jefferson County Road Department reimburse the Peninsula Plywood Corporation one half of the cost of the survey not to exceed $5,000.00. ADOPTED this 8 day of April, 1955. BOARD OF JEFli'ERSON COUNTY COMMISSIONERS LYALL AREY ---Charmian . . . -_..- SEAL ATTEST: HELEN J. EADS Jefferson l;ou"nTy.dAudi t.or and Ex-officio Clerk of the Board. . GEORGE HUNTINGFORD ---- Member ----.-- BERTI L KRUSE Member--" -- I ## ~xmbctmr2:gJi!xJbmeodQrJCYIl~gg:inlll;xxn:dc1lXOOl)ddxax&lmlnoti;iU: The repair work on the Nordland road at Strombeck's corner, that is replacing two 60" in. culverts, was approved by the Board and Resolution No. C-263 was signed as follows: RESOLUTION NO. 0-263. COUNTY ROAD PROJECT NO. 136. BEFORE THE BOARD OF JEFFERSON COUNTY COMMISSIONERS, STATE OF WASHINGTON. In the matter of the Nordland Road (County Road No. 53) ) Resolution to replace the existing bridge with ) concrete culvert pipe and to realign the existing road by grading, draining and surfacing. IT IS HEREBY RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their inten- tion to replace the existing bridge with concrete culver pipe and to realign the existing road by grading, draining and surfacing. BE IT FURTHER RESOLVED UIAT for the foregoing proper hereby appropriated sums in the following detail: Gas Tax Funds Donations, etc. Lo c. Engr. $ # Right of Way Items of Work: Day Labor Contract Constr. Engr. county road purpose t here is Other $ Total $ 7. OOO.OCLH __"_ I Total $ 7.000.00 $ $ $ 7.000.Q.o The county road purpose herein described is HEREBY DECLARED to be a public necessity and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law provided. BE I'l' FURTHER RESOLVED that this purpose be performed by day labor in accordance with the Standard Road and Bridge Specifi cntions of the State of Washington as adopted by this Board. ADOPTED this g day of April, 1955. BOARD Oli' JEFFERSON COUNTY COMMISSIONEHS LYALL AREY .'u - mialrmail" - -- GEORGE HUNTINGFORD ----.- . Main bar. .... _. BERTI L KRUSE --...- -, Menioo I' - .. SEAL ATTEST: HELEN J. EADS County Auditor and tx-officio Clerk of the Board. 1/# I For the purposo of relocating a curve from Maple to Market St., and to drain, grade and ourface the Irondale road, the work was approved and Resolution No. C-264 waD eie;ned as follows: